CN108838950A - The special operations bracket of impact drill and the application in beam bottom secondary structure bar planting - Google Patents

The special operations bracket of impact drill and the application in beam bottom secondary structure bar planting Download PDF

Info

Publication number
CN108838950A
CN108838950A CN201810580209.8A CN201810580209A CN108838950A CN 108838950 A CN108838950 A CN 108838950A CN 201810580209 A CN201810580209 A CN 201810580209A CN 108838950 A CN108838950 A CN 108838950A
Authority
CN
China
Prior art keywords
vertical bar
impact drill
bar
bracket
long
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810580209.8A
Other languages
Chinese (zh)
Inventor
杨旭
梁广远
汪从
刘宗宝
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC5 Group Shanghai Corp Ltd
Original Assignee
MCC5 Group Shanghai Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC5 Group Shanghai Corp Ltd filed Critical MCC5 Group Shanghai Corp Ltd
Priority to CN201810580209.8A priority Critical patent/CN108838950A/en
Publication of CN108838950A publication Critical patent/CN108838950A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25DPERCUSSIVE TOOLS
    • B25D16/00Portable percussive machines with superimposed rotation, the rotational movement of the output shaft of a motor being modified to generate axial impacts on the tool bit
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B25HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
    • B25DPERCUSSIVE TOOLS
    • B25D17/00Details of, or accessories for, portable power-driven percussive tools
    • B25D17/28Supports; Devices for holding power-driven percussive tools in working position

Abstract

A kind of special operations bracket of impact drill, including the 1st vertical bar and 4 the 2nd vertical bars, it is characterised in that:1st vertical bar is the long flitch of long 3000mm-4000mm, and the 2nd vertical bar is the long flitch of long 3000mm-4000mm, wherein:The through-hole of 1st vertical bar and the 2nd vertical bar matches, and it is flexibly connected between each other with three pairs of isometric connecting plates, reach parallelogram linkage, the lowermost one end of the connection board of three pairs of isometric connecting plates is equipped with extended end, extended end is used as ripping bar, make the 1st vertical bar being parallel to each other and the 2nd vertical bar make opposite upper and lower displacement under ripping bar effect to change, implements the drilling of impact drill.The advantages of present invention has moving rack structure simple, easy to make, and construction quality is safe and reliable, can satisfy drilling demand completely, is not required to high altitude operation, improves work efficiency, and saves the expense of movable Scaffold and reduces engineering cost.

Description

The special operations bracket of impact drill and the application in beam bottom secondary structure bar planting
Technical field
The present invention relates to a kind of timberings, specifically, being the special operations bracket of impact drill a kind of and secondary in beam bottom Application in structure bar planting.
Background technique
Cao Feidian integrate bonded area innovation undertaking center projects, 5#, 6# apartment first floor, two layers of layer Gao Jun 5m with On.In floor beam bottom secondary structure bar planting drilling, jenny scaffold need to be usually set up, but it is laborious to take a lot of work.
Therefore, for above-mentioned the shortcomings that setting up jenny scaffold and shortcoming, bar planting use can be drilled through by researching and developing Hole, and the special operations bracket and its construction method of the impact drill of human and material resources and financial resources are saved, it is very necessary.
Summary of the invention
The purpose of the present invention is to propose a kind of special operations bracket for reducing high altitude operation, simple and practical impact drill.
It is another object of the present invention to propose a kind of reduction high altitude operation, the special operations of simple and practical impact drill Application of the bracket in floor beam bottom secondary structure bar planting.
To achieve the above object, the technical solution of the invention is as follows:
A kind of special operations bracket of impact drill, including the 1st vertical bar and 4 the 2nd vertical bars, it is characterised in that:
1st vertical bar is the long flitch of long 3000mm-4000mm, on the shaft of the 1st vertical bar bottom it is equidistant be equipped with three it is logical Hole, pitch-row 280mm;Impact drill is fixed with fixed frame in 1st vertical bar top, makes the drill bit of impact drill at the top of the 1st vertical bar;
2nd vertical bar is the long flitch of long 3000mm-4000mm, on the shaft at the top of the 2nd vertical bar it is equidistant be equipped with three it is logical Hole, pitch-row 280mm;
Wherein:The through-hole of 1st vertical bar and the 2nd vertical bar matches, and is flexibly connected between each other with three pairs of isometric connecting plates, each pair of The both ends of connecting plate are clamped on the outside of the 1st vertical bar and the 2nd vertical bar by bolt activity, reach parallelogram linkage, and three Extended end is equipped with to the lowermost one end of the connection board of isometric connecting plate, extended end is used as ripping bar, makes mutually under ripping bar effect The 1st parallel vertical bar and the 2nd vertical bar are made opposite upper and lower displacement and are changed, and the drilling of impact drill is implemented.
The special operations bracket of impact drill of the invention can also be further achieved by the following technical measures.
The special operations bracket of impact drill above-mentioned, wherein the long flitch specification 100*50mm.
The special operations bracket of impact drill above-mentioned, wherein the connecting plate is 14mm thickness multi-layer wood mould plate.
The special operations bracket of impact drill above-mentioned, wherein the ripping bar is long 1000mm flitch, flitch specification is 100* 50mm。
The special operations bracket of impact drill above-mentioned, wherein further including that impact drill and the 1st vertical bar are fastened with iron wire.
A kind of application of the special operations bracket of impact drill in beam bottom secondary structure bar planting.
After adopting the above technical scheme, the special operations bracket of impact drill of the invention and in beam bottom secondary structure bar planting Application have the following advantages that:
1, moving rack structure is simple, easy to make;
2, construction quality is safe and reliable, can satisfy drilling demand completely, is not required to high altitude operation, improves work efficiency;
3, the expense of movable Scaffold is saved, engineering cost is reduced.
Detailed description of the invention
Fig. 1 is the special operations supporting structure schematic diagram of the impact drill of the embodiment of the present invention.
In figure:1 impact drill, 2 fixed frames, 3 the 1st vertical bars, 4 the 2nd vertical bars, 5 ripping bars, 6 bolts, 7 the 1st connecting plates, 8 the 2nd connect Fishplate bar.
Specific embodiment
With reference to embodiments and its attached drawing further explains the present invention.
Embodiment 1
The special operations bracket of impact drill of the invention, including the 1st vertical bar and 4 the 2nd vertical bars.
It is the special operations supporting structure schematic diagram of the impact drill of the embodiment of the present invention referring now to Fig. 1, Fig. 1.As schemed Show, the 1st vertical bar 3 is the long flitch of long 4000mm, equidistant on the shaft of the 1st vertical bar bottom to be equipped with three through-holes, pitch-row 280mm;The fixed impact drill 1 of the fixed frame 2 that 1st vertical bar top flitch makes is wound impact drill and the 1st vertical bar admittedly with iron wire It is fixed secured.Make the drill bit of impact drill at the top of the 1st vertical bar;The long flitch specification 100*50mm.
2nd vertical bar 4 is the long flitch of long 4000mm, equidistant on the shaft at the top of the 2nd vertical bar to be equipped with three through-holes, Pitch-row 280mm.
Wherein:The through-hole of 1st vertical bar and the 2nd vertical bar matches, and is flexibly connected between each other with three pairs of isometric connecting plates, The both ends of each pair of connecting plate are clamped on the outside of the 1st vertical bar and the 2nd vertical bar by 6 activity of bolt, reach parallelogram connection-rod machine Structure, the lowermost one end of the connection board of three pairs of isometric connecting plates are equipped with extended end, and extended end is used as ripping bar 5, under ripping bar effect Make the 1st vertical bar being parallel to each other and the 2nd vertical bar make opposite upper and lower displacement to change, implements the drilling of impact drill.1st connecting plate, 7 He 2nd connecting plate 8 is 14mm thickness multi-layer wood mould plate.The ripping bar is long 1000mm flitch, and flitch specification is 100*50mm.
Embodiment 2
In the present embodiment, make ripping bar using the long flitch of a root long 1m, flitch specification is that 100*50mm substitutes third pair completely Isometric connecting plate is matched with the 1st connecting plate 7, the 2nd connecting plate 8, and upper and lower pressing ripping bar can freely control applying for impact drill Work height.The rest part of the present embodiment is the same as embodiment 1.
Embodiment 3
Application of the special operations bracket of impact drill of the invention in floor beam bottom secondary structure bar planting.It is secondary in floor beam bottom Construction technology process in structure bar planting:Positioning, unwrapping wire-bar planting drilling-drilling cleaning and the processing-drilling of bar planting are tested Receipts-preparation structure glue-drilling injecting glue-implantation reinforcing bar is simultaneously fixed temporarily-solidify-bar planting bar drawing inspection-bar planting protection and coagulation The casting of soil.In practice of construction in accordance with《Concrete structure reinforcement design specification》(GB50367-2006)Every predetermined operation. The drilling depth of impact drill is 120mm-375mm.
The present invention is with substantive distinguishing features and significant technological progress, the special operations bracket of impact drill of the invention and in beam bottom Application in secondary structure bar planting, movable support cost of manufacture is extremely low, and material is easy to get, and construction method is simple, easy to operate. By the use of movable support, drilling demand can satisfy completely, save the expense of movable Scaffold, be not required to high altitude operation, It improves work efficiency.
The special operations bracket of impact drill of the invention and application method in beam bottom secondary structure bar planting are in Cao Feidian It is used in comprehensive bonded area innovation undertaking center projects engineering, significant effect improves work efficiency, and speeds up the work.
Above embodiments are used for illustrative purposes only, rather than limitation of the present invention, the technology people in relation to technical field Member, without departing from the spirit and scope of the present invention, can also make various transformation or variation.Therefore, all equivalent Technical solution also should belong to scope of the invention, should be limited by each claim.

Claims (6)

1. a kind of special operations bracket of impact drill, including the 1st vertical bar and 4 the 2nd vertical bars, it is characterised in that:
1st vertical bar is the long flitch of long 3000mm-4000mm, on the shaft of the 1st vertical bar bottom it is equidistant be equipped with three it is logical Hole, pitch-row 280mm;Impact drill is fixed with fixed frame in 1st vertical bar top, makes the drill bit of impact drill at the top of the 1st vertical bar;
2nd vertical bar is the long flitch of long 3000mm-4000mm, on the shaft at the top of the 2nd vertical bar it is equidistant be equipped with three it is logical Hole, pitch-row 280mm;
Wherein:The through-hole of 1st vertical bar and the 2nd vertical bar matches, and is flexibly connected between each other with three pairs of isometric connecting plates, each pair of The both ends of connecting plate are clamped on the outside of the 1st vertical bar and the 2nd vertical bar by bolt activity, reach parallelogram linkage, and three Extended end is equipped with to the lowermost one end of the connection board of isometric connecting plate, extended end is used as ripping bar, makes mutually under ripping bar effect The 1st parallel vertical bar and the 2nd vertical bar are made opposite upper and lower displacement and are changed, and the drilling of impact drill is implemented.
2. the special operations bracket of impact drill as described in claim 1, which is characterized in that the long flitch specification 100* 50mm。
3. the special operations bracket of impact drill as described in claim 1, which is characterized in that the connecting plate is 14mm thickness multilayer Plank sheathing.
4. the special operations bracket of impact drill as described in claim 1, which is characterized in that the ripping bar is long 1000mm wood Side, flitch specification are 100*50mm.
5. the special operations bracket of impact drill as described in claim 1, which is characterized in that further include with iron wire by impact drill with 1st vertical bar is fastened.
6. a kind of application of special operations bracket of impact drill as described in claim 1 in beam bottom secondary structure bar planting.
CN201810580209.8A 2018-06-07 2018-06-07 The special operations bracket of impact drill and the application in beam bottom secondary structure bar planting Pending CN108838950A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810580209.8A CN108838950A (en) 2018-06-07 2018-06-07 The special operations bracket of impact drill and the application in beam bottom secondary structure bar planting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810580209.8A CN108838950A (en) 2018-06-07 2018-06-07 The special operations bracket of impact drill and the application in beam bottom secondary structure bar planting

Publications (1)

Publication Number Publication Date
CN108838950A true CN108838950A (en) 2018-11-20

Family

ID=64211394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810580209.8A Pending CN108838950A (en) 2018-06-07 2018-06-07 The special operations bracket of impact drill and the application in beam bottom secondary structure bar planting

Country Status (1)

Country Link
CN (1) CN108838950A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201881357U (en) * 2010-11-30 2011-06-29 中冶建工有限公司 Mounting support of rebar planting impact drill
CN102248200A (en) * 2011-07-05 2011-11-23 中国新兴保信建设总公司 Smart tool for planting reinforcing bars and punching holes on roof
CN202199803U (en) * 2011-09-05 2012-04-25 山西四建集团有限公司 Drilling device for bonded rebar
CN204975422U (en) * 2015-08-26 2016-01-20 中冶天工集团有限公司 A lift drilling equipment for install expansion bolts on roof boarding
CN207139708U (en) * 2017-04-14 2018-03-27 滨州医学院 A kind of Mobile vertical rig

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201881357U (en) * 2010-11-30 2011-06-29 中冶建工有限公司 Mounting support of rebar planting impact drill
CN102248200A (en) * 2011-07-05 2011-11-23 中国新兴保信建设总公司 Smart tool for planting reinforcing bars and punching holes on roof
CN202199803U (en) * 2011-09-05 2012-04-25 山西四建集团有限公司 Drilling device for bonded rebar
CN204975422U (en) * 2015-08-26 2016-01-20 中冶天工集团有限公司 A lift drilling equipment for install expansion bolts on roof boarding
CN207139708U (en) * 2017-04-14 2018-03-27 滨州医学院 A kind of Mobile vertical rig

Similar Documents

Publication Publication Date Title
CN104942506B (en) Low-floor bogie outside beam assembling and welding tool and assembling and welding method thereof
CN108838950A (en) The special operations bracket of impact drill and the application in beam bottom secondary structure bar planting
CN105500474A (en) Laminated wood and production method and application thereof
CN103628675A (en) Bailey beam type formwork supporting system and construction method thereof for super high-rise transfer story crossbeam
CN103321449B (en) Frame construction adds the processing method of layer building
CN102605945B (en) Manufacturing method of big wood formwork
CN206220474U (en) A kind of plate device of bamboo-wood structure glued board and shaped steel combination
CN102189411B (en) Welding rack structure of numerically controlled drilling and milling machine
CN206233358U (en) Modularization beam-to-column connection device
CN104929294A (en) Concrete composite plate with built-in cross hollow square steel pipes
CN106522363B (en) Modularization beam-to-column connection device and attaching method thereof
JP3211545U (en) Concrete formwork structure
CN206859479U (en) A kind of steel bar girder laminated floor slab
CN106192772B (en) Jack bascule and mobile formwork for mobile formwork
CN102587688B (en) Method for simultaneous construction of additionally built superstructure and reinforcement of original understructure
CN205400120U (en) A reinforced structure for reinforcing concrete post roof beam
CN206465601U (en) A kind of SIP wallboards cold pressing device
CN211646905U (en) Steel bar truss prestressed concrete superimposed sheet
CN212002421U (en) Reinforced structure for reinforcing reinforced concrete beam by adopting angle steel
CN212772782U (en) Variable steel frame for super high-rise building construction
CN211735796U (en) Connecting structure of slotted wood beam and concrete slab
CN210685147U (en) Reinforced concrete combined prefabricated bottom plate
Grenley 25.-The Effect of Edge Load on the Racking Strength of Clay Masonry
CN210177752U (en) Combined movable wall
CN202064623U (en) Assembly type integral lifting scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181120

RJ01 Rejection of invention patent application after publication