CN108842910A - A kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method - Google Patents

A kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method Download PDF

Info

Publication number
CN108842910A
CN108842910A CN201811025332.XA CN201811025332A CN108842910A CN 108842910 A CN108842910 A CN 108842910A CN 201811025332 A CN201811025332 A CN 201811025332A CN 108842910 A CN108842910 A CN 108842910A
Authority
CN
China
Prior art keywords
bearing unit
vertical
bearing
connection
lateral
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811025332.XA
Other languages
Chinese (zh)
Inventor
张泽宇
岳清瑞
侯兆新
王月栋
许伟
龚超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Industry Co., Ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Original Assignee
Central Research Institute of Building and Construction Co Ltd MCC Group
China Jingye Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Central Research Institute of Building and Construction Co Ltd MCC Group, China Jingye Engineering Corp Ltd filed Critical Central Research Institute of Building and Construction Co Ltd MCC Group
Priority to CN201811025332.XA priority Critical patent/CN108842910A/en
Publication of CN108842910A publication Critical patent/CN108842910A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/19Three-dimensional [3D] framework structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B5/00Floors; Floor construction with regard to insulation; Connections specially adapted therefor
    • E04B5/02Load-carrying floor structures formed substantially of prefabricated units
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/04Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal
    • E04C3/06Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of metal with substantially solid, i.e. unapertured, web
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H1/00Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
    • E04H1/02Dwelling houses; Buildings for temporary habitation, e.g. summer houses
    • E04H1/04Apartment houses arranged in two or more levels
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H9/00Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate
    • E04H9/02Buildings, groups of buildings or shelters adapted to withstand or provide protection against abnormal external influences, e.g. war-like action, earthquake or extreme climate withstanding earthquake or sinking of ground
    • E04H9/024Structures with steel columns and beams

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Business, Economics & Management (AREA)
  • Emergency Management (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The present invention provides a kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method, Housing Structure System includes vertical bearing unit, lateral bearing unit and precast floor slab;The vertical bearing unit includes a vertical load-bearing section, or is successively docked up and down by several vertical load-bearing sections.In short, construction is simple of the present invention, high reliablity, avoid a large amount of reinforced bar engineering in construction site, improve construction efficiency.

Description

A kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method
Technical field
The present invention relates to construction engineering technical fields, more particularly, to a kind of more limb steel columns of assembled-freely-supported concrete plate house Structural system and its construction method.
Background technique
Steel building proportion in China's is less than 10% at present, be mainly used in industrial premises, high rise multi-rise commercial building and On public building.Limitation China's steel building promote and apply factor be it is various, including some structural levels Technical problem, such as:1, steel building is mostly frame structure, applies and there are problems that head beam reveals column in house;2, it is applying There are the connection of the main structures components such as a large amount of beam-column-diagonal braces during work, the factory of the presence of these connecting nodes to component Prefabricated and on-site hoisting precision proposes higher requirement, also limits the assembly speed of main structure to a certain extent Degree;3, the floor of steel building is various informative, but is intended to carry out live reinforcing bar binding, exists and connect complexity with main structure Problem, this is also a key factor for limiting steel construction assembly construction efficiency;4, retaining wall and steel construction main body mismatch, It is difficult to reduce exterior wall thickness while realizing retaining wall building function, saves the interior space;5, the scene of external wall protection body Installation causes gap between main structure, and the post-processing in these gaps brings no small problem to construction, also to enclose The seepage control and crack resistance of parapet wall body brings hidden danger.
Summary of the invention
The purpose of the present invention is to provide a kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction parties Method, to solve above-mentioned at least one technical problem existing in the prior art.
In order to solve the above technical problems, a kind of more limb steel columns of assembled provided by the invention-freely-supported concrete plate residential structure body System, including:Vertical bearing unit, lateral bearing unit and precast floor slab;
The vertical bearing unit includes a vertical load-bearing section, or is successively docked up and down by several vertical load-bearing sections It forms;
The vertical load-bearing section includes:Vertical supporting frame and what is be arranged on the outside of vertical supporting frame first go along with sb. to guard him Wall;The vertical supporting frame includes connection column;
It is described transverse direction bearing unit include:Lateral supporting frame and what is be arranged on the outside of lateral supporting frame second enclose Parapet wall body;The transverse direction supporting frame includes the horizontal top grid beam in the second retaining wall top edges;
Multiple vertical bearing units are erect as the vertical load-carrying members parallel interval of building;The transverse direction load-bearing list Member is arranged between the two neighboring vertical bearing unit, and the both ends of the top grid beam are respectively arranged with stretching described second The connection end of retaining wall;The connection end and the connection column connect, and the transverse direction bearing unit passes through on described Frame beam is suspended on the connection column of the two neighboring vertical bearing unit;
The precast floor slab edge includes the clinch for connecting with the lateral bearing unit, and clinch is overlapped on institute It states in the grid beam of lateral bearing unit top, connection structure is provided on the upper side frame top surface of the beam, the precast floor slab is taken Socket part is provided with reinforcing bar lantern ring, and the upper connection structure is plugged in the reinforcing bar lantern ring, holds in precast floor slab and the transverse direction It is integral that weight unit junction casting concrete connect precast floor slab with the lateral bearing unit;The transverse direction load-bearing list Concrete is filled in gap between member and the vertical bearing unit of the left and right sides, so that the transverse direction bearing unit and left and right The vertical bearing unit connection of two sides is integral.
Further, the Housing Structure System is multilayered structure, and on horizontal cross-section, length is not waited multiple described perpendicular It is staggered to load-bearing septa intersegmental, i.e., the vertical load-bearing section docking site of the vertical bearing unit of adjacent two is not located In same layer.
Further, in the height direction, the length (height when standing upright) of the single vertical load-bearing section is house knot Structure system layer high one times or several times.
Further, the length (height when standing upright) of the vertical load-bearing section be Housing Structure System layer high twice or Three times of person;The high vertical load-bearing section of twice layer high of the vertical load-bearing section and three times layer is staggered.
So that the connecting portion of vertical load-bearing section is not completely in same layer as a result, avoids the occurrence of the weak floor vertically connected.
Further, in the height direction, the neighbouring two lateral bearing units include upper lateral load-bearing list First and lower lateral bearing unit;It is spaced between upper transverse direction bearing unit and lower lateral bearing unit, the precast floor slab Edge protrudes into the interval, and is overlapped in the grid beam of lower lateral bearing unit top.
Further, the lateral supporting frame includes the horizontal lower frame in the second retaining wall lower edge Beam;Lower connection structure is preset on the bottom surface of the following grid beam;The lower connection structure of the upper lateral bearing unit is to underthrust It connects in the reinforcing bar lantern ring at the precast floor slab edge.
Further, the gap between the upper lateral bearing unit and the vertical bearing unit of two sides and The interval between the upper lateral bearing unit and lower lateral bearing unit connects to form a U-shaped post-cast strip;It is described it is U-shaped after It pours band and is filled completely with concrete, the upper lateral bearing unit, vertical bearing unit and lower lateral bearing unit connect into One is whole.
Further, the precast floor slab clinch top edge is provided with the stage of sinking, in the height direction, described The following grid beam of upper transverse direction bearing unit protrudes into the stage, the company of being formed between the stage and the upper lateral bearing unit Lead to the L-type seam inside and outside the interval.
In the height direction, the following grid beam of the prefabricated enclosure wall in the top protrudes into the clinch stage, i.e., prefabricated building The top surface of plate is higher by the lower frame soffit setting of the prefabricated enclosure wall in top, thus the following grid beam self-assembling formation of the prefabricated enclosure wall in top One prevents the position limiting structure that precast floor slab moves horizontally, and when the natural calamities such as earthquake occur, can effectively prevent precast floor slab The steel frame that is detached from prefabricated enclosure wall and fall, anti-seismic performance is more preferable.
Further, the upper connection structure and the lower connection structure are peg, connecting rod, lengths of rebar or frame-type Connector.
Further, the vertical supporting frame further includes:Main load-bearing pillar and attachment beam;The connection column parallel interval It is erected at the outside of the main load-bearing pillar, the two is fixedly connected by the attachment beam;
Alternatively, vertical supporting frame includes the connection column that two parallel intervals are erect, pass through between two connection columns Attachment beam is fixedly connected with diagonal brace.
Further, the vertical bearing unit cross section is L-type, constitutes the vertical load-bearing of L-type of the vertical bearing unit of L-type Section includes the main load-bearing pillar and two connection columns that rectangular type is laid;Two connection columns lead to respectively The attachment beam is crossed to be connected on two adjacent sides of the main load-bearing pillar.
Further, the vertical bearing unit cross section is "-" type, constitutes a word of the vertical bearing unit of "-" type The vertical load-bearing section of type includes a main load-bearing pillar and two connection columns;Two connection columns pass through institute respectively Attachment beam is stated to be connected on two opposite sides of the main load-bearing pillar.
Further, the vertical bearing unit cross section is T-type, constitutes the vertical load-bearing of T-type of the vertical bearing unit of T-type Section includes a main load-bearing pillar and three connection columns;Three connection columns pass through the attachment beam respectively and connect It connects on three sides of the main load-bearing pillar.
Further, the vertical bearing unit cross section is cross, constitutes the cross of cross vertical bearing unit The vertical load-bearing section of type includes a main load-bearing pillar and four connection columns;Four connection columns pass through institute respectively Attachment beam is stated to be connected on four sides of the main load-bearing pillar.
Further, the vertical bearing unit cross section is "-" type, and the vertical supporting frame includes two parallel The connection column being arranged;It is fixedly connected by the attachment beam with diagonal brace between two connection columns.
Further, the main load-bearing pillar is the fashioned iron that cross section is box;It is H-type that the connection column, which is cross section, Fashioned iron;The attachment beam is i-shape steel beam.
Further, the top grid beam and following grid beam are i-shape steel beam, and i-shape steel beam includes the edge of a wing and web; The outer side wing edge surface programming of the top grid beam and following grid beam has peg.
Further, the distal end faces of the top grid beam are provided with end plate, and top grid beam passes through end plate and high-strength spiral shell Bolt and the connection column connect.
Further, the vertical supporting frame further includes diagonal brace;
And/or the lateral supporting frame further includes diagonal brace.
Wherein, diagonal brace is preferably the fashioned iron that cross section is box.
Wherein, the vertical bearing unit, lateral bearing unit and precast floor slab are prefabricated component.Vertical supporting frame Welded in advance with lateral supporting frame in factory and form general frame, then the non-structural elements such as retaining wall in the factory with hold Weight frame formed by integrally casting forms to form bearing unit.
Further, the precast floor slab edge includes the docking section docked with contiguous prefabricated floor, the edge of docking section Top surface is provided with heavy platform, and docking section is provided with overhanging beard muscle in the corresponding side surface of heavy platform;Adjacent two are described prefabricated Floor is docking together, and the heavy platform on two precast floor slab docking sections docks to form a U-type groove, on two precast floor slab docking sections Beard muscle mutually overlaps connection;Concrete is filled in U-type groove.
The more limb steel columns of assembled-freely-supported concrete plate Housing Structure System disclosed by the invention proposes a kind of by the various knots such as beam column Structure component and retaining wall integral preform are integral unit, realize the housing building of steel-structure body of quick assembling at the construction field (site) System.The feature of system maximum is that multilayered structure component and retaining wall are prefabricated in the factory and are integrated lifting elements, is solving While the problems such as head beam reveals column, building enclosure mismatches, the processing of mounting structure piece, reduce component connecting portion, accelerates Speed of application.
Specifically, the system solves the following problems of traditional steel structure system:
1, the section for reducing single column encrypts the arrangement of column, and multiple steel column integral preforms are vertical bearing unit, reduces beam Flange width solves the problems, such as that head beam reveals column with wall integral preform;
2, using the freely-supported floor of the connection structures such as reinforcing bar lantern ring and flange of beam peg, construction is simple, high reliablity, solution The problem of the live assembling reinforcement complexity such as laminated floor slab, improves construction efficiency;
3, steel column, diagonal brace and enclosure wall are vertical bearing unit, girder steel and enclosure wall integral preform in factory's integral preform For lateral bearing unit, solve the problems, such as that retaining wall is unmatched with main body steel construction;
4, two three-decker component and retaining wall are arrived in factory's integral preform, one lifting, reduces structure at the scene Assembly connection position, accelerates speed of application;
5, U-shaped post-cast strip is set in column wall, beam slab connecting portion, solves the problems, such as the processing of piece between assembly unit.
In short, construction is simple of the present invention, high reliablity, avoid a large amount of reinforced bar engineering in construction site, improve construction Efficiency.
In addition, the upper connection structure is plugged in the reinforcing bar lantern ring, thus self-assembling formation one prevents precast floor slab The position limiting structure moved horizontally can effectively prevent precast floor slab to be detached from prefabricated enclosure wall when the natural calamities such as earthquake occur Steel frame and fall, anti-seismic performance is more preferable.
The invention also discloses a kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System construction method, packets Include following steps:
Step 1:Lift vertical load-bearing section described in first segment, the vertical load-bearing section of two layers sections and three layer of one section The vertical load-bearing septa intersegmental interlaced arrangement;
Step 2:Lift first layer described in transverse direction bearing unit, it is described transverse direction bearing unit top grid beam both ends and The connection column connection;
Step 3:Precast floor slab described in first layer is lifted, the precast floor slab is overlapped on the lateral bearing unit, on Upper connection structure on frame top surface of the beam is plugged in the reinforcing bar lantern ring of the clinch of precast floor slab;
Step 4:According to step 2 and three methods, lifted described in transverse direction bearing unit described in the second layer and the second layer respectively Precast floor slab;
Step 5:Lift vertical load-bearing section described in the second section, the vertical load-bearing section of the second section and the vertical load-bearing section pair of first segment It connects in succession;
Step 6:According to the lateral bearing unit that Step 2: three and four, lifts third to five layers respectively and described pre- Floor processed;
Step 7:Concrete is filled in the gap of the transverse direction bearing unit two sides and bottom, so that the transverse direction load-bearing list First, the described precast floor slab and the vertical bearing unit pour integral;
And so on, vertical load-bearing section is constantly connected upwards and lifts lateral bearing unit and precast floor slab until setting Layer is high.
Further, when two neighbouring vertical load-bearing sections connection, the master of two vertical load-bearing sections is held Weight column butt weld connection, connects column and diagonal brace uses high strength exploitation.
Further, the vertical load-bearing section docking site be located at that layer is high 1/3 at.
Invention construction is simple of the present invention, high reliablity avoid a large amount of reinforced bar engineering in construction site, improve construction effect Rate.
Detailed description of the invention
It below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art be briefly described, it should be apparent that, it is described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, is also possible to obtain other drawings based on these drawings.
Fig. 1 is the more limb steel columns of assembled provided in an embodiment of the present invention-freely-supported concrete plate Housing Structure System perspective view;
Fig. 2 is the structural schematic diagram of the vertical load-bearing section of L-type in the embodiment of the present invention;
Fig. 3 is the transverse sectional view (or top view) of the vertical load-bearing section of L-type in Fig. 2;
Fig. 4 is the structural schematic diagram of the vertical load-bearing section of T-type in the embodiment of the present invention;
Fig. 5 is the transverse sectional view (or top view) of the vertical load-bearing section of T-type in Fig. 4;
Fig. 6 is the structural schematic diagram of the vertical load-bearing section of a word sprag type in the embodiment of the present invention;
Fig. 7 is the transverse sectional view (or top view) of the vertical load-bearing section of a word sprag type in Fig. 6;
Fig. 8 is the perspective view of lateral bearing unit in the embodiment of the present invention;
Fig. 9 is the perspective view of precast floor slab in the embodiment of the present invention;
Structural schematic diagram when Figure 10 is the lifting vertical load-bearing section of first segment in the embodiment of the present invention;
Figure 11 is structural schematic diagram when lifting first layer transverse direction bearing unit in the embodiment of the present invention;
Figure 12 is top grid beam and the partial schematic diagram that connect column connecting portion in the embodiment of the present invention;
Figure 13 is structural schematic diagram when lifting first layer precast floor slab in the embodiment of the present invention;
Figure 14 is the connection structure diagram of precast floor slab and lateral bearing unit in the embodiment of the present invention;
Figure 15 is structural schematic diagram when lifting second layer transverse direction bearing unit and precast floor slab in the embodiment of the present invention;
Figure 16 is structural schematic diagram when connecting the vertical load-bearing section of the second section in the embodiment of the present invention;
Figure 17 is the partial schematic diagram of the vertical load-bearing section splicing point of L-type in the embodiment of the present invention;
Figure 18 is the partial schematic diagram of the vertical load-bearing section splicing point of a word sprag type in the embodiment of the present invention;
Figure 19 is the structural schematic diagram of the U-shaped post-cast strip of lateral bearing unit surrounding in the embodiment of the present invention;
Figure 20 is the AA cross-sectional view in Figure 19.
Appended drawing reference:
The vertical bearing unit of 10-;The vertical load-bearing section of 10a-L type;The vertical load-bearing section of 10b-T type;Mono- word sprag type of 10- is vertical Load-bearing section;The first retaining wall of 11-;The main load-bearing pillar of 12-;13- connection column;14- attachment beam;15- diagonal brace;20- transverse direction load-bearing Unit;The second retaining wall of 21-;The top 22- grid beam;22a- connection end;The upper connection structure of 23-;24- end plate;The prefabricated building 30- Plate;31- clinch;The docking section 32-;33- reinforcing bar lantern ring;34- beard muscle;The post-cast strip 40-.
Specific embodiment
Technical solution of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's every other embodiment obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term " center ", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, It is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for descriptive purposes only and cannot be understood as indicating or suggesting relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can To be mechanical connection, it is also possible to be electrically connected;It can be directly connected, can also can be indirectly connected through an intermediary Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
Below with reference to specific embodiment the present invention will be further explained explanation.
Embodiment 1
As shown in Fig. 1-2 0, a kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System provided in this embodiment.
As shown in figure 1, Housing Structure System is by vertical bearing unit 10, lateral bearing unit 20 and prefabricated building Plate 30 is assembled.
Wherein vertical bearing unit 10 is made of a vertical load-bearing section or several vertical load-bearing sections.Vertical load-bearing The quantity of section is determined according to the actual layer number and height of Housing Structure System.Vertical bearing unit 10 is by several vertical load-bearing sections When composition, several vertical load-bearing sections successively dock up and down.
Referring to shown in Fig. 2, vertical load-bearing section includes:Vertical supporting frame and it is arranged on the outside of vertical supporting frame First retaining wall 11;Vertical supporting frame includes connection column 13;Referring to shown in Fig. 8, lateral bearing unit 20 includes:Laterally Supporting frame and the second retaining wall 21 being arranged on the outside of lateral supporting frame;Lateral supporting frame includes horizontal The top grid beam 22 of two retaining walls, 21 top edges;Multiple vertical bearing units 10 are parallel as the vertical load-carrying members of building It erects at interval;Lateral bearing unit 20 is arranged between two neighboring vertical bearing unit 10, and the both ends of top grid beam 22 are distinguished It is provided with the connection end 22a for stretching out the second retaining wall 21;Connection end 22a is connected with column 13 is connect, lateral load-bearing list Member 20 is suspended on the connection column 13 of two neighboring vertical bearing unit 10 by top grid beam 22;As shown in figures 9 and 14, in advance 30 edge of floor processed includes the clinch 31 for connecting with lateral bearing unit 20, and clinch 31 is overlapped on lateral bearing unit In 20 top grid beams 22, connection structure 23 is provided on 22 top surface of top grid beam, the clinch 31 of precast floor slab 30 is provided with Reinforcing bar lantern ring 33, upper connection structure 23 are plugged in reinforcing bar lantern ring 33, and the fixation of after-pouring concrete makes precast floor slab 30 and transverse direction Bearing unit 20 connects integral;It fills in gap between lateral bearing unit 20 and the vertical bearing unit 10 of the left and right sides Concrete so that lateral bearing unit 20 connect with the vertical bearing unit 10 of the left and right sides it is integral.
Wherein, vertical supporting frame further includes:Main load-bearing pillar 12 and attachment beam 14;Connection 13 parallel interval of column is erected at The outside of main load-bearing pillar 12, the two are fixedly connected by attachment beam 14;Alternatively, vertical supporting frame includes that two parallel intervals are perpendicular Vertical connection column 13 is fixedly connected between two connection columns with diagonal brace by attachment beam.
Vertical 10 cross-sectional shape of bearing unit is set according to its placement location and with the connection needs of lateral bearing unit Count into diversified forms.
For example, the vertical bearing unit of L-type in building corner is arranged in, as shown in Figures 2 and 3, the vertical bearing unit of L-type is constituted The vertical load-bearing section 10a of L-type include a main load-bearing pillar 12 and two connection columns 13 that rectangular type is laid;Two connections are vertical Column 13 is connected on two adjacent sides of main load-bearing pillar 12 by attachment beam 14 respectively.
The vertical bearing unit of T-type such as connecting between exterior wall and interior wall constitutes T-type and vertically holds as shown in Figures 4 and 5 The vertical load-bearing section 10b of the T-type of weight unit includes a main load-bearing pillar 12 and three connection columns 13;Three connection columns 13 are distinguished It is connected on three sides of main load-bearing pillar 12 by attachment beam 14.
The for another example "-" type or a vertical load-bearing of word sprag type for two in same metope lateral bearing unit connections Unit, as shown in Figures 6 and 7, the vertical load-bearing section 10c of a word sprag type for constituting a vertical bearing unit of word sprag type includes two Connection column 13 disposed in parallel;It is fixedly connected by attachment beam 14 with diagonal brace 15 between two connection columns 13.Constitute a word The vertical load-bearing section of the "-" type of the vertical bearing unit of type may include a main load-bearing pillar 12 and two connection columns 13;Two companies Column 13 is connect to be connected on two opposite sides of main load-bearing pillar 12 by attachment beam 14 respectively.
Certainly can also need to be arranged cross section according to the connection between four interior walls is cross vertical bearing unit, The cross vertical load-bearing section for forming cross vertical bearing unit includes a main load-bearing pillar 12 and four connection columns 13;Four A connection column 13 is connected on four sides of main load-bearing pillar 12 by attachment beam 14 respectively.
Wherein more preferably, main load-bearing pillar 12 is the fashioned iron that cross section is box;It is H-type that connection column 13, which is cross section, Fashioned iron;Attachment beam 14 is i-shape steel beam.
Housing Structure System is multilayered structure, and on horizontal cross-section, equal multiple vertical load-bearing septa intersegmentals do not interlock length Setting, i.e., the vertical load-bearing section docking section 32 of adjacent two vertical bearing units 10 is not at same layer, makes vertical load-bearing The connecting portion of section is not completely in same layer, avoids the occurrence of the weak floor vertically connected
In the height direction, the length (height when standing upright) of single vertical load-bearing section is high one of Housing Structure System layer Times or several times.The length (height when standing upright) of preferred vertical load-bearing section be Housing Structure System layer high twice or Three times;The high vertical load-bearing section of twice layer high of vertical load-bearing section and three times layer is staggered.
When multilayered structure, in the height direction, neighbouring two lateral bearing units 20 include upper lateral load-bearing list Member 20 and lower lateral bearing unit 20;Spaced, prefabricated building between upper transverse direction bearing unit 20 and lower lateral bearing unit 20 The edge of plate 30 protrudes into interval, and is overlapped in 20 top grid beam 22 of lower lateral bearing unit.
It is further preferable that lateral supporting frame include the horizontal following grid beam in 21 lower edge of the second retaining wall (not It shows);Lower connection structure (preferably identical as upper connection structure) is preset on the bottom surface of following grid beam;Upper transverse direction bearing unit 20 Downward 30 edge of grafting precast floor slab of lower connection structure reinforcing bar lantern ring 33 in.
Referring to Fig.1 shown in 9 and 20, it is upper transverse direction bearing unit 20 and the vertical bearing unit 10 of two sides between gap and Interval between upper transverse direction bearing unit 20 and lower lateral bearing unit 20 connects to form a U-shaped post-cast strip 40;It uses U-shaped post-cast strip Concrete fills completely, and it is whole that upper transverse direction bearing unit 20, vertical bearing unit 10 and lower lateral bearing unit 20 connect into one Body.
Wherein, top grid beam 22 and following grid beam are preferably i-shape steel beam, and i-shape steel beam includes the edge of a wing and web;On The peg of frame beam 22 and the outer side wing edge surface programming of following grid beam as upper connection structure and lower connection structure.
In any of the above-described technical solution optionally, 30 clinch of precast floor slab, 31 top edge is provided with the rank of sinking Platform, in the height direction, the following grid beam of upper transverse direction bearing unit 20 protrude into stage, stage and upper lateral bearing unit 20 it Between form the inside and outside L-type seam in connection interval.In the height direction, the following grid beam of the prefabricated enclosure wall in top protrudes into 31 stage of clinch Interior, i.e. the top surface of precast floor slab 30 is higher by the lower frame soffit setting of the prefabricated enclosure wall in top.
Wherein, upper connection structure 23 and lower connection structure are preferably peg, naturally it is also possible to connecting rod, lengths of rebar or The substitution such as frame-type connector.Wherein, the wing of multiple peg uniform weldings in the I-beam as top grid beam or following grid beam On edge lateral surface.
Referring in particular to shown in Figure 12, the distal end faces of top grid beam 22 are provided with end plate 24, and top grid beam 22 passes through end plate 24 and high-strength bolt with connect column 13 connect.
It also can according to need one or several diagonal braces of setting on vertical supporting frame and lateral supporting frame;
Wherein, diagonal brace is preferably the fashioned iron that cross section is box.
In the present embodiment, vertical bearing unit, lateral bearing unit and precast floor slab 30 are prefabricated component.Vertically hold Weight frame and lateral supporting frame weld in advance in factory and form general frame, and then the non-structural elements such as retaining wall are in factory In form to form bearing unit with supporting frame formed by integrally casting.
Referring in particular to shown in Fig. 9,30 edge of precast floor slab includes the docking section 32 docked with contiguous prefabricated floor 30, docking The edge top surface in portion 32 is provided with heavy platform, and docking section 32 is provided with overhanging beard muscle 34 in the corresponding side surface of heavy platform;It is adjacent Two precast floor slabs 30 be docking together, the heavy platform on two 30 docking sections 32 of precast floor slab docks to form a U-type groove, two The mutually overlap joint connection of beard muscle 34 on 30 docking section 32 of precast floor slab;Concrete is filled in U-type groove.
The more limb steel columns of assembled-freely-supported concrete plate Housing Structure System disclosed by the invention proposes a kind of by the various knots such as beam column Structure component and retaining wall integral preform are integral unit, realize the housing building of steel-structure body of quick assembling at the construction field (site) System.The feature of system maximum is that multilayered structure component and retaining wall are prefabricated in the factory and are integrated lifting elements, is solving While the problems such as head beam reveals column, building enclosure mismatches, the processing of mounting structure piece, reduce component connecting portion, accelerates Speed of application.
Specifically, the system solves the following problems of traditional steel structure system:
1, the section for reducing single column encrypts the arrangement of column, and multiple steel column integral preforms are vertical bearing unit 10, reduces Flange of beam width solves the problems, such as that head beam reveals column with wall integral preform;
2, using the freely-supported floor of the connection structures such as reinforcing bar lantern ring 33 and flange of beam peg, construction is simple, high reliablity, solution The problem of the live assembling reinforcement complexity of laminated floor slab etc. of having determined, improves construction efficiency;
3, steel column, diagonal brace 15 and enclosure wall are vertical bearing unit 10, girder steel and enclosure wall one in factory's integral preform It is made as lateral bearing unit 20 in advance, solves the problems, such as that retaining wall is unmatched with main body steel construction;
4, two three-decker component and retaining wall are arrived in factory's integral preform, one lifting, reduces structure at the scene Assembly connection position, accelerates speed of application;
5, U-shaped post-cast strip is set in column wall, beam slab connecting portion, solves the problems, such as the processing of piece between assembly unit.
In short, construction is simple of the present invention, high reliablity, avoid a large amount of reinforced bar engineering in construction site, improve construction Efficiency.
Embodiment 2
The invention also discloses a kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System construction method, packets Include following steps:
Step 1:Referring to Fig.1 shown in 0, the vertical load-bearing section of first segment is lifted, the vertical load-bearing section of two layers sections and three layer one The vertical load-bearing septa intersegmental interlaced arrangement of section;
Step 2:Referring to Fig.1 shown in 1, first layer transverse direction bearing unit 20, the top grid beam of lateral bearing unit 20 are lifted 22 both ends are connected with column 13 is connect;
Step 3:Referring to Fig.1 shown in 3 and 14, first layer precast floor slab 30 is lifted, precast floor slab 30 is overlapped on lateral load-bearing On unit 20, the upper connection structure 23 on 22 top surface of top grid beam is plugged on the reinforcing bar lantern ring 33 of the clinch 31 of precast floor slab 30 It is interior;
Step 4:Referring to Fig.1 shown in 5, according to step 2 and three methods, 20 He of second layer transverse direction bearing unit is lifted respectively Second layer precast floor slab 30;
Step 5:Referring to Fig.1 shown in 6, the vertical load-bearing section of the second section is lifted, the vertical load-bearing section of the second section and first segment are vertical Load-bearing section is connected;Vertical load-bearing section docking site is preferably provided in every layer of 1/3 layer of eminence, consequently facilitating operation, mentions High working efficiency.
Step 6:According to Step 2: three and four, the lateral bearing unit 20 and precast floor slab of third to five layers are lifted respectively 30;
Step 7:Referring to Fig.1 shown in 9 and 20, concrete is filled in the gap of lateral 20 two sides of bearing unit and bottom, so that Lateral bearing unit 20, precast floor slab 30 and vertical bearing unit 10 pour integral;
And so on, constantly connect vertical load-bearing section upwards and lift lateral bearing unit 20 and precast floor slab 30 until It is high to set layer.
Referring to Fig.1 shown in 7 and 18, when neighbouring two vertical load-bearing sections connect, the master of two vertical load-bearing sections is held 12 butt weld of weight column connection, connects column 13 and diagonal brace 15 uses high strength exploitation.
Invention construction is simple of the present invention, high reliablity avoid a large amount of reinforced bar engineering in construction site, improve construction effect Rate.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, those skilled in the art should understand that:Its according to So be possible to modify the technical solutions described in the foregoing embodiments, or to some or all of the technical features into Row equivalent replacement;And these are modified or replaceed, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System, which is characterized in that including:Vertical bearing unit, cross To bearing unit and precast floor slab;
The vertical bearing unit includes a vertical load-bearing section, or successively docked up and down by several vertical load-bearing sections and At;
The vertical load-bearing section includes:Vertical supporting frame and the first retaining wall being arranged on the outside of vertical supporting frame; The vertical supporting frame includes connection column;
It is described transverse direction bearing unit include:Lateral supporting frame and the second enclosure wall being arranged on the outside of lateral supporting frame Body;The transverse direction supporting frame includes the horizontal top grid beam in the second retaining wall top edges;
Multiple vertical bearing units are erect as the vertical load-carrying members parallel interval of building;The transverse direction bearing unit is set It sets between the two neighboring vertical bearing unit, the both ends of the top grid beam are respectively arranged with stretching described second and go along with sb. to guard him The connection end of wall;The connection end and the connection column connect, and the transverse direction bearing unit passes through the upper side frame Beam is suspended on the connection column of the two neighboring vertical bearing unit;
The precast floor slab edge includes the clinch for connecting with the lateral bearing unit, and clinch is overlapped on the cross To in the grid beam of bearing unit top, connection structure, the clinch of the precast floor slab are provided on the upper side frame top surface of the beam It is provided with reinforcing bar lantern ring, the upper connection structure is plugged in the reinforcing bar lantern ring, in precast floor slab and the lateral load-bearing list It is integral that first junction casting concrete connect precast floor slab with the lateral bearing unit;It is described transverse direction bearing unit with Concrete is filled in gap between the vertical bearing unit of the left and right sides, so that the transverse direction bearing unit and the left and right sides The vertical bearing unit connection it is integral.
2. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 1, which is characterized in that described Housing Structure System is multilayered structure, and on horizontal cross-section, equal multiple vertical load-bearing septa intersegmentals are not staggered length, The vertical load-bearing section docking site of the vertical bearing unit of i.e. adjacent two is not at same layer.
3. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 2, which is characterized in that in height It spends on direction, the length of the single vertical load-bearing section is one times high or several times of Housing Structure System layer.
4. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 2, which is characterized in that described The length of vertical load-bearing section is high twice or three times of Housing Structure System layer;Twice layer high of the vertical load-bearing section and three Times high vertical load-bearing section of layer is staggered.
5. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 1, which is characterized in that in height It spends on direction, the lateral bearing unit of neighbouring two includes upper lateral bearing unit and lower lateral bearing unit;On Spaced between lateral bearing unit and lower lateral bearing unit, the edge of the precast floor slab protrudes into the interval, and It is overlapped in the grid beam of lower lateral bearing unit top.
6. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 5, which is characterized in that described Lateral supporting frame includes the horizontal following grid beam in the second retaining wall lower edge;On the bottom surface of the following grid beam It is preset with lower connection structure;Precast floor slab edge described in the downward grafting of lower connection structure of the upper lateral bearing unit it is described In reinforcing bar lantern ring.
7. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 5, which is characterized in that described The gap and the upper lateral bearing unit between upper transverse direction bearing unit and the vertical bearing unit of two sides with The interval between lower transverse direction bearing unit connects to form a U-shaped post-cast strip;The U-shaped post-cast strip is filled out completely with concrete It builds, the upper lateral bearing unit, vertical bearing unit and lower lateral bearing unit connection are integral.
8. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 6, which is characterized in that described Upper connection structure and the lower connection structure are peg, connecting rod, lengths of rebar or frame-type connector.
9. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 1, which is characterized in that described Vertically supporting frame further includes:Main load-bearing pillar and attachment beam;The connection column parallel interval is erected at the main load-bearing pillar Outside, the two are fixedly connected by the attachment beam;
Alternatively, vertical supporting frame includes the connection column that two parallel intervals are erect, pass through connection between two connection columns Beam is fixedly connected with diagonal brace.
10. the more limb steel columns of assembled-freely-supported concrete plate Housing Structure System according to claim 9, which is characterized in that described Main load-bearing pillar is the fashioned iron that cross section is box;The connection column is the fashioned iron that cross section is H-type;The attachment beam is I-shaped Section steel beam.
CN201811025332.XA 2018-09-04 2018-09-04 A kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method Pending CN108842910A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811025332.XA CN108842910A (en) 2018-09-04 2018-09-04 A kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811025332.XA CN108842910A (en) 2018-09-04 2018-09-04 A kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method

Publications (1)

Publication Number Publication Date
CN108842910A true CN108842910A (en) 2018-11-20

Family

ID=64189040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811025332.XA Pending CN108842910A (en) 2018-09-04 2018-09-04 A kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method

Country Status (1)

Country Link
CN (1) CN108842910A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372186A (en) * 2018-12-03 2019-02-22 北京工业大学 Assembled frame system with concrete-filled steel tubular split-limb combined special-shaped column and shock-absorbing wall
US11105111B2 (en) * 2019-07-15 2021-08-31 Industry-Academic Cooperation Foundation, Dankook University Buttress assembly for seismic reinforcing of building having non-bearing walls
CN116556547A (en) * 2023-06-09 2023-08-08 河南迅隆实业有限公司 A prefabricated building structure component and assembly method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101390781B1 (en) * 2013-11-27 2014-04-30 (주)에스엠구조안전진단 Floor construction method for steel structure using weak-axis semi-rigid connection of h-shape column
CN205917973U (en) * 2016-07-15 2017-02-01 河北晶通建筑科技股份有限公司 Precast beam integration composite wall panel
CN106401036A (en) * 2016-11-16 2017-02-15 浙江工业大学工程设计集团有限公司 Assembled type steel framework prefabricated concrete floor slab structure
CN207469591U (en) * 2017-10-23 2018-06-08 沈阳建筑大学 Steel and wood composite structure load bearing heat preserving wallboard
CN207739480U (en) * 2018-01-12 2018-08-17 赵志平 A kind of sustainable full module-assembled building system of green
CN208870177U (en) * 2018-09-04 2019-05-17 中冶建筑研究总院有限公司 A prefabricated multi-limb steel column-simple-supported concrete slab residential structural system

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101390781B1 (en) * 2013-11-27 2014-04-30 (주)에스엠구조안전진단 Floor construction method for steel structure using weak-axis semi-rigid connection of h-shape column
CN205917973U (en) * 2016-07-15 2017-02-01 河北晶通建筑科技股份有限公司 Precast beam integration composite wall panel
CN106401036A (en) * 2016-11-16 2017-02-15 浙江工业大学工程设计集团有限公司 Assembled type steel framework prefabricated concrete floor slab structure
CN207469591U (en) * 2017-10-23 2018-06-08 沈阳建筑大学 Steel and wood composite structure load bearing heat preserving wallboard
CN207739480U (en) * 2018-01-12 2018-08-17 赵志平 A kind of sustainable full module-assembled building system of green
CN208870177U (en) * 2018-09-04 2019-05-17 中冶建筑研究总院有限公司 A prefabricated multi-limb steel column-simple-supported concrete slab residential structural system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109372186A (en) * 2018-12-03 2019-02-22 北京工业大学 Assembled frame system with concrete-filled steel tubular split-limb combined special-shaped column and shock-absorbing wall
US11105111B2 (en) * 2019-07-15 2021-08-31 Industry-Academic Cooperation Foundation, Dankook University Buttress assembly for seismic reinforcing of building having non-bearing walls
CN116556547A (en) * 2023-06-09 2023-08-08 河南迅隆实业有限公司 A prefabricated building structure component and assembly method

Similar Documents

Publication Publication Date Title
US11680401B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
CN108842910A (en) A kind of more limb steel columns of assembled-freely-supported concrete plate Housing Structure System and its construction method
CN208870184U (en) A node structure and residential structure system for rigid connection of steel structure beams and columns
CN208870177U (en) A prefabricated multi-limb steel column-simple-supported concrete slab residential structural system
CN108951862B (en) Node structure for rigid connection of rolled steel beam and steel column, manufacturing method and residential structure system
CN108867872B (en) Node structure for rigid connection of steel structure beam column, manufacturing method thereof and residential structure system
CN110512776A (en) A kind of construction method of assembling type steel structure Multicarity steel plate combined shear wall
KR200414349Y1 (en) Connection structure of precast concrete structure
JP4996370B2 (en) Frame assembly method and building frame
CN208950062U (en) A kind of assembled steel frame concrete building plate composite structure
CN208870234U (en) A wall beam unit for prefabricated residential system and its connecting structure
CN108867879A (en) A kind of assembled steel frame concrete building plate composite structure and its construction method
CN208870179U (en) A T-shaped vertical load-bearing member and connecting structure for prefabricated steel structure
CN203834741U (en) Prefabricated steel beam joint L-shaped mixed coupled wall
CN208950463U (en) A kind of prefabricated enclosure wall of steel frame
JPS627339B2 (en)
CN104047380A (en) Assembly steel beam joint T-shaped mixed coupled wall and construction method thereof
EP1431469A2 (en) Method of forming a pillar and its junction with a girder, and pillar thus obtained
CN208870171U (en) L-shaped vertical load-bearing member and connecting structure for prefabricated steel structure
CN208870170U (en) An in-line vertical load-bearing member for prefabricated steel structure
RU110784U1 (en) CONSTRUCTION CONNECTION ASSEMBLY
JP2000303552A (en) How to build a reinforced cage
JP2002146903A (en) Construction method of stairs
CN208870251U (en) A prefabricated floor slab for prefabricated steel structures
CN106032700A (en) Integral template assembling structure of reinforced concrete floor board

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20201209

Address after: 100088 Beijing city Haidian District Xitucheng Road No. 33

Applicant after: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Applicant after: CHINA JINGYE ENGINEERING Corp.,Ltd.

Applicant after: China Metallurgical Industry Co., Ltd

Address before: 100088 Beijing city Haidian District Xitucheng Road No. 33

Applicant before: CENTRAL RESEARCH INSTITUTE OF BUILDING AND CONSTRUCTION CO., LTD. MCC Group

Applicant before: CHINA JINGYE ENGINEERING Corp.,Ltd.