CN108825240A - The mining methods of open-stope method afterwards disposable false bottom consolidated fill - Google Patents

The mining methods of open-stope method afterwards disposable false bottom consolidated fill Download PDF

Info

Publication number
CN108825240A
CN108825240A CN201810621524.0A CN201810621524A CN108825240A CN 108825240 A CN108825240 A CN 108825240A CN 201810621524 A CN201810621524 A CN 201810621524A CN 108825240 A CN108825240 A CN 108825240A
Authority
CN
China
Prior art keywords
false bottom
foundation
mineral building
back production
pillar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810621524.0A
Other languages
Chinese (zh)
Inventor
陈大佼
田宏海
王东华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Original Assignee
Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd filed Critical Gansu Jiu Steel Group Hongxing Iron and Steel Co Ltd
Priority to CN201810621524.0A priority Critical patent/CN108825240A/en
Publication of CN108825240A publication Critical patent/CN108825240A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/16Methods of underground mining; Layouts therefor
    • E21C41/22Methods of underground mining; Layouts therefor for ores, e.g. mining placers
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F15/00Methods or devices for placing filling-up materials in underground workings

Abstract

The invention discloses a kind of mining methods of open-stope method afterwards disposable false bottom consolidated fill, belong to underground mining method field, solves the problems, such as traditional Discarded Stope afterwards disposable cementing mining technology vacation bottom construction period and curing time is long, mining efficiency is low.The technical scheme is that:Mineral building back production is carried out, then the complete mineral building of back production is filled;Pillar recovery is carried out, then the complete ore pillar of back production is filled;The foundation retained during mineral building and pillar recovery draw adopting, false bottom is laid with drawing the foundation bottom adopted, then carries out foundation filling.The beneficial effects of the invention are as follows:Due to mineral building back production and the destruction during mine to false bottom can be fallen to avoid traditional handicraft, ensure the intensity for filling false bottom well, provide necessary condition for the top pillar recycling of rear process;The top pillar rate of recovery can be improved;Can to avoid drawn due to first step foundation adopt, the false bottom laying construction period it is long, the problem of back production low efficiency.

Description

The mining methods of open-stope method afterwards disposable false bottom consolidated fill
Technical field
The invention belongs to underground mining method fields, and in particular to a kind of open-stope method afterwards disposable false bottom consolidated fill Mining methods.
Background technique
Traditional Discarded Stope afterwards disposable cementing mining technology first carry out foundation draw adopt, false bottom is laid with, then carries out mine The back production and filling in room and ore pillar, this requires false bottom to bear the later period and falls mine and back production blasting impact, this technique is to filling false bottom Intensity requirement is high, and false bottom construction period and curing time are long;Drawn due to foundation adopt, false bottom laying construction it is difficult, draw extraction early period Mine amount is few, and mining efficiency is low.
Summary of the invention
The object of the present invention is to provide a kind of mining methods of open-stope method afterwards disposable false bottom consolidated fill, to solve to pass It unites Discarded Stope afterwards disposable cementing mining technology vacation bottom construction period and the problem that curing time is long, mining efficiency is low.
The technical scheme is that:A kind of mining methods of open-stope method afterwards disposable false bottom consolidated fill, including with Lower step:
Step 1: carrying out mineral building back production, then the complete mineral building of back production is filled;
Step 2: carrying out pillar recovery, then the complete ore pillar of back production is filled;
Step 3: the foundation retained during mineral building and pillar recovery draw adopting, vacation is laid with drawing the foundation bottom adopted Then bottom carries out foundation filling.
As a further improvement of the present invention, in step 3, foundation filling uses all-tailing cemented filling mode.
As a further improvement of the present invention, in step 1, mineral building is filled using all-tailing cemented filling mode.
As a further improvement of the present invention, in step 2, ore pillar is mutually tied using tailing cemented filling with waste fill The mode of conjunction is filled.
As a further improvement of the present invention, in step 1, mineral building back production is adopted using ladder-like move back from the top down.
As a further improvement of the present invention, in step 2, pillar recovery moves back the side adopted using ladder-like from the top down Formula.
The present invention changes the construction procedure of traditional Discarded Stope afterwards disposable cementing mining technology, obtains following Technical effect:
1. due to mineral building back production and the destruction during mine to false bottom can be fallen to avoid traditional handicraft, filling is ensured well The intensity at false bottom provides necessary condition for the top pillar recycling of rear process;
2. the top pillar rate of recovery can be improved, resource utilization is substantially increased, has played economy of resources;
3. can to avoid drawn due to first step foundation adopt, the false bottom laying construction period it is long, the problem of back production low efficiency, release Production capacity has apparent economic benefit.
Detailed description of the invention
Fig. 1 is the flow chart of the specific embodiment of the invention.
Specific embodiment
The following examples can further illustrate the present invention, but do not limit the invention in any way.
Embodiment 1:
The Gansu Orebody in Jingtieshan mining industry Co., Ltd middle section capper ore 2760-2820 uses technical solution of the present invention.Birch The ditch copper mine middle section ore body thickness is big, and ore body interior thickness is all larger than 30m.According to actual production conditions, it is every to divide capper ore Mono- middle section 60m, every 10m mono- layering, in middle section bottom, every 10m arranges an ore removal river, forms ore removal structure.Construction process As shown in Figure 1, steps are as follows:
A, mineral building drilling drift is arranged:Nugget divides in such a way that mineral building and ore pillar are alternately arranged, and the middle section is all using vertical Straight ore body mode arranges mineral building, and drilling drift width and height are 3m;
B, drilling drift vacation bottom is laid with:The reinforced concrete artificial bottom of 0.5m thickness is laid in drilling drift;
C, mineral building deep hole is arranged:Use YGZ-90 borehole drilling machine construction deep hole;
D, mineral building back production:Mineral building using from the top down it is ladder-like move back adopt by the way of carry out back production;
E, mineral building fills:The complete mineral building of back production is filled using all-tailing cemented filling mode.
F, pillar recovery:Ore pillar using from the top down it is ladder-like move back adopt by the way of carry out back production;
G, ore pillar fills:Ore pillar is filled in such a way that tailing cemented filling and waste fill combine;
H, foundation, which is drawn, adopts:The foundation retained during mineral building and pillar recovery draw adopting;
I, foundation vacation bottom is laid with:At the filling vacation bottom for drawing the foundation bottom laying 0.5m thickness adopted, false bottom and mineral building rock drilling lane are false Bottom is linked to be an entirety.
J, foundation fills:Foundation filling is carried out using all-tailing cemented filling mode.
In the present embodiment, all using such false bottom laying process, false bottom laying implementation result is good in middle section, solves well It has determined foundation and cap pillar extraction difficulty and the low problem of the rate of extraction.
The present embodiment also solves foundation and draws the problem of adopting, and ore body bottom column stope rate reaches 95% or more, amounts to more recovery articles About 300,000 tons of Copper Ores of position 2.2% create about 18,000,000 yuan of economic benefit.
The present embodiment middle section bottom vacation bottom forms an entirety, and cap pillar extraction rate is increased to 60% by 40%, recycle ore 4 more Ten thousand tons, create 2,400,000 yuan of economic benefit.
This invention ensures that filling false bottom intensity, destruction of the back production explosion to false bottom is filled is avoided, later period vacation is reduced Bottom maintenance cost.

Claims (6)

1. a kind of mining methods of open-stope method afterwards disposable false bottom consolidated fill, include the following steps:
Step 1: carrying out mineral building back production, then the complete mineral building of back production is filled;
Step 2: carrying out pillar recovery, then the complete ore pillar of back production is filled;
Step 3: the foundation retained during mineral building and pillar recovery draw adopting, vacation is laid with drawing the foundation bottom adopted Then bottom carries out foundation filling.
2. the mining methods of open-stope method according to claim 1 afterwards disposable false bottom consolidated fill, it is characterised in that:? In step 3, the foundation filling uses all-tailing cemented filling mode.
3. afterwards disposably the mining methods of false bottom consolidated fill, feature exist open-stope method according to claim 1 or 2 In:In step 1, the mineral building is filled using all-tailing cemented filling mode.
4. the mining methods of open-stope method according to claim 3 afterwards disposable false bottom consolidated fill, it is characterised in that:? In step 2, the ore pillar is filled in such a way that tailing cemented filling and waste fill combine.
5. the mining methods of open-stope method according to claim 4 afterwards disposable false bottom consolidated fill, it is characterised in that:? In step 1, the mineral building back production is adopted using ladder-like move back from the top down.
6. the mining methods of open-stope method according to claim 5 afterwards disposable false bottom consolidated fill, it is characterised in that:? In step 2, the pillar recovery using from the top down it is ladder-like move back adopt by the way of.
CN201810621524.0A 2018-06-15 2018-06-15 The mining methods of open-stope method afterwards disposable false bottom consolidated fill Pending CN108825240A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810621524.0A CN108825240A (en) 2018-06-15 2018-06-15 The mining methods of open-stope method afterwards disposable false bottom consolidated fill

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810621524.0A CN108825240A (en) 2018-06-15 2018-06-15 The mining methods of open-stope method afterwards disposable false bottom consolidated fill

Publications (1)

Publication Number Publication Date
CN108825240A true CN108825240A (en) 2018-11-16

Family

ID=64142195

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810621524.0A Pending CN108825240A (en) 2018-06-15 2018-06-15 The mining methods of open-stope method afterwards disposable false bottom consolidated fill

Country Status (1)

Country Link
CN (1) CN108825240A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284882A (en) * 2019-06-04 2019-09-27 甘肃酒钢集团宏兴钢铁股份有限公司 A kind of mining methods

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2052111C1 (en) * 1992-10-06 1996-01-10 Дальневосточный государственный технический университет Method for mining steeply dipping ore bodies
CN101858217A (en) * 2010-05-18 2010-10-13 中南大学 House pillar changeable panel upward demix filling mining method
CN106761758A (en) * 2017-01-18 2017-05-31 长沙有色冶金设计研究院有限公司 Artificial concrete guard wall reconstruct studding waste fill mining methods

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2052111C1 (en) * 1992-10-06 1996-01-10 Дальневосточный государственный технический университет Method for mining steeply dipping ore bodies
CN101858217A (en) * 2010-05-18 2010-10-13 中南大学 House pillar changeable panel upward demix filling mining method
CN106761758A (en) * 2017-01-18 2017-05-31 长沙有色冶金设计研究院有限公司 Artificial concrete guard wall reconstruct studding waste fill mining methods

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
朱俊宁等: "某矿分段空场嗣后胶结充填底柱置换方法研究", 《金属矿山》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110284882A (en) * 2019-06-04 2019-09-27 甘肃酒钢集团宏兴钢铁股份有限公司 A kind of mining methods

Similar Documents

Publication Publication Date Title
CN102704934B (en) High-yield and low-cost subsequent filling mining method for underground mine
CN107339104B (en) Security personnel's curtain wall recovery method
CN104632220B (en) Mining method with adjustable and controllable structure size of gentle dip medium-thickness ore body strip column reconstructed stope
CN103967493B (en) A kind of slight slope and thin ore body ore pillar mining codes
CN103161480A (en) Method for actively supporting lane side filling gob-side entry retaining
CN101737052A (en) Sublevel fill-mining method
CN102953732A (en) Room-and-pillar major-diameter longhole inverted-step-like segmented lateral caving subsequent filling mining method
CN102748029A (en) Sectional mining method
CN103233771A (en) Roof contacting process in goaf filling treating procedure
CN103184870A (en) Open backfilling mining method during borehole drilling period
CN102979526B (en) Building process of ore removal trench by adopting filling method in medium-length hole sublevel mining
CN108894785A (en) A kind of layer and section combination recovery method of breaking ore body interlayer
CN103161467B (en) Horizontal moderately thick mine body compartment type filling mining method
CN107130962A (en) Sublevel caving subsequent cemented filling mining method for thick and large ore body
CN109899070B (en) Slow-inclination medium-thickness ore body solid-waste-free filling mining method based on ellipsoid ore drawing structure
CN104234716B (en) The packed cofferdam method of mining by the way of filling
CN106089207A (en) Super high seam work surface gob side entry driving thin coal pillar stays equipment, method
CN105863727B (en) Method for treating pillar goaf
CN108104816A (en) Upward mining method of steeply inclined thin ore body
WO2022241972A1 (en) Method for recovering stored ore when transitioning from caving method to filling method
CN108825241A (en) The back production blasting mining technique of big thick ore body
CN108825240A (en) The mining methods of open-stope method afterwards disposable false bottom consolidated fill
CN102817614B (en) Stope structure arrangement mode suitable for underground mine high productivity and low cost subsequent filling
CN105735994A (en) Technique for constructing artificial waterproof ore pillar through access back-filling stoping method
CN106437838A (en) Drawing and filling ores synchronous horizontal deep hole shrinkage method in the later stage after truck directly removing ores under polycrystalline substance

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181116

RJ01 Rejection of invention patent application after publication