CN108827546A - A kind of construction supervision external wall water test device - Google Patents
A kind of construction supervision external wall water test device Download PDFInfo
- Publication number
- CN108827546A CN108827546A CN201810962528.5A CN201810962528A CN108827546A CN 108827546 A CN108827546 A CN 108827546A CN 201810962528 A CN201810962528 A CN 201810962528A CN 108827546 A CN108827546 A CN 108827546A
- Authority
- CN
- China
- Prior art keywords
- fixed frame
- wall
- water
- spray pipe
- absorbent module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01M—TESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
- G01M3/00—Investigating fluid-tightness of structures
- G01M3/02—Investigating fluid-tightness of structures by using fluid or vacuum
Abstract
The invention discloses a kind of construction supervision external wall water test devices, its key points of the technical solution are that:A kind of construction supervision external wall water test device, including water tank, outlet pipe, spray pipe, water pump and fixed mechanism, water pump is located in water tank and connect with outlet pipe, outlet pipe is connect with spray pipe, spray pipe is in horizontally disposed, spray pipe is provided with several hole for water sprayings towards wall, fixed mechanism includes two fixed frames for being set to spray pipe both ends, set on fixed frame towards the first absorbent module of wall, set on fixed frame and the second absorbent module below the first absorbent module, first absorbent module is close to the upper surface of fixed frame, second absorbent module is slidably connected to the fixed frame along the vertical direction, spray pipe is slidably connected to two fixed frames along the vertical direction, the moving assembly that fixed mount setting has driving spray pipe to move up and down.The present invention is capable of the infiltration situation of efficient and convenient test architecture exterior wall.
Description
Technical field
The invention belongs to Architectural Equipment fields, survey more specifically, it relates to which a kind of construction supervision is seeped water with external wall
Trial assembly is set.
Background technique
With the increase of skyscraper, external wall of high-rise building or window side infiltration situation increase, and when engineering construction, generally occur
The phenomenon that leak, is more, when exterior wall is examined and seeped water, often goes with water pipe water drenching or when rainy to check, find out several
Leakage point is repaired, check potential leakage point without careful, the hidden danger of leak is caused to exterior walls of buildings, in the future
In use process, will occur the case where exterior wall or infiltration of window side when raining larger, and seriously affect the normal use of building.
Therefore it needs to propose the new technical solution of one kind to solve the above problems.
Summary of the invention
In view of the deficiencies of the prior art, the present invention intends to provide a kind of construction supervision to be seeped water with external wall
Test device is capable of the infiltration situation of efficient and convenient test architecture exterior wall.
To achieve the above object, the present invention provides following technical solutions:A kind of construction supervision external wall infiltration survey
Trial assembly is set, including water tank, outlet pipe, spray pipe, water pump and fixed mechanism, and the water pump is located in water tank and and outlet pipe
Connection, the outlet pipe are connect with the spray pipe, and for the spray pipe in being horizontally disposed with, the spray pipe is provided with several courts
To the hole for water spraying of wall, the fixed mechanism include two be set to the fixed frame at the spray pipe both ends, be set to it is described solid
Determine frame towards wall the first absorbent module, be set to the fixed frame and be located at the first absorbent module below the second absorption group
Part, the fixed frame is in being vertically arranged, and first absorbent module is close to the upper surface of fixed frame, second absorbent module
It is slidably connected to the fixed frame along the vertical direction, the spray pipe is slidably connected to two fixed frames along the vertical direction,
The fixed mount setting has the moving assembly for driving the spray pipe to move up and down.
By using above-mentioned technical proposal, fixed frame is fixed on by wall by the first absorbent module and the second absorbent module
Water in water tank to reach fixed spray pipe, while being pumped into spray pipe by water pump and sprayed water to wall, passed through simultaneously by body
Moving assembly driving spray pipe moves up and down, and increases the area that spray pipe sprays water to wall;Then by the first absorbent module with
First absorbent module, to reach fixed frame relative to the second absorbent module slide downward, is connected to by wall separation again later
Wall, and separate the second absorbent module with wall, the second absorbent module is downwardly gravitating move a certain distance after adsorb again
It is connected to wall.Fixed frame and spray pipe move down certain distance in this way, and convenient again to wall different location water spray, and
Facilitate test wall leakage situation.
The present invention is further arranged to:The moving assembly includes the cunning for being opened in the fixed frame towards spray pipe side wall
Slot, the feed screw nut for being fixedly connected on one of them sliding block, turns the sliding block for being slidably connected to the sliding slot along the vertical direction
It is dynamic to be connected to the fixed frame and lead screw corresponding with feed screw nut, be fixedly connected on the fixed frame upper surface and drive silk
The driving motor of thick stick rotation, the lead screw are in be vertically arranged and be threadedly coupled with feed screw nut.
By using above-mentioned technical proposal, lead screw rotation is driven by driving motor, lead screw drives feed screw nut and sliding block
It moves up and down, reaches driving spray pipe in this way and moved up and down relative to fixed frame.
The present invention is further arranged to:First absorbent module includes being fixedly connected on the fixed frame towards wall side
First electric cylinder of wall, is fixedly connected on described first at the first link block for being fixedly connected on the first electric cylinder output shaft
Link block is simultaneously adsorbed in the first bleeder sucker of wall, is set to first link block and be used for the first bleeder sucker
First asepwirator pump of pumping.
By using above-mentioned technical proposal, exporting elongate axis by the first electric cylinder makes the first bleeder sucker be connected to wall
Body, while the first bleeder sucker is evacuated by the first asepwirator pump, so that reaching the first bleeder sucker is pulled on wall
Body makes fixed frame be fixed on wall.
The present invention is further arranged to:Second absorbent module is slidably connected to the sliding of fixed frame along the vertical direction
Block, is fixedly connected on the second electronic of the slipping block at the slippage slot for being opened in the fixed frame and sliding up and down for slipping block
Cylinder, the second link block for being fixedly connected on the second electric cylinder output shaft are fixedly connected on second link block and adsorb
In wall the second bleeder sucker, be set to second link block and for the second bleeder sucker be evacuated second suction
Air pump.
By using above-mentioned technical proposal, wall is pulled on by the second bleeder sucker and is facilitated the second electric cylinder and cunning
It moves block and is fixed on wall, and when needing that fixed frame is driven to move down, first stop the first asepwirator pump air-breathing, while passing through the
One electric cylinder pulls the first bleeder sucker, separates the first bleeder sucker with wall, such fixed frame just passes through slippage slot
Certain distance is moved towards relative to slipping block, then drives the first bleeder sucker to be connected to wall by the first electric cylinder again
Body, and the first bleeder sucker is evacuated by the first asepwirator pump, so that the first bleeder sucker is pulled on wall;Then stop
Two asepwirator pumps, and separated the second bleeder sucker with wall by the second electric cylinder, such slipping block and the second electric cylinder
Certain distance is moved down with respect to fixed frame, the second bleeder sucker is then pulled on wall again, thus reaches solid
Determine frame to move down, and spray pipe is facilitated to spray water remaining position of wall.
The present invention is further arranged to:The outlet pipe is provided with the regulating valve for adjusting outlet pipe water yield.
By using above-mentioned technical proposal, by adjusting valve regulation outlet pipe water yield.
The present invention is further arranged to:Connecing for the water for receiving hole for water spraying ejection is provided between two fixed frames
Box is received, the reception box is fixedly connected on two fixed frame lower end surfaces, and the reception cassette bottom face is connected with water supply reflow tank
Return pipe.
By using above-mentioned technical proposal, the water that hole for water spraying sprays is received by receiving box, the received water of box is received and passes through
In return pipe reflow tank.
The present invention is further arranged to:The reception box upper surface is hinged with the deflector for fitting in the wall, water conservancy diversion
Plate and the reception box hinged end are provided with the torsional spring that driving deflector upper surface fits in wall.
By using above-mentioned technical proposal, deflector upper surface is driven to fit in wall by torsional spring, to facilitate water spray
The water that hole sprays is flowed into along deflector and is received in box, is facilitated and is received the water that hole for water spraying sprays.
The present invention is further arranged to:The fixed frame upper surface is fixedly connected with the pull ring for rope connection.
By using above-mentioned technical proposal, by rope, system is connected to pull ring, it is possible to prevente effectively from fixed frame is fallen down, mentions
The high security performance of invention.
In conclusion the invention has the advantages that:
When testing external wall seepage, fixed frame is fixed on by wall by the first bleeder sucker and the second bleeder sucker, from
And reach fixed spray pipe, while the water in water tank is pumped by spray pipe by water pump and is sprayed water to wall, while passing through driving
The rotation of motor driven lead screw, and drive sliding block and spray pipe to move up and down by lead screw, increase the face that spray pipe sprays water to wall
Product;Then by first stopping the first asepwirator pump air-breathing, while the first bleeder sucker is pulled by the first electric cylinder, makes the first pumping
Gas formula sucker is separated with wall, and such fixed frame just passes through slippage slot and moves towards certain distance relative to slipping block, then again
It drives the first bleeder sucker to be connected to wall by the first electric cylinder, and the first bleeder sucker is taken out by the first asepwirator pump
Gas makes the first bleeder sucker be pulled on wall;Then stop the second asepwirator pump, and be evacuated by the second electric cylinder by second
Formula sucker is separated with wall, and such slipping block and the second electric cylinder move down certain distance with respect to fixed frame, then again
Second bleeder sucker is pulled on wall, thus reaches fixed frame and moves down, and is convenient again to wall different location
Water spray, and facilitate test wall leakage situation.
Detailed description of the invention
Fig. 1 is the perspective view of the present embodiment;
Fig. 2 is the present embodiment cross-sectional view one, is mainly used for showing sliding slot and sliding block;
Fig. 3 is the present embodiment cross-sectional view two, is mainly used for showing the first absorbent module and the second absorbent module.
Detailed description of the invention:1, water tank;2, outlet pipe;3, spray pipe;4, water pump;5, hole for water spraying;6, fixed frame;7, sliding slot;8,
Sliding block;9, feed screw nut;10, lead screw;11, driving motor;12, the first electric cylinder;13, the first link block;14, the first bleeder
Sucker;15, the first asepwirator pump;16, slipping block;17, slippage slot;18, the second electric cylinder;19, the second link block;20, it second takes out
Gas formula sucker;21, the second asepwirator pump;22, regulating valve;23, box is received;24, return pipe;25, deflector;26, torsional spring;27, it draws
Ring.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Wherein identical components are presented with like reference characters.It should be noted that word used in the following description
Language "front", "rear", "left", "right", "up" and "down" refer to the direction in attached drawing, word " bottom surface " and " top surface ", "inner" and
"outside" refers respectively to the direction towards or away from geometric center of specific component.
As depicted in figs. 1 and 2, a kind of construction supervision external wall water test device, including water tank 1, outlet pipe 2,
Spray pipe 3, water pump 4, water pump 4 are located in water tank 1 and connect with outlet pipe 2, and outlet pipe 2 is connect with spray pipe 3, and spray pipe
3 in being horizontally disposed with, and the side wall of spray pipe 3 towards wall offers several hole for water sprayings 5.Spray pipe 3, which is provided with, consolidates spray pipe 3
Due to the fixed mechanism of wall, fixed mechanism includes two fixed frames 6 for being respectively arranged at 3 both ends of spray pipe, and fixed frame 6 is in perpendicular
Straight setting, spray pipe 3 is slidably connected to fixed frame 6 along the vertical direction, and fixed frame 6 is provided on driving spray pipe 3 and moves down
Dynamic moving assembly, and the side wall of fixed frame 6 towards wall is provided with the first absorbent module and the second absorbent module, and second inhales
Attached component is located at the underface of the first absorbent module, and the first absorbent module is close to 6 upper surface of fixed frame, the second absorption group
Part is slidably connected to fixed frame 6 along the vertical direction.It is by the first absorbent module and the second absorbent module that fixed frame 6 is fixed in this way
In wall, to reach fixed spray pipe 3, while the water in water tank 1 is pumped by spray pipe 3 by water pump 4 and is sprayed water to wall,
It drives spray pipe 3 to move up and down by moving assembly simultaneously, increases the area that spray pipe 3 sprays water to wall;Then pass through first
Absorbent module is separated with wall, to reach fixed frame 6 relative to the second absorbent module slide downward, later again by the first absorption
Component is connected to wall, and separates the second absorbent module with wall, and the second absorbent module is downwardly gravitating to be moved a certain distance
Absorption is connected to wall again afterwards.Fixed frame 6 and spray pipe 3 in this way moves down certain distance, and it is convenient again to wall not
It sprays water with position, and facilitates test wall leakage situation.
As shown in Fig. 2, moving assembly includes the sliding slot 7 for being opened in fixed frame 6 towards 3 side wall of spray pipe, sliding slot 7 is in vertical
Setting, and sliding block 8 is slidably connected in sliding slot 7, the both ends of spray pipe 3 are fixedly connected with corresponding sliding block 8 respectively, wherein one
A sliding block 8 is fixedly connected with feed screw nut 9, and corresponding fixed frame 6 is rotatably connected to the silk being threadedly coupled with feed screw nut 9
Thick stick 10, lead screw 10 are in be vertically arranged, and 6 upper surface of fixed frame is fixedly connected with the driving motor 11 that driving lead screw 10 rotates.
Lead screw 10 is driven to rotate by driving motor 11 in this way, lead screw 10 drives feed screw nut 9 and sliding block 8 to move up and down, and reaches in this way
Driving spray pipe 3 is moved up and down relative to fixed frame 6.
As shown in figure 3, the first absorbent module includes being fixedly connected on first electric cylinder of the fixed frame 6 towards wall side wall
12, the first electric cylinder 12 is close to 6 upper surface of fixed frame, and 12 output shaft of the first electric cylinder is towards wall, and the first electric cylinder
12 output shafts are fixedly connected with the first link block 13, and the first link block 13 is fixedly connected with the first bleeder suction for being adsorbed in wall
Disk 14, while the first link block 13 is equipped with the first asepwirator pump 15 to the pumping of the first bleeder sucker 14, the first asepwirator pump 15
It can be miniature asepwirator pump.Exporting elongate axis by the first electric cylinder 12 in this way makes the first bleeder sucker 14 be connected to wall,
First bleeder sucker 14 is evacuated by the first asepwirator pump 15 simultaneously, is pulled on to reach the first bleeder sucker 14
Wall makes fixed frame 6 be fixed on wall.
As shown in figure 3, the second absorbent module includes the slipping block 16 for being slidably connected to fixed frame 6 along the vertical direction, it is fixed
Frame 6 offers the slippage slot 17 slided up and down for slipping block 16, and slipping block 16 is fixedly connected with the second electric cylinder 18, the second electricity
18 output shaft of cylinder is moved towards wall, and 18 output shaft of the second electric cylinder is fixedly connected with the second link block 19, the second link block 19
It is fixedly connected with the second bleeder sucker 20 for being adsorbed in wall, and the second link block 19 is equipped with to the second bleeder sucker
Second asepwirator pump 21 of 20 pumpings.Wall is pulled on by the second bleeder sucker 20 to facilitate the second electric cylinder 18 and slipping block
16 are fixed on wall, and when needing that fixed frame 6 is driven to move down, first stop 15 air-breathing of the first asepwirator pump, pass through simultaneously
First electric cylinder 12 pulls the first bleeder sucker 14, separates the first bleeder sucker 14 with wall, and such fixed frame 6 is just logical
It crosses slippage slot 17 and moves towards certain distance relative to slipping block 16, the first bleeder is then driven by the first electric cylinder 12 again
Sucker 14 is connected to wall, and is evacuated by the first asepwirator pump 15 to the first bleeder sucker 14, makes the first bleeder sucker 14
It is pulled on wall;Then stop the second asepwirator pump 21, and pass through the second electric cylinder 18 for the second bleeder sucker 20 and wall
Separation, such slipping block 16 and the second electric cylinder 18 move down certain distance with respect to fixed frame 6, then take out again by second
Gas formula sucker 20 is pulled on wall, thus reaches fixed frame 6 and moves down, and spray pipe 3 is facilitated to spray remaining position of wall
Water.
In order to facilitate 5 amount of water sprayed of hole for water spraying is adjusted, as shown in Figure 1, outlet pipe 2, which is equipped with, adjusts 2 water yield of outlet pipe
Regulating valve 22, regulating valve 22 can be ball valve, adjust 2 water yield of outlet pipe by regulating valve 22.
The water sprayed in order to facilitate recycling hole for water spraying 5 is equipped with reception between two fixed frames 6 as shown in figures 1 and 3
Box 23 receives box 23 and is located at the lower end surface of two fixed frames 6, and receives 23 bottom surface of box and be connected with the return water connecting with water tank 1
Pipe 24, in this way the reception received water of box 23 pass through in 24 reflow tank 1 of return pipe;Receiving 23 upper surface of box is hinged with fitting simultaneously
In the deflector 25 of wall, 25 upper surface of deflector fits in wall, and deflector 25 is set with 23 hinged end of reception box
It is equipped with the torsional spring 26 that driving 25 upper surface of deflector fits in wall.25 upper surface of deflector is driven to fit in wall by torsional spring 26
Body receives in box 23 so that the water for facilitating hole for water spraying 5 to spray is flowed into along deflector 25, facilitates and receives the water that hole for water spraying 5 sprays.
As shown in Figure 1,6 upper surface of fixed frame is also fixedly connected with the pull ring 27 connect for rope system.Pass through rope system in this way
It is connected to pull ring 27, it is possible to prevente effectively from fixed frame 6 is fallen down, improves the security performance of invention.
It is by the first bleeder sucker 14 and the second bleeder sucker 20 that fixed frame 6 is fixed when testing external wall seepage
In wall, to reach fixed spray pipe 3, while the water in water tank 1 is pumped by spray pipe 3 by water pump 4 and is sprayed water to wall,
It drives lead screw 10 to rotate by driving motor 11 simultaneously, and drives sliding block 8 and spray pipe 3 to move up and down by lead screw 10, increase
The area that spray pipe 3 sprays water to wall;Then it by first stopping 15 air-breathing of the first asepwirator pump, while being drawn by the first electric cylinder 12
Dynamic first bleeder sucker 14, separates the first bleeder sucker 14 with wall, and such fixed frame 6 is just opposite by slippage slot 17
Certain distance is moved towards in slipping block 16, then drives the first bleeder sucker 14 to be connected to wall by the first electric cylinder 12 again
Body, and first bleeder sucker 14 is evacuated by the first asepwirator pump 15, so that the first bleeder sucker 14 is pulled on wall;Then
Stop the second asepwirator pump 21, and is separated the second bleeder sucker 20 with wall by the second electric cylinder 18, such slipping block
16 and second electric cylinder 18 with respect to fixed frame 6 move down certain distance, then the second bleeder sucker 20 is attracted again
In wall, thus reach fixed frame 6 and move down, and is convenient again to wall different location water spray, and facilitates test wall
Seep water situation.
Specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
It can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as in this hair
All by the protection of Patent Law in bright scope of the claims.
Claims (8)
1. a kind of construction supervision external wall water test device, including water tank(1), outlet pipe(2), spray pipe(3), water pump
(4)And fixed mechanism, the water pump(4)Positioned at water tank(1)Interior and and outlet pipe(2)Connection, the outlet pipe(2)With institute
State spray pipe(3)Connection, the spray pipe(3)In horizontally disposed, the spray pipe(3)It is provided with several sprays towards wall
Water hole(5), it is characterised in that:The fixed mechanism includes two and is set to the spray pipe(3)The fixed frame at both ends(6), set
It is placed in the fixed frame(6)Towards wall the first absorbent module, be set to the fixed frame(6)And it is located at the first absorbent module
Second absorbent module of lower section, the fixed frame(6)In being vertically arranged, first absorbent module is close to fixed frame(6)'s
Upper surface, second absorbent module are slidably connected to the fixed frame along the vertical direction(6), the spray pipe(3)Along vertical
Direction is slidably connected to two fixed frames(6), the fixed frame(6)It is provided with the driving spray pipe(3)It moves up and down
Moving assembly.
2. a kind of construction supervision according to claim 1 external wall water test device, it is characterised in that:The shifting
Dynamic component includes being opened in the fixed frame(6)Towards spray pipe(3)The sliding slot of side wall(7), be along the vertical direction slidably connected to
The sliding slot(7)Sliding block(8), be fixedly connected on one of them described sliding block(8)Feed screw nut(9), be rotationally connected with institute
State fixed frame(6)And and feed screw nut(9)Corresponding lead screw(10), be fixedly connected on the fixed frame(6)It simultaneously drives upper surface
Dynamic lead screw(10)The driving motor of rotation(11), the lead screw(10)In being vertically arranged and and feed screw nut(9)It is threadedly coupled.
3. a kind of construction supervision according to claim 2 external wall water test device, it is characterised in that:Described
One absorbent module includes being fixedly connected on the fixed frame(6)Towards the first electric cylinder of wall side wall(12), be fixedly connected on
First electric cylinder(12)First link block of output shaft(13), be fixedly connected on first link block(13)And it is adsorbed in
First bleeder sucker of wall(14), be set to first link block(13)And for the first bleeder sucker(14)It takes out
First asepwirator pump of gas(15).
4. a kind of construction supervision according to claim 3 external wall water test device, it is characterised in that:Described
Two absorbent modules are slidably connected to fixed frame along the vertical direction(6)Slipping block(16), be opened in the fixed frame(6)And for cunning
Move block(16)The slippage slot slided up and down(17), be fixedly connected on the slipping block(16)The second electric cylinder(18), fixed connect
It is connected to second electric cylinder(18)Second link block of output shaft(19), be fixedly connected on second link block(19)And it inhales
Invest the second bleeder sucker of wall(20), be set to second link block(19)And for the second bleeder sucker
(20)Second asepwirator pump of pumping(21).
5. a kind of construction supervision according to claim 1 external wall water test device, it is characterised in that:It is described go out
Water pipe(2)It is provided with adjusting outlet pipe(2)The regulating valve of water yield(22).
6. a kind of construction supervision according to claim 1 external wall water test device, it is characterised in that:Two institutes
State fixed frame(6)Between be provided with for receiving hole for water spraying(5)The reception box of the water of ejection(23), the reception box(23)It is fixed
It is connected to two fixed frames(6)Lower end surface, the reception box(23)Bottom surface is connected with water supply reflow tank(1)Return pipe
(24).
7. a kind of construction supervision according to claim 6 external wall water test device, it is characterised in that:It is described to connect
Receive box(23)Upper surface is hinged with the deflector for fitting in the wall(25), deflector(25)With the reception box(23)Hingedly
End is provided with driving deflector(25)Upper surface fits in the torsional spring of wall(26).
8. a kind of construction supervision according to claim 1 external wall water test device, it is characterised in that:It is described solid
Determine frame(6)Upper surface is fixedly connected with the pull ring for rope connection(27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810962528.5A CN108827546B (en) | 2018-08-22 | 2018-08-22 | Building outer wall infiltration testing arrangement for building supervision |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810962528.5A CN108827546B (en) | 2018-08-22 | 2018-08-22 | Building outer wall infiltration testing arrangement for building supervision |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108827546A true CN108827546A (en) | 2018-11-16 |
CN108827546B CN108827546B (en) | 2020-03-24 |
Family
ID=64150432
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810962528.5A Active CN108827546B (en) | 2018-08-22 | 2018-08-22 | Building outer wall infiltration testing arrangement for building supervision |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108827546B (en) |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110749534A (en) * | 2019-11-21 | 2020-02-04 | 盐城市兆泉项目管理有限公司 | Window limit infiltration testing arrangement is used in engineering supervision |
CN111610132A (en) * | 2020-06-14 | 2020-09-01 | 无锡踏达机电科技有限公司 | Wall body water seepage performance check out test set for construction |
CN111678645A (en) * | 2020-06-01 | 2020-09-18 | 合肥工大建设监理有限责任公司 | Building outer wall infiltration testing arrangement for building supervision |
CN111812006A (en) * | 2020-07-08 | 2020-10-23 | 惠州市筑成工程管理有限公司 | Building outer wall and window limit infiltration testing arrangement for engineering supervision |
CN111879675A (en) * | 2020-07-24 | 2020-11-03 | 惠州建安工程项目管理有限公司 | Window infiltration testing arrangement is used in engineering supervision |
CN112113712A (en) * | 2020-09-14 | 2020-12-22 | 福建互华土木工程管理有限公司 | Detection device and method for detecting quality defects of building outer wall |
CN113008458A (en) * | 2021-02-24 | 2021-06-22 | 新疆卓越工程项目管理有限公司 | Building outer wall infiltration testing arrangement for building supervision |
CN113075115A (en) * | 2021-03-17 | 2021-07-06 | 福建祥和工程项目管理有限公司 | Building outer wall water seepage testing device for building supervision and detecting method |
CN113212580A (en) * | 2021-04-26 | 2021-08-06 | 安徽宏基建设项目管理有限公司 | Engineering is managed with building outer wall infiltration testing arrangement |
CN113310870A (en) * | 2021-05-20 | 2021-08-27 | 丁先喜 | Seepage testing device for project supervision |
CN113820338A (en) * | 2021-03-11 | 2021-12-21 | 深圳市国浩土地房地产资产评估咨询有限公司 | Wall defect detection equipment for real estate assessment |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004093309A (en) * | 2002-08-30 | 2004-03-25 | Kumagai Gumi Co Ltd | Method for sprinkling on wall surface |
CN202442846U (en) * | 2012-03-07 | 2012-09-19 | 天津东正测控技术发展有限公司 | Sprinkling test device for building external eave doors and windows |
CN203263305U (en) * | 2013-03-14 | 2013-11-06 | 青岛大学 | Wall robot cleaner |
CN104015832A (en) * | 2014-06-17 | 2014-09-03 | 东南大学 | Pneumatic wall-climbing robot |
CN104545670A (en) * | 2015-01-16 | 2015-04-29 | 郑州电力高等专科学校 | High-rise external wall remote control glass wiping device |
CN205612411U (en) * | 2016-03-27 | 2016-10-05 | 哈尔滨工大服务机器人有限公司 | Outer wall clearing robot for building |
CN205670066U (en) * | 2016-06-12 | 2016-11-02 | 王炜平 | A kind of construction supervision external wall and window limit water test device |
CN106419722A (en) * | 2016-10-28 | 2017-02-22 | 唐山新禾智能科技有限公司 | Automatic glass cleaning robot |
CN106725141A (en) * | 2017-01-23 | 2017-05-31 | 北京嘉寓门窗幕墙股份有限公司 | A kind of leaping over obstacles outside Wall Cleaning machine people and operating method |
CN206772500U (en) * | 2017-04-20 | 2017-12-19 | 中国建筑第二工程局有限公司 | A kind of multi-functional exterior window water drenching detection means |
CN107687920A (en) * | 2017-09-04 | 2018-02-13 | 吴步晨 | A kind of construction supervision construction wall water test device |
CN107692920A (en) * | 2017-11-10 | 2018-02-16 | 安徽工程大学 | A kind of cleaning glass machine people |
-
2018
- 2018-08-22 CN CN201810962528.5A patent/CN108827546B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004093309A (en) * | 2002-08-30 | 2004-03-25 | Kumagai Gumi Co Ltd | Method for sprinkling on wall surface |
CN202442846U (en) * | 2012-03-07 | 2012-09-19 | 天津东正测控技术发展有限公司 | Sprinkling test device for building external eave doors and windows |
CN203263305U (en) * | 2013-03-14 | 2013-11-06 | 青岛大学 | Wall robot cleaner |
CN104015832A (en) * | 2014-06-17 | 2014-09-03 | 东南大学 | Pneumatic wall-climbing robot |
CN104545670A (en) * | 2015-01-16 | 2015-04-29 | 郑州电力高等专科学校 | High-rise external wall remote control glass wiping device |
CN205612411U (en) * | 2016-03-27 | 2016-10-05 | 哈尔滨工大服务机器人有限公司 | Outer wall clearing robot for building |
CN205670066U (en) * | 2016-06-12 | 2016-11-02 | 王炜平 | A kind of construction supervision external wall and window limit water test device |
CN106419722A (en) * | 2016-10-28 | 2017-02-22 | 唐山新禾智能科技有限公司 | Automatic glass cleaning robot |
CN106725141A (en) * | 2017-01-23 | 2017-05-31 | 北京嘉寓门窗幕墙股份有限公司 | A kind of leaping over obstacles outside Wall Cleaning machine people and operating method |
CN206772500U (en) * | 2017-04-20 | 2017-12-19 | 中国建筑第二工程局有限公司 | A kind of multi-functional exterior window water drenching detection means |
CN107687920A (en) * | 2017-09-04 | 2018-02-13 | 吴步晨 | A kind of construction supervision construction wall water test device |
CN107692920A (en) * | 2017-11-10 | 2018-02-16 | 安徽工程大学 | A kind of cleaning glass machine people |
Cited By (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110749534A (en) * | 2019-11-21 | 2020-02-04 | 盐城市兆泉项目管理有限公司 | Window limit infiltration testing arrangement is used in engineering supervision |
CN111678645A (en) * | 2020-06-01 | 2020-09-18 | 合肥工大建设监理有限责任公司 | Building outer wall infiltration testing arrangement for building supervision |
CN111610132A (en) * | 2020-06-14 | 2020-09-01 | 无锡踏达机电科技有限公司 | Wall body water seepage performance check out test set for construction |
CN111812006A (en) * | 2020-07-08 | 2020-10-23 | 惠州市筑成工程管理有限公司 | Building outer wall and window limit infiltration testing arrangement for engineering supervision |
CN111879675A (en) * | 2020-07-24 | 2020-11-03 | 惠州建安工程项目管理有限公司 | Window infiltration testing arrangement is used in engineering supervision |
CN111879675B (en) * | 2020-07-24 | 2023-08-29 | 惠州建安工程项目管理有限公司 | Engineering is managed with window infiltration testing arrangement |
CN112113712B (en) * | 2020-09-14 | 2022-08-12 | 福建互华土木工程管理有限公司 | Detection device and method for detecting quality defects of building outer wall |
CN112113712A (en) * | 2020-09-14 | 2020-12-22 | 福建互华土木工程管理有限公司 | Detection device and method for detecting quality defects of building outer wall |
CN113008458A (en) * | 2021-02-24 | 2021-06-22 | 新疆卓越工程项目管理有限公司 | Building outer wall infiltration testing arrangement for building supervision |
CN113820338A (en) * | 2021-03-11 | 2021-12-21 | 深圳市国浩土地房地产资产评估咨询有限公司 | Wall defect detection equipment for real estate assessment |
CN113820338B (en) * | 2021-03-11 | 2024-01-30 | 深圳市国浩土地房地产资产评估咨询有限公司 | Wall defect detection equipment for real estate assessment |
CN113075115A (en) * | 2021-03-17 | 2021-07-06 | 福建祥和工程项目管理有限公司 | Building outer wall water seepage testing device for building supervision and detecting method |
CN113212580A (en) * | 2021-04-26 | 2021-08-06 | 安徽宏基建设项目管理有限公司 | Engineering is managed with building outer wall infiltration testing arrangement |
CN113310870A (en) * | 2021-05-20 | 2021-08-27 | 丁先喜 | Seepage testing device for project supervision |
CN113310870B (en) * | 2021-05-20 | 2023-06-09 | 丁先喜 | Engineering is managed and is used infiltration testing arrangement |
Also Published As
Publication number | Publication date |
---|---|
CN108827546B (en) | 2020-03-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108827546A (en) | A kind of construction supervision external wall water test device | |
CN209470814U (en) | A kind of project supervision external wall seepage test device | |
CN107503502A (en) | A kind of high-altitude spraying unmanned plane and its operating method | |
CN211247071U (en) | A complementary unit that is used for medical panel plastic spraying equipment of high efficiency | |
CN107859503B (en) | Energy-saving closed hydraulic pumping unit | |
CN106000737A (en) | Mechanism capable of adjusting elevation angle of spray head and irrigation device with mechanism | |
CN208039764U (en) | A kind of vertical automatic Wall brick device of construction | |
CN106395466A (en) | Tension control and heat dissipation equipment used before film lamination | |
CN215964229U (en) | Construction engineering is with dustproof water smoke sprinkler | |
CN209165867U (en) | For manufacturing the snow making apparatus of natural snow | |
CN213435385U (en) | Production is with square cavity glass rubber coating device | |
CN212275165U (en) | Window limit infiltration testing arrangement is used in engineering supervision | |
CN111734105B (en) | Indoor small-size construction work platform for building engineering | |
CN208643060U (en) | A kind of spray-painting plant of billet | |
CN114635750A (en) | Tunnel construction drainer | |
CN116441084A (en) | Paint spraying machine with paint aerosol control structure and paint spraying process | |
CN108837641A (en) | A kind of vehicle-mounted haze processing unit of municipal and environment-friendly | |
CN216062533U (en) | Fixed frame spray set that climbs | |
CN204074368U (en) | Priming paint paint spray booth | |
CN208445958U (en) | A kind of agricultural production environment-friendly type mulch absorbing recovery device | |
CN113006525A (en) | High altitude outer wall is repaired and is paintd drawing device | |
CN207863835U (en) | A kind of automatic cleaning depositing dust screen window of left/right rotation dynamic formula spray | |
CN206415287U (en) | A kind of dermatoglyph paint spray-painting plant of piece surface leather texture imitation | |
CN110255921A (en) | A kind of two-layer coating air-cooling device | |
CN219930664U (en) | Road fine surface maintenance device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: Wenzhou City, Zhejiang province 325000 Fei Xia Road No. 824 Building Room 202 Hongyun Patentee after: Zhejiang Huaxia Construction Project Management Co., Ltd Address before: Wenzhou City, Zhejiang province 325000 Fei Xia Road No. 824 Building Room 202 Hongyun Patentee before: WENZHOU HUAXIA CONSTRUCTION SUPERVISION Co.,Ltd. |