CN108914896A - Rubbish blocking apparatus in a kind of hydraulic engineering small stream - Google Patents
Rubbish blocking apparatus in a kind of hydraulic engineering small stream Download PDFInfo
- Publication number
- CN108914896A CN108914896A CN201810606641.XA CN201810606641A CN108914896A CN 108914896 A CN108914896 A CN 108914896A CN 201810606641 A CN201810606641 A CN 201810606641A CN 108914896 A CN108914896 A CN 108914896A
- Authority
- CN
- China
- Prior art keywords
- sliding rail
- link
- plate
- sliding
- screen frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000000903 blocking Effects 0.000 title claims abstract description 20
- 238000004140 cleaning Methods 0.000 abstract description 19
- 101700078171 KNTC1 Proteins 0.000 description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,PD94bWwgdmVyc2lvbj0nMS4wJyBlbmNvZGluZz0naXNvLTg4NTktMSc/Pgo8c3ZnIHZlcnNpb249JzEuMScgYmFzZVByb2ZpbGU9J2Z1bGwnCiAgICAgICAgICAgICAgeG1sbnM9J2h0dHA6Ly93d3cudzMub3JnLzIwMDAvc3ZnJwogICAgICAgICAgICAgICAgICAgICAgeG1sbnM6cmRraXQ9J2h0dHA6Ly93d3cucmRraXQub3JnL3htbCcKICAgICAgICAgICAgICAgICAgICAgIHhtbG5zOnhsaW5rPSdodHRwOi8vd3d3LnczLm9yZy8xOTk5L3hsaW5rJwogICAgICAgICAgICAgICAgICB4bWw6c3BhY2U9J3ByZXNlcnZlJwp3aWR0aD0nODVweCcgaGVpZ2h0PSc4NXB4JyB2aWV3Qm94PScwIDAgODUgODUnPgo8IS0tIEVORCBPRiBIRUFERVIgLS0+CjxyZWN0IHN0eWxlPSdvcGFjaXR5OjEuMDtmaWxsOiNGRkZGRkY7c3Ryb2tlOm5vbmUnIHdpZHRoPSc4NS4wJyBoZWlnaHQ9Jzg1LjAnIHg9JzAuMCcgeT0nMC4wJz4gPC9yZWN0Pgo8dGV4dCB4PScxMy4zJyB5PSc1My42JyBjbGFzcz0nYXRvbS0wJyBzdHlsZT0nZm9udC1zaXplOjIzcHg7Zm9udC1zdHlsZTpub3JtYWw7Zm9udC13ZWlnaHQ6bm9ybWFsO2ZpbGwtb3BhY2l0eToxO3N0cm9rZTpub25lO2ZvbnQtZmFtaWx5OnNhbnMtc2VyaWY7dGV4dC1hbmNob3I6c3RhcnQ7ZmlsbDojRTg0MjM1JyA+SDwvdGV4dD4KPHRleHQgeD0nMjguMicgeT0nNjIuOScgY2xhc3M9J2F0b20tMCcgc3R5bGU9J2ZvbnQtc2l6ZToxNXB4O2ZvbnQtc3R5bGU6bm9ybWFsO2ZvbnQtd2VpZ2h0Om5vcm1hbDtmaWxsLW9wYWNpdHk6MTtzdHJva2U6bm9uZTtmb250LWZhbWlseTpzYW5zLXNlcmlmO3RleHQtYW5jaG9yOnN0YXJ0O2ZpbGw6I0U4NDIzNScgPjI8L3RleHQ+Cjx0ZXh0IHg9JzM1LjAnIHk9JzUzLjYnIGNsYXNzPSdhdG9tLTAnIHN0eWxlPSdmb250LXNpemU6MjNweDtmb250LXN0eWxlOm5vcm1hbDtmb250LXdlaWdodDpub3JtYWw7ZmlsbC1vcGFjaXR5OjE7c3Ryb2tlOm5vbmU7Zm9udC1mYW1pbHk6c2Fucy1zZXJpZjt0ZXh0LWFuY2hvcjpzdGFydDtmaWxsOiNFODQyMzUnID5PPC90ZXh0Pgo8L3N2Zz4K O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 5
- 238000010586 diagram Methods 0.000 description 3
- 238000009434 installation Methods 0.000 description 2
- 238000009987 spinning Methods 0.000 description 2
- 239000003643 water by type Substances 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B15/00—Cleaning or keeping clear the surface of open water; Apparatus therefor
- E02B15/04—Devices for cleaning or keeping clear the surface of open water from oil or like floating materials by separating or removing these materials
- E02B15/06—Barriers therefor construed for applying processing agents or for collecting pollutants, e.g. absorbent
Abstract
The present invention relates to rubbish blocking apparatus in a kind of rubbish blocking apparatus more particularly to a kind of hydraulic engineering small stream.Technical problem of the invention:A kind of cleaning quickly rubbish blocking apparatus in comprehensive, highly-safe hydraulic engineering small stream is provided.Implementer's case of the invention is:Rubbish blocking apparatus in a kind of hydraulic engineering small stream, includes first connecting rod, the first inserted link, the first web plate, the first sliding rail, the first sliding block, pushing hands, the second web plate, the second sliding rail, the second sliding block, garbage collection frame etc.;The left side of first connecting rod is uniformly connected with the first inserted link, and the first web plate is connected on the right side of first connecting rod, is equipped with the first sliding rail on the upside of the first web plate, slidingtype is connected with the first sliding block on the first sliding rail.The first web plate and the second web plate that the present invention is arranged can intercept the rubbish in stream, and garbage collection frame can be cleared up by the garbage collection of interception, then uniformly, effectively increase the speed that rubbish is intercepted and cleared up in small stream.
Description
Technical field
The present invention relates to rubbish blocking apparatus in a kind of rubbish blocking apparatus more particularly to a kind of hydraulic engineering small stream.
Background technique
In the brook beside rice field, it can be seen that the rubbish to get off along water flow, these rubbish need to handle as soon as possible,
Otherwise the water in brook can be polluted, and it is all these rubbish to be cleared up in brook bank with tool by people now, and it is some
It flows too fast rubbish or even has little time cleaning and be just brought to downstream, and the mode of manual cleaning these rubbish is also unusual
Slowly, if people accidentally falls into brook during clearing up rubbish, it also occur that safety accident.
To sum up, needing to research and develop a kind of cleaning at present, quickly rubbish intercepts dress in comprehensive, highly-safe hydraulic engineering small stream
It sets, to overcome the disadvantage that cleaning speed is slow, not comprehensive, safety is low in the prior art.
Summary of the invention
In order to overcome in the prior art cleaning speed it is slow, not comprehensively, the low disadvantage of safety, technical problem of the invention:
A kind of cleaning quickly rubbish blocking apparatus in comprehensive, highly-safe hydraulic engineering small stream is provided.
Implementer's case of the invention is:Rubbish blocking apparatus in a kind of hydraulic engineering small stream, includes the first connection
Bar, the first inserted link, the first web plate, the first sliding rail, the first sliding block, pushing hands, the second web plate, the second sliding rail, the second sliding block, rubbish are received
Collect frame, big screen frame, third sliding rail, third sliding block, small screen frame, the first guide sleeve, the first bracing wire, pull ring, link, the second connecting rod,
Second inserted link and wheel, the left side of first connecting rod are uniformly connected with the first inserted link, are connected with first on the right side of first connecting rod
Web plate, the first web plate upside are equipped with the first sliding rail, and slidingtype is connected with the first sliding block on the first sliding rail, connect on the upside of the first sliding block
It is connected to pushing hands, the second web plate is connected on the right side of the first sliding block, the second web plate is located at the forward right side of the first sliding rail, the second web plate front side
Left part is mounted on the second sliding rail on front side of right part and the first web plate, and slidingtype is connected with the second sliding block on two the second sliding rails,
It is connected with garbage collection frame between two the second sliding blocks, the right side of second sliding block in left side is connected with big screen frame, and the of right side
The left side of two sliding blocks is connected with small screen frame, and small screen frame is located at the upper right side of big screen frame and cooperates therewith, on the upside of big screen frame
Middle part is equipped with third sliding rail, and slidingtype is connected with third sliding block, third sliding block right side and small screen frame left side on third sliding rail
Middle part is connected, and the first guide sleeve is respectively connected at the top of two the second sliding rails, is equipped with pull ring, two pull rings on the upside of two the first guide sleeves
Downside is respectively connected with the first bracing wire, and first is drawstring through the first guide sleeve, the other end of two first bracing wires respectively with garbage collection
The left upper portion of frame is connected with right upper portion, and the right upper portion of second sliding rail in left side is hingedly connected with link, the second web plate
Right side is connected with the second connecting rod, is uniformly provided with the second inserted link on the right side of the second connecting rod, first connecting rod and the second connecting rod
Bottom end is mounted on wheel.
Further, further include have bearing block, shaft, link block, the first bolt, the first nut, rocking handle, connecting plate,
Second bolt and wing nut, two the second sliding rail tops rear sides are mounted on bearing block, are respectively connected with shaft in two bearings seat,
Two shaft upper outsides are respectively connected with link block, and two link block outer uppers are respectively connected with the first bolt, on two the first bolts
The first nut is connected with by way of screw-type connection, the right end of right side shaft is connected with rocking handle, two shaft inside upper parts
It is connected with connecting plate, is provided with a word hole on the right side of connecting plate, a word hole is located at the upside of the shaft on right side, and the is connected in a word hole
Two bolts, wing nut is connected on the second bolt, and wing nut is located on the upside of a word hole.
Further, further include having the second guide sleeve, L shape bolt and the second nut, the first inserted link top and the second connection
Bar top is respectively connected with the second guide sleeve, and L shape bolt is respectively connected in two the second guide sleeves, passes through screw thread on the inside of two L shape bolts
The mode of connection is connected with the second nut, and the second nut is located on the inside of the second guide sleeve.
Further, further including having spring, push plate, fixed pulley, notch plate, plug, the second bracing wire and lifting the ball, small screen frame
Right side inner wall front and rear sides are respectively connected with spring, and spring is in contraction state, and spring left end is connected with push plate, the length of push plate with
The width of small screen frame cooperates, and big screen frame left side central portion is equipped with fixed pulley, and big screen frame left back is connected with notch plate, recessed
Shape plate left end is connected with plug, and push plate left side central portion is connected with the second bracing wire, and the other end of the second bracing wire is connected with lifting the ball, and second
Around on front side of fixed pulley and across notch plate, lifting the ball is located at notch plate rear for bracing wire.
Further, further include having the 4th sliding rail, Four-slider and rubber block, inner wall bottom connection on rear side of small screen frame
There is the 4th sliding rail, slidingtype is connected with Four-slider on the 4th sliding rail, and the front side and push plate rear end of Four-slider are to connection, and the 4th
It is fixedly connected with rubber block on front side of sliding rail right part, rubber block is located at the right side of Four-slider.
When rubbish is more in small stream needs to clear up, this equipment can be moved in stream by user, shifting of the wheel to equipment
It is dynamic to help out, the waters of the depth of water and width suitable is found, the first inserted link of equipment is then inserted into the bank on the left of brook,
First connecting rod is fixed, then pulls the second connecting rod again, the second connecting rod drives the second web plate to move to the right, and first is sliding
It is mobile that rail and the first sliding block assist the second web plate, and small screen frame moves right under the cooperation of third sliding rail and third sliding block, makes
The width that garbage collection frame integrally adapts to brook is obtained, preferably rubbish is intercepted, the second inserted link is inserted into brook by user
Right bank so, can secure the equipment in brook so that the second connecting rod be fixed, when stream flows through, the first web plate
The rubbish in stream can be intercepted rapidly with the second web plate, when garbage collection needs to clear up to a certain amount, user
Another person's assistance can be called in, two people stand respectively on the both sides in brook, pull ring is pulled up, and pull ring passes through the first bracing wire for rubbish
Rubbish collection frame is pulled upwardly, and after garbage collection frame to be drawn high to certain height, user can be begun a clean up on garbage collection frame
Rubbish, after it is cleaned out, user slowly unclamps link, so that garbage collection frame moves down reset, can carry out again
Rubbish intercepts, and after rubbish cleans out, user successively extracts the second inserted link and the first inserted link from the bank of two sides, and link can
For fixing pushing hands, its movement is prevented, convenient for the movement of equipment, after equipment is put in order, user can keep equipment well.
Before adjusting and installing equipment, the adjustable wing nut of user allows connecting plate in the shaft on right side
It is mobile, when after the installation is completed, user adjusts wing nut and is fixed on connecting plate in the shaft on right side, thus by the shaft of two sides
It is connected, then the first nut of two sides is rotated to from the first bolt and removed by user, respectively covers the pull ring of two sides right
It answers on the first bolt of side, then by the first nut spinning reduction and pull ring is fixed on first between the first nut and link block
On bolt, then, user's positive direction rotates rocking handle, and rocking handle drives link block rotation by the cooperation of connecting plate and shaft, so that
First bracing wire of two sides so just can be such that garbage collection frame moves up rotating around on the first bolt of two sides, use
Rocking handle opposite direction is rotated again after cleaning out garbage collection frame and resets garbage collection frame by family, and so, user only needs
One people can be carried out the cleaning of rubbish, realize one man operation.
When garbage collection frame is moved upwards up to the position higher than the second connecting rod, user moves inward L shape bolt,
And the second nut of turn fixes L shape bolt, at this moment user can unclamp rocking handle, and the protrusion part on the inside of L shape bolt can incite somebody to action
The garbage collection frame of whereabouts is fixed on this position, and user can attentively clear up rubbish, improves the convenience of equipment.
When needing to clear up the rubbish on garbage collection frame, user can pull lifting the ball, and lifting the ball can be in order to fixing second
The position of bracing wire, lifting the ball drive push plate to be moved to the left by the second bracing wire, and spring elongation, push plate is by the rubbish in garbage collection frame
It pushes to the left, then user unclamps lifting the ball, and spring contraction drives push plate to reset, if necessary the repeatable operation of user, by rubbish
It is all cleaned to side, more convenient user clears up.
When user pulls lifting the ball to drive push plate to be moved to the left by the second bracing wire, the 4th sliding rail, Four-slider phase interworking
It is mobile to close auxiliary push plate, keeps the movement of push plate more smooth, when spring contraction drives push plate to reset, rubber block be can produce
Certain buffer function, and can anti-thrust plate over-travel cause the extra loss of equipment.
The invention has the advantages that:The first web plate and the second web plate that the present invention is arranged can block the rubbish in stream
Cut down and, and garbage collection frame can be cleared up by the garbage collection of interception, then uniformly, effectively increase rubbish in small stream intercept and
The speed of cleaning;And the first web plate and the cooperation of the second web plate, can more comprehensively clear up the rubbish in small stream;Meanwhile it originally setting
For by being provided with bracing wire and pull ring, allows people to carry out rubbish cleaning on small stream side, people is avoided to salvage rubbish by hand
Shi Bushen falls into the water, and greatly improves the safety that dust man makees in small stream.
Detailed description of the invention
Fig. 1 is the first schematic view of the front view of the invention.
Fig. 2 is the first partial top structural schematic diagram of the invention.
Fig. 3 is second of schematic view of the front view of the invention.
Fig. 4 is the third schematic view of the front view of the invention.
Fig. 5 is second of partial top structural schematic diagram of the invention.
Fig. 6 is the third partial top structural schematic diagram of the invention.
The meaning of appended drawing reference in figure:1:First connecting rod, 2:First inserted link, 3:First web plate, 4:First sliding rail, 5:The
One sliding block, 6:Pushing hands, 7:Second web plate, 8:Second sliding rail, 81:Second sliding block, 9:Garbage collection frame, 91:Big screen frame, 92:The
Three sliding rails, 93:Third sliding block, 94:Small screen frame, 10:First guide sleeve, 11:First bracing wire, 12:Pull ring, 13:Link, 14:Second
Connecting rod, 15:Second inserted link, 16:Wheel, 17:Bearing block, 18:Shaft, 19:Link block, 20:First bolt, 21:First spiral shell
Mother, 22:Rocking handle, 23:Connecting plate, 24:One word hole, 25:Second bolt, 26:Wing nut, 27:Second guide sleeve, 28:L shape spiral shell
Bolt, 29:Second nut, 30:Spring, 31:Push plate, 32:Fixed pulley, 33:Notch plate, 34:Plug, 35:Second bracing wire, 36:It draws
Ball, 37:4th sliding rail, 38:Four-slider, 39:Rubber block.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Embodiment 1
Rubbish blocking apparatus includes as shown in figures 1 to 6 first connecting rod 1, the first inserted link 2, in a kind of hydraulic engineering small stream
One web plate 3, the first sliding rail 4, the first sliding block 5, pushing hands 6, the second web plate 7, the second sliding rail 8, the second sliding block 81, garbage collection frame 9,
Big screen frame 91, third sliding rail 92, third sliding block 93, small screen frame 94, the first guide sleeve 10, the first bracing wire 11, pull ring 12, link 13,
Second connecting rod 14, the second inserted link 15 and wheel 16, the left side of first connecting rod 1 are uniformly connected with the first inserted link 2, and first connects
It is connected with the first web plate 3 on the right side of extension bar 1, the first sliding rail 4 is installed, slidingtype is connected on the first sliding rail 4 on the upside of first web plate 3
First sliding block 5 is connected with pushing hands 6 on the upside of first sliding block 5, the second web plate 7 is connected on the right side of the first sliding block 5, the second web plate 7 is located at
The forward right side of first sliding rail 4,7 front side right part of the second web plate and 3 front side left part of the first web plate are mounted on the second sliding rail 8, and two
Equal slidingtype is connected with the second sliding block 81 on second sliding rail 8, is connected with garbage collection frame 9, left side between two the second sliding blocks 81
The right side of the second sliding block 81 be connected with big screen frame 91, the left side of second sliding block 81 on right side is connected with small screen frame 94, small
Screen frame 94 is located at the upper right side of big screen frame 91 and cooperates therewith, and middle side part is equipped with third sliding rail 92 on big screen frame 91, the
Slidingtype is connected with third sliding block 93 on three sliding rails 92, is connected in the middle part of 93 right side of third sliding block and small 94 left side of screen frame, and two
It is respectively connected with the first guide sleeve 10 at the top of a second sliding rail 8, pull ring 12, two pull rings, 12 downside are equipped on the upside of two the first guide sleeves 10
Be respectively connected with the first bracing wire 11, the first bracing wire 11 passes through the first guide sleeve 10, the other end of two first bracing wires 11 respectively with rubbish
The left upper portion of collection frame 9 is connected with right upper portion, and the right upper portion of second sliding rail 8 in left side is hingedly connected with link 13,
It is connected with the second connecting rod 14 on the right side of second web plate 7, the second inserted link 15, first connecting rod are uniformly provided on the right side of the second connecting rod 14
1 and second the bottom end of connecting rod 14 be mounted on wheel 16.
Embodiment 2
Rubbish blocking apparatus includes as shown in figures 1 to 6 first connecting rod 1, the first inserted link 2, in a kind of hydraulic engineering small stream
One web plate 3, the first sliding rail 4, the first sliding block 5, pushing hands 6, the second web plate 7, the second sliding rail 8, the second sliding block 81, garbage collection frame 9,
Big screen frame 91, third sliding rail 92, third sliding block 93, small screen frame 94, the first guide sleeve 10, the first bracing wire 11, pull ring 12, link 13,
Second connecting rod 14, the second inserted link 15 and wheel 16, the left side of first connecting rod 1 are uniformly connected with the first inserted link 2, and first connects
It is connected with the first web plate 3 on the right side of extension bar 1, the first sliding rail 4 is installed, slidingtype is connected on the first sliding rail 4 on the upside of first web plate 3
First sliding block 5 is connected with pushing hands 6 on the upside of first sliding block 5, the second web plate 7 is connected on the right side of the first sliding block 5, the second web plate 7 is located at
The forward right side of first sliding rail 4,7 front side right part of the second web plate and 3 front side left part of the first web plate are mounted on the second sliding rail 8, and two
Equal slidingtype is connected with the second sliding block 81 on second sliding rail 8, is connected with garbage collection frame 9, left side between two the second sliding blocks 81
The right side of the second sliding block 81 be connected with big screen frame 91, the left side of second sliding block 81 on right side is connected with small screen frame 94, small
Screen frame 94 is located at the upper right side of big screen frame 91 and cooperates therewith, and middle side part is equipped with third sliding rail 92 on big screen frame 91, the
Slidingtype is connected with third sliding block 93 on three sliding rails 92, is connected in the middle part of 93 right side of third sliding block and small 94 left side of screen frame, and two
It is respectively connected with the first guide sleeve 10 at the top of a second sliding rail 8, pull ring 12, two pull rings, 12 downside are equipped on the upside of two the first guide sleeves 10
Be respectively connected with the first bracing wire 11, the first bracing wire 11 passes through the first guide sleeve 10, the other end of two first bracing wires 11 respectively with rubbish
The left upper portion of collection frame 9 is connected with right upper portion, and the right upper portion of second sliding rail 8 in left side is hingedly connected with link 13,
It is connected with the second connecting rod 14 on the right side of second web plate 7, the second inserted link 15, first connecting rod are uniformly provided on the right side of the second connecting rod 14
1 and second the bottom end of connecting rod 14 be mounted on wheel 16.
It further include having bearing block 17, shaft 18, link block 19, the first bolt 20, the first nut 21, rocking handle 22, connecting plate
23, the second bolt 25 and wing nut 26, are mounted on bearing block 17 on rear side of two 8 tops of the second sliding rail, in two bearings seat 17
It is respectively connected with shaft 18, two shafts, 18 upper outside is respectively connected with link block 19, and two link blocks, 19 outer upper is respectively connected with
One bolt 20 is connected with the first nut 21 on two the first bolts 20 by way of screw-type connection, right side shaft 18
Right end is connected with rocking handle 22, and two shafts, 18 inside upper part is connected with connecting plate 23, and a word hole 24, a word are provided on the right side of connecting plate 23
Hole 24 is located at the upside of the shaft 18 on right side, and the second bolt 25 is connected in a word hole 24, is connected with butterfly on the second bolt 25
Nut 26, wing nut 26 are located at 24 upside of a word hole.
Embodiment 3
Rubbish blocking apparatus includes as shown in figures 1 to 6 first connecting rod 1, the first inserted link 2, in a kind of hydraulic engineering small stream
One web plate 3, the first sliding rail 4, the first sliding block 5, pushing hands 6, the second web plate 7, the second sliding rail 8, the second sliding block 81, garbage collection frame 9,
Big screen frame 91, third sliding rail 92, third sliding block 93, small screen frame 94, the first guide sleeve 10, the first bracing wire 11, pull ring 12, link 13,
Second connecting rod 14, the second inserted link 15 and wheel 16, the left side of first connecting rod 1 are uniformly connected with the first inserted link 2, and first connects
It is connected with the first web plate 3 on the right side of extension bar 1, the first sliding rail 4 is installed, slidingtype is connected on the first sliding rail 4 on the upside of first web plate 3
First sliding block 5 is connected with pushing hands 6 on the upside of first sliding block 5, the second web plate 7 is connected on the right side of the first sliding block 5, the second web plate 7 is located at
The forward right side of first sliding rail 4,7 front side right part of the second web plate and 3 front side left part of the first web plate are mounted on the second sliding rail 8, and two
Equal slidingtype is connected with the second sliding block 81 on second sliding rail 8, is connected with garbage collection frame 9, left side between two the second sliding blocks 81
The right side of the second sliding block 81 be connected with big screen frame 91, the left side of second sliding block 81 on right side is connected with small screen frame 94, small
Screen frame 94 is located at the upper right side of big screen frame 91 and cooperates therewith, and middle side part is equipped with third sliding rail 92 on big screen frame 91, the
Slidingtype is connected with third sliding block 93 on three sliding rails 92, is connected in the middle part of 93 right side of third sliding block and small 94 left side of screen frame, and two
It is respectively connected with the first guide sleeve 10 at the top of a second sliding rail 8, pull ring 12, two pull rings, 12 downside are equipped on the upside of two the first guide sleeves 10
Be respectively connected with the first bracing wire 11, the first bracing wire 11 passes through the first guide sleeve 10, the other end of two first bracing wires 11 respectively with rubbish
The left upper portion of collection frame 9 is connected with right upper portion, and the right upper portion of second sliding rail 8 in left side is hingedly connected with link 13,
It is connected with the second connecting rod 14 on the right side of second web plate 7, the second inserted link 15, first connecting rod are uniformly provided on the right side of the second connecting rod 14
1 and second the bottom end of connecting rod 14 be mounted on wheel 16.
It further include having bearing block 17, shaft 18, link block 19, the first bolt 20, the first nut 21, rocking handle 22, connecting plate
23, the second bolt 25 and wing nut 26, are mounted on bearing block 17 on rear side of two 8 tops of the second sliding rail, in two bearings seat 17
It is respectively connected with shaft 18, two shafts, 18 upper outside is respectively connected with link block 19, and two link blocks, 19 outer upper is respectively connected with
One bolt 20 is connected with the first nut 21 on two the first bolts 20 by way of screw-type connection, right side shaft 18
Right end is connected with rocking handle 22, and two shafts, 18 inside upper part is connected with connecting plate 23, and a word hole 24, a word are provided on the right side of connecting plate 23
Hole 24 is located at the upside of the shaft 18 on right side, and the second bolt 25 is connected in a word hole 24, is connected with butterfly on the second bolt 25
Nut 26, wing nut 26 are located at 24 upside of a word hole.
It further include having the second guide sleeve 27, L shape bolt 28 and the second nut 29,2 top of the first inserted link and the second connecting rod 14
Top is respectively connected with the second guide sleeve 27, and L shape bolt 28 is respectively connected in two the second guide sleeves 27, and two L shape bolts, 28 inside is logical
It crosses the mode being threadedly coupled and is connected with the second nut 29, the second nut 29 is located at 27 inside of the second guide sleeve.
Embodiment 4
Rubbish blocking apparatus includes as shown in figures 1 to 6 first connecting rod 1, the first inserted link 2, in a kind of hydraulic engineering small stream
One web plate 3, the first sliding rail 4, the first sliding block 5, pushing hands 6, the second web plate 7, the second sliding rail 8, the second sliding block 81, garbage collection frame 9,
Big screen frame 91, third sliding rail 92, third sliding block 93, small screen frame 94, the first guide sleeve 10, the first bracing wire 11, pull ring 12, link 13,
Second connecting rod 14, the second inserted link 15 and wheel 16, the left side of first connecting rod 1 are uniformly connected with the first inserted link 2, and first connects
It is connected with the first web plate 3 on the right side of extension bar 1, the first sliding rail 4 is installed, slidingtype is connected on the first sliding rail 4 on the upside of first web plate 3
First sliding block 5 is connected with pushing hands 6 on the upside of first sliding block 5, the second web plate 7 is connected on the right side of the first sliding block 5, the second web plate 7 is located at
The forward right side of first sliding rail 4,7 front side right part of the second web plate and 3 front side left part of the first web plate are mounted on the second sliding rail 8, and two
Equal slidingtype is connected with the second sliding block 81 on second sliding rail 8, is connected with garbage collection frame 9, left side between two the second sliding blocks 81
The right side of the second sliding block 81 be connected with big screen frame 91, the left side of second sliding block 81 on right side is connected with small screen frame 94, small
Screen frame 94 is located at the upper right side of big screen frame 91 and cooperates therewith, and middle side part is equipped with third sliding rail 92 on big screen frame 91, the
Slidingtype is connected with third sliding block 93 on three sliding rails 92, is connected in the middle part of 93 right side of third sliding block and small 94 left side of screen frame, and two
It is respectively connected with the first guide sleeve 10 at the top of a second sliding rail 8, pull ring 12, two pull rings, 12 downside are equipped on the upside of two the first guide sleeves 10
Be respectively connected with the first bracing wire 11, the first bracing wire 11 passes through the first guide sleeve 10, the other end of two first bracing wires 11 respectively with rubbish
The left upper portion of collection frame 9 is connected with right upper portion, and the right upper portion of second sliding rail 8 in left side is hingedly connected with link 13,
It is connected with the second connecting rod 14 on the right side of second web plate 7, the second inserted link 15, first connecting rod are uniformly provided on the right side of the second connecting rod 14
1 and second the bottom end of connecting rod 14 be mounted on wheel 16.
It further include having bearing block 17, shaft 18, link block 19, the first bolt 20, the first nut 21, rocking handle 22, connecting plate
23, the second bolt 25 and wing nut 26, are mounted on bearing block 17 on rear side of two 8 tops of the second sliding rail, in two bearings seat 17
It is respectively connected with shaft 18, two shafts, 18 upper outside is respectively connected with link block 19, and two link blocks, 19 outer upper is respectively connected with
One bolt 20 is connected with the first nut 21 on two the first bolts 20 by way of screw-type connection, right side shaft 18
Right end is connected with rocking handle 22, and two shafts, 18 inside upper part is connected with connecting plate 23, and a word hole 24, a word are provided on the right side of connecting plate 23
Hole 24 is located at the upside of the shaft 18 on right side, and the second bolt 25 is connected in a word hole 24, is connected with butterfly on the second bolt 25
Nut 26, wing nut 26 are located at 24 upside of a word hole.
It further include having the second guide sleeve 27, L shape bolt 28 and the second nut 29,2 top of the first inserted link and the second connecting rod 14
Top is respectively connected with the second guide sleeve 27, and L shape bolt 28 is respectively connected in two the second guide sleeves 27, and two L shape bolts, 28 inside is logical
It crosses the mode being threadedly coupled and is connected with the second nut 29, the second nut 29 is located at 27 inside of the second guide sleeve.
It further include having spring 30, push plate 31, fixed pulley 32, notch plate 33, plug 34, the second bracing wire 35 and lifting the ball 36, it is small
94 right side inner wall front and rear sides of screen frame are respectively connected with spring 30, and spring 30 is in contraction state, and 30 left end of spring is connected with push plate
31, the width mutual cooperation of the length of push plate 31 and small screen frame 94, big 91 left side central portion of screen frame is equipped with fixed pulley 32, big screen frame
91 left backs are connected with notch plate 33, and 33 left end of notch plate is connected with plug 34, and 31 left side central portion of push plate is connected with the second drawing
Line 35, the other end of the second bracing wire 35 are connected with lifting the ball 36, and the second bracing wire 35 is around 32 front side of fixed pulley and passes through notch plate 33,
Lifting the ball 36 is located at 33 rear of notch plate.
Embodiment 5
Rubbish blocking apparatus includes as shown in figures 1 to 6 first connecting rod 1, the first inserted link 2, in a kind of hydraulic engineering small stream
One web plate 3, the first sliding rail 4, the first sliding block 5, pushing hands 6, the second web plate 7, the second sliding rail 8, the second sliding block 81, garbage collection frame 9,
Big screen frame 91, third sliding rail 92, third sliding block 93, small screen frame 94, the first guide sleeve 10, the first bracing wire 11, pull ring 12, link 13,
Second connecting rod 14, the second inserted link 15 and wheel 16, the left side of first connecting rod 1 are uniformly connected with the first inserted link 2, and first connects
It is connected with the first web plate 3 on the right side of extension bar 1, the first sliding rail 4 is installed, slidingtype is connected on the first sliding rail 4 on the upside of first web plate 3
First sliding block 5 is connected with pushing hands 6 on the upside of first sliding block 5, the second web plate 7 is connected on the right side of the first sliding block 5, the second web plate 7 is located at
The forward right side of first sliding rail 4,7 front side right part of the second web plate and 3 front side left part of the first web plate are mounted on the second sliding rail 8, and two
Equal slidingtype is connected with the second sliding block 81 on second sliding rail 8, is connected with garbage collection frame 9, left side between two the second sliding blocks 81
The right side of the second sliding block 81 be connected with big screen frame 91, the left side of second sliding block 81 on right side is connected with small screen frame 94, small
Screen frame 94 is located at the upper right side of big screen frame 91 and cooperates therewith, and middle side part is equipped with third sliding rail 92 on big screen frame 91, the
Slidingtype is connected with third sliding block 93 on three sliding rails 92, is connected in the middle part of 93 right side of third sliding block and small 94 left side of screen frame, and two
It is respectively connected with the first guide sleeve 10 at the top of a second sliding rail 8, pull ring 12, two pull rings, 12 downside are equipped on the upside of two the first guide sleeves 10
Be respectively connected with the first bracing wire 11, the first bracing wire 11 passes through the first guide sleeve 10, the other end of two first bracing wires 11 respectively with rubbish
The left upper portion of collection frame 9 is connected with right upper portion, and the right upper portion of second sliding rail 8 in left side is hingedly connected with link 13,
It is connected with the second connecting rod 14 on the right side of second web plate 7, the second inserted link 15, first connecting rod are uniformly provided on the right side of the second connecting rod 14
1 and second the bottom end of connecting rod 14 be mounted on wheel 16.
It further include having bearing block 17, shaft 18, link block 19, the first bolt 20, the first nut 21, rocking handle 22, connecting plate
23, the second bolt 25 and wing nut 26, are mounted on bearing block 17 on rear side of two 8 tops of the second sliding rail, in two bearings seat 17
It is respectively connected with shaft 18, two shafts, 18 upper outside is respectively connected with link block 19, and two link blocks, 19 outer upper is respectively connected with
One bolt 20 is connected with the first nut 21 on two the first bolts 20 by way of screw-type connection, right side shaft 18
Right end is connected with rocking handle 22, and two shafts, 18 inside upper part is connected with connecting plate 23, and a word hole 24, a word are provided on the right side of connecting plate 23
Hole 24 is located at the upside of the shaft 18 on right side, and the second bolt 25 is connected in a word hole 24, is connected with butterfly on the second bolt 25
Nut 26, wing nut 26 are located at 24 upside of a word hole.
It further include having the second guide sleeve 27, L shape bolt 28 and the second nut 29,2 top of the first inserted link and the second connecting rod 14
Top is respectively connected with the second guide sleeve 27, and L shape bolt 28 is respectively connected in two the second guide sleeves 27, and two L shape bolts, 28 inside is logical
It crosses the mode being threadedly coupled and is connected with the second nut 29, the second nut 29 is located at 27 inside of the second guide sleeve.
It further include having spring 30, push plate 31, fixed pulley 32, notch plate 33, plug 34, the second bracing wire 35 and lifting the ball 36, it is small
94 right side inner wall front and rear sides of screen frame are respectively connected with spring 30, and spring 30 is in contraction state, and 30 left end of spring is connected with push plate
31, the width mutual cooperation of the length of push plate 31 and small screen frame 94, big 91 left side central portion of screen frame is equipped with fixed pulley 32, big screen frame
91 left backs are connected with notch plate 33, and 33 left end of notch plate is connected with plug 34, and 31 left side central portion of push plate is connected with the second drawing
Line 35, the other end of the second bracing wire 35 are connected with lifting the ball 36, and the second bracing wire 35 is around 32 front side of fixed pulley and passes through notch plate 33,
Lifting the ball 36 is located at 33 rear of notch plate.
It further include having the 4th sliding rail 37, Four-slider 38 and rubber block 39, small 94 rear side inner wall bottom of screen frame is connected with
4th sliding rail 37, slidingtype is connected with Four-slider 38 on the 4th sliding rail 37, the front side and 31 rear end of push plate of Four-slider 38 to
Connection, 37 right part of the 4th sliding rail front side are fixedly connected with rubber block 39, and rubber block 39 is located at the right side of Four-slider 38.
When rubbish is more in small stream needs to clear up, this equipment can be moved in stream by user, and wheel 16 is to equipment
Movement helps out, and finds the waters of the depth of water and width suitable, then by the bank on the left of the first inserted link 2 insertion brook of equipment
Side, first connecting rod 1 is fixed, the second connecting rod 14 is then pulled again, and the second connecting rod 14 drives the second web plate 7 sidesway to the right
Dynamic, the first sliding rail 4 and the first sliding block 5 assist the second web plate 7 mobile, and small screen frame 94 is in third sliding rail 92 and third sliding block 93
It moves right under cooperation, so that the whole width for adapting to brook of garbage collection frame 9, preferably intercepts rubbish, user will
Second inserted link 15 is inserted into the right bank in brook, thus the second connecting rod 14 is fixed, so, brook can be secured the equipment in
In, when stream flows through, the first web plate 3 and the second web plate 7 can rapidly be intercepted the rubbish in stream, when garbage collection is arrived
When a certain amount needs to clear up, user can call in another person's assistance, and two people are stood respectively on the both sides in brook, and pull ring 12 is upward
It pulls, garbage collection frame 9 is pulled upwardly by pull ring 12 by the first bracing wire 11, and garbage collection frame 9 is drawn high to certain height
Afterwards, user can begin a clean up the rubbish on garbage collection frame 9, and after it is cleaned out, user slowly unclamps link 13, so that rubbish
Rubbish collection frame 9 moves down reset, can carry out rubbish interception again, and after rubbish cleans out, user is by the second inserted link 15
It is successively extracted from the bank of two sides with the first inserted link 2, link 13 can be used for fixing pushing hands 6, prevent its movement, convenient for the shifting of equipment
Dynamic, after equipment is put in order, user can keep equipment well.
Before adjusting and installing equipment, the adjustable wing nut 26 of user turns connecting plate 23 on right side
It is moved on axis 18, when after the installation is completed, user adjusts wing nut 26 and is fixed on connecting plate 23 in the shaft 18 on right side, thus
The shaft 18 of two sides is connected, then user extremely removes the first nut 21 rotation of two sides from the first bolt 20, respectively
By 12 sets of pull ring of two sides on the first bolt 20 of respective side, then by 21 spinning reduction of the first nut and pull ring 12 is fixed on
On the first bolt 20 between first nut 21 and link block 19, then, user's positive direction rotates rocking handle 22, and rocking handle 22 passes through company
The cooperation of fishplate bar 23 and shaft 18 drives link block 19 to rotate, so that the first bracing wire 11 of two sides is rotating around the first spiral shell in two sides
On bolt 20, so just garbage collection frame 9 can be made to move up, user will shake again after cleaning out garbage collection frame 9
The rotation of 22 opposite direction of handle resets garbage collection frame 9, and so, user only needs a people to can be carried out the cleaning of rubbish,
Realize one man operation.
When garbage collection frame 9 is moved upwards up to the position higher than the second connecting rod 14, user by L shape bolt 28 inwardly
It is mobile, and the second nut of turn 29 is fixed by L shape bolt 28, at this moment user can unclamp rocking handle 22, convex on the inside of L shape bolt 28
The garbage collection frame 9 of whereabouts can be fixed on this position by part out, and user can attentively clear up rubbish, improve equipment just
Benefit.
When needing to clear up the rubbish on garbage collection frame 9, user can pull lifting the ball 36, and lifting the ball 36 can be in order to fixation
The position of second bracing wire 35, lifting the ball 36 drive push plate 31 to be moved to the left by the second bracing wire 35, and spring 30 stretches, and push plate 31 is by rubbish
Rubbish in rubbish collection frame 9 pushes to the left, and then user unclamps lifting the ball 36, and spring 30, which is shunk, drives push plate 31 to reset, if any must
The repeatable operation of user is wanted, rubbish is all cleaned to side, more convenient user clears up.
When user pulls lifting the ball 36 to drive push plate 31 to be moved to the left by the second bracing wire 35, the 4th sliding rail the 37, the 4th is sliding
Block 38, which cooperates, assists push plate 31 mobile, keeps the movement of push plate 31 more smooth, drives push plate 31 to reset when spring 30 is shunk
When, rubber block 39 can produce certain buffer function, and can anti-31 over-travel of thrust plate cause the extra of equipment
Loss.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention rather than protects to the present invention
The limitation of range is protected, although the invention is described in detail with reference to the preferred embodiments, those skilled in the art should
Understand, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the essence of technical solution of the present invention
And range.
Claims (5)
1. rubbish blocking apparatus in a kind of hydraulic engineering small stream, feature are being:It include first connecting rod, the first inserted link,
One web plate, the first sliding rail, the first sliding block, pushing hands, the second web plate, the second sliding rail, the second sliding block, garbage collection frame, big screen frame,
Three sliding rails, third sliding block, small screen frame, the first guide sleeve, the first bracing wire, pull ring, link, the second connecting rod, the second inserted link and wheel,
The left side of first connecting rod is uniformly connected with the first inserted link, is connected with the first web plate on the right side of first connecting rod, on the first web plate
Side is equipped with the first sliding rail, and slidingtype is connected with the first sliding block on the first sliding rail, and pushing hands is connected on the upside of the first sliding block, and first is sliding
The second web plate is connected on the right side of block, the second web plate is located at the forward right side of the first sliding rail, right part and the first web plate on front side of the second web plate
Front side left part is mounted on the second sliding rail, and slidingtype is connected with the second sliding block on two the second sliding rails, two the second sliding blocks it
Between be connected with garbage collection frame, the right side of second sliding block in left side is connected with big screen frame, the left side of second sliding block on right side
It is connected with small screen frame, small screen frame is located at the upper right side of big screen frame and cooperates therewith, and middle part is equipped with third on the upside of big screen frame
Sliding rail, slidingtype is connected with third sliding block on third sliding rail, is connected on the right side of third sliding block with small screen frame left side middle part, and two
It is respectively connected with the first guide sleeve at the top of second sliding rail, pull ring is equipped on the upside of two the first guide sleeves, the is respectively connected on the downside of two pull rings
One bracing wire, first is drawstring through the first guide sleeve, the other end of two first bracing wires respectively with the left upper portion of garbage collection frame and
Right upper portion is connected, and the right upper portion of second sliding rail in left side is hingedly connected with link, is connected with second on the right side of the second web plate
Connecting rod, is uniformly provided with the second inserted link on the right side of the second connecting rod, and the bottom end of first connecting rod and the second connecting rod is mounted on wheel
Son.
2. rubbish blocking apparatus in a kind of hydraulic engineering small stream described in accordance with the claim 1, feature are being:It further include having axis
Hold seat, shaft, link block, the first bolt, the first nut, rocking handle, connecting plate, the second bolt and wing nut, two second cunnings
It is mounted on bearing block on rear side of rail top, shaft is respectively connected in two bearings seat, two shaft upper outsides are respectively connected with link block,
Two link block outer uppers are respectively connected with the first bolt, are connected on two the first bolts by way of screw-type connection
One nut, the right end of right side shaft are connected with rocking handle, and two shaft inside upper parts are connected with connecting plate, are provided with a word on the right side of connecting plate
Hole, a word hole are located at the upside of the shaft on right side, the second bolt are connected in a word hole, butterfly spiral shell is connected on the second bolt
Mother, wing nut are located on the upside of a word hole.
3. rubbish blocking apparatus in a kind of hydraulic engineering small stream, feature are being according to claim 2:It further include having
Two guide sleeves, L shape bolt and the second nut, the first inserted link top and the second connecting rod top are respectively connected with the second guide sleeve, and two
It is respectively connected with L shape bolt in two guide sleeves, the mode being connected through a screw thread on the inside of two L shape bolts is connected with the second nut, and second
Nut is located on the inside of the second guide sleeve.
4. rubbish blocking apparatus in a kind of hydraulic engineering small stream described in accordance with the claim 3, feature are being:It further include having bullet
Spring, push plate, fixed pulley, notch plate, plug, the second bracing wire and lifting the ball, small screen frame right side inner wall front and rear sides are respectively connected with spring,
Spring is in contraction state, and spring left end is connected with push plate, the width mutual cooperation of the length of push plate and small screen frame, a big screen frame left side
Middle side part is equipped with fixed pulley, and big screen frame left back is connected with notch plate, and notch plate left end is connected with plug, on the left of push plate in
Portion is connected with the second bracing wire, and the other end of the second bracing wire is connected with lifting the ball, and the second bracing wire is around on front side of fixed pulley and across spill
Plate, lifting the ball are located at notch plate rear.
5. rubbish blocking apparatus in a kind of hydraulic engineering small stream, feature are being according to claim 4:It further include having
Four sliding rails, Four-slider and rubber block, small screen frame rear side inner wall bottom are connected with the 4th sliding rail, and slidingtype connects on the 4th sliding rail
It is connected to Four-slider, to connection, the 4th sliding rail right part front side is fixedly connected with rubber stop for the front side and push plate rear end of Four-slider
Block, rubber block are located at the right side of Four-slider.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810606641.XA CN108914896A (en) | 2018-06-13 | 2018-06-13 | Rubbish blocking apparatus in a kind of hydraulic engineering small stream |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810606641.XA CN108914896A (en) | 2018-06-13 | 2018-06-13 | Rubbish blocking apparatus in a kind of hydraulic engineering small stream |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108914896A true CN108914896A (en) | 2018-11-30 |
Family
ID=64420575
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810606641.XA Pending CN108914896A (en) | 2018-06-13 | 2018-06-13 | Rubbish blocking apparatus in a kind of hydraulic engineering small stream |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108914896A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109771994A (en) * | 2019-03-27 | 2019-05-21 | 廖婧 | A kind of flocculation basin dross cleaning equipment |
CN109850960A (en) * | 2018-12-27 | 2019-06-07 | 徐蔓 | A kind of ditch polluted water impurity interception door |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10159165A (en) * | 1996-11-28 | 1998-06-16 | Fumiaki Kusumoto | Dust catch net |
CN103362110A (en) * | 2013-06-24 | 2013-10-23 | 河海大学 | Self-adaptive trash holding device with variable grid distance and length |
CN203701060U (en) * | 2014-02-18 | 2014-07-09 | 亓勇 | Anti-blocking and antifouling fence for hydraulic engineering |
CN106400747A (en) * | 2016-10-14 | 2017-02-15 | 成都绿迪科技有限公司 | Novel riverway filth interception device |
CN206245293U (en) * | 2016-11-29 | 2017-06-13 | 路嘉 | A kind of new medium or smallsized river trash rack device |
CN207159965U (en) * | 2017-08-23 | 2018-03-30 | 高振焱 | A kind of hydraulic engineering fence of removing contamination |
-
2018
- 2018-06-13 CN CN201810606641.XA patent/CN108914896A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10159165A (en) * | 1996-11-28 | 1998-06-16 | Fumiaki Kusumoto | Dust catch net |
CN103362110A (en) * | 2013-06-24 | 2013-10-23 | 河海大学 | Self-adaptive trash holding device with variable grid distance and length |
CN203701060U (en) * | 2014-02-18 | 2014-07-09 | 亓勇 | Anti-blocking and antifouling fence for hydraulic engineering |
CN106400747A (en) * | 2016-10-14 | 2017-02-15 | 成都绿迪科技有限公司 | Novel riverway filth interception device |
CN206245293U (en) * | 2016-11-29 | 2017-06-13 | 路嘉 | A kind of new medium or smallsized river trash rack device |
CN207159965U (en) * | 2017-08-23 | 2018-03-30 | 高振焱 | A kind of hydraulic engineering fence of removing contamination |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109850960A (en) * | 2018-12-27 | 2019-06-07 | 徐蔓 | A kind of ditch polluted water impurity interception door |
CN109771994A (en) * | 2019-03-27 | 2019-05-21 | 廖婧 | A kind of flocculation basin dross cleaning equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108914896A (en) | Rubbish blocking apparatus in a kind of hydraulic engineering small stream | |
CN210049216U (en) | A intercepting device for administering water surface floating pollutant in river course | |
CN110604952B (en) | Automatic pull throughs of sewage filtration | |
CN100591402C (en) | Filter-cloth curved-stretching rapping mechanism of pressure filter and rapping method | |
KR101431519B1 (en) | A dust removing machine with open-close type screen | |
CN107724316A (en) | Housing construction removes ponding environmental protecting device | |
CN109736786A (en) | A kind of continuous wave positive pulse generator of linear motor driving | |
CN109837978A (en) | A kind of climb type pipeline cleaning machine people from bottom to top | |
CN106956871B (en) | A kind of coal bunker spiral loosening knife system | |
KR101325346B1 (en) | Roller cleaning apparatus | |
CN110064990A (en) | A kind of grinding apparatus easy to use for maintenance of the vessel | |
KR200367382Y1 (en) | An underwater cart for sludge collector with absorbing cylinder | |
CN106262974A (en) | A kind of for Fructus Vitis viniferae automatic clearing apparatus | |
CN111068389A (en) | Sewage treatment fisher | |
CN108172346B (en) | Core and plastic selector in electric wire | |
CN107964933B (en) | A kind of trash rack sewage cleaning device | |
CN107938811A (en) | A kind of turnover plate type Vatch basin | |
CN206448252U (en) | River course floating refuse block | |
CN109372096A (en) | A kind of sewer line dredging device | |
CN206070491U (en) | One kind blocks drift solution arranging device | |
CN210032706U (en) | Drainage pipe maintenance operation safety device | |
CN213897434U (en) | Desanding system is collected to municipal administration rainwater | |
CN214485906U (en) | Water supply and drainage pipeline blockage preventing device | |
CN108104187A (en) | A kind of hydraulic engineering rubbish cleaning equipment | |
CN208437023U (en) | Jigging machine exclusion device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181130 |
|
RJ01 | Rejection of invention patent application after publication |