CN108867477A - A kind of municipal public engineering assembling guardrail - Google Patents

A kind of municipal public engineering assembling guardrail Download PDF

Info

Publication number
CN108867477A
CN108867477A CN201810885867.8A CN201810885867A CN108867477A CN 108867477 A CN108867477 A CN 108867477A CN 201810885867 A CN201810885867 A CN 201810885867A CN 108867477 A CN108867477 A CN 108867477A
Authority
CN
China
Prior art keywords
connection
column
hole
female
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810885867.8A
Other languages
Chinese (zh)
Inventor
段侠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gong Chunyan
Original Assignee
Hefei Xia Kang Agel Ecommerce Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hefei Xia Kang Agel Ecommerce Ltd filed Critical Hefei Xia Kang Agel Ecommerce Ltd
Priority to CN201810885867.8A priority Critical patent/CN108867477A/en
Publication of CN108867477A publication Critical patent/CN108867477A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/02Continuous barriers extending along roads or between traffic lanes
    • E01F15/04Continuous barriers extending along roads or between traffic lanes essentially made of longitudinal beams or rigid strips supported above ground at spaced points
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F15/00Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact
    • E01F15/14Safety arrangements for slowing, redirecting or stopping errant vehicles, e.g. guard posts or bollards; Arrangements for reducing damage to roadside structures due to vehicular impact specially adapted for local protection, e.g. for bridge piers, for traffic islands
    • E01F15/145Means for vehicle stopping using impact energy absorbers

Abstract

The invention discloses a kind of municipal public engineering assembling guardrails, including the first connection frame, the second connection frame, column, sliding slot, spring, slide and rubber base, first connection frame one end is equipped with the second connection frame, the first connection frame and second connection frame one end are mounted on column, two sides offer sliding slot inside first connecting column and the second connecting column, the sliding slot is internally provided with spring, the spring one end is equipped with slide, and described slide one end passes through sliding slot and connect with outer rubber seat;Entirely through being bolted, overall structure can be split guardrail of the present invention, be easily installed folding, convenient transportation, while can adjust angle according to actual road conditions;When in face of hitting, pass through spring and rubber base collective effect anticollision.

Description

A kind of municipal public engineering assembling guardrail
Technical field
The present invention relates to municipal public engineering field, specially a kind of municipal public engineering assembling guardrail.
Background technique
Municipal Infrastructure is the important guarantee for building city material progress and cultural and ideological progress.Municipal basis is set Apply be urban development basis, be constantly ensure urban sustainable development a critical facility, it mainly by traffic, Water supply, combustion gas, environmental sanitation, every engineering system such as power supply, communicates, takes precautions against natural calamities and constitute draining;Guardrail is mainly used for house, highway, quotient To the protection and protection of personal safety and installations and facilities in the occasions such as industry area, public place, guardrail everywhere may be used in we live See, for guardrail according to the difference of height, the price of every meter of length also can be different.
Existing municipal public engineering is generally entirety entirely through welded connecting with assembling guardrail, can not assemble and fold, Operated in whole handling process more complicated, be not easy to operate, and on slalom course can not according to the change of route angle into Row installation;Guardrail is subject to hit on road surface simultaneously, damages.
Summary of the invention
The purpose of the present invention is to provide a kind of municipal public engineering assembling guardrails, in order to overcome above-mentioned technology to ask Topic, entirely through being bolted, overall structure can be split guardrail, be easily installed folding, convenient transportation, while can be according to reality Border road conditions adjust angle;When in face of hitting, pass through spring and rubber base collective effect anticollision.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of municipal public engineering assembling guardrail, including first connection frame, second connection frame, column, sliding slot, spring, Slide and rubber base, first connection frame one end are equipped with the second connection frame, the first connection frame and the second connection frame one End is mounted on column;
It is described first connection frame include the first top beam, the first connecting column, the first bottom beam, first connection female end, first through hole, First connection nose and the second through-hole, first top beam bottom is equidistant to be installed by welding with the first connecting column, and described first connects It connects column bottom and is installed by welding with the first bottom beam, first top beam and first bottom beam one end are provided with the first connection female end, described First through hole is offered at the top of first connection female end, it is convex that first top beam and the first bottom beam other end are provided with the first connection End, the first connection nose top offer the second through-hole;
The second connection frame includes that the second top beam, the second connecting column, the second bottom beam, the second connection nose and third are logical Hole, second top beam bottom is equidistant to be installed by welding with the second connecting column, and second connection column bottom is installed by welding with the Two bottom beams, second top beam and the second bottom beam both ends are provided with the second connection nose, open at the top of the second connection nose Equipped with third through-hole;
The column includes pedestal, shaft, the second connection female end, fourth hole, third connection female end and fifth hole, institute It states the socket of shaft bottom and pedestal is installed, two sides are corresponding at the top of the shaft is equipped with the second connection female end second connection female end top Portion offers fourth hole, and the shaft two sides of the bottom are corresponding to be equipped with third connection female end, the third connection female end top Offer fifth hole;
Two sides offer sliding slot inside first connecting column and the second connecting column, and the sliding slot is internally provided with bullet Spring, the spring one end are equipped with slide, and described slide one end passes through sliding slot and connect with outer rubber seat.
As a further solution of the present invention:The first connection frame and the second connection frame are bolted, and described the One connection female end and the second connection nose pass through first through hole by bolt and connect with third through-hole.
As a further solution of the present invention:The the first connection nose and column of first top beam of the first connection frame Third connection female end passes through the second through-hole by bolt and connects with fifth hole, the first bottom beam of the first connection frame Second connection female end of the first connection nose and column passes through the second through-hole by bolt and connects with fourth hole.
As a further solution of the present invention:The the second connection nose and column of second top beam of the second connection frame Third connection female end passes through third through-hole by bolt and connects with fifth hole, and the second of the second bottom beam of the second connection frame Second connection female end of connection nose and column passes through third through-hole by bolt and connects with fourth hole.
As a further solution of the present invention:The column side connect frame with first and is bolted, and the column is another Side connect frame connection with second
Beneficial effects of the present invention:The present invention is designed by reasonable structure, and entirely through being bolted, first connects guardrail It connects frame and the second connection frame is bolted rear both ends and connects respectively with column, overall structure is easy for installation and removal, just It is folded in installation, convenient transportation, while mutual angle can be adjusted according to actual road conditions and matched with bending road surface, conveniently made With;It is effective by the first connecting column and the second connecting column contained spring and external rubber base collective effect when in face of hitting Absorption collide, play the role of anticollision.
Detailed description of the invention
In order to facilitate the understanding of those skilled in the art, the present invention will be further described below with reference to the drawings.
Fig. 1 is overall structure of the present invention.
Fig. 2 is that the present invention first connects mount structure schematic diagram.
Fig. 3 is that the present invention second connects mount structure schematic diagram.
Fig. 4 is pillar construction schematic diagram of the present invention.
Fig. 5 is the first connecting column of the invention and the second connecting column schematic diagram of internal structure.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with embodiment, it is clear that described reality Applying example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is general Logical technical staff all other embodiment obtained without creative efforts belongs to what the present invention protected Range.
As shown in Figs. 1-5, a kind of municipal public engineering assembling guardrail, including the first connection frame 1, second connect frame 2, stand Column 3, sliding slot 401, spring 402, slide 403 and rubber base 404, first connection 1 one end of frame are equipped with the second connection frame 2, and first Connection frame 1 and second connection 2 one end of frame are mounted on column 3, complete assembling convenient for overall co-ordination connection;
First connection frame 1 include the first top beam 101, the first connecting column 102, the first bottom beam 103, first connection female end 104, First through hole 105, first connects nose 106 and the second through-hole 107, and 101 bottom of the first top beam is equidistant to be installed by welding with first Connecting column 102,102 bottom of the first connecting column are installed by welding with the first bottom beam 103, guarantee that inter-module closely connects, convenient for improving Whole support strength, the first top beam 101 and 103 one end of the first bottom beam are provided with the first connection female end 104, the first connection female end 104 tops offer first through hole 105, and the first top beam 101 and 103 other end of the first bottom beam are provided with the first connection nose 106, The second through-hole 107 is offered at the top of first connection nose 106, by the mutual cooperation of connection female end and connection nose, is then led to It crosses and is bolted, facilitate installation and adjustment angle;
Second connection frame 2 includes the second top beam 201, the second connecting column 202, the second bottom beam 203, second connection nose 204 With third through-hole 205,201 bottom of the second top beam is equidistant to be installed by welding with the second connecting column 202,202 bottom of the second connecting column It is installed by welding with the second bottom beam 203, guarantees that inter-module closely connects, convenient for improving whole support strength, 201 He of the second top beam Second bottom beam, 203 both ends are provided with the second connection nose 204, offer third through-hole 205 at the top of the second connection nose 204, By the mutual cooperation of connection female end and connection nose, then it is bolted, facilitates installation and adjustment angle;
Column 3 includes pedestal 301, the connection of shaft 302, second female end 303, fourth hole 304, third connection female end 305 With fifth hole 306, the socket of 302 bottom of shaft is equipped with pedestal 301, and 302 top two sides of shaft correspondence is equipped with the second connection Female end 303 second connects and offers fourth hole 304 at the top of female end 303, and 302 two sides of the bottom of shaft are corresponding to be equipped with third connection Female end 305, third connect and offer fifth hole 306 at the top of female end 305, pass through connection female end and connect the phase interworking of nose It closes, is then bolted, facilitates installation and adjustment angle;
First connecting column 102 and 202 inside two sides of the second connecting column offer sliding slot 401, and sliding slot 401 is internally provided with Spring 402,402 one end of spring are equipped with slide 403, and 403 one end of slide passes through sliding slot 401 and connect with outer rubber seat 404, just In the compressed spring 402 when being subjected to impact and rubber base 404, is alleviated by elastic deformation and absorb impact, play the role of protecting against shock.
First connection frame 1 and the second connection frame 2 are bolted, the first connection female end 104 and the second connection nose 204 First through hole 105 is passed through by bolt and third through-hole 205 connects, and is convenient for assembly and connection, is facilitated practical operation, be conveniently adjusted angle Degree.
First connection nose 106 of the first top beam 101 of the first connection frame 1 connects female end 305 with the third of column 3 and passes through Bolt passes through the second through-hole 107 and fifth hole 306 connects, the first connection nose of the first bottom beam 103 of the first connection frame 1 106 and the second connection female end 303 of column 3 second through-hole 107 and fourth hole 304 passed through by bolt connect, convenient for assembling Connection, facilitates practical operation, is conveniently adjusted angle.
Second connection nose 204 of the second top beam 201 of the second connection frame 2 connects female end 305 with the third of column 3 and passes through Bolt passes through third through-hole 205 and fifth hole 306 connects, the second connection nose of the second bottom beam 203 of the second connection frame 2 204 and the second connection female end 303 of column 3 third through-hole 205 and fourth hole 304 passed through by bolt connect, convenient for assembling Connection, facilitates practical operation, is conveniently adjusted angle.
3 side of column connect frame 1 with first and is bolted, and 3 other side of column connect frame 2 with second and connects, and facilitates entirety It is cooperatively connected each other, entire guardrail is caused to be linked together.
The working principle of the invention:3 side of column second connection female end 303 and third connection female end 305 can respectively with First top beam 101 of the first connection frame 1 and the first connection female end 104 of the first bottom beam 103 are bolted, 3 other side of column Second connection female end 303 and third connection female end 305 can connect the second top beam 201 and the second bottom beam 203 of frame 2 with second respectively Second connection nose 204 be bolted, wherein first connection frame 1 the first top beam 101 and the first bottom beam 103 first connection Second connection nose 204 of the second top beam 201 and the second bottom beam 203 of female end 104 and the second connection frame 2 is bolted, in this way It entirely through being bolted, is played a supporting role by pedestal 301, while the first top beam 101 and the first bottom beam 103 pass through first Connecting column 102 is welded to connect, and the second top beam 201 and the second bottom beam 203 are welded to connect by the second connecting column 202, the first connection It is provided with spring 402 in the sliding slot 401 opened up inside column 102 and the second connecting column 202, is connected by slide 403 and rubber base 404 It connects, collective effect Anti-knocking.
The present invention is designed by reasonable structure, and for guardrail entirely through being bolted, the first connection frame and second connects frame Rear both ends are bolted to connect with column respectively, overall structure is easy for installation and removal, and is easily installed folding, facilitates fortune It is defeated, while mutual angle can be adjusted according to actual road conditions and matched with bending road surface, it is easy to use;When in face of hitting, lead to It crosses the first connecting column and the second connecting column contained spring and external rubber base collective effect effectively absorbs collision.Play anticollision The effect of hitting.
In the description of this specification, the description of reference term " one embodiment ", " example ", " specific example " etc. means Particular features, structures, materials, or characteristics described in conjunction with this embodiment or example are contained at least one implementation of the invention In example or example.In the present specification, schematic expression of the above terms may not refer to the same embodiment or example. Moreover, particular features, structures, materials, or characteristics described can be in any one or more of the embodiments or examples to close Suitable mode combines.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.There is no detailed for preferred embodiment All details are described, are not limited the invention to the specific embodiments described.Obviously, according to the content of this specification, It can make many modifications and variations.These embodiments are chosen and specifically described to this specification, is in order to better explain the present invention Principle and practical application, so that skilled artisan be enable to better understand and utilize the present invention.The present invention is only It is limited by claims and its full scope and equivalent.

Claims (5)

1. a kind of municipal public engineering assembling guardrail, which is characterized in that including first connection frame (1), second connection frame (2), Column (3), sliding slot (401), spring (402), slide (403) and rubber base (404), first connection frame (1) one end installation There is the second connection frame (2), first connection frame (1) and second connection frame (2) one end are mounted on column (3);
First connection frame (1) includes the first top beam (101), the first connecting column (102), the first bottom beam (103), the first connection Female end (104), first through hole (105), the first connection nose (106) and the second through-hole (107), the first top beam (101) bottom Portion is equidistant to be installed by welding with the first connecting column (102), and the first connecting column (102) bottom is installed by welding with the first bottom beam (103), first top beam (101) and the first bottom beam (103) one end are provided with the first connection female end (104), and described first connects It connects and is offered first through hole (105) at the top of female end (104), first top beam (101) and the setting of the first bottom beam (103) other end There is the first connection nose (106), offers the second through-hole (107) at the top of first connection nose (106);
Second connection frame (2) includes the second top beam (201), the second connecting column (202), the second bottom beam (203), the second connection Nose (204) and third through-hole (205), the second top beam (201) bottom is equidistant to be installed by welding with the second connecting column (202), the second connecting column (202) bottom is installed by welding with the second bottom beam (203), second top beam (201) and second Bottom beam (203) both ends are provided with the second connection nose (204), and it is logical to offer third at the top of second connection nose (204) Hole (205);
The column (3) includes pedestal (301), shaft (302), the second connection female end (303), fourth hole (304), third company Female end (305) and fifth hole (306) are connect, shaft (302) the bottom socket is equipped with pedestal (301), the shaft (302) Corresponding be equipped at the top of the second connection female end (303) second connection female end (303) in top two sides offers fourth hole (304), Shaft (302) two sides of the bottom are corresponding to be equipped with third connection female end (305), opens at the top of third connection female end (305) Equipped with fifth hole (306);
First connecting column (102) and the internal two sides of the second connecting column (202) offer sliding slot (401), the sliding slot (401) it is internally provided with spring (402), described spring (402) one end is equipped with slide (403), and described slide (403) one end is worn Sliding slot (401) is crossed to connect with outer rubber seat (404).
2. a kind of municipal public engineering assembling guardrail according to claim 1, which is characterized in that the first connection frame (1) it is bolted with the second connection frame (2), first connection female end (104) and the second connection nose (204) pass through spiral shell Bolt passes through first through hole (105) and third through-hole (205) connects.
3. a kind of municipal public engineering assembling guardrail according to claim 1, which is characterized in that the first connection frame (1) the first connection nose (106) of the first top beam (101) connects female end (305) with the third of column (3) and is passed through by bolt Second through-hole (107) and fifth hole (306) connection, the first of the first bottom beam (103) of first connection frame (1) connect The second connection female end (303) for connecing nose (106) and column (3) passes through the second through-hole (107) and fourth hole by bolt (304) it connects.
4. a kind of municipal public engineering assembling guardrail according to claim 1, which is characterized in that the second connection frame (2) the second connection nose (204) of the second top beam (201) connects female end (305) with the third of column (3) and is passed through by bolt Second connection of third through-hole (205) and fifth hole (306) connection, the second bottom beam (203) of second connection frame (2) is convex The second connection female end (303) of (204) and column (3) is held to pass through third through-hole (205) and fourth hole (304) even by bolt It connects.
5. a kind of municipal public engineering assembling guardrail according to claim 1, which is characterized in that the column (3) one Side connect frame (1) with first and is bolted, and column (3) other side connect frame (2) connection with second.
CN201810885867.8A 2018-08-06 2018-08-06 A kind of municipal public engineering assembling guardrail Pending CN108867477A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810885867.8A CN108867477A (en) 2018-08-06 2018-08-06 A kind of municipal public engineering assembling guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810885867.8A CN108867477A (en) 2018-08-06 2018-08-06 A kind of municipal public engineering assembling guardrail

Publications (1)

Publication Number Publication Date
CN108867477A true CN108867477A (en) 2018-11-23

Family

ID=64307700

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810885867.8A Pending CN108867477A (en) 2018-08-06 2018-08-06 A kind of municipal public engineering assembling guardrail

Country Status (1)

Country Link
CN (1) CN108867477A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501626A (en) * 2020-04-24 2020-08-07 杜永胜 Safe traffic isolated column

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205134243U (en) * 2015-11-30 2016-04-06 袁媛 Urban road guardrail
CN205990779U (en) * 2016-08-23 2017-03-01 赵志刚 Bound defence rail is faced in a kind of anticollision canalization
CN206090407U (en) * 2016-08-04 2017-04-12 朱得斌 Anticollision traffic safety guardrail
CN206941476U (en) * 2017-05-27 2018-01-30 青海第六路桥建设有限公司 A kind of highway barrier
CN206986799U (en) * 2017-07-14 2018-02-09 王根 A kind of Anti-collision freeway guardrail
CN207315000U (en) * 2017-08-30 2018-05-04 靳立宝 A kind of construction of the highway cushioning guard fence

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205134243U (en) * 2015-11-30 2016-04-06 袁媛 Urban road guardrail
CN206090407U (en) * 2016-08-04 2017-04-12 朱得斌 Anticollision traffic safety guardrail
CN205990779U (en) * 2016-08-23 2017-03-01 赵志刚 Bound defence rail is faced in a kind of anticollision canalization
CN206941476U (en) * 2017-05-27 2018-01-30 青海第六路桥建设有限公司 A kind of highway barrier
CN206986799U (en) * 2017-07-14 2018-02-09 王根 A kind of Anti-collision freeway guardrail
CN207315000U (en) * 2017-08-30 2018-05-04 靳立宝 A kind of construction of the highway cushioning guard fence

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111501626A (en) * 2020-04-24 2020-08-07 杜永胜 Safe traffic isolated column

Similar Documents

Publication Publication Date Title
CN108867477A (en) A kind of municipal public engineering assembling guardrail
CN206986799U (en) A kind of Anti-collision freeway guardrail
CN207776545U (en) A kind of high-strength steel controller perturbation ductility construction
CN207210946U (en) A kind of novel bridge bumper and absorbing shock bearing
CN106836072B (en) Municipal administration greening isolation guardrail
CN109629762A (en) The cross foot joint of recoverable function after a kind of shake of additional anti-side coupling beam
CN204516316U (en) The netted antiaircraft gun billboard of a kind of outdoor ball node
CN208844465U (en) A kind of highway protective fence
CN209082335U (en) A kind of municipal administration Collison fence for bridge
CN209211303U (en) A kind of totally-enclosed landscape sound barrier
CN205893969U (en) Steel construction road protection device
CN205242241U (en) Security isolation type bridge structures
CN209082397U (en) A kind of municipal works channel protective device
CN110777691B (en) Road sign and mounting process thereof
CN107700388A (en) A kind of road construction safe fence with Environmental-protecting dust-removing function
CN107119978A (en) Encorbelment protection advertisement enclosure wall
CN208733535U (en) A kind of temporary guard rail of the urban transportation convenient for building
CN101859516A (en) Wind-resistance display board stand
CN209212056U (en) A kind of isolation guardrail
CN202809532U (en) Solar city road central guardrail without welding section
CN110777691A (en) Road sign and mounting process thereof
CN209538090U (en) A kind of highway guard rail
CN206736799U (en) A kind of base for traffic guard rail
CN208219509U (en) A kind of compound guardrail being readily transported disassembly
CN213389869U (en) Guard bar

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210203

Address after: 236600 No. 97, Gongtang village, linzhuang village committee, Fentai Town, Taihe County, Fuyang City, Anhui Province

Applicant after: Gong Chunyan

Address before: 230000 room 705, huashengda Yuncheng commercial office building, south of Yuxi Road, Cuozhen Town, Feidong County, Hefei City, Anhui Province

Applicant before: HEFEI XIAKANG E-COMMERCE Co.,Ltd.

TA01 Transfer of patent application right