CN108894473A - A kind of senior building engineering waterproofing construction method - Google Patents

A kind of senior building engineering waterproofing construction method Download PDF

Info

Publication number
CN108894473A
CN108894473A CN201810738061.6A CN201810738061A CN108894473A CN 108894473 A CN108894473 A CN 108894473A CN 201810738061 A CN201810738061 A CN 201810738061A CN 108894473 A CN108894473 A CN 108894473A
Authority
CN
China
Prior art keywords
chamber
bevel gear
wall
cavity
drives
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810738061.6A
Other languages
Chinese (zh)
Inventor
谢晓峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiangshan Zhi Hang Mechanical And Electrical Technology Co Ltd
Xiangshan Zhihang Electromechanical Technology Co Ltd
Original Assignee
Xiangshan Zhi Hang Mechanical And Electrical Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xiangshan Zhi Hang Mechanical And Electrical Technology Co Ltd filed Critical Xiangshan Zhi Hang Mechanical And Electrical Technology Co Ltd
Priority to CN201810738061.6A priority Critical patent/CN108894473A/en
Publication of CN108894473A publication Critical patent/CN108894473A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/02Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
    • E04F21/06Implements for applying plaster, insulating material, or the like
    • E04F21/08Mechanical implements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Catching Or Destruction (AREA)

Abstract

The invention discloses a kind of senior building engineering waterproofing construction methods,It uses a kind of construction equipment,The construction equipment includes cabinet,Stir chamber is provided in the cabinet,The stir chamber upper end wall is rotatably assorted the stirring rod for being connected with and extending downwardly,The stirring rod outer surface is evenly distributed with several stirring blades,The first drive cavity is provided with below the stir chamber,The stirring rod is downward through the stir chamber lower end wall and protrudes into first drive cavity,The stirring rod lower end is rotatably assorted with the first drive cavity lower end wall and connect,The stirring rod outer surface is installed with the first bevel gear in first drive cavity,Conversion chamber is provided in the wall of first drive cavity left end,Present device structure is simple,It is easy to use,The labor intensity of worker can effectively be mitigated,And it can satisfy the use demand under varying environment.

Description

A kind of senior building engineering waterproofing construction method
Technical field
The present invention relates to building fields, and in particular to a kind of senior building engineering waterproofing construction method.
Background technique
With the development of science and technology, social progress, country promotes always high-tech development, the brushing of wall water-repellent paint The mode manually brushed now is mostly used, the labor intensity of worker is very high, and existing some painting devices can only carry out single side To brushing, it is difficult to satisfy the use demand, therefore be badly in need of a kind of novel equipment.
Summary of the invention
The purpose of the present invention is to provide a kind of senior building engineering waterproofing construction methods, can overcome the upper of the prior art State defect.
According to the present invention, a kind of senior building engineering waterproofing construction method of present device is set using a kind of construction Standby, the construction equipment includes cabinet, and stir chamber is provided in the cabinet, and the stir chamber upper end wall, which is rotatably assorted, to be connected with The stirring rod extended downwardly, the stirring rod outer surface are evenly distributed with several stirring blades, are provided with below the stir chamber First drive cavity, the stirring rod is downward through the stir chamber lower end wall and protrudes into first drive cavity, the stirring rod Lower end is rotatably assorted with the first drive cavity lower end wall and connect, and the stirring rod outer surface is installed with positioned at first transmission Intracavitary first bevel gear is provided with conversion chamber, the intracavitary sliding connection of conversion in the wall of first drive cavity left end There is conversion block, the perforative power cavity in left and right is provided in the conversion block, is installed with first between end wall above and below the power cavity Motor, the first motor right end output shaft protrude into the right first drive cavity, the first motor right end output shaft appearance Face has been connected by power second bevel gear, and the conversion chamber left is provided with and communicated with the second drive cavity, and the first motor left end is defeated Shaft protrudes into second drive cavity to the left, and the first motor left end output shaft outer surface has been connected by power triconodont Wheel, the second drive cavity upper end wall are rotatably assorted the first rotary shaft for being connected with and extending downwardly, the first rotary shaft appearance Face is installed with the 4th bevel gear, and the second drive cavity lower end wall is provided with and communicated with third drive cavity, first axial rotary Under protrude into the third drive cavity, first rotary shaft lower end is rotatably assorted with the third drive cavity lower end wall and connect, institute The first spur gear that the first rotary shaft outer surface is installed in the third drive cavity is stated, first spur gear left is nibbled Conjunction has the second spur gear, and second spur gear is rotatably assorted with the third drive cavity lower end wall by shaft and is connect, described Second spur gear left is engaged with third spur gear, and the third spur gear inner surface is installed with the threaded rod extended up and down, institute It states threaded rod lower end and is rotatably assorted with the third drive cavity lower end wall and connect, is provided in the third drive cavity upper end wall One accommodating chamber, the first accommodating chamber top are provided with and communicated with the lifting chamber of opening to the left, and the threaded rod is upward through described First accommodating chamber simultaneously protrudes into the lifting chamber, and the threaded rod upper end is rotatably assorted with the lifting chamber upper end wall and connect, described Threaded rod outer surface thread is connected with threaded block, and the threaded block and the lifting chamber are slidably connected, the conversion It is provided with and communicated with connecting cavity below chamber, is provided with and communicated with push chamber below the connecting cavity, it is fixed in the push chamber right end wall There is the first electric pushrod, the push rod left end of first electric pushrod has been connected by power pushing block, the pushing block and the push chamber Sliding connection, the pushing block upper surface are installed with the connecting rod upwardly extended, and the connecting rod extends upwardly into the connection Chamber is simultaneously fixedly connected with the conversion block lower end surface, is installed with distance sensing device on the downside of the cabinet left side;
Described method includes following steps:
Before equipment operation, water-repellent paint is sent into the stir chamber by the adding mouth, is finished to water-repellent paint addition, First electric pushrod is started to work, and first electric pushrod drives the pushing block to move right, and the pushing block passes through institute Stating connecting rod drives the conversion block to move right, and engages to the first bevel gear and second bevel gear, described first is electronic Push rod stops working, and the first motor is started to work, and the first motor right end output shaft drives the second bevel gear to turn Dynamic, the second bevel gear drives the first bevel gear rotation, and the first bevel gear drives the stirring rod rotation, thus The water-repellent paint is stirred, is stirred evenly to the water-repellent paint, the first motor stops working, first electricity Dynamic push rod reverse operation, returns to initial position to the conversion block, first electric pushrod stops working.
When needing horizontal direction brush water-repellent paint, the idler wheel drive whole equipment along wall to be brushed direction forward Mobile, to drive the rotating cylinder to be bonded the wall rolls forward, while the pump housing is started to work, the water-repellent paint is logical The pump housing is crossed into the first entrance, so that the water-repellent paint is sprayed to the wall by the spray head, thus right Wall brush water-repellent paint.
When needing vertical direction brush water-repellent paint, second electric pushrod is started to work, second electric pushrod It drives the power block to move up, is engaged to the 5th bevel gear and the 6th bevel gear, second electric pushrod stops Work, second motor are started to work, and second motor output shaft drives the 5th bevel gear rotation, the 5th cone Gear drives the 6th bevel gear rotation, and the 6th bevel gear drives the second rotary shaft rotation, to second rotation Shaft rotates 90 degree, and second motor stops working, and first electric pushrod is started to work, first electric pushrod It drives the pushing block to be moved to the left, is engaged to the third hand tap gear and the 4th bevel gear, first electric pushrod stops work Make, the first motor is started to work, and first motor left end output shaft drives the third hand tap gear rotation, the third Bevel gear drives the 4th bevel gear rotation, and the 4th bevel gear drives the first rotary shaft rotation, first rotation Shaft drives the threaded rod to rotate by first spur gear, the second spur gear and third spur gear, the threaded rod band It moves the threaded block to move down, while the pump housing is started to work, the water-repellent paint enters described the by the pump housing One entrance, so that the water-repellent paint is sprayed to the wall by the spray head, thus to wall brush water-repellent paint.
Optionally, wherein the threaded block left side is installed with the lifting arm extended to the left, and the lifting arm left end is fixed There is work box, working chamber is provided in the work box, is installed with the second electric pushrod in the working chamber lower end wall, described The push rod upper end of two electric pushrods is connected by power dynamic piece, and the power block and the working chamber are slidably connected, described The second motor is installed in power block upper surface, second motor output shaft upper end has been connected by power in the work box The 5th bevel gear, the second accommodating chamber of connection exterior space, second accommodating chamber are provided in the wall of the working chamber left end Interior be rotatably assorted by bearing is connected with the second rotary shaft that left and right extends, and second rotary shaft protrudes into the work to the left Make chamber, second rotary shaft left end outer surface is installed with the 6th bevel gear, and second rotary shaft stretches out exterior space to the left, The rotary shaft outer surface is symmetrical above and below to be installed with frame body, turns to be installed with fixed link between upper and lower two frame bodies, described solid Fixed pole outer surface, which is rotatably assorted, is connected with rotating cylinder, and the work box upper surface is installed with the support arm upwardly extended, the support Left and right is provided through the first cavity in arm, and first cavity left is provided with and communicated with first entrance, and the first entrance is left Side is provided with and communicated with connecting tube, and the support arm left side is installed with first pipe, and it is logical that second is provided in the first pipe Chamber, first cavity are connected to second cavity, and second cavity left, which is provided with and communicated with, is fixedly arranged on first pipe The spray head of road left end.
Optionally, wherein the cabinet upper surface is installed with the pump housing, and the pump housing lower end surface is provided with second entrance, institute It states pump housing left side and is provided with first outlet, the first outlet is connected with the connecting tube, under the wall of the stir chamber left end Side is provided with and communicated with second pipe, and the second pipe is connected with the second entrance, in the stir chamber right end wall upside Portion is provided with the adding mouth of connection exterior space, and the cabinet lower end surface bilateral symmetry is installed with supporting seat, the support leg Seat lower end is provided with idler wheel.
Optionally, wherein the distance sensing device includes range sensor, be installed on the downside of the cabinet left side away from From sensor, the range sensor left side is provided with detecting head.
The beneficial effects of the invention are as follows:Before equipment operation, by water-repellent paint by being stirred described in adding mouth feeding Chamber is mixed, is finished to water-repellent paint addition, first electric pushrod is started to work, described in the first electric pushrod driving Pushing block moves right, and the pushing block drives the conversion block to move right by the connecting rod, to the first bevel gear and Second bevel gear engagement, first electric pushrod stop working, and the first motor is started to work, the first motor right end Output shaft drives the second bevel gear rotation, and the second bevel gear drives the first bevel gear rotation, first cone Gear drives the stirring rod rotation, to be stirred to the water-repellent paint, stirs evenly to the water-repellent paint, described First motor stops working, the first electric pushrod reverse operation, returns to initial position, first electricity to the conversion block Dynamic push rod stops working, thus before to wall brush water-repellent paint, makes to apply more uniform, effectively improves waterproof effect.
When needing horizontal direction brush water-repellent paint, the idler wheel drive whole equipment along wall to be brushed direction forward Mobile, to drive the rotating cylinder to be bonded the wall rolls forward, while the pump housing is started to work, the water-repellent paint is logical The pump housing is crossed into the first entrance, so that the water-repellent paint is sprayed to the wall by the spray head, thus right Wall brush water-repellent paint is carried out the brushing of water-repellent paint to wall by the way of automation, significantly reduces the labour of worker Intensity improves painting efficiency.
When needing vertical direction brush water-repellent paint, second electric pushrod is started to work, second electric pushrod It drives the power block to move up, is engaged to the 5th bevel gear and the 6th bevel gear, second electric pushrod stops Work, second motor are started to work, and second motor output shaft drives the 5th bevel gear rotation, the 5th cone Gear drives the 6th bevel gear rotation, and the 6th bevel gear drives the second rotary shaft rotation, to second rotation Shaft rotates 90 degree, and second motor stops working, and first electric pushrod is started to work, first electric pushrod It drives the pushing block to be moved to the left, is engaged to the third hand tap gear and the 4th bevel gear, first electric pushrod stops work Make, the first motor is started to work, and first motor left end output shaft drives the third hand tap gear rotation, the third Bevel gear drives the 4th bevel gear rotation, and the 4th bevel gear drives the first rotary shaft rotation, first rotation Shaft drives the threaded rod to rotate by first spur gear, the second spur gear and third spur gear, the threaded rod band It moves the threaded block to move down, while the pump housing is started to work, the water-repellent paint enters described the by the pump housing One entrance, so that the water-repellent paint is sprayed into the wall by the spray head, thus to wall brush water-repellent paint, the present invention It is brushed using level and brushes two kinds of working methods vertically and effectively improve equipment to meet the use demand under varying environment Functionality and practicability.
The above, the specific embodiment only invented, but invent protection scope be not limited thereto, it is any without The change or replacement that creative work is expected are crossed, should all be covered within the protection scope of invention.Therefore, the protection scope of invention It should be determined by the scope of protection defined in the claims.
Detailed description of the invention
It, below will be to embodiment or existing in order to illustrate more clearly of inventive embodiments or technical solution in the prior art Attached drawing needed in technical description is briefly described, it should be apparent that, the accompanying drawings in the following description is only to invent Some embodiments for those of ordinary skill in the art without creative efforts, can also basis These attached drawings obtain other attached drawings.
Fig. 1 is a kind of overall structure diagram of senior building engineering waterproofing construction method of the invention;
Fig. 2 is the schematic diagram in the direction A in Fig. 1;
Fig. 3 is the schematic diagram in the direction B in Fig. 1.
Specific embodiment
All features disclosed in this specification or disclosed all methods or in the process the step of, in addition to mutually exclusive Feature and/or step other than, can combine in any way.
This specification(Including any accessory claim, abstract and attached drawing)Disclosed in any feature, except non-specifically chatting It states, can be replaced by other alternative features that are equivalent or have similar purpose.That is, unless specifically stated, each feature is only It is an example in a series of equivalent or similar characteristics.
As shown in Figure 1-3, a kind of senior building engineering waterproofing construction method of the invention, uses a kind of construction equipment, The construction equipment includes cabinet 100, and stir chamber 101,101 upper end wall of the stir chamber rotation are provided in the cabinet 100 It is connected with the stirring rod 102 extended downwardly, 102 outer surface of stirring rod is evenly distributed with several stirring blades 103, institute State and be provided with the first drive cavity 104 below stir chamber 101, the stirring rod 102 downward through 101 lower end wall of stir chamber simultaneously First drive cavity 104 is protruded into, 102 lower end of stirring rod is rotatably assorted with 104 lower end wall of the first drive cavity and connect, 102 outer surface of stirring rod is installed with the first bevel gear 105 in first drive cavity 104, first transmission It is provided with conversion chamber 106 in 104 left end wall of chamber, is slidably connected with conversion block 107, the conversion in the conversion chamber 106 It is provided with the perforative power cavity 108 in left and right in block 107, is installed with first motor 109 between about 108 end wall of power cavity, The 109 right end output shaft of first motor protrudes into the right first drive cavity 104, the 109 right end output shaft of first motor Outer surface has been connected by power second bevel gear 110, and 106 left of conversion chamber is provided with and communicated with the second drive cavity 111, and described One motor, 109 left end output shaft protrudes into second drive cavity 111 to the left, outside the 109 left end output shaft of first motor Surface has been connected by power third hand tap gear 112, and 111 upper end wall of the second drive cavity is rotatably assorted for being connected with and extending downwardly One rotary shaft 113,113 outer surface of the first rotary shaft are installed with the 4th bevel gear 114,111 lower end of the second drive cavity Wall is provided with and communicated with third drive cavity 115, and first rotary shaft 113 extends downwardly into the third drive cavity 115, and described first 113 lower end of rotary shaft is rotatably assorted with 115 lower end wall of third drive cavity and connect, and 113 outer surface of the first rotary shaft is solid Equipped with the first spur gear 116 being located in the third drive cavity 115, it is straight that 116 left of the first spur gear is engaged with second Gear 117, second spur gear 117 are rotatably assorted with 115 lower end wall of third drive cavity by shaft and are connect, and described Two spur gears, 117 left is engaged with third spur gear 118, and 118 inner surface of third spur gear is installed with the spiral shell extended up and down Rasp bar 121,121 lower end of threaded rod are rotatably assorted with 115 lower end wall of third drive cavity and connect, the third drive cavity It is provided with the first accommodating chamber 119 in 115 upper end walls, the lifting of opening to the left is provided with and communicated with above first accommodating chamber 119 Chamber 120, the threaded rod 121 are upward through first accommodating chamber 119 and protrude into the lifting chamber 120, the threaded rod 121 Upper end is rotatably assorted with 120 upper end wall of lifting chamber and connect, and 121 outer surface thread of threaded rod is connected with threaded block 122, the threaded block 122 is slidably connected with the lifting chamber 120, is provided with and communicated with connection below the conversion chamber 106 Chamber 123, push chamber 125 is provided with and communicated with below the connecting cavity 123, and it is electric to be installed with first in the 125 right end wall of push chamber Dynamic push rod 126, the push rod left end of first electric pushrod 126 have been connected by power pushing block 127, and the pushing block 127 is pushed away with described Chamber 125 is sent to be slidably connected, 127 upper surface of pushing block is installed with the connecting rod 124 upwardly extended, the connecting rod 124 It extends upwardly into the connecting cavity 123 and is fixedly connected with 107 lower end surface of conversion block, it is solid on the downside of 100 left side of cabinet Equipped with distance sensing device;
Described method includes following steps:
Before equipment operation, water-repellent paint is sent into the stir chamber 101 by the adding mouth 305, is added to the water-repellent paint Add complete, first electric pushrod 126 is started to work, and first electric pushrod 126 drives the pushing block 127 to move right Dynamic, the pushing block 127 drives the conversion block 107 to move right by the connecting rod 124, to the first bevel gear 105 It is engaged with second bevel gear 110, first electric pushrod 126 stops working, and the first motor 109 is started to work, described 109 right end output shaft of first motor drives the second bevel gear 110 to rotate, and the second bevel gear 110 drives described first Bevel gear 105 rotates, and the first bevel gear 105 drives the stirring rod 102 to rotate, to stir the water-repellent paint It mixes, is stirred evenly to the water-repellent paint, the first motor 109 stops working, the reversed work of first electric pushrod 126 Make, returns to initial position to the conversion block 107, first electric pushrod 126 stops working.
When needing horizontal direction brush water-repellent paint, the idler wheel 307 drives whole equipment along the direction of wall to be brushed It moves forward, thus drive the rotating cylinder 213 to be bonded the wall rolls forward, while the pump housing 302 is started to work, it is described Water-repellent paint enters the first entrance 216 by the pump housing 302, so that the water-repellent paint is passed through the spray head 220 The wall is sprayed to, thus to wall brush water-repellent paint.
When needing vertical direction brush water-repellent paint, second electric pushrod 204 is started to work, and described second electronic pushes away Bar 204 drives the power block 205 to move up, and engages to the 5th bevel gear 207 and the 6th bevel gear 210, and described the Two electric pushrods 204 stop working, and second motor 207 is started to work, 207 output shaft of the second motor driving described the The rotation of five bevel gears 207, the 5th bevel gear 207 drive the 6th bevel gear 210 to rotate, the 6th bevel gear 210 It drives second rotary shaft 209 to rotate, rotates 90 degree to second rotary shaft 209, second motor 207 stops work To make, first electric pushrod 126 is started to work, and first electric pushrod 126 drives the pushing block 127 to be moved to the left, to The third hand tap gear 112 and the engagement of the 4th bevel gear 114, first electric pushrod 126 stop working, the first motor 109 start to work, and the 109 left end output shaft of first motor drives the third hand tap gear 112 to rotate, the third hand tap gear 112 drive the 4th bevel gear 114 rotation, and the 4th bevel gear 114 drives first rotary shaft 113 to rotate, described First rotary shaft 113 drives the threaded rod by first spur gear 116, the second spur gear 117 and third spur gear 118 121 rotations, the threaded rod 121 drive the threaded block 122 to move down, while the pump housing 302 is started to work, described anti- Water paint enters the first entrance 216 by the pump housing 302, so that the water-repellent paint be sprayed by the spray head 220 To the wall, thus to wall brush water-repellent paint.
Optionally, wherein 122 left side of threaded block is installed with the lifting arm 201 extended to the left, the lifting arm 201 left ends are installed with work box 202, and working chamber 203 is provided in the work box 202, is consolidated in 203 lower end wall of working chamber Equipped with the second electric pushrod 204, the push rod upper end of second electric pushrod 204 is connected by power dynamic piece 205, the power Block 205 and the working chamber 203 are slidably connected, and are installed with the second motor 206 in 205 upper surface of power block, described Second motor, 206 output shaft upper end is connected by power the 5th bevel gear 207 in the work box 202, the working chamber It is provided with the second accommodating chamber 208 of connection exterior space in 203 left end walls, is rotated in second accommodating chamber 208 by bearing It is connected with the second rotary shaft 209 that left and right extends, second rotary shaft 209 protrudes into the working chamber 203 to the left, Second rotary shaft, the 209 left end outer surface is installed with the 6th bevel gear 210, and second rotary shaft 209 is stretched out external to the left Space, 209 outer surface of rotary shaft is symmetrical above and below to be installed with frame body 211, turns to be installed between upper and lower two frame bodies 211 Fixed link 212,212 outer surface of fixed link, which is rotatably assorted, is connected with rotating cylinder 213, and 202 upper surface of work box is installed with The support arm 214 upwardly extended, the interior left and right of the support arm are provided through the first cavity 215,215 left of the first cavity It is provided with and communicated with first entrance 216,216 left of first entrance is provided with and communicated with connecting tube 217, and the support arm 214 is left End face is installed with first pipe 218, and the second cavity 219, first cavity 215 and institute are provided in the first pipe 218 The connection of the second cavity 219 is stated, 219 left of the second cavity is provided with and communicated with the spray for being fixedly arranged on 218 left end of first pipe First 220.
Optionally, wherein 100 upper surface of cabinet is installed with the pump housing 302, and 302 lower end surface of the pump housing is provided with Two entrances 303,302 left side of the pump housing are provided with first outlet 304, the first outlet 304 and 217 phase of connecting tube Connection, the 101 left end wall downside of stir chamber are provided with and communicated with second pipe 301, and the second pipe 301 enters with described second Mouth 303 is connected, and the 101 right end wall upper interior of stir chamber is provided with the adding mouth 305 of connection exterior space, the cabinet 100 lower end surfaces bilateral symmetry is installed with supporting seat 306, and 306 lower end of supporting seat is provided with idler wheel 307.
Optionally, wherein the distance sensing device includes range sensor 401, solid on the downside of 100 left side of cabinet Equipped with range sensor 401,401 left side of range sensor is provided with detecting head 402.
The beneficial effects of the invention are as follows:Before equipment operation, by water-repellent paint by being stirred described in adding mouth feeding Chamber is mixed, is finished to water-repellent paint addition, first electric pushrod is started to work, described in the first electric pushrod driving Pushing block moves right, and the pushing block drives the conversion block to move right by the connecting rod, to the first bevel gear and Second bevel gear engagement, first electric pushrod stop working, and the first motor is started to work, the first motor right end Output shaft drives the second bevel gear rotation, and the second bevel gear drives the first bevel gear rotation, first cone Gear drives the stirring rod rotation, to be stirred to the water-repellent paint, stirs evenly to the water-repellent paint, described First motor stops working, the first electric pushrod reverse operation, returns to initial position, first electricity to the conversion block Dynamic push rod stops working, thus before to wall brush water-repellent paint, makes to apply more uniform, effectively improves waterproof effect.
When needing horizontal direction brush water-repellent paint, the idler wheel drive whole equipment along wall to be brushed direction forward Mobile, to drive the rotating cylinder to be bonded the wall rolls forward, while the pump housing is started to work, the water-repellent paint is logical The pump housing is crossed into the first entrance, so that the water-repellent paint is sprayed to the wall by the spray head, thus right Wall brush water-repellent paint is carried out the brushing of water-repellent paint to wall by the way of automation, significantly reduces the labour of worker Intensity improves painting efficiency.
When needing vertical direction brush water-repellent paint, second electric pushrod is started to work, second electric pushrod It drives the power block to move up, is engaged to the 5th bevel gear and the 6th bevel gear, second electric pushrod stops Work, second motor are started to work, and second motor output shaft drives the 5th bevel gear rotation, the 5th cone Gear drives the 6th bevel gear rotation, and the 6th bevel gear drives the second rotary shaft rotation, to second rotation Shaft rotates 90 degree, and second motor stops working, and first electric pushrod is started to work, first electric pushrod It drives the pushing block to be moved to the left, is engaged to the third hand tap gear and the 4th bevel gear, first electric pushrod stops work Make, the first motor is started to work, and first motor left end output shaft drives the third hand tap gear rotation, the third Bevel gear drives the 4th bevel gear rotation, and the 4th bevel gear drives the first rotary shaft rotation, first rotation Shaft drives the threaded rod to rotate by first spur gear, the second spur gear and third spur gear, the threaded rod band It moves the threaded block to move down, while the pump housing is started to work, the water-repellent paint enters described the by the pump housing One entrance, so that the water-repellent paint is sprayed into the wall by the spray head, thus to wall brush water-repellent paint, the present invention It is brushed using level and brushes two kinds of working methods vertically and effectively improve equipment to meet the use demand under varying environment Functionality and practicability.
The above, the specific embodiment only invented, but invent protection scope be not limited thereto, it is any without The change or replacement that creative work is expected are crossed, should all be covered within the protection scope of invention.Therefore, the protection scope of invention It should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of senior building engineering waterproofing construction method uses a kind of construction equipment, the construction equipment includes cabinet, It is characterized in that:It is provided with stir chamber in the cabinet, the stir chamber upper end wall is rotatably assorted the stirring for being connected with and extending downwardly Bar, the stirring rod outer surface is evenly distributed with several stirring blades, is provided with the first drive cavity below the stir chamber, described Stirring rod is downward through the stir chamber lower end wall and protrudes into first drive cavity, and the stirring rod lower end and described first passes Dynamic chamber lower end wall is rotatably assorted connection, and what the stirring rod outer surface was installed in first drive cavity first bores tooth Wheel, is provided with conversion chamber in the wall of first drive cavity left end, and the conversion is intracavitary to be slidably connected with conversion block, and described turn It changes in block and is provided with the perforative power cavity in left and right, be installed with first motor, first electricity above and below the power cavity between end wall Machine right end output shaft protrudes into the right first drive cavity, and the first motor right end output shaft outer surface has been connected by power second Bevel gear, the conversion chamber left are provided with and communicated with the second drive cavity, and first motor left end output shaft protrudes into described to the left Second drive cavity, the first motor left end output shaft outer surface have been connected by power third hand tap gear, second transmission Chamber upper end wall is rotatably assorted the first rotary shaft for being connected with and extending downwardly, and first rotary shaft outer surface is installed with the 4th cone tooth Wheel, the second drive cavity lower end wall are provided with and communicated with third drive cavity, and first rotary shaft extends downwardly into the third and passes Dynamic chamber, first rotary shaft lower end are rotatably assorted with the third drive cavity lower end wall and connect, the first rotary shaft appearance Face is installed with the first spur gear in the third drive cavity, and first spur gear left is engaged with the second spur gear, Second spur gear is rotatably assorted with the third drive cavity lower end wall by shaft and is connect, and second spur gear left is nibbled Conjunction has third spur gear, and the third spur gear inner surface is installed with the threaded rod extended up and down, the threaded rod lower end and institute It states third drive cavity lower end wall to be rotatably assorted connection, is provided with the first accommodating chamber in the third drive cavity upper end wall, described The lifting chamber of opening to the left is provided with and communicated with above one accommodating chamber, the threaded rod is upward through first accommodating chamber and protrudes into The lifting chamber, the threaded rod upper end are rotatably assorted with the lifting chamber upper end wall and connect, the threaded rod outer surface thread It is connected with threaded block, the threaded block and the lifting chamber are slidably connected, are provided with and communicated with below the conversion chamber Connecting cavity, the connecting cavity lower section are provided with and communicated with push chamber, are installed with the first electric pushrod, institute in the push chamber right end wall The push rod left end for stating the first electric pushrod has been connected by power pushing block, and the pushing block and the push chamber are slidably connected, described Pushing block upper surface is installed with the connecting rod upwardly extended, the connecting rod extend upwardly into the connecting cavity and under the conversion block End face is fixedly connected, and is installed with distance sensing device on the downside of the cabinet left side;
Described method includes following steps:
Before equipment operation, water-repellent paint is sent into the stir chamber by the adding mouth, is finished to water-repellent paint addition, First electric pushrod is started to work, and first electric pushrod drives the pushing block to move right, and the pushing block passes through institute Stating connecting rod drives the conversion block to move right, and engages to the first bevel gear and second bevel gear, described first is electronic Push rod stops working, and the first motor is started to work, and the first motor right end output shaft drives the second bevel gear to turn Dynamic, the second bevel gear drives the first bevel gear rotation, and the first bevel gear drives the stirring rod rotation, thus The water-repellent paint is stirred, is stirred evenly to the water-repellent paint, the first motor stops working, first electricity Dynamic push rod reverse operation, returns to initial position to the conversion block, first electric pushrod stops working;When needs level side When to brush water-repellent paint, the idler wheel drives whole equipment to move forward along the direction of wall to be brushed, to drive described turn Cylinder is bonded the wall rolls forward, while the pump housing is started to work, and the water-repellent paint passes through described in pump housing entrance First entrance, so that the water-repellent paint is sprayed to the wall by the spray head, thus to wall brush water-repellent paint;When need When wanting vertical direction brush water-repellent paint, second electric pushrod is started to work, and second electric pushrod drives the power Block moves up, and engages to the 5th bevel gear and the 6th bevel gear, and second electric pushrod stops working, and described second Motor is started to work, and second motor output shaft drives the 5th bevel gear to rotate, described in the 5th bevel gear drive The rotation of 6th bevel gear, the 6th bevel gear drives the second rotary shaft rotation, to second rotary shaft rotation 90 Degree, second motor stop working, and first electric pushrod is started to work, and first electric pushrod drives the pushing block It is moved to the left, is engaged to the third hand tap gear and the 4th bevel gear, first electric pushrod stops working, first electricity Machine is started to work, and first motor left end output shaft drives the third hand tap gear rotation, and the third hand tap gear drives institute The rotation of the 4th bevel gear is stated, the 4th bevel gear drives the first rotary shaft rotation, and first rotary shaft passes through described First spur gear, the second spur gear and third spur gear drive the threaded rod rotation, and the threaded rod drives the threaded block It moves down, while the pump housing is started to work, the water-repellent paint enters the first entrance by the pump housing, thus will The water-repellent paint sprays to the wall by the spray head, thus to wall brush water-repellent paint.
2. a kind of senior building engineering waterproofing construction method as described in claim 1, it is characterised in that:The threaded block left end Face is installed with the lifting arm extended to the left, and the lifting arm left end is installed with work box, is provided with working chamber in the work box, The second electric pushrod is installed in the working chamber lower end wall, the push rod upper end of second electric pushrod is connected by power dynamic Block, the power block and the working chamber are slidably connected, and are installed with the second motor in power block upper surface, and described the Two motor output shaft upper ends are connected by power the 5th bevel gear in the work box, setting in the wall of the working chamber left end There is the second accommodating chamber of connection exterior space, is rotatably assorted in second accommodating chamber by bearing and is connected with the of left and right extension Two rotary shafts, second rotary shaft protrude into the working chamber to the left, and second rotary shaft left end outer surface is installed with 6th bevel gear, second rotary shaft stretch out exterior space to the left, and the rotary shaft outer surface is symmetrical above and below to be installed with frame body, Turn to be installed with fixed link between upper and lower two frame bodies, the fixed rod outer surface, which is rotatably assorted, is connected with rotating cylinder, the work Make case upper surface and be installed with the support arm upwardly extended, is controlled in the support arm and be provided through the first cavity, described first Cavity left is provided with and communicated with first entrance, and the first entrance left is provided with and communicated with connecting tube, the support arm left side It is installed with first pipe, the second cavity is provided in the first pipe, first cavity is connected to second cavity, institute It states the second cavity left and is provided with and communicated with the spray head for being fixedly arranged on the first pipe left end.
3. a kind of senior building engineering waterproofing construction method as described in claim 1, it is characterised in that:The cabinet upper surface It is installed with the pump housing, the pump housing lower end surface is provided with second entrance, and the pump housing left side is provided with first outlet, and described first Outlet is connected with the connecting tube, is provided with and communicated with second pipe on the downside of the wall of the stir chamber left end, the second pipe and The second entrance is connected, and the stir chamber right end wall upper interior is provided with the adding mouth of connection exterior space, the case Body lower end surface bilateral symmetry is installed with supporting seat, and the supporting seat lower end is provided with idler wheel.
4. a kind of senior building engineering waterproofing construction method as described in claim 1, it is characterised in that:The distance perception should fill It sets including range sensor, range sensor, the range sensor left side setting is installed on the downside of the cabinet left side There is detecting head.
CN201810738061.6A 2018-07-06 2018-07-06 A kind of senior building engineering waterproofing construction method Withdrawn CN108894473A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810738061.6A CN108894473A (en) 2018-07-06 2018-07-06 A kind of senior building engineering waterproofing construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810738061.6A CN108894473A (en) 2018-07-06 2018-07-06 A kind of senior building engineering waterproofing construction method

Publications (1)

Publication Number Publication Date
CN108894473A true CN108894473A (en) 2018-11-27

Family

ID=64348431

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810738061.6A Withdrawn CN108894473A (en) 2018-07-06 2018-07-06 A kind of senior building engineering waterproofing construction method

Country Status (1)

Country Link
CN (1) CN108894473A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110394263A (en) * 2019-08-02 2019-11-01 嵊州航羽电子有限公司 A kind of insulated door insulating moulding coating automatic spraying equipment
CN110439229A (en) * 2019-08-22 2019-11-12 山东滕建建设集团有限公司 A kind of assembly wall spray-painting plant for building
CN112160560A (en) * 2020-11-16 2021-01-01 深圳市雯逸水晶有限公司 Even roll-coating formula painting device of wall for fitment
CN113123565A (en) * 2020-01-10 2021-07-16 广东博智林机器人有限公司 Putty coating device and robot

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110394263A (en) * 2019-08-02 2019-11-01 嵊州航羽电子有限公司 A kind of insulated door insulating moulding coating automatic spraying equipment
CN110394263B (en) * 2019-08-02 2020-11-20 泉州森泸玩具有限公司 Automatic thermal insulation coating spraying equipment for thermal insulation door
CN110439229A (en) * 2019-08-22 2019-11-12 山东滕建建设集团有限公司 A kind of assembly wall spray-painting plant for building
CN113123565A (en) * 2020-01-10 2021-07-16 广东博智林机器人有限公司 Putty coating device and robot
CN112160560A (en) * 2020-11-16 2021-01-01 深圳市雯逸水晶有限公司 Even roll-coating formula painting device of wall for fitment
CN112160560B (en) * 2020-11-16 2021-04-27 深圳中大建筑装饰有限公司 Even roll-coating formula painting device of wall for fitment

Similar Documents

Publication Publication Date Title
CN107630547B (en) A kind of wall plastering device with liquid self-feeding function
CN108894473A (en) A kind of senior building engineering waterproofing construction method
CN207484912U (en) A kind of wall plastering device with liquid self-feeding
CN108716270A (en) A kind of waterproof construction construction method
CN206026246U (en) Wall cleaning device
CN108858809A (en) A kind of building wall drilling equipment
CN208168277U (en) A kind of multi-functional painting device of indoor decoration
CN108356006A (en) A kind of rust removing device for steel tube
CN108094147A (en) A kind of Chinese garden planting fertilizer irrigation device
CN108252493A (en) A kind of construction effective wall plaster equipment
CN112024156A (en) Anticorrosive outer wall painting device of water conservancy pipeline
CN110125060A (en) A kind of cleaning device of technical machinery special for automatic
CN110107058A (en) A kind of indoor wall finishing fast spraying mopping device
CN208757439U (en) It is a kind of with the coating evenly mixing device for adding water charging function automatically
CN205146825U (en) Tub device
CN210613887U (en) Fine arts coating grinder
CN110871180A (en) Cleaning device for construction machinery
CN212790257U (en) Building engineering dust collector that environmental protection used
CN108868074A (en) A kind of novel building engineering waterproofing construction method
CN205659849U (en) Suspension type outer wall paint whitewashes device
CN214915148U (en) Mixing and stirring tank for reverse osmosis scale inhibitor production
CN110435004A (en) A kind of construction concrete batch plant
CN213557931U (en) Vertical rotary drum type flush coater is used in feed production
CN114319788A (en) Whitewash device for building
CN209953434U (en) Cleaning device of reaction kettle for chemical production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20181127

WW01 Invention patent application withdrawn after publication