CN108843117B - 输电线路铁塔主材快速更换方法及其装置 - Google Patents
输电线路铁塔主材快速更换方法及其装置 Download PDFInfo
- Publication number
- CN108843117B CN108843117B CN201811118812.0A CN201811118812A CN108843117B CN 108843117 B CN108843117 B CN 108843117B CN 201811118812 A CN201811118812 A CN 201811118812A CN 108843117 B CN108843117 B CN 108843117B
- Authority
- CN
- China
- Prior art keywords
- tower
- transmission line
- line iron
- main material
- iron tower
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Electric Cable Installation (AREA)
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
一种输电线路铁塔主材快速更换方法及其装置,具体步骤如下所示:在与待更换主材相对侧的输电线路铁塔塔身部和地面之间连接拉线;在输电线路铁塔原坏损主材段所在塔脚基础安装塔脚固定座;在输电线路铁塔塔身原坏损主材段所在侧安装连接挂件;在塔脚固定座外侧与连接挂件之间连接长度可调的支撑杆,并调节支撑杆长度,使支撑杆牢固支撑于塔脚固定座与连接挂件之间;将输电线路铁塔坏损主材拆除并更换新主材;拆除塔脚固定板、连接件和支撑杆;拆除连接在输电线路铁塔塔身和地面之间连接拉线。其可降低作业强度,减小施工面积,降低用工成本,无需断电,保证企业和居民正常用电。
Description
技术领域
本发明涉及输电线路铁塔,尤其涉及一种输电线路铁塔主材快速更换方法及其装置。
背景技术
随着输电线路的发展建设以及输电线路所处地质、地形条件越来越复杂,难免遇到山体垮塌、地震等自然灾害或人为破坏造成输电线路铁塔受损,给输电线路造成严重事故,危及线路正常运行。
目前,输电线路铁塔主材更换方式是利用吊车将铁塔起吊起更换,由于输电线路铁塔大多数建立在山区、丘陵、田地当中,这里涉及到临时占地问题,如果在田地里施工,需占地1.5~2亩,如受到当地百姓阻碍会给施工作业带来许多麻烦,而所需施工费用达到会1.5~3万元的费用,另还需要停电施工,造成施工环节较多。
综上所述,现有的更换输电铁塔塔脚的方法作业强度高、施工占地面积大、用工成本高、且需临时停电,影响企业和居民正常用电。
发明内容
本发明是为了解决上述技术问题,提供一种输电线路铁塔主材快速更换方法及其装置,其可降低作业强度,减小施工面积,降低用工成本,无需断电,保证企业和居民正常用电。
本发明的技术解决方案是:
输电线路铁塔主材快速更换方法,其特殊之处在于,具体步骤如下所示:
1)在与待更换主材相对侧的输电线路铁塔塔身部和地面之间连接拉线;
2)在输电线路铁塔原坏损主材段所在塔脚基础安装塔脚固定座;
3)在输电线路铁塔塔身原坏损主材段所在侧安装连接挂件;
4)在塔脚固定座外侧与连接挂件之间连接长度可调的支撑杆,并调节支撑杆长度,使支撑杆牢固支撑于塔脚固定座与连接挂件之间;
5)将输电线路铁塔坏损主材拆除并更换新主材;
6)拆除塔脚固定板、连接件和支撑杆;
7)拆除连接在输电线路铁塔塔身和地面之间连接拉线。
上述输电线路铁塔主材快速更换方法涉及到的输电线路铁塔主材快速更换装置,包括塔脚固定座、连接挂件、连接在塔脚固定座和连接挂件之间的支撑杆;所述塔脚固定座包括由二个对扣连接的直角固定套分体构成的方形固定套、固设于其中一直角固定套分体顶部的水平支撑板、连接在水平支撑板底面与其所在的直角固定套分体底部之间的斜支撑、固设于水平支撑板顶面的导轨、与导轨滑动安装的滑板、连接在导轨与滑板之间的定位螺栓构成;所述连接挂件是由连接板、设于连接板一面与输电线路铁塔塔身连接的第一耳板、设于连接板另一面与支撑杆连接的第二耳板构成;所述支撑杆是由二节支撑节和通过螺纹连接在二节支撑节之间的调节螺纹套构成。
进一步优选,所述支撑杆为二根,二根支撑杆底端铰接于所述水平支撑板两侧,二根支撑杆顶端铰接于所述对应侧第二耳板并相交。
进一步优选:所述二个直角固定套分体通过螺栓连接。
本发明的有益效果是:
由于在输电线路铁塔原坏损主材段所在塔脚基础安装塔脚固定座;在输电线路铁塔塔身原坏损主材段所在侧安装连接挂件;在塔脚固定座外侧与连接挂件之间连接长度可调的支撑杆,取代了吊车吊装铁塔的方式,降低了作业强度,减小了施工面积,降低了用工成本,无需断电,保证了企业和居民正常用电。
附图说明
图1是本发明的结构示意图;
图2是图1的俯视图;
图中:1-方形固定套,2-水平支撑板,3-斜支撑,4-导轨,5-滑板,6-定位螺栓,7-连接板,8-第一耳板,9-第二耳板,10-支撑节,11-调节螺纹套。
具体实施方式
如图1、图2所示,输电线路铁塔主材快速更换装置,包括塔脚固定座、连接挂件、连接在塔脚固定座和连接挂件之间的支撑杆;所述塔脚固定座包括由二个通过螺栓对扣连接的直角固定套分体构成的方形固定套1、固设于其中一直角固定套分体顶部的水平支撑板2、连接在水平支撑板2底面与其所在的直角固定套分体底部之间的斜支撑3、固设于水平支撑板2顶面的导轨4、与导轨4滑动安装的滑板5、连接在导轨4与滑板5之间的定位螺栓6构成;所述连接挂件是由连接板7、设于连接板7一面与输电线路铁塔塔身连接的第一耳板8、设于连接板7另一面与支撑杆连接的第二耳板9构成;所述支撑杆是由二节支撑节10和通过螺纹连接在二节支撑节10之间的调节螺纹套11构成,所述支撑杆为二根,二根支撑杆底端铰接于所述水平支撑板2两侧,二根支撑杆顶端铰接于所述对应侧第二耳板9并相交。
输电线路铁塔主材快速更换方法,具体步骤如下所示:
1)在与待更换主材相对侧的输电线路铁塔塔身部和地面之间连接拉线;
2)在输电线路铁塔原坏损主材段所在塔脚基础安装塔脚固定座;
3)在输电线路铁塔塔身原坏损主材段所在侧安装连接挂件;
4)在塔脚固定座外侧与连接挂件之间连接长度可调的支撑杆,并调节支撑杆长度,使支撑杆牢固支撑于塔脚固定座与连接挂件之间;
5)将输电线路铁塔坏损主材拆除并更换新主材;
6)拆除塔脚固定板、连接件和支撑杆;
7)拆除连接在输电线路铁塔塔身和地面之间连接拉线。
以上仅为本发明的具体实施例而已,并不用于限制本发明,对于本领域的技术人员来说,本发明可以有各种更改和变化。凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。
Claims (2)
1.输电线路铁塔主材快速更换方法,其特征在于,具体步骤如下所示:
1)在与待更换主材相对侧的输电线路铁塔塔身部和地面之间连接拉线;
2)在输电线路铁塔原坏损主材段所在塔脚基础采用输电线路铁塔主材更换工具对塔脚固定座进行安装;所述输电线路铁塔主材更换工具包括塔脚固定座、连接挂件、连接在塔脚固定座和连接挂件之间的支撑杆;所述塔脚固定座包括由二个对扣连接的直角固定套分体构成的方形固定套、固设于其中一直角固定套分体顶部的水平支撑板、连接在水平支撑板底面与其所在的直角固定套分体底部之间的斜支撑、固设于水平支撑板顶面的导轨、与导轨滑动安装的滑板、连接在导轨与滑板之间的定位螺栓构成;
3)在输电线路铁塔塔身原坏损主材段所在侧采用输电线路铁塔主材更换工具对连接挂件进行安装,所述输电线路铁塔主材更换工具中连接挂件是由连接板、设于连接板一面与输电线路铁塔塔身连接的第一耳板、设于连接板另一面与支撑杆连接的第二耳板构成;
4)在塔脚固定座外侧与连接挂件之间使用输电线路铁塔主材更换工具中连接长度可调的支撑杆,并调节支撑杆长度,使支撑杆牢固支撑于塔脚固定座与连接挂件之间;所述支撑杆是由二节支撑节和通过螺纹连接在二节支撑节之间的调节螺纹套构成;所述支撑杆为二根,二根支撑杆底端铰接于所述水平支撑板两侧,二根支撑杆顶端铰接于所述对应侧第二耳板并相交;
5)将输电线路铁塔坏损主材拆除并更换新主材;
6)拆除塔脚固定板、连接件和支撑杆;
7)拆除连接在输电线路铁塔塔身和地面之间连接拉线。
2.根据权利要求1所述的输电线路铁塔主材快速更换方法,其特征在于:所述二个直角固定套分体通过螺栓连接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811118812.0A CN108843117B (zh) | 2018-09-25 | 2018-09-25 | 输电线路铁塔主材快速更换方法及其装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811118812.0A CN108843117B (zh) | 2018-09-25 | 2018-09-25 | 输电线路铁塔主材快速更换方法及其装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108843117A CN108843117A (zh) | 2018-11-20 |
CN108843117B true CN108843117B (zh) | 2024-05-17 |
Family
ID=64188006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811118812.0A Active CN108843117B (zh) | 2018-09-25 | 2018-09-25 | 输电线路铁塔主材快速更换方法及其装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108843117B (zh) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111030015B (zh) * | 2019-11-29 | 2022-03-18 | 国网山东省电力公司经济技术研究院 | 一种电力杆塔 |
CN111411811A (zh) * | 2020-03-20 | 2020-07-14 | 张阳生 | 一种高压铁塔杆件更换方法 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008199732A (ja) * | 2007-02-09 | 2008-08-28 | Tokyo Electric Power Co Inc:The | 鉄塔の仮支持装置及びこれを用いた鉄塔の工事方法 |
KR20100012734A (ko) * | 2008-07-29 | 2010-02-08 | (자)자유이엔씨 | 철탑 노후사재 교체공구 및 이를 이용한 철탑 노후사재교체공법 |
CN102661057A (zh) * | 2012-05-30 | 2012-09-12 | 衡水供电公司 | 电力转角塔拉腿主材更换方法以及专用主材卡具 |
KR101608624B1 (ko) * | 2015-07-16 | 2016-04-01 | 한국전력공사 | 송전철탑 상향공법 |
JP5948632B1 (ja) * | 2015-06-04 | 2016-07-06 | 東京電力ホールディングス株式会社 | 山形鋼鉄塔の主柱材取替え工法 |
JP2016205066A (ja) * | 2015-04-28 | 2016-12-08 | 中国電力株式会社 | 鉄塔頂部嵩上げ工法 |
CN208918397U (zh) * | 2018-09-25 | 2019-05-31 | 国网辽宁省电力有限公司锦州供电公司 | 输电线路铁塔主材更换工具 |
-
2018
- 2018-09-25 CN CN201811118812.0A patent/CN108843117B/zh active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2008199732A (ja) * | 2007-02-09 | 2008-08-28 | Tokyo Electric Power Co Inc:The | 鉄塔の仮支持装置及びこれを用いた鉄塔の工事方法 |
KR20100012734A (ko) * | 2008-07-29 | 2010-02-08 | (자)자유이엔씨 | 철탑 노후사재 교체공구 및 이를 이용한 철탑 노후사재교체공법 |
CN102661057A (zh) * | 2012-05-30 | 2012-09-12 | 衡水供电公司 | 电力转角塔拉腿主材更换方法以及专用主材卡具 |
JP2016205066A (ja) * | 2015-04-28 | 2016-12-08 | 中国電力株式会社 | 鉄塔頂部嵩上げ工法 |
JP5948632B1 (ja) * | 2015-06-04 | 2016-07-06 | 東京電力ホールディングス株式会社 | 山形鋼鉄塔の主柱材取替え工法 |
KR101608624B1 (ko) * | 2015-07-16 | 2016-04-01 | 한국전력공사 | 송전철탑 상향공법 |
CN208918397U (zh) * | 2018-09-25 | 2019-05-31 | 国网辽宁省电力有限公司锦州供电公司 | 输电线路铁塔主材更换工具 |
Also Published As
Publication number | Publication date |
---|---|
CN108843117A (zh) | 2018-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108843117B (zh) | 输电线路铁塔主材快速更换方法及其装置 | |
CN207847228U (zh) | 一种防倾倒水泥电线杆 | |
CN201671391U (zh) | 轻型线路抢修塔 | |
CN106505466A (zh) | 一种配网不停电作业的升降式绝缘横担及其作业方法 | |
CN103326304A (zh) | 一种10kV带电引流线支撑装置 | |
CN204645793U (zh) | 一种输电线路的抢修塔 | |
CN107654106B (zh) | 输电铁塔塔脚更换方法 | |
CN206148848U (zh) | 一种大吨位带电导线的提升装置 | |
CN208918397U (zh) | 输电线路铁塔主材更换工具 | |
CN106759557A (zh) | 一种采动区输电铁塔水平变形恢复装置 | |
CN103362315B (zh) | 一种管道整体吊装用的吊架及其施工方法 | |
CN212837092U (zh) | 一种市政道路基坑安全防护装置 | |
CN207768939U (zh) | 一种变电检修的安全带固定架 | |
CN207276078U (zh) | 便携式吊装器 | |
CN206538036U (zh) | 工具式可调液压电缆盘支架 | |
CN211981139U (zh) | 一种电力铁塔用避雷装置 | |
CN203571222U (zh) | 一种梯级式电缆桥架 | |
CN203222892U (zh) | 网架结构车站拱形大门 | |
CN217791923U (zh) | 智能升降桌支撑结构 | |
CN205259681U (zh) | 一种高压输电铁塔加固补强结构 | |
CN206090604U (zh) | 一种采空区自适应调整基础的装置 | |
CN205646718U (zh) | 一种新型变电站支架 | |
CN112482870B (zh) | 一种杆塔原位升高装置 | |
CN212875308U (zh) | 一种拓展性好的市政道路工程用线路支架 | |
CN203445835U (zh) | 一种基于太阳能的烤烟动力装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB03 | Change of inventor or designer information |
Inventor after: Li Weimin Inventor after: Lv Dayong Inventor after: Wang Jun Inventor after: Wang Enxiang Inventor after: Wu Kun Inventor before: Li Weimin Inventor before: Lv Dayong Inventor before: Wang Jun Inventor before: Wang Enxiang Inventor before: Wu Kun |
|
CB03 | Change of inventor or designer information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |