CN108882296A - A kind of method and device handling message - Google Patents

A kind of method and device handling message Download PDF

Info

Publication number
CN108882296A
CN108882296A CN201810646268.0A CN201810646268A CN108882296A CN 108882296 A CN108882296 A CN 108882296A CN 201810646268 A CN201810646268 A CN 201810646268A CN 108882296 A CN108882296 A CN 108882296A
Authority
CN
China
Prior art keywords
interim
resource utilization
message
resource
preset
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810646268.0A
Other languages
Chinese (zh)
Other versions
CN108882296B (en
Inventor
夏添
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
New H3C Security Technologies Co Ltd
Original Assignee
New H3C Security Technologies Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by New H3C Security Technologies Co Ltd filed Critical New H3C Security Technologies Co Ltd
Priority to CN201810646268.0A priority Critical patent/CN108882296B/en
Publication of CN108882296A publication Critical patent/CN108882296A/en
Application granted granted Critical
Publication of CN108882296B publication Critical patent/CN108882296B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/0289Congestion control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/20Control channels or signalling for resource management
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/50Allocation or scheduling criteria for wireless resources
    • H04W72/535Allocation or scheduling criteria for wireless resources based on resource usage policies

Abstract

This application provides a kind of method and devices for handling message, it is related to field of communication technology, this method is applied to the management control plane CP in Broadband Remote Access Server BRAS, interim CP resource pool, at least one forwarding surface UP, interim CP resource pool and at least one static state CP for each UP distribution are additionally provided in BRAS, wherein, it include at least one interim CP in interim CP resource pool, this method includes:When detecting online request message of the first UP to the first CP transmission user terminal, judge whether the resource utilization of the first CP is greater than preset resource utilization threshold, if the resource utilization of the first CP is greater than preset resource utilization threshold, not used first interim CP is then determined in interim CP resource pool, and the first redirection message is sent to the first UP, the mark of the first interim CP is carried in first redirection message, so that the first UP sends online request message to the first interim CP.The utilization rate of Internet resources can be improved using the application.

Description

A kind of method and device handling message
Technical field
This application involves fields of communication technology, more particularly to a kind of method and device for handling message.
Background technique
With flourishing for mobile Internet, the quantity and portfolio of mobile subscriber surges.In order to promote BRAS The performance and capacity of (Broadband Remote Access Server, Broadband Remote Access Server), operator, which uses, to be turned The BRAS that separates with control plane leaven dough to handle and forward the message of mobile subscriber.Wherein, BRAS includes CP (Control Plane, control plane) and UP (User Plane, user face (alternatively referred to as forwarding surface)).In a user area, CP with RADIUS (Remote Authentication Dial In User Service, remote customer dialing authentication service) service The operation systems such as device, DHCP (Dynamic Host Configuration Protocol, dynamic host configuration protocol) server It is connected, the dialing message reported for receiving the UP in a certain region, and mobile subscriber is authenticated.After certification passes through, CP Forwarding-table item is issued to UP, so that UP is forwarded according to service message of the forwarding-table item to mobile subscriber.
Currently, usually there will be tidal effect in a communications system.Tidal effect referred in certain time, used with mobile The regular directional flow in family, the portfolio of mobile subscriber also flow therewith, so that some regions occur within certain time Bursty traffic leads to network congestion.Common tidal effect generally include the period migrate and happen suddenly flowing two kinds of situations.Period It migrates and refers to:Portfolio is periodically migrated between multiple regions, but total traffic kept stable.It is common in central quotient Business area (Central Business District, CBD), large-scale residential quarters, the dormitory area in campus network and teaching area etc.. For example, would generally be migrated between CBD and residential block between at work with non-working time, mobile subscriber.Burst flowing Refer to:Portfolio increases suddenly in a certain specific time period.It is common in the occasions such as large-scale assembly, concert, sports tournament.Example Such as, stadiums assemble a large amount of mobile subscribers within the time for holding competitive sports.
In order to cope with tidal effect, operator can be in network construction and planning, by the performance and capacity in each region It is designed according to traffic peak.For example, total user volume in region 1 and region 2 is 100, but in daytime, the user in region 1 Measuring peak value is 90;At night, the user volume peak value in region 2 is 90.Then operator can be by the use of the CP of corresponding region 1 and region 2 Family amount is set as 180.However, practical total user volume in region 1 and region 2 is 100, this will lead to the utilization rates of Internet resources compared with It is low.
Summary of the invention
The embodiment of the present application is designed to provide a kind of method and device for handling message, and Internet resources can be improved Utilization rate.Specific technical solution is as follows.
In a first aspect, providing a kind of method for handling message, the method is applied to Broadband Remote Access Server Interim CP resource pool, at least one forwarding surface UP are additionally provided in management control plane CP, the BRAS in BRAS and be every At least one static state CP of a UP distribution, wherein include at least one interim CP, the method packet in the interim CP resource pool It includes:
When detecting online request message of the first UP to the first CP transmission user terminal, the money of the first CP is judged Whether source utilization rate is greater than preset resource utilization threshold, and the first CP is that the management CP is that the first UP is distributed CP;
If the resource utilization of the first CP is greater than the preset resource utilization threshold, in the interim CP Not used first interim CP is determined in resource pool, and sends the first redirection message to the first UP, and described first resets The mark of the first interim CP is carried into message, so that the first UP sends the online request to the described first interim CP Message.
With reference to first aspect, in the first possible implementation of the first aspect, the method also includes:
If there are not used interim CP in the interim CP resource pool, execute described in the interim CP resource pool The step of middle determination not used first interim CP;
If not used interim CP is not present in the interim CP resource pool, in the CP distributed for the first UP It determines the 2nd minimum CP of resource utilization, sends the second redirection message, second redirection message to the first UP In carry the mark of the 2nd CP so that the first UP sends the online request message to the 2nd CP.
With reference to first aspect, in second of possible implementation of the first aspect, the method also includes:
If the resource utilization of the first CP is greater than preset resource utilization threshold, it is judged as the first UP Whether the resource utilization of other CP of distribution is greater than the preset resource utilization threshold;
The preset resource utilization threshold is all larger than if it is the resource utilization of other CP of the first UP distribution Value then executes the not used first interim CP step determining in the interim CP resource pool;
If it is there are resource utilizations to be less than the preset resource utilization in other CP of the first UP distribution The CP of threshold value then sends third redirection message to the first UP, carries the 3rd CP's in the third redirection message Mark, so that the first UP sends the online request message to the 3rd CP, the 3rd CP is for the first UP The minimum CP of resource utilization in other CP of distribution.
With reference to first aspect, in the third possible implementation of the first aspect, the method also includes:
If the corresponding user terminal of the first interim CP is offline, the described first interim CP is discharged;Alternatively,
User terminal is sent to the described first interim CP if the first UP is not detected in default aging duration Online request message then discharges the described first interim CP.
With reference to first aspect, described in the interim CP resource in the 4th kind of possible implementation of the first aspect After determining not used first interim CP in pond, the method also includes:
In the mapping table of preset UP and CP, the corresponding relationship of the first UP and the first interim CP are added List item.
With reference to first aspect, in the 5th kind of possible implementation of the first aspect, the method also includes:
When detecting that current time is in preset first time range, being not used in the interim CP resource pool Interim CP in, determine the interim CP of the first ratio, and the interim CP of first ratio is distributed into the first UP.
Second aspect, provides a kind of device for handling message, and described device is applied to Broadband Remote Access Server Interim CP resource pool, at least one forwarding surface UP are additionally provided in management control plane CP, the BRAS in BRAS and be every At least one static state CP of a UP distribution, wherein include at least one interim CP, described device packet in the interim CP resource pool It includes:
First judgment module, for when detect the first UP to the first CP send user terminal online request message when, Judge whether the resource utilization of the first CP is greater than preset resource utilization threshold, the first CP is the management CP For the CP of the first UP distribution;
First sending module, if the resource utilization for the first CP is greater than the preset resource utilization threshold Value then determines not used first interim CP in the interim CP resource pool, and sends first to the first UP and redirect Message carries the mark of the first interim CP in first redirection message, so that the first UP is interim to described first CP sends the online request message.
In conjunction with second aspect, in the first possible implementation of the second aspect, described device further includes:
First determining module, if in the interim CP resource pool there are not used interim CP, described in triggering First sending module executes described the step of not used first interim CP is determined in the interim CP resource pool;
Second sending module, if for not used interim CP to be not present in the interim CP resource pool, for institute It states and determines the 2nd minimum CP of resource utilization in the CP of the first UP distribution, send the second redirection message to the first UP, The mark of the 2nd CP is carried in second redirection message, so that the first UP is to described in the 2nd CP transmission Online request message.
In conjunction with second aspect, in second of possible implementation of the second aspect, described device further includes:
Second judgment module, if the resource utilization for the first CP is greater than preset resource utilization threshold, Then it is judged as whether the resource utilization of other CP of the first UP distribution is greater than the preset resource utilization threshold;
Second determining module, the resource utilization of other CP for distributing if it is the first UP are all larger than described pre- If resource utilization threshold, then triggering first sending module and executing the determination in the interim CP resource pool does not make First interim CP step;
Third sending module, in other CP for being distributed if it is the first UP there are resource utilization be less than it is described The CP of preset resource utilization threshold then sends third redirection message, the third redirection message to the first UP In carry the mark of the 3rd CP so that the first UP sends the online request message, the third to the 3rd CP CP is the CP that resource utilization is minimum in other CP for the first UP distribution.
In conjunction with second aspect, in the third possible implementation of the second aspect, described device further includes:
First release module discharges described the if offline for the corresponding user terminal of the described first interim CP One interim CP;Alternatively,
Second release module, if interim to described first for the first UP to be not detected in default aging duration CP sends the online request message of user terminal, then discharges the described first interim CP.
In conjunction with second aspect, in the 4th kind of possible implementation of the second aspect, described device further includes:
Adding module is faced in the mapping table of preset UP and CP, adding the first UP and described first When CP corresponding relationship list item.
In conjunction with second aspect, in the 5th kind of possible implementation of the second aspect, described device further includes:
Distribution module, for being provided in the interim CP when detecting that current time is in preset first time range In not used interim CP in the pond of source, the interim CP of the first ratio is determined, and the interim CP of first ratio is distributed to First UP.
The third aspect provides a kind of message processor, including processor, communication interface, memory and communication bus, Wherein, processor, communication interface, memory complete mutual communication by communication bus;
Memory, for storing computer program;
Processor when for executing the program stored on memory, realizes method and step described in first aspect.
Fourth aspect provides a kind of machine readable storage medium, is stored with machine-executable instruction, by processor tune When with executing, the machine-executable instruction promotes the processor:Realize method and step described in first aspect.
5th aspect, provides a kind of computer program product comprising instruction, when run on a computer, so that The method that computer executes any of the above-described processing message.
The embodiment of the present application provides a kind of method for handling message, and in this method, interim CP resource is provided in BRAS Pond includes that at least one is capable of the interim CP of dynamic dispatching in the interim CP resource pool.When detecting that the first UP sends out to the first CP When sending the online request message of user terminal, judge whether the resource utilization of the first CP is greater than preset resource utilization threshold Value, if the resource utilization of the first CP is greater than preset resource utilization threshold, determination does not make in interim CP resource pool First interim CP, and the first redirection message is sent to the first UP, the first interim CP is carried in the first redirection message Mark so that the first UP sends online request message to the first interim CP.In this way, first can not be handled when the first CP overloads When the online request message that UP is sent, by being handled for not used first interim CP in the first UP distribution temporary resource pond Line request message.Can solve tide effect without the traffic peak planned network according to each region based on this programme Caused by answering while network congestion problem, the utilization rate of Internet resources is improved.
Detailed description of the invention
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of application for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is system framework figure provided by the embodiments of the present application;
Fig. 2 is a kind of flow chart of method for handling message provided by the embodiments of the present application;
Fig. 3 is a kind of exemplary flow chart of method for handling message provided by the embodiments of the present application;
Fig. 4 is a kind of structural schematic diagram of device for handling message provided by the embodiments of the present application;
Fig. 5 is a kind of structural schematic diagram of device for handling message provided by the embodiments of the present application;
Fig. 6 is a kind of structural schematic diagram of device for handling message provided by the embodiments of the present application;
Fig. 7 is a kind of structural schematic diagram of device for handling message provided by the embodiments of the present application;
Fig. 8 is a kind of structural schematic diagram of device for handling message provided by the embodiments of the present application;
Fig. 9 is a kind of structural schematic diagram of device for handling message provided by the embodiments of the present application;
Figure 10 is the structural schematic diagram of management CP provided by the embodiments of the present application.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present application, technical solutions in the embodiments of the present application carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of embodiments of the present application, instead of all the embodiments.It is based on Embodiment in the application, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall in the protection scope of this application.
The embodiment of the present application provides a kind of method for handling message, and this method can be applied to the management CP in BRAS. BRAS includes CP and at least one UP.In the embodiment of the present invention, the CP in BRAS can be divided into multiple virtual CP (alternatively referred to as Virtual BRAS).Multiple virtual CP can be divided into static CP, interim CP and management CP.Wherein, static CP is fixed allocation to a certain UP Virtual CP;Interim CP is to be allocated temporarily to the virtual CP that UP handles online request message when the corresponding virtual CP overload of UP; CP is managed for the resource utilization according to the corresponding each virtual CP of UP, it is determined whether distribute interim CP for UP.
Fig. 1 is system framework figure provided by the embodiments of the present application, as shown in Figure 1, the system may include BRAS, user's end End 1 and user terminal 2.BRAS may include the corresponding static state CP2 of corresponding static state CP1, the UP2 of management CP, UP1, UP2, UP1 and Interim CP resource pool.It wherein, include interim CP1 and interim CP2 in interim CP resource pool.User terminal 1 and user terminal 2 are distinguished It is connected with UP1, UP2, UP1, UP2, static state CP1, static state CP2, interim CP1, interim CP2 are connected with management CP, and UP1 is for handling The message of user terminal in region 1, message of the UP2 for user terminal in processing region 2.When management CP detects UP1 to quiet When state CP1 sends the online request message of user terminal 1, it can be determined that it is preset whether the resource utilization of static CP1 is greater than Resource utilization threshold.If the resource utilization of static state CP1 is greater than preset resource utilization threshold, CP is managed interim Not used interim CP1 is determined in CP resource pool, and sends the first redirection message to UP1.Wherein, in the first redirection message Carry the mark of interim CP1.UP1 receives the first redirection message, the online request message for then sending user terminal 1 It is forwarded to interim CP1.
It is detailed to a kind of method progress for handling message provided by the embodiments of the present application below in conjunction with specific embodiment Explanation, as shown in Fig. 2, specific step is as follows.
Step 201, when detecting online request message of the first UP to the first CP transmission user terminal, judge the first CP Resource utilization whether be greater than preset resource utilization threshold.
Wherein, the first CP is to manage the CP that CP is the first UP distribution.
In an implementation, when user terminal needs to be linked into network, user terminal can be to the UP in its affiliated area (i.e. First UP) send online request message.It, can be online by this after first UP receives the online request message of user terminal transmission Request message is forwarded to the CP (i.e. the first CP) of currently processed online request message.
Wherein, the first CP can be the static CP that management CP is the first UP distribution, be also possible to manage CP for the first UP points The interim CP matched.For example, if the resource utilization that management CP is the first static state CP of the first UP distribution is not more than preset resource Using threshold value, then when the first UP receives the online request message of user terminal transmission, online request message is sent to First static state CP, the first static state CP are CP, i.e. the first CP of currently processed online request message, and managing CP at this time is the first UP The CP of distribution is the first static state CP.If the resource utilization for managing the first static state CP that CP is the first UP distribution is greater than preset money Source utilization rate threshold value then manages CP for interim CP1 and distributes to the first UP, at this point, including in CP of the management CP for the first UP distribution First static state CP and interim CP1 reports online request when the first UP receives the online request message of user terminal transmission Text is sent to interim CP1, which is CP, i.e. the first CP of currently processed online request message, and managing CP at this time is first The CP of UP distribution is the first static state CP and interim CP1.
Management CP in resource utilization threshold can be stored in advance, the resource utilization threshold can by technical staff according to Experience is configured.For example, the resource utilization threshold of CP can be arranged by way of order in technical staff in management CP It is 80%.Wherein, command format can be:vbras resource-limit80.Managing CP can be with the first UP of real-time detection The no online request message that user terminal is sent to the first CP, when management CP detects that the first UP sends user terminal to the first CP Online request message when, judge whether the resource utilization of the first CP is greater than or equal to preset resource utilization threshold.Such as Fruit is then to illustrate the first CP overload, can not handle the online request message, and management CP executes step 202.Otherwise, illustrate first CP does not overload, can handle the online request message.Wherein, the resource of the first CP may include the memory of the first CP, centre Managing device (Central Processing Unit, CPU) etc. influences the resource of the first CP treatment effeciency.
Step 202, if the resource utilization of the first CP is greater than preset resource utilization threshold, in interim CP resource Not used first interim CP is determined in pond, and sends the first redirection message to the first UP, is carried in the first redirection message There is the mark of the first interim CP, so that the first UP sends online request message to the first interim CP.
In an implementation, if the resource utilization of the first CP is greater than or equal to preset resource utilization threshold, CP is managed The interim CP being not used by (the i.e. first interim CP) can be randomly choosed in interim CP resource pool handles online request report Text, and the first redirection message is sent to the first UP.Wherein, the mark of the first interim CP can be carried in the first redirection message Know.CP is managed in interim CP resource pool after selected first interim CP, it can be by the corresponding relationship of the first UP and the first interim CP It stores into the mapping table of UP and CP, to prevent follow-up management CP from the first interim CP is distributed to other UP.Correspondingly, pipe When reason CP selects interim CP in interim CP resource pool, it can also determine that is be not used by faces according to the mapping table of UP and CP When CP.
After first UP receives the first redirection message, the first interim CP can be set to processing access request message CP, it is subsequent, when the first UP receives the online request message of user terminal transmission, online request message can be forwarded to the One interim CP.First interim CP is according to online request message to certificate server (such as AAA (AuthenticationAuthorizationAccounting, verifying authorization book keeping operation) server) send certification request.Wherein, The corresponding authentication information of user terminal is carried in certification request.If certification passes through, the first interim CP can pass through the first UP It notifies user terminal online, and access control is carried out to user terminal, meanwhile, certificate server can open the user terminal The operation such as charging.After user terminal is online, the first interim CP can also generate user management list item, and be sent to the first UP.The After one UP receives user management list item, hardware forwarding table item can be generated according to user management list item.It is subsequent, when the first UP connects When receiving the service message of user terminal transmission, the service message can be forwarded according to hardware forwarding table item.
It should be noted that if user terminal is that dynamic subscriber can after the first interim CP receives online request message To parse to online request message, the user terminal informations such as the physical location of user terminal are obtained.Then, the first interim CP The corresponding authentication information (such as username and password) of user terminal can be generated according to user terminal information, and to authentication service Device sends certification request.Wherein, the corresponding authentication information of user terminal can be carried in the certification request.
If user terminal is static subscriber, after the first interim CP receives online request message, available user is whole Corresponding preconfigured authentication information is held, and sends certification request to certificate server.Wherein, it can be taken in the certification request With the corresponding authentication information of user terminal.
The method of processing message provided by the present application turns to introduce interim CP resource pool in control separation networking in BRAS, can It realizes that BARS system according to network service dynamic change dynamic adaptation resource, effectively copes with mobile network's tidal effect, realizes Distribution according to need promotes resource utilization, and intelligence is coped with a large amount of network service bursts or migrated, and mitigates the same of operator's networking cost When construct high-efficiency network.
Optionally, management CP can first judge in interim CP resource pool with the presence or absence of the interim CP not used by other UP. Then, corresponding step is executed further according to judging result, concrete processing procedure is as follows.
Judging result one executes if there are not used interim CP in interim CP resource pool in interim CP resource pool The step of middle determination not used first interim CP.
In an implementation, if there is the interim CP not used by other UP in interim CP resource pool, managing CP can be Not used first interim CP is determined in interim CP resource pool, and concrete processing procedure is detailed in step 202, and details are not described herein again.
It optionally, can be preset after management CP determines not used first interim CP in interim CP resource pool In the mapping table of UP and CP, the list item of the corresponding relationship of the first UP and the first interim CP is added.
It in an implementation, can be by first after managing CP determining not used first interim CP in interim CP resource pool The corresponding relationship of the interim CP of UP and first is added in the mapping table of preset UP and CP.Managing CP can be with real-time detection For the resource utilization of the CP of the first UP distribution, and the resource utilization of the CP of distribution is stored in the mapping table of UP and CP In.The mapping table can be as shown in Table 1.
Table one
Judging result two, if not used interim CP is not present in interim CP resource pool, what is distributed for the first UP The 2nd minimum CP of resource utilization is determined in CP, is sent the second redirection message to the first UP, is taken in the second redirection message Mark with the 2nd CP, so that the first UP sends online request message to the 2nd CP.
In an implementation, if there is no the interim CP not used by other UP in interim CP resource pool, managing CP can be with The minimum CP (i.e. the 2nd CP) of resource utilization is selected to handle online request message in the CP distributed for the first UP, and to first UP sends the second redirection message.Wherein, the mark of the 2nd CP can be carried in the second redirection message.In this way, the first UP After receiving the second redirection message, the 2nd CP can be set to the CP of processing access request message, subsequent, the first UP is received After the online request message sent to user terminal, online request message can be forwarded to the 2nd CP.
It optionally, can be into if managing CP if the resource utilization of the first CP is greater than preset resource utilization threshold One step is judged as whether the resource utilization of other CP of the first UP distribution is all larger than preset resource utilization threshold.If it is The resource utilization of other CP of the first UP distribution is all larger than preset resource utilization threshold, then executes in interim CP resource pool The interim CP step of middle determination not used first.It is preset if it is being less than in other CP of the first UP distribution there are resource utilization Resource utilization threshold CP, then send third redirection message to the first UP, carry third in third redirection message The mark of CP, so that the first UP sends online request message to the 3rd CP, the 3rd CP is provided in other CP distributed for the first UP The minimum CP of source utilization rate.
In an implementation, preset resource utilization threshold is all larger than if it is the resource utilization of other CP of the first UP distribution Value, then explanation is that other CP of the first UP distribution can not handle online request message, and management CP can be in interim CP resource pool The interim CP of middle determination not used first, concrete processing procedure are detailed in step 202, and details are not described herein again.
CP in other CP distributed if it is the first UP there are resource utilization less than preset resource utilization threshold, Then explanation is the presence of the CP that can handle online request message in other CP of the first UP distribution.Correspondingly, management CP can be Online request message is handled for the minimum CP (i.e. the 3rd CP) of selection resource utilization in other CP of the first UP distribution, and to the One UP sends third redirection message.Wherein, the mark of the 3rd CP can be carried in third redirection message.In this way, first After UP receives third redirection message, the 3rd CP can be set to the CP of processing access request message, subsequent, the first UP connects After the online request message for receiving user terminal transmission, online request message can be forwarded to the 3rd CP.For the first UP distribution Other CP may include manage CP be the first UP distribution static CP, can also include management CP be the first UP distribution it is interim CP。
Optionally, management CP can also discharge the first interim CP when the first interim CP meets preset condition, specific to locate Reason mode can be as follows.
Mode one discharges the first interim CP if the corresponding user terminal of the first interim CP is offline.
In an implementation, if the user terminal accessed on the first interim CP is all offline, illustrate that the first interim CP is in Idle state, at this point, management CP can discharge the first interim CP, so that the first interim CP is distributed to others by follow-up management CP UP is used.
Mode two sends the upper of user terminal to the first interim CP if the first UP is not detected in default aging duration Line request message then discharges the first interim CP, uses so that the first interim CP is distributed to other UP by follow-up management CP.
In an implementation, the corresponding aging duration of CP that promising first UP distribution can be stored in advance in CP is managed.The aging Duration can be rule of thumb configured by technical staff.If management CP does not connect in the corresponding aging duration of the first interim CP The online request message that the first UP sends user terminal to the first interim CP is received, then illustrates that the first interim CP is in idle shape State makes at this point, management CP can discharge the first interim CP so that the first interim CP is distributed to other UP by follow-up management CP With.For example, as shown in Table 2, when the first interim CP corresponding aging, is 20 hours a length of, if management CP was at continuous 20 hours It does not receive the online request message that the first UP sends user terminal to the first interim CP inside, then discharges the first interim CP.
Table two
UP title Static CP/ resource utilization Interim CP/ resource utilization Aging duration
First UP First static state CP/80% First interim CP/40% 20 hours
2nd UP Second static state CP/60% --- ---
It should be noted that if the first interim CP is currently processed online request message in the CP for the first UP distribution CP then manages CP after discharging the first interim CP.Management CP can select resource utilization most in the CP distributed for the first UP Low CP (i.e. the 4th CP) handles online request message, and sends the 4th redirection message to the first UP.Wherein, it the 4th redirects The mark of the 4th CP can be carried in message.In this way, the 4th CP can be set after the first UP receives the 4th redirection message It is set to the CP of processing access request message, it is subsequent, after the first UP receives the online request message of user terminal transmission, it can incite somebody to action Online request message is forwarded to the 4th CP.
Optionally, management CP can be that the first UP distributes interim CP according to current time.Concrete processing procedure is as follows.Work as inspection When measuring current time and being in preset first time range, in the not used interim CP in interim CP resource pool, determine The interim CP of first ratio, and the interim CP of the first ratio is distributed into the first UP.
In an implementation, the corresponding time range of each UP and allocation proportion can be previously stored with by managing in CP.The time model Enclosing can be rule of thumb configured with allocation proportion by technical staff.When management CP detects that current time is in the first UP pairs When the first time range answered, in the interim CP that can not used by other UP in interim CP resource pool of management CP, the is determined The interim CP of one ratio, and the interim CP of the first ratio is distributed into the first UP.For example, the corresponding time range of the first UP is 9: 00 to 18:00, allocation proportion 80% includes 10 not used interim CP in interim CP resource pool, then when management CP detection 9 are in current time:00 to 18:When 00, management CP can select 8 interim CP to distribute to first in interim CP resource pool UP.When management CP detects current time first time end of extent (EOE), management CP discharges these interim CP.In this way, management CP It can be the first UP distribution first in the corresponding region of first time range according to the first time range belonging to current time The interim CP of ratio, to alleviate the flow pressure of the first UP.
It is similar, in the embodiment of the present application, can also on aaa server setup time range, and set each time The corresponding region of range.In this way, aaa server (can be described as the second time model according to the time range belonging to current time Enclose), the certification request that the CP in the corresponding region of the second time range of priority processing is sent, to further alleviate big flow Pressure.
The embodiment of the present application provides a kind of method for handling message, and in this method, interim CP resource is provided in BRAS Pond includes that at least one is capable of the interim CP of dynamic dispatching in the interim CP resource pool.When detecting that the first UP sends out to the first CP When sending the online request message of user terminal, judge whether the resource utilization of the first CP is greater than preset resource utilization threshold Value, if the resource utilization of the first CP is greater than preset resource utilization threshold, determination does not make in interim CP resource pool First interim CP, and the first redirection message is sent to the first UP, the first interim CP is carried in the first redirection message Mark so that the first UP sends online request message to the first interim CP.In this way, first can not be handled when the first CP overloads When the online request message that UP is sent, by being handled for not used first interim CP in the first UP distribution temporary resource pond Line request message.Can solve tide effect without the traffic peak planned network according to each region based on this programme Caused by answering while network congestion problem, the utilization rate of Internet resources is improved.
As shown in figure 3, specifically including following step for a kind of method example for handling message provided in an embodiment of the present invention Suddenly.
Step 301, management CP detects that the first UP sends the online request message of user terminal to the first CP.
Wherein, it is the CP that the first UP is currently distributed that the first CP, which is management CP, can be static CP, is also possible to interim CP.
Step 302, management CP judges whether the resource utilization of the first CP is greater than preset resource utilization threshold.
If the resource utilization of the first CP is greater than or equal to preset resource utilization threshold, 303 are thened follow the steps;Such as The resource utilization of the first CP of fruit is less than preset resource utilization threshold, thens follow the steps 314~315.
Step 303, management CP is judged as whether the resource utilization of other CP of the first UP distribution is greater than preset resource Utilization threshold.
Preset resource utilization threshold, step are all larger than if it is the resource utilization of other CP of the first UP distribution 304~310;If it is there are resource utilizations to be less than preset resource utilization threshold in other CP of the first UP distribution CP thens follow the steps 311~313.
Step 304, management CP judges in interim CP resource pool with the presence or absence of not used interim CP.
If thening follow the steps 305~307 there are not used interim CP in interim CP resource pool;If interim CP money Not used interim CP is not present in the pond of source, thens follow the steps 308~310.
Step 305, management CP determines not used first interim CP in interim CP resource pool, and the first interim CP is distributed The first redirection message is sent to the first UP, and to the first UP.
Wherein, the mark of the first interim CP is carried in the first redirection message.First UP receives the first redirection report The online request message that user terminal is sent is forwarded to the first interim CP then according to the mark of the first interim CP by text.
Step 306, the first interim CP generates user management list item.
Step 307, user management list item is sent to the first UP by the first interim CP, so that the first UP generates hardware forwarding table ?.
Step 308, management CP determination minimum the 2nd CP of resource utilization in the CP distributed for the first UP, and to first UP sends the second redirection message.
Wherein, the mark of the 2nd CP is carried in the second redirection message.First UP receives the second redirection message, so Afterwards according to the mark of the 2nd CP, the online request message that user terminal is sent is forwarded to the 2nd CP.
Step 309, the 2nd CP generates user management list item.
Step 310, user management list item is sent to the first UP by the 2nd CP, so that the first UP generates hardware forwarding table item.
Step 311, management CP the 3rd minimum CP of determining resource utilization in other CP distributed for the first UP, and to First UP sends third redirection message.
Wherein, the mark of the 3rd CP is carried in third redirection message.First UP receives third redirection message, so Afterwards according to the mark of the 3rd CP, the online request message that user terminal is sent is forwarded to the 3rd CP.
Step 312, the 3rd CP generates user management list item.
Step 313, user management list item is sent to the first UP by the 3rd CP, so that the first UP generates hardware forwarding table item.
Step 314, the first CP generates user management list item.
Step 315, user management list item is sent to the first UP by the first CP, so that the first UP generates hardware forwarding table item.
Based on the same technical idea, as shown in figure 4, the embodiment of the present application also provides a kind of device for handling message, Interim CP resource is additionally provided in management the control plane CP, BRAS that the device is applied in Broadband Remote Access Server BRAS Pond, at least one forwarding surface UP and at least one static state CP for each UP distribution, wherein include in interim CP resource pool At least one interim CP, the device include:
First judgment module 410, for working as the online request message for detecting the first UP to the first CP transmission user terminal When, judge whether the resource utilization of the first CP is greater than preset resource utilization threshold, the first CP is that management CP is the first UP The CP of distribution;
First sending module 420, if the resource utilization for the first CP is greater than preset resource utilization threshold, Not used first interim CP is determined in interim CP resource pool, and sends the first redirection message to the first UP, and first resets The mark of the first interim CP is carried into message, so that the first UP sends online request message to the first interim CP.
Optionally, as shown in figure 5, the device further includes:
First determining module 430, if for there are not used interim CP, the first hairs of triggering in interim CP resource pool Module 420 is sent to execute the step of determining not used first interim CP in interim CP resource pool;
Second sending module 440, if being first for not used interim CP to be not present in interim CP resource pool The 2nd minimum CP of resource utilization is determined in the CP of UP distribution, sends the second redirection message to the first UP, second redirects The mark of the 2nd CP is carried in message, so that the first UP sends online request message to the 2nd CP.
Optionally, as shown in fig. 6, the device further includes:
Second judgment module 450, if the resource utilization for the first CP is greater than preset resource utilization threshold, It is judged as whether the resource utilization of other CP of the first UP distribution is greater than preset resource utilization threshold;
Second determining module 460, the resource utilization of other CP for distributing if it is the first UP are all larger than preset Resource utilization threshold then triggers the execution of the first sending module 420 and determines that not used first is interim in interim CP resource pool CP step;
Third sending module 470, in other CP for being distributed if it is the first UP there are resource utilization be less than it is default Resource utilization threshold CP, then send third redirection message to the first UP, carry third in third redirection message The mark of CP, so that the first UP sends online request message to the 3rd CP, the 3rd CP is provided in other CP distributed for the first UP The minimum CP of source utilization rate.
Optionally, as shown in fig. 7, the device further includes:
First release module 480, if offline for the corresponding user terminal of the first interim CP, release first is interim CP;Alternatively,
Second release module 490, if for the first UP to be not detected in default aging duration to the first interim CP hair The online request message of user terminal is sent, then discharges the first interim CP.
Optionally, as shown in figure 8, the device further includes:
Adding module 4100, for adding the first UP and the first interim CP in the mapping table of preset UP and CP Corresponding relationship list item.
Optionally, as shown in figure 9, the device further includes:
Distribution module 4110, for being provided in interim CP when detecting that current time is in preset first time range In not used interim CP in the pond of source, the interim CP of the first ratio is determined, and the interim CP of the first ratio is distributed to first UP。
The embodiment of the present application provides a kind of device for handling message, and in the device, interim CP resource is provided in BRAS Pond includes that at least one is capable of the interim CP of dynamic dispatching in the interim CP resource pool.It is detected when by first judgment module 310 When sending the online request message of user terminal to the first CP to the first UP, it is pre- to judge whether the resource utilization of the first CP is greater than If resource utilization threshold, if the resource utilization of the first CP be greater than preset resource utilization threshold, pass through first Sending module 320 determines not used first interim CP in interim CP resource pool, and sends first to the first UP and redirect report Text carries the mark of the first interim CP in the first redirection message, so that the first UP sends online request to the first interim CP Message.In this way, when can not handle the online request message of the first UP transmission, passing through the first sending module 320 when the first CP overloads Not used first interim CP in temporary resource pond, which is distributed, for the first UP handles online request message.Based on this programme, it is not necessarily to According to the traffic peak planned network in each region, can solve the same of network congestion problem caused by tidal effect When, improve the utilization rate of Internet resources.
The embodiment of the present application also provides a kind of Broadband Remote Access Server BRAS, the BRAS setting management CP, BRAS In be additionally provided with interim CP resource pool, at least one forwarding surface UP and for each UP distribution at least one static state CP, In, it include at least one interim CP in interim CP resource pool, as shown in Figure 10, management CP includes processor 1001, communication interface 1002, memory 1003 and communication bus 1004, wherein processor 1001, communication interface 1002, memory 1003 pass through communication Bus 1004 completes mutual communication,
Memory 1003, for storing computer program;
Processor 1001, when for executing the program stored on memory 1003, so that management CP executes following step Suddenly, which includes:
When detecting online request message of the first UP to the first CP transmission user terminal, the money of the first CP is judged Whether source utilization rate is greater than preset resource utilization threshold, and the first CP is that the management CP is that the first UP is distributed CP;
If the resource utilization of the first CP is greater than the preset resource utilization threshold, in the interim CP Not used first interim CP is determined in resource pool, and sends the first redirection message to the first UP, and described first resets The mark of the first interim CP is carried into message, so that the first UP sends the online request to the described first interim CP Message.
The communication bus that above-mentioned electronic equipment is mentioned can be Peripheral Component Interconnect standard (Peripheral Component Interconnect, PCI) bus or expanding the industrial standard structure (Extended Industry Standard Architecture, EISA) bus etc..The communication bus can be divided into address bus, data/address bus, control bus etc..For just It is only indicated with a thick line in expression, figure, it is not intended that an only bus or a type of bus.
Communication interface is for the communication between above-mentioned electronic equipment and other equipment.
Memory may include random access memory (Random Access Memory, RAM), also may include non-easy The property lost memory (Non-Volatile Memory, NVM), for example, at least a magnetic disk storage.Optionally, memory may be used also To be storage device that at least one is located remotely from aforementioned processor.
Above-mentioned processor can be general processor, including central processing unit (Central Processing Unit, CPU), network processing unit (Network Processor, NP) etc.;It can also be digital signal processor (Digital Signal Processing, DSP), it is specific integrated circuit (Application Specific Integrated Circuit, ASIC), existing It is field programmable gate array (Field-Programmable Gate Array, FPGA) or other programmable logic device, discrete Door or transistor logic, discrete hardware components.
The embodiment of the present application provides a kind of management CP, and interim CP resource pool is provided in BRAS, the interim CP resource pool In include at least one be capable of the interim CP of dynamic dispatching.In management CP, when detect the first UP to the first CP send user When the online request message of terminal, judge whether the resource utilization of the first CP is greater than preset resource utilization threshold, if The resource utilization of first CP is greater than preset resource utilization threshold, then not used first is determined in interim CP resource pool Interim CP, and the first redirection message is sent to the first UP, the mark of the first interim CP is carried in the first redirection message, with The first UP is set to send online request message to the first interim CP.In this way, the upper of the first UP transmission can not be handled when the first CP overloads When line request message, reported by distributing not used first interim CP in temporary resource pond for the first UP to handle online request Text.It can solved caused by tidal effect based on this programme without the traffic peak planned network according to each region While network congestion problem, the utilization rate of Internet resources is improved.
In another embodiment provided by the invention, a kind of computer readable storage medium is additionally provided, which can It reads to be stored with computer program in storage medium, the computer program realizes any of the above-described processing message when being executed by processor Method the step of.
In another embodiment provided by the invention, a kind of computer program product comprising instruction is additionally provided, when it When running on computers, so that the method that computer executes any processing message in above-described embodiment.
In the above-described embodiments, can come wholly or partly by software, hardware, firmware or any combination thereof real It is existing.When implemented in software, it can entirely or partly realize in the form of a computer program product.The computer program Product includes one or more computer instructions.When loading on computers and executing the computer program instructions, all or It partly generates according to process or function described in the embodiment of the present invention.The computer can be general purpose computer, dedicated meter Calculation machine, computer network or other programmable devices.The computer instruction can store in computer readable storage medium In, or from a computer readable storage medium to the transmission of another computer readable storage medium, for example, the computer Instruction can pass through wired (such as coaxial cable, optical fiber, number from a web-site, computer, server or data center User's line (DSL)) or wireless (such as infrared, wireless, microwave etc.) mode to another web-site, computer, server or Data center is transmitted.The computer readable storage medium can be any usable medium that computer can access or It is comprising data storage devices such as one or more usable mediums integrated server, data centers.The usable medium can be with It is magnetic medium, (for example, floppy disk, hard disk, tape), optical medium (for example, DVD) or semiconductor medium (such as solid state hard disk Solid State Disk (SSD)) etc..
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
Each embodiment in this specification is all made of relevant mode and describes, same and similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for device reality For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method Part explanation.
The foregoing is merely the preferred embodiments of the application, are not intended to limit the protection scope of the application.It is all Any modification, equivalent replacement, improvement and so within spirit herein and principle are all contained in the protection scope of the application It is interior.

Claims (14)

1. a kind of method for handling message, which is characterized in that the method is applied in Broadband Remote Access Server BRAS Control plane CP is managed, interim CP resource pool, at least one forwarding surface UP are additionally provided in the BRAS and is distributed for each UP At least one static state CP, wherein in the interim CP resource pool include at least one interim CP, the method includes:
When detecting online request message of the first UP to the first CP transmission user terminal, the resource benefit of the first CP is judged Whether it is greater than preset resource utilization threshold with rate, the first CP is the CP that the management CP is the first UP distribution;
If the resource utilization of the first CP is greater than the preset resource utilization threshold, in the interim CP resource Not used first interim CP is determined in pond, and sends the first redirection message to the first UP, and described first redirects report The mark of the first interim CP is carried in text, so that the first UP sends the online request report to the described first interim CP Text.
2. the method according to claim 1, wherein the method also includes:
If there are not used interim CP in the interim CP resource pool, execute described true in the interim CP resource pool The step of fixed not used first interim CP;
If not used interim CP is not present in the interim CP resource pool, determined in the CP distributed for the first UP The 2nd minimum CP of resource utilization sends the second redirection message to the first UP, takes in second redirection message Mark with the 2nd CP, so that the first UP sends the online request message to the 2nd CP.
3. the method according to claim 1, wherein the method also includes:
If the resource utilization of the first CP is greater than preset resource utilization threshold, it is judged as the first UP distribution The resource utilization of other CP whether be greater than the preset resource utilization threshold;
It is all larger than the preset resource utilization threshold if it is the resource utilization of other CP of the first UP distribution, Execute the not used first interim CP step determining in the interim CP resource pool;
If it is there are resource utilizations to be less than the preset resource utilization threshold in other CP of the first UP distribution CP, then send third redirection message to the first UP, the mark of the 3rd CP carried in the third redirection message, So that the first UP sends the online request message to the 3rd CP, the 3rd CP is distributed for the first UP The minimum CP of resource utilization in other CP.
4. the method according to claim 1, wherein the method also includes:
If the corresponding user terminal of the first interim CP is offline, the described first interim CP is discharged;Alternatively,
The online of user terminal is sent to the described first interim CP if the first UP is not detected in default aging duration Request message then discharges the described first interim CP.
5. the method according to claim 1, wherein the determination in the interim CP resource pool is not used After first interim CP, the method also includes:
In the mapping table of preset UP and CP, the table of the corresponding relationship of the first UP and first interim CP is added ?.
6. the method according to claim 1, wherein the method also includes:
When detecting that current time is in preset first time range, not used in the interim CP resource pool faces When CP in, determine the interim CP of the first ratio, and the interim CP of first ratio is distributed into the first UP.
7. a kind of device for handling message, which is characterized in that described device is applied in Broadband Remote Access Server BRAS Control plane CP is managed, interim CP resource pool, at least one forwarding surface UP are additionally provided in the BRAS and is distributed for each UP At least one static state CP, wherein include at least one interim CP in the interim CP resource pool, described device includes:
First judgment module, for judging when detecting online request message of the first UP to the first CP transmission user terminal Whether the resource utilization of the first CP is greater than preset resource utilization threshold, and the first CP is that the management CP is institute State the CP of the first UP distribution;
First sending module, if the resource utilization for the first CP is greater than the preset resource utilization threshold, Not used first interim CP is then determined in the interim CP resource pool, and is sent first to the first UP and redirected report Text carries the mark of the first interim CP in first redirection message, so that the first UP is to the described first interim CP Send the online request message.
8. device according to claim 7, which is characterized in that described device further includes:
First determining module, if for, there are not used interim CP, triggering described first in the interim CP resource pool Sending module executes described the step of not used first interim CP is determined in the interim CP resource pool;
Second sending module, if being described for not used interim CP to be not present in the interim CP resource pool The 2nd minimum CP of resource utilization is determined in the CP of one UP distribution, sends the second redirection message to the first UP, it is described The mark of the 2nd CP is carried in second redirection message, so that the first UP is described online to the 2nd CP transmission Request message.
9. device according to claim 7, which is characterized in that described device further includes:
Second judgment module is sentenced if the resource utilization for the first CP is greater than preset resource utilization threshold Break as whether the resource utilization of other CP of the first UP distribution is greater than the preset resource utilization threshold;
Second determining module, the resource utilization of other CP for distributing if it is the first UP are all larger than described preset It is not used then to trigger the first sending module execution determination in the interim CP resource pool for resource utilization threshold First interim CP step;
Third sending module, in other CP for being distributed if it is the first UP there are resource utilization be less than it is described default Resource utilization threshold CP, then send third redirection message to the first UP, take in the third redirection message Mark with the 3rd CP, so that the first UP sends the online request message to the 3rd CP, the 3rd CP is For the CP that resource utilization in other CP of the first UP distribution is minimum.
10. device according to claim 7, which is characterized in that described device further includes:
If first release module discharges described first and faces offline for the corresponding user terminal of the described first interim CP When CP;Alternatively,
Second release module, if for the first UP to be not detected in default aging duration to the described first interim CP hair The online request message for sending user terminal then discharges the described first interim CP.
11. device according to claim 7, which is characterized in that described device further includes:
Adding module, for adding the first UP and first interim CP in the mapping table of preset UP and CP Corresponding relationship list item.
12. device according to claim 7, which is characterized in that described device further includes:
Distribution module, for when detecting that current time is in preset first time range, in the interim CP resource pool In not used interim CP in, determine the interim CP of the first ratio, and the interim CP of first ratio distributed to described First UP.
13. a kind of message processor, which is characterized in that including processor, communication interface, memory and communication bus, wherein Processor, communication interface, memory complete mutual communication by communication bus;
Memory, for storing computer program;
Processor when for executing the program stored on memory, realizes any method and step of claim 1-6.
14. a kind of machine readable storage medium, which is characterized in that be stored with machine-executable instruction, by processor call and When execution, the machine-executable instruction promotes the processor:Realize any method and step of claim 1-6.
CN201810646268.0A 2018-06-21 2018-06-21 Method and device for processing message Active CN108882296B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810646268.0A CN108882296B (en) 2018-06-21 2018-06-21 Method and device for processing message

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810646268.0A CN108882296B (en) 2018-06-21 2018-06-21 Method and device for processing message

Publications (2)

Publication Number Publication Date
CN108882296A true CN108882296A (en) 2018-11-23
CN108882296B CN108882296B (en) 2022-08-19

Family

ID=64340278

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810646268.0A Active CN108882296B (en) 2018-06-21 2018-06-21 Method and device for processing message

Country Status (1)

Country Link
CN (1) CN108882296B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111953571A (en) * 2020-07-29 2020-11-17 新华三技术有限公司 vBRAS, server and storage medium
WO2021129190A1 (en) * 2019-12-27 2021-07-01 中兴通讯股份有限公司 Forwarding method and device, and broadband remote access server forwarding plane

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060193249A1 (en) * 2005-02-28 2006-08-31 Network Equipment Technologies, Inc. Preservation of a PPP session in a redundant system
CN1972248A (en) * 2005-11-21 2007-05-30 阿尔卡特公司 Network node with control plane processor overload protection
CN106534376A (en) * 2016-12-29 2017-03-22 北京华为数字技术有限公司 User online load balancing method, apparatus and device
CN107769973A (en) * 2017-10-26 2018-03-06 新华三技术有限公司 A kind of message forwarding method and device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20060193249A1 (en) * 2005-02-28 2006-08-31 Network Equipment Technologies, Inc. Preservation of a PPP session in a redundant system
CN1972248A (en) * 2005-11-21 2007-05-30 阿尔卡特公司 Network node with control plane processor overload protection
US20070127491A1 (en) * 2005-11-21 2007-06-07 Alcatel Network node with control plane processor overload protection
CN106534376A (en) * 2016-12-29 2017-03-22 北京华为数字技术有限公司 User online load balancing method, apparatus and device
CN107769973A (en) * 2017-10-26 2018-03-06 新华三技术有限公司 A kind of message forwarding method and device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021129190A1 (en) * 2019-12-27 2021-07-01 中兴通讯股份有限公司 Forwarding method and device, and broadband remote access server forwarding plane
CN111953571A (en) * 2020-07-29 2020-11-17 新华三技术有限公司 vBRAS, server and storage medium
CN111953571B (en) * 2020-07-29 2022-10-21 新华三技术有限公司 vBRAS, server and storage medium

Also Published As

Publication number Publication date
CN108882296B (en) 2022-08-19

Similar Documents

Publication Publication Date Title
CN109660607A (en) A kind of service request distribution method, method of reseptance, device and server cluster
CN110830391A (en) Resource allocation method and device and cluster system
US7849505B2 (en) System and method of selecting a virtual private network access server
EP3128422A1 (en) Application scaling management method and apparatus
US11070586B2 (en) Cryptographic network protocol escalation path
JP6999051B2 (en) Communication systems, methods, servers and programs
EP3310093B1 (en) Traffic control method and apparatus
CN101873269B (en) Data retransmission device and method for distributing buffer to ports
US10425788B2 (en) Equal distance different members node placement method and system
CN111629046B (en) Edge computing cooperation method, edge computing equipment and terminal
CN106341270B (en) A kind of fault handling method and device
JP2022549055A (en) NODE RATE LIMITING METHOD, APPARATUS, ELECTRONIC DEVICE AND STORAGE MEDIUM
CN107547430B (en) Message sending method and device
CN108183950A (en) A kind of network equipment establishes the method and device of connection
WO2017035717A1 (en) Distributed denial of service attack detection method and associated device
CN106255154A (en) A kind of SiteServer LBS based on resource utilization and method
CN104539558A (en) Capacity-expansible IP telephone exchange blade mechanism frame and automatic capacity expansion method
CN108882296A (en) A kind of method and device handling message
US11811635B2 (en) Network traffic migration method and apparatus
CN109982034A (en) Access request processing method and processing device in video monitoring system
WO2013178108A1 (en) Rate control system and method based on wlan
CN108366133B (en) TS server scheduling method, scheduling device and storage medium
US9923794B2 (en) Method, apparatus, and system for identifying abnormal IP data stream
CN108696427A (en) A kind of data transmission method and device
Hou et al. Modeling and analysis of spectrum handoffs for real-time traffic in cognitive radio networks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant