CN108871128A CN201810722062.1A CN201810722062A CN108871128A CN 108871128 A CN108871128 A CN 108871128A CN 201810722062 A CN201810722062 A CN 201810722062A CN 108871128 A CN108871128 A CN 108871128A
Authority
CN
China
Prior art keywords
angle steel
tubular
power transmission
preformed particles
transmission tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810722062.1A
Other languages
Chinese (zh)
Other versions
CN108871128B (en
Inventor
钟明寿
龙源
纪冲
赵长啸
李兴华
高福银
陈德志
李本伟
殷勤
马华源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Monarch Explosion Engineering Technology Co Ltd
Army Engineering University of PLA
Original Assignee
Nanjing Monarch Explosion Engineering Technology Co Ltd
Army Engineering University of PLA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Monarch Explosion Engineering Technology Co Ltd, Army Engineering University of PLA filed Critical Nanjing Monarch Explosion Engineering Technology Co Ltd
Priority to CN201810722062.1A priority Critical patent/CN108871128B/en
Publication of CN108871128A publication Critical patent/CN108871128A/en
Application granted granted Critical
Publication of CN108871128B publication Critical patent/CN108871128B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/02Particular applications of blasting techniques for demolition of tall structures, e.g. chimney stacks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/348Arrangements for demolition towers or the like
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Abstract

The invention discloses a kind of methods using preformed particles medium explosion power transmission tower, include the following steps:(1)According to the structure of power transmission tower, angle steel is processed;(2)It is punched in angle steel suitable position;(3)Demolition set is transported at power transmission tower, the first angle steel and Bolted angle connection to be blasted form tubular structure, third angle steel are installed in the bottom of tubular structure, by the sealed bottom of tubular structure;(4)Connecting tube is put into tubular structure, pack is put into connecting tube, and preformed particles medium is filled outside connecting tube;(5)Tubular structure is sealed by third angle steel at the top of tubular structure;(6)Protection, evacuation, warning, can detonate after the completion of preparation before detonating.The present invention only needs that whole device is fixed into tubular structure using angle steel and bolt, and preformed particles medium and pack are placed in confined space, using the Incoercibility of preformed particles medium, greatly improves explosion extent of the destruction, can guarantee demolition effect.

Description

A method of utilizing preformed particles medium explosion power transmission tower
Technical field
The present invention relates to a kind of methods using preformed particles medium explosion power transmission tower, belong to explosion field.
Background technique
According to planning, following China 10-20 will build tens of extra-high voltage direct-current engineerings, gradually form extra-high voltage and hand over directly Serial-parallel power grid is flowed, is powered by extra-high voltage direct-current, AC system to central and east load center.To alleviate multi-infeed HVDC system face Receiving end network voltage reactive power support scarce capacity, the transmitting system faced intensively leads to problems such as short circuit current get over line, extra-high voltage point Layer direct current becomes new direct current access module.Compared with conventional extra-high voltage direct-current, the main distinction is the high-end change of current of inverter side Change, low side change of current change are respectively connected to 500kV, 1000kV power grid, and alternating current filter and reactive power compensator are also respectively connected to 500kV, 1000kV power grid.
But when building UHV transmission tower, most of old steel tower and newly-built new steel tower are on same path, it is necessary to It just can be carried out construction after former route grounded-line, steel tower are removed.Angle steel an iron rake with three to six teeth dismounting in China's still belongs to the primary stage, needs to pass through Worker removes, and large labor intensity, working efficiency are low, and risk is high.It, can not be by punching explosion, only in angle steel an iron rake with three to six teeth Energy dobie, a big chunk energy are dispersed into air, and demolition effect is poor.Since power transmission tower is located at mountain area, without abundance Electric power, scene not can be carried out welding, cannot large batch of shipped material moreover, traffic of mountain area is inconvenient.
Summary of the invention
Goal of the invention:In order to overcome the deficiencies in the prior art, the present invention provides a kind of utilization preformed particles medium The method of explosion power transmission tower, it is only necessary to whole device is fixed into tubular structure using angle steel and bolt, put in confined space It is equipped with preformed particles medium and pack, using the Incoercibility of preformed particles medium, greatly improves explosion extent of the destruction, It can guarantee demolition effect.
Technical solution:In order to solve the above technical problems, the method for the invention using preformed particles medium explosion power transmission tower, Include the following steps:
(1) according to the structure of power transmission tower, the first angle steel, the second angle steel, third angle steel and the fourth angle of suitable dimension are processed Fourth angle steel is welded on the both ends on the inside of the first angle steel by steel;
(2) it is punched in the first angle steel, the second angle steel, third angle steel and fourth angle steel suitable position, prepares preformed particles and be situated between Matter, pack, Nonel detonator, connecting tube;
(3) demolition set is transported at power transmission tower, the first angle steel is formed by the second angle steel and Bolted angle connection to be blasted Tubular structure installs third angle steel in the bottom of tubular structure, and third angle steel is connected by bolt and the first angle steel and fourth angle steel It connects, by the sealed bottom of tubular structure;
(4) connecting tube is put into tubular structure, pack is put into connecting tube, and pack passes through stemming in connecting tube Fixed, pack is drawn out to outside tubular structure by Nonel detonator, and preformed particles medium is filled outside connecting tube, until prefabricated Slightly below the first angle steel upper end opening height after the completion of granule medium natural subsidence;
(5) tubular structure is sealed by third angle steel at the top of tubular structure, third angle steel and the first angle steel and the 4th Angle steel is bolted;
(6) it protects, evacuate, warning, can detonate after the completion of preparation before detonating.
Preferably, being machined with waist type groove on the third angle steel.
Preferably, the pack is rock emulsion explosive in the step (2), it is easier to obtain compared with control explosive.
Preferably, in the step (4), the interval 10-20cm of adjacent pack in the connecting tube, same amount of fried Dose more makes full use of explosive acting ability.
Beneficial effect:Method using preformed particles medium explosion power transmission tower of the invention, it is only necessary to utilize angle steel and spiral shell Whole device is fixed into tubular structure by bolt, and preformed particles medium and pack are placed in confined space, utilizes preformed particles The Incoercibility of medium greatly improves explosion extent of the destruction, can guarantee demolition effect;And concrete block is compared, Preformed particles medium is more conducive to transport, the explosion of the more suitable power transmission tower for having inconvenient traffic.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Fig. 2 is the cross-sectional view of Fig. 1.
Specific embodiment
The present invention will be further explained with reference to the accompanying drawing.
As depicted in figs. 1 and 2, the blasting method of the device of the invention using preformed particles medium explosion power transmission tower, packet Include following steps:
(1) as needed, the first angle steel 1, the second angle steel 3, third angle steel 4 and the fourth angle steel 5 of suitable dimension are processed, it will Fourth angle steel 5 is welded on the both ends of 1 inside of the first angle steel;
(2) it is punched in the first angle steel 1, the second angle steel 3, third angle steel 4 and 5 suitable position of fourth angle steel, prepares prefabricated Granule medium 2, pack 7, Nonel detonator, connecting tube;
(3) demolition set being transported at power transmission tower, the first angle steel 1 is connect by the second angle steel 3 with angle steel 6 to be blasted, Tubular structure is formed, third angle steel 4 is installed in the bottom of tubular structure, third angle steel 4 passes through bolt and the first angle steel 1 and the 4th Angle steel 5 connects, by the sealed bottom of tubular structure;
(4) connecting tube is put into tubular structure, pack 7 is put into connecting tube, and pack 7 can pass through in connecting tube Stemming is fixed, and pack 7 is drawn out to outside tubular structure by Nonel detonator, and preformed particles medium 2 is filled outside connecting tube, until Slightly below the first angle steel upper end opening height after the completion of 2 natural subsidence of preformed particles medium;
(5) tubular structure is sealed by third angle steel 4 at the top of tubular structure, third angle steel 4 and the first angle steel 1 and Four angle steel 5 are bolted;
(6) it protects, evacuate, warning, can detonate after the completion of preparation before detonating.
It is integral that the present invention utilizes the second angle steel 3 to connect the first angle steel 1 with angle steel 6 to be blasted, in the company of two angle steel Connect that place is fixed by the second angle steel 3, can suitable various angle angle steel 6 to be blasted explosion, the angle steel to be blasted 6 of various angles First angle steel 1 can be connect to integral, formation confined space by the second angle steel 3 with angle steel 6 to be blasted.
In the present invention, preformed particles medium 2 is preferably sand medium, and the partial size of sand medium is 0.25-0.35mm, connecting tube Preferably pvc pipe.On the outside of dismounting angle steel to be blasted every 5cm be cut into horizontal and vertical pre- joint-cutting (long 40mm, it is wide 5mm), pre- joint-cutting substantially increases demolition effect by glue sealing, pre- joint-cutting.Second angle steel select thickness be at least twice to The angle steel of explosion angle steel thickness improves demolition effect.

Claims (4)

1. a kind of method using preformed particles medium explosion power transmission tower, it is characterised in that:Include the following steps:
(1)According to the structure of power transmission tower, the first angle steel, the second angle steel, third angle steel and the fourth angle steel of suitable dimension are processed, it will Fourth angle steel is welded on the both ends on the inside of the first angle steel;
(2)It is punched in the first angle steel, the second angle steel, third angle steel and fourth angle steel suitable position, prepares preformed particles medium, medicine Packet, Nonel detonator, connecting tube;
(3)Demolition set is transported at power transmission tower, the first angle steel forms tubular by the second angle steel and Bolted angle connection to be blasted Structure installs third angle steel in the bottom of tubular structure, and third angle steel is connect by bolt with the first angle steel and fourth angle steel, will The sealed bottom of tubular structure;
(4)Connecting tube is put into tubular structure, pack is put into connecting tube, and pack is solid by stemming in connecting tube Fixed, pack is drawn out to outside tubular structure by Nonel detonator, and preformed particles medium is filled outside connecting tube, until preformed particles Slightly below the first angle steel upper end opening height after the completion of medium natural subsidence;
(5)Tubular structure is sealed by third angle steel at the top of tubular structure, third angle steel and the first angle steel and fourth angle steel It is bolted;
(6)Protection, evacuation, warning, can detonate after the completion of preparation before detonating.
2. the method according to claim 1 using preformed particles medium explosion power transmission tower, it is characterised in that:The step (1)In, waist type groove is machined on the third angle steel.
3. the method according to claim 1 using preformed particles medium explosion power transmission tower, it is characterised in that:The step (2)In, the pack is rock emulsion explosive.
4. the method according to claim 1 using preformed particles medium explosion power transmission tower, it is characterised in that:The step (4)In, the interval 10-20cm of adjacent pack in the connecting tube.
CN201810722062.1A 2018-07-04 2018-07-04 Method for blasting power transmission tower by using prefabricated granular medium Active CN108871128B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810722062.1A CN108871128B (en) 2018-07-04 2018-07-04 Method for blasting power transmission tower by using prefabricated granular medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810722062.1A CN108871128B (en) 2018-07-04 2018-07-04 Method for blasting power transmission tower by using prefabricated granular medium

Publications (2)

Publication Number Publication Date
CN108871128A true CN108871128A (en) 2018-11-23
CN108871128B CN108871128B (en) 2020-03-10

Family

ID=64298969

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810722062.1A Active CN108871128B (en) 2018-07-04 2018-07-04 Method for blasting power transmission tower by using prefabricated granular medium

Country Status (1)

Country Link
CN (1) CN108871128B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100559936B1 (en) * 2005-01-04 2006-03-13 대원전기 주식회사 Blasting method for constructing base of power transmission tower
CN102953576A (en) * 2012-10-30 2013-03-06 中国电力科学研究院 Steel pipe and angle iron hybrid ultrahigh-voltage power transmission tower
CN103938888A (en) * 2014-05-14 2014-07-23 中钢集团武汉安全环保研究院有限公司 Blasting demolition method for cylindrical steel column structure buildings
CN104964624A (en) * 2015-07-01 2015-10-07 武汉宏伟交通爆破工程有限公司 Axial embedded blast hole of reinforced concrete beam and blasting demolition method
CN107328328A (en) * 2017-08-24 2017-11-07 徐州雷鸣民爆器材有限公司 The blasting method of steel construction

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100559936B1 (en) * 2005-01-04 2006-03-13 대원전기 주식회사 Blasting method for constructing base of power transmission tower
CN102953576A (en) * 2012-10-30 2013-03-06 中国电力科学研究院 Steel pipe and angle iron hybrid ultrahigh-voltage power transmission tower
CN103938888A (en) * 2014-05-14 2014-07-23 中钢集团武汉安全环保研究院有限公司 Blasting demolition method for cylindrical steel column structure buildings
CN104964624A (en) * 2015-07-01 2015-10-07 武汉宏伟交通爆破工程有限公司 Axial embedded blast hole of reinforced concrete beam and blasting demolition method
CN107328328A (en) * 2017-08-24 2017-11-07 徐州雷鸣民爆器材有限公司 The blasting method of steel construction

Also Published As

Publication number Publication date
CN108871128B (en) 2020-03-10

Similar Documents

Publication Publication Date Title
CN100390495C (en) Technology method of artificial frozen soil control blasting by deep surface forzen method
CN108871128A (en) A method of utilizing preformed particles medium explosion power transmission tower
CN108871126A (en) Utilize the device of preformed particles medium explosion power transmission tower
CN108931165A (en) A kind of hydraulic pressure demolition device of the steel angle structure power transmission tower positioned at mountain area
CN204881365U (en) Utmost point closely blasting construction damping gathers ability joint -cutting cartridge bag
CN108871125B (en) The hydraulic pressure demolition method of steel angle structure power transmission tower
CN108894535A (en) A kind of hydraulic pressure demolition device of steel angle structure power transmission tower
CN108952306A (en) A kind of hydraulic pressure demolition method of the steel angle structure power transmission tower positioned at mountain area
CN107843160A (en) A kind of initiation net of deep foundation pit reinforced concrete support beam demolition blasting
CN108871127A (en) A kind of demolition set of steel angle structure power transmission tower and blasting method
CN103374356A (en) Flue arch crown online opening pipe connecting method for smoke waste-heat utilization of coke oven
CN204291659U (en) A kind of outdoor cabinet
CN207686723U (en) Help mining structure in outdoor end side mine continuous miner end
CN206250573U (en) A kind of overvoltage lightning protection device
CN206722319U (en) Building waste clears device during skyscraper main structure construction
CN104215136B (en) Reinforced beam demolition blasting blast hole projectile filling, blocking and pressure slag structure and demolition blasting method
CN102748028B (en) Building block type constructing method of standardized prefabricated module of bottom structure of underground mining
CN206073827U (en) A kind of Pass blocks demolition set
CN104911632B (en) A kind of removable separating aluminium pot superstructure
CN104142101B (en) A kind of explosive composition device for surface mine directional cutting explosion
CN213140155U (en) Mining novel blank separating and conveying machine
CN210242588U (en) Novel energy-gathering pipe device
CN213040790U (en) Ground air heat source pump air conditioning recycling device
CN211783101U (en) Engineering blasting big gun hole charging equipment
CN212843221U (en) Presplitting blasting device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant