CN108756168A - A kind of wall plastering device for building - Google Patents
A kind of wall plastering device for building Download PDFInfo
- Publication number
- CN108756168A CN108756168A CN201810874573.5A CN201810874573A CN108756168A CN 108756168 A CN108756168 A CN 108756168A CN 201810874573 A CN201810874573 A CN 201810874573A CN 108756168 A CN108756168 A CN 108756168A
- Authority
- CN
- China
- Prior art keywords
- bearing
- belt pulley
- shaft
- supporting rod
- motor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 claims abstract description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 42
- 239000002965 rope Substances 0.000 claims description 31
- 238000003756 stirring Methods 0.000 claims description 17
- 210000004916 vomit Anatomy 0.000 claims description 15
- 210000003491 Skin Anatomy 0.000 claims description 6
- 230000005611 electricity Effects 0.000 claims 1
- 238000010422 painting Methods 0.000 abstract description 15
- 239000003973 paint Substances 0.000 description 16
- 238000010586 diagram Methods 0.000 description 5
- 238000001035 drying Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/06—Implements for applying plaster, insulating material, or the like
- E04F21/08—Mechanical implements
Abstract
The present invention relates to a kind of painting device more particularly to a kind of wall plastering devices for building.Technical problem is:There is provided a kind of can replace the wall plastering device for building that artificial, work is rapid, can prevent from making dirty clothes.The technical scheme is that:A kind of wall plastering device for building includes wheel, first rotating shaft, first bearing, pedestal, the first belt pulley, first motor, the first connection belt, reel etc.;Pedestal lower part is equipped with first bearing, and first rotating shaft is equipped with by way of interference connection in first bearing, and wheel is equipped in first rotating shaft, and the installation of pedestal inside top is from left to right sequentially installed with first support bar and first motor.Invention achieves can replace the effect that artificial, work is rapid, can prevent from making dirty clothes, manpower can be liberated using this equipment, it replaces manually painting wall with machinery, can easily plastering wall it is high-rise, it is safe to use, and painting is uniform, and using effect is obviously better than artificial, and work efficiency is high.
Description
Technical field
The present invention relates to a kind of painting device more particularly to a kind of wall plastering devices for building.
Background technology
Building is the general name of building and structures, is people to meet social life needs, utilizes grasped object
Matter technological means, and the artificial environment created with certain scientific law, geomantic omen theory and aesthetic principle.
With the fast development of building cause, requirement of the people to living environment is also higher and higher, and general building is being built
It being needed to interior painting after good, the higher place in wall top needs worker to set up ladder, plastering wall labor intensive, and
Working environment is poor, is easy to make clothes dirty.
Invention content
In order to overcome the higher place in wall top that worker is needed to set up ladder, plastering wall labor intensive and work
Environment is poor, the shortcomings that being easy to make clothes dirty, and technical problem is:There is provided one kind can be instead of artificial, work is rapid, can prevent
Make the wall plastering device for building of clothes dirty.
The technical scheme is that:A kind of wall plastering device for building includes wheel, first rotating shaft, first axle
Hold, pedestal, the first belt pulley, first motor, first connection belt, reel, the second shaft, the second belt pulley, first support
Bar, rope, sliding rail, second support bar, 3rd bearing, third shaft, directive wheel, sliding block, the second motor, third belt pulley,
Four supporting rods, the second connection belt, the 4th belt pulley, fourth bearing, hollow rotating shaft, disk hairbrush, connecting tube and second bearing,
Pedestal lower part is equipped with first bearing, is equipped with first rotating shaft in first bearing by way of interference connection, in first rotating shaft
Wheel is installed, the installation of pedestal inside top is from left to right sequentially installed with first support bar and first motor, and first motor is defeated
First belt pulley is installed, first support bar lower end is equipped with second bearing, is connected by interference in second bearing on shaft
Mode is equipped with the second shaft, has pounded the second belt pulley and reel in the second shaft, the second belt pulley and the first belt pulley it
Between the first connection belt is installed, be wound with rope on reel, second support bar, second support bar top be installed at the top of sliding rail
Portion is equipped with 3rd bearing, is equipped with third shaft by way of interference connection in 3rd bearing, is equipped in third shaft
Directive wheel, rope bypass directive wheel, and slidingtype is equipped with sliding block on sliding rail, and rope is connected with sliding block, and sliding block right part is equipped with the
Two motors, third belt pulley is equipped on the second motor, and sliding block right part is also equipped with the 4th supporting rod, the 4th supporting rod right part peace
Equipped with fourth bearing, hollow rotating shaft is installed by way of interference connection in fourth bearing, the 4th is equipped on hollow rotating shaft
Belt pulley and disk hairbrush are equipped with the second connection belt, hollow rotating shaft front end peace between the 4th belt pulley and third belt pulley
Equipped with connecting tube.
Further, further include having the 5th supporting rod, the 5th belt pulley, 5th bearing, the 5th shaft, cam, link block, bullet
Spring, mobile bar, cylinder body, piston, third connection belt, the first check valve, feed pipe, the second check valve and water tank, pedestal inside
Top center is equipped with the 5th supporting rod, and the 5th supporting rod lower end is equipped with 5th bearing, is connected by interference in 5th bearing
Mode the 5th shaft is installed, the 5th belt pulley and cam, the 5th belt pulley and the first belt pulley are installed in the 5th shaft
Between third connection belt is installed, upper right quarter is equipped with cylinder body on the inside of pedestal, and cylinder body inner sliding type is equipped with piston, and piston is left
Portion is equipped with mobile bar, and mobile bar left end is equipped with link block, link block and cam contact, is equipped between link block and cylinder body
Spring, cylinder body top are connected with connecting tube, and the second check valve is equipped in connecting tube, and cylinder body right part is equipped with feed pipe, charging
First check valve is installed, pedestal top is equipped with water tank, and water tank is connected with feed pipe in pipe.
Further, further include having the 7th shaft, stirring rod, the 7th supporting rod, the 8th supporting rod, third motor and the 7th axis
It holds, pedestal top is equipped with the 8th supporting rod, and the 8th supporting rod upper right quarter is equipped with third motor, the installation of the 8th supporting rod right part
There are the 7th supporting rod, the 7th supporting rod right end that 7th bearing is installed, is equipped with by way of interference connection in 7th bearing
7th shaft, the 7th shaft are connected with third motor, and stirring rod is equipped in the 7th shaft.
Further, further include having lid and felt circle, water tank upper is equipped with lid, is equipped with through-hole among lid, and the 7th
Shaft passes through through-hole, and felt circle is equipped in through-hole.
Further, further include having vomit pipe, rubber pad and threaded cap, water tank upper right quarter is equipped with vomit pipe, on vomit pipe
Portion is equipped with threaded cap, and rubber pad is equipped between threaded cap and connecting tube.
Connecting tube is connected with painting paint vehicle manually, the second motor is manually started and constantly rotates, keep third belt pulley continuous
Rotation makes the 4th belt pulley constantly rotate, drives disk hairbrush constantly to rotate by hollow rotating shaft by the second connection belt, right
Wall is painted, and it is constantly clockwise and reverse, keep the first belt pulley constantly clockwise and reverse to manually start first motor, by the
One connection belt keeps the second belt pulley constantly clockwise and reverses, and keeps reel constantly clockwise by the second shaft and reverses, makes rope
Subband movable slider constantly moves up and down, and disk hairbrush is driven constantly to move up and down, and increases painting area.
Because further include have the 5th supporting rod, the 5th belt pulley, 5th bearing, the 5th shaft, cam, link block, spring,
Mobile bar, cylinder body, piston, the first check valve, third connection belt, feed pipe, the second check valve and water tank, pedestal inside top
Centre is equipped with the 5th supporting rod, and the 5th supporting rod lower end is equipped with 5th bearing, the side connected by interference in 5th bearing
Formula is equipped with the 5th shaft, the 5th belt pulley and cam is equipped in the 5th shaft, between the 5th belt pulley and the first belt pulley
Third connection belt is installed, upper right quarter is equipped with cylinder body on the inside of pedestal, and cylinder body inner sliding type is equipped with piston, piston left part peace
Equipped with mobile bar, mobile bar left end is equipped with link block, link block and cam contact, and bullet is equipped between link block and cylinder body
Spring, cylinder body top are connected with connecting tube, and the second check valve is equipped in connecting tube, and cylinder body right part is equipped with feed pipe, feed pipe
First check valve is inside installed, pedestal top is equipped with water tank, and water tank is connected with feed pipe, is manually put into water tank suitable
Paint vehicle is painted, the first belt pulley constantly rotates, and connecting belt by third makes the 5th belt pulley constantly rotate, and passes through the 5th shaft
So that cam is constantly rotated, link block is made constantly to move left and right, is constantly moved left and right by mobile bar band piston, make painting paint vehicle
Enter cylinder body from feed pipe, is flowed into disk hairbrush from connecting tube, it is easy to use.
Because further including having the 7th shaft, stirring rod, the 7th supporting rod, the 8th supporting rod, third motor and 7th bearing,
Pedestal top is equipped with the 8th supporting rod, and the 8th supporting rod upper right quarter is equipped with third motor, and the 8th supporting rod right part is equipped with
7th supporting rod, the 7th supporting rod right end are equipped with 7th bearing, and the is equipped with by way of interference connection in 7th bearing
Seven shafts, the 7th shaft are connected with third motor, and stirring rod is equipped in the 7th shaft, manually start third motor and constantly turn
It is dynamic, it drives the 7th shaft constantly to rotate, stirring rod is made constantly to rotate, painting paint vehicle is stirred, prevents paint vehicle from drying.
Because further including having lid and felt circle, water tank upper is equipped with lid, and through-hole, the 7th shaft are equipped among lid
Felt circle is equipped in through-hole, through-hole, lid and felt circle can increase the air-tightness of water tank, prevent internal paint vehicle from drying.
Because further including having vomit pipe, rubber pad and threaded cap, water tank upper right quarter is equipped with vomit pipe, vomit pipe top peace
Equipped with threaded cap, rubber pad is installed between threaded cap and connecting tube, threaded cap is opened manually, paint vehicle, rubber are added into water tank
Rubber cushion can increase air-tightness.
The present invention has the following advantages:Invention achieves that can replace, artificial, work is rapid, can prevent from making clothes dirty
Effect, can liberate manpower using this equipment, replace manually painting wall with machinery, being capable of easily plastering wall
High level, it is safe to use, and paint uniformly, using effect is obviously better than artificial, and work efficiency is high.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is second of main structure diagram of the present invention.
Fig. 3 is the third main structure diagram of the present invention.
Fig. 4 is the 4th kind of main structure diagram of the present invention.
Fig. 5 is the 5th kind of main structure diagram of the present invention.
Parts title and serial number in figure:1. wheel, 2. first rotating shafts, 3. first bearings, 4. pedestals, 5. first belts
Wheel, 6. first motors, 7. first connection belts, 8. reels, 9. second shafts, 10. second belt pulleys, 11. first support bars,
12. rope, 13. sliding rails, 14. second support bars, 15. 3rd bearings, 16. third shafts, 17. directive wheels, 18. sliding blocks, 19.
Two motors, 20. third belt pulleys, 21. the 4th supporting rods, 22. second connection belts, 23. the 4th belt pulleys, 24. fourth bearings,
25. hollow rotating shaft, 26. disk hairbrush, 27. connecting tubes, 28. thirds connect belt, 29. the 5th supporting rods, 30. the 5th belts
Wheel, 31. 5th bearings, 32. the 5th shafts, 33. cams, 34. link blocks, 35. springs, 36. mobile bars, 37. cylinder bodies, 38. live
Plug, 39. first check valves, 40. feed pipes, 41. second check valves, 42. water tanks, 43. the 7th shafts, 44. stirring rods, 45. the
Seven supporting rods, 46. the 8th supporting rods, 47. third motors, 48. 7th bearings, 49. lids, 50. through-holes, 51. felt circles, 52.
Vomit pipe, 53. rubber pads, 54. threaded caps, 60. second bearings.
Specific implementation mode
With reference to specific embodiment, the present invention is described further, it is also necessary to explanation, unless otherwise
Specific regulation and restriction, term is such as:Setting, installation, connected, connection shall be understood in a broad sense, for example, it may be fixedly connected,
It may be a detachable connection, or be integrally connected;It can be mechanical connection, can also be electrical connection;It can be directly connected,
Can also can be indirectly connected through an intermediary the connection inside two elements.For those of ordinary skill in the art
For, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment 1
A kind of wall plastering device for building, as shown in Figs. 1-5, include wheel 1, first rotating shaft 2, first bearing 3, pedestal 4,
First belt pulley 5, first motor 6, first connect belt 7, reel 8, the second shaft 9, the second belt pulley 10, first support bar
11, rope 12, sliding rail 13, second support bar 14,3rd bearing 15, third shaft 16, directive wheel 17, sliding block 18, the second motor
19, third belt pulley 20, the 4th supporting rod 21, second connection belt 22, the 4th belt pulley 23, fourth bearing 24, hollow rotating shaft
25, disk hairbrush 26, connecting tube 27 and second bearing 60,4 lower part of pedestal are equipped with first bearing 3, passed through in first bearing 3
The mode of connection of being full of is equipped with first rotating shaft 2, and wheel 1 is equipped in first rotating shaft 2, and 4 inside top of pedestal is installed from left to right
It is sequentially installed with first support bar 11 and first motor 6, the first belt pulley 5, the first support are installed on 6 output shaft of first motor
11 lower end of bar is equipped with second bearing 60, is equipped with the second shaft 9 in second bearing 60 by way of interference connection, second turn
The second belt pulley 10 and reel 8 have been pounded on axis 9, and the first connection skin is installed between the second belt pulley 10 and the first belt pulley 5
Band 7 is wound with rope 12 on reel 8, and 13 top of sliding rail is equipped with second support bar 14, and 14 top of second support bar is equipped with
3rd bearing 15,3rd bearing 15 is interior to be equipped with third shaft 16 by way of interference connection, is equipped in third shaft 16
Directive wheel 17, rope 12 bypass directive wheel 17, and slidingtype is equipped with sliding block 18 on sliding rail 13, and rope 12 is connected with sliding block 18, sliding
18 right part of block is equipped with the second motor 19, and third belt pulley 20 is equipped on the second motor 19, and 18 right part of sliding block is also equipped with
Four supporting rods 21,21 right part of the 4th supporting rod are equipped with fourth bearing 24, are pacified by way of interference connection in fourth bearing 24
Equipped with hollow rotating shaft 25, the 4th belt pulley 23 and disk hairbrush 26, the 4th belt pulley 23 and third are installed on hollow rotating shaft 25
Second connection belt 22 is installed, 25 front end of hollow rotating shaft is equipped with connecting tube 27 between belt pulley 20.
Embodiment 2
A kind of wall plastering device for building, as shown in Figs. 1-5, include wheel 1, first rotating shaft 2, first bearing 3, pedestal 4,
First belt pulley 5, first motor 6, first connect belt 7, reel 8, the second shaft 9, the second belt pulley 10, first support bar
11, rope 12, sliding rail 13, second support bar 14,3rd bearing 15, third shaft 16, directive wheel 17, sliding block 18, the second motor
19, third belt pulley 20, the 4th supporting rod 21, second connection belt 22, the 4th belt pulley 23, fourth bearing 24, hollow rotating shaft
25, disk hairbrush 26, connecting tube 27 and second bearing 60,4 lower part of pedestal are equipped with first bearing 3, passed through in first bearing 3
The mode of connection of being full of is equipped with first rotating shaft 2, and wheel 1 is equipped in first rotating shaft 2, and 4 inside top of pedestal is installed from left to right
It is sequentially installed with first support bar 11 and first motor 6, the first belt pulley 5, the first support are installed on 6 output shaft of first motor
11 lower end of bar is equipped with second bearing 60, is equipped with the second shaft 9 in second bearing 60 by way of interference connection, second turn
The second belt pulley 10 and reel 8 have been pounded on axis 9, and the first connection skin is installed between the second belt pulley 10 and the first belt pulley 5
Band 7 is wound with rope 12 on reel 8, and 13 top of sliding rail is equipped with second support bar 14, and 14 top of second support bar is equipped with
3rd bearing 15,3rd bearing 15 is interior to be equipped with third shaft 16 by way of interference connection, is equipped in third shaft 16
Directive wheel 17, rope 12 bypass directive wheel 17, and slidingtype is equipped with sliding block 18 on sliding rail 13, and rope 12 is connected with sliding block 18, sliding
18 right part of block is equipped with the second motor 19, and third belt pulley 20 is equipped on the second motor 19, and 18 right part of sliding block is also equipped with
Four supporting rods 21,21 right part of the 4th supporting rod are equipped with fourth bearing 24, are pacified by way of interference connection in fourth bearing 24
Equipped with hollow rotating shaft 25, the 4th belt pulley 23 and disk hairbrush 26, the 4th belt pulley 23 and third are installed on hollow rotating shaft 25
Second connection belt 22 is installed, 25 front end of hollow rotating shaft is equipped with connecting tube 27 between belt pulley 20.
Further include having the 5th supporting rod 29, the 5th belt pulley 30,5th bearing 31, the 5th shaft 32, cam 33, link block
34, spring 35, mobile bar 36, cylinder body 37, piston 38, third connection belt 28, the first check valve 39, feed pipe 40, second are single
To valve 41 and water tank 42, the 5th supporting rod 29 is installed among 4 inside top of pedestal, 29 lower end of the 5th supporting rod is equipped with the 5th
Bearing 31,5th bearing 31 is interior to be equipped with the 5th shaft 32 by way of interference connection, and the 5th is equipped in the 5th shaft 32
Belt pulley 30 and cam 33 are equipped with third connection belt 28,4 inside of pedestal between the 5th belt pulley 30 and the first belt pulley 5
Upper right quarter is equipped with cylinder body 37, and 37 inner sliding type of cylinder body is equipped with piston 38, and 38 left part of piston is equipped with mobile bar 36, mobile bar
36 left ends are equipped with link block 34, and link block 34 is contacted with cam 33, and spring 35, cylinder are equipped between link block 34 and cylinder body 37
37 top of body is connected with connecting tube 27, and the second check valve 41 is equipped in connecting tube 27, and 37 right part of cylinder body is equipped with feed pipe 40,
First check valve 39 is installed, 4 top of pedestal is equipped with water tank 42, and water tank 42 is connected with feed pipe 40 in feed pipe 40.
Embodiment 3
A kind of wall plastering device for building, as shown in Figs. 1-5, include wheel 1, first rotating shaft 2, first bearing 3, pedestal 4,
First belt pulley 5, first motor 6, first connect belt 7, reel 8, the second shaft 9, the second belt pulley 10, first support bar
11, rope 12, sliding rail 13, second support bar 14,3rd bearing 15, third shaft 16, directive wheel 17, sliding block 18, the second motor
19, third belt pulley 20, the 4th supporting rod 21, second connection belt 22, the 4th belt pulley 23, fourth bearing 24, hollow rotating shaft
25, disk hairbrush 26, connecting tube 27 and second bearing 60,4 lower part of pedestal are equipped with first bearing 3, passed through in first bearing 3
The mode of connection of being full of is equipped with first rotating shaft 2, and wheel 1 is equipped in first rotating shaft 2, and 4 inside top of pedestal is installed from left to right
It is sequentially installed with first support bar 11 and first motor 6, the first belt pulley 5, the first support are installed on 6 output shaft of first motor
11 lower end of bar is equipped with second bearing 60, is equipped with the second shaft 9 in second bearing 60 by way of interference connection, second turn
The second belt pulley 10 and reel 8 have been pounded on axis 9, and the first connection skin is installed between the second belt pulley 10 and the first belt pulley 5
Band 7 is wound with rope 12 on reel 8, and 13 top of sliding rail is equipped with second support bar 14, and 14 top of second support bar is equipped with
3rd bearing 15,3rd bearing 15 is interior to be equipped with third shaft 16 by way of interference connection, is equipped in third shaft 16
Directive wheel 17, rope 12 bypass directive wheel 17, and slidingtype is equipped with sliding block 18 on sliding rail 13, and rope 12 is connected with sliding block 18, sliding
18 right part of block is equipped with the second motor 19, and third belt pulley 20 is equipped on the second motor 19, and 18 right part of sliding block is also equipped with
Four supporting rods 21,21 right part of the 4th supporting rod are equipped with fourth bearing 24, are pacified by way of interference connection in fourth bearing 24
Equipped with hollow rotating shaft 25, the 4th belt pulley 23 and disk hairbrush 26, the 4th belt pulley 23 and third are installed on hollow rotating shaft 25
Second connection belt 22 is installed, 25 front end of hollow rotating shaft is equipped with connecting tube 27 between belt pulley 20.
Further include having the 5th supporting rod 29, the 5th belt pulley 30,5th bearing 31, the 5th shaft 32, cam 33, link block
34, spring 35, mobile bar 36, cylinder body 37, piston 38, third connection belt 28, the first check valve 39, feed pipe 40, second are single
To valve 41 and water tank 42, the 5th supporting rod 29 is installed among 4 inside top of pedestal, 29 lower end of the 5th supporting rod is equipped with the 5th
Bearing 31,5th bearing 31 is interior to be equipped with the 5th shaft 32 by way of interference connection, and the 5th is equipped in the 5th shaft 32
Belt pulley 30 and cam 33 are equipped with third connection belt 28,4 inside of pedestal between the 5th belt pulley 30 and the first belt pulley 5
Upper right quarter is equipped with cylinder body 37, and 37 inner sliding type of cylinder body is equipped with piston 38, and 38 left part of piston is equipped with mobile bar 36, mobile bar
36 left ends are equipped with link block 34, and link block 34 is contacted with cam 33, and spring 35, cylinder are equipped between link block 34 and cylinder body 37
37 top of body is connected with connecting tube 27, and the second check valve 41 is equipped in connecting tube 27, and 37 right part of cylinder body is equipped with feed pipe 40,
First check valve 39 is installed, 4 top of pedestal is equipped with water tank 42, and water tank 42 is connected with feed pipe 40 in feed pipe 40.
Further include having the 7th shaft 43, stirring rod 44, the 7th supporting rod 45, the 8th supporting rod 46, third motor 47 and
Seven bearings 48,4 top of pedestal are equipped with the 8th supporting rod 46, and 46 upper right quarter of the 8th supporting rod is equipped with third motor 47, and the 8th
46 right part of supporting rod is equipped with the 7th supporting rod 45, and 45 right end of the 7th supporting rod is equipped with 7th bearing 48, in 7th bearing 48
The 7th shaft 43 is installed by way of interference connection, the 7th shaft 43 is connected with third motor 47, pacifies in the 7th shaft 43
Equipped with stirring rod 44.
Embodiment 4
A kind of wall plastering device for building, as shown in Figs. 1-5, include wheel 1, first rotating shaft 2, first bearing 3, pedestal 4,
First belt pulley 5, first motor 6, first connect belt 7, reel 8, the second shaft 9, the second belt pulley 10, first support bar
11, rope 12, sliding rail 13, second support bar 14,3rd bearing 15, third shaft 16, directive wheel 17, sliding block 18, the second motor
19, third belt pulley 20, the 4th supporting rod 21, second connection belt 22, the 4th belt pulley 23, fourth bearing 24, hollow rotating shaft
25, disk hairbrush 26, connecting tube 27 and second bearing 60,4 lower part of pedestal are equipped with first bearing 3, passed through in first bearing 3
The mode of connection of being full of is equipped with first rotating shaft 2, and wheel 1 is equipped in first rotating shaft 2, and 4 inside top of pedestal is installed from left to right
It is sequentially installed with first support bar 11 and first motor 6, the first belt pulley 5, the first support are installed on 6 output shaft of first motor
11 lower end of bar is equipped with second bearing 60, is equipped with the second shaft 9 in second bearing 60 by way of interference connection, second turn
The second belt pulley 10 and reel 8 have been pounded on axis 9, and the first connection skin is installed between the second belt pulley 10 and the first belt pulley 5
Band 7 is wound with rope 12 on reel 8, and 13 top of sliding rail is equipped with second support bar 14, and 14 top of second support bar is equipped with
3rd bearing 15,3rd bearing 15 is interior to be equipped with third shaft 16 by way of interference connection, is equipped in third shaft 16
Directive wheel 17, rope 12 bypass directive wheel 17, and slidingtype is equipped with sliding block 18 on sliding rail 13, and rope 12 is connected with sliding block 18, sliding
18 right part of block is equipped with the second motor 19, and third belt pulley 20 is equipped on the second motor 19, and 18 right part of sliding block is also equipped with
Four supporting rods 21,21 right part of the 4th supporting rod are equipped with fourth bearing 24, are pacified by way of interference connection in fourth bearing 24
Equipped with hollow rotating shaft 25, the 4th belt pulley 23 and disk hairbrush 26, the 4th belt pulley 23 and third are installed on hollow rotating shaft 25
Second connection belt 22 is installed, 25 front end of hollow rotating shaft is equipped with connecting tube 27 between belt pulley 20.
Further include having the 5th supporting rod 29, the 5th belt pulley 30,5th bearing 31, the 5th shaft 32, cam 33, link block
34, spring 35, mobile bar 36, cylinder body 37, piston 38, third connection belt 28, the first check valve 39, feed pipe 40, second are single
To valve 41 and water tank 42, the 5th supporting rod 29 is installed among 4 inside top of pedestal, 29 lower end of the 5th supporting rod is equipped with the 5th
Bearing 31,5th bearing 31 is interior to be equipped with the 5th shaft 32 by way of interference connection, and the 5th is equipped in the 5th shaft 32
Belt pulley 30 and cam 33 are equipped with third connection belt 28,4 inside of pedestal between the 5th belt pulley 30 and the first belt pulley 5
Upper right quarter is equipped with cylinder body 37, and 37 inner sliding type of cylinder body is equipped with piston 38, and 38 left part of piston is equipped with mobile bar 36, mobile bar
36 left ends are equipped with link block 34, and link block 34 is contacted with cam 33, and spring 35, cylinder are equipped between link block 34 and cylinder body 37
37 top of body is connected with connecting tube 27, and the second check valve 41 is equipped in connecting tube 27, and 37 right part of cylinder body is equipped with feed pipe 40,
First check valve 39 is installed, 4 top of pedestal is equipped with water tank 42, and water tank 42 is connected with feed pipe 40 in feed pipe 40.
Further include having the 7th shaft 43, stirring rod 44, the 7th supporting rod 45, the 8th supporting rod 46, third motor 47 and
Seven bearings 48,4 top of pedestal are equipped with the 8th supporting rod 46, and 46 upper right quarter of the 8th supporting rod is equipped with third motor 47, and the 8th
46 right part of supporting rod is equipped with the 7th supporting rod 45, and 45 right end of the 7th supporting rod is equipped with 7th bearing 48, in 7th bearing 48
The 7th shaft 43 is installed by way of interference connection, the 7th shaft 43 is connected with third motor 47, pacifies in the 7th shaft 43
Equipped with stirring rod 44.
Further include having lid 49 and felt circle 51,42 top of water tank is equipped with lid 49, and through-hole 50 is equipped among lid 49,
7th shaft 43 passes through through-hole 50, and felt circle 51 is equipped in through-hole 50.
Embodiment 5
A kind of wall plastering device for building, as shown in Figs. 1-5, include wheel 1, first rotating shaft 2, first bearing 3, pedestal 4,
First belt pulley 5, first motor 6, first connect belt 7, reel 8, the second shaft 9, the second belt pulley 10, first support bar
11, rope 12, sliding rail 13, second support bar 14,3rd bearing 15, third shaft 16, directive wheel 17, sliding block 18, the second motor
19, third belt pulley 20, the 4th supporting rod 21, second connection belt 22, the 4th belt pulley 23, fourth bearing 24, hollow rotating shaft
25, disk hairbrush 26, connecting tube 27 and second bearing 60,4 lower part of pedestal are equipped with first bearing 3, passed through in first bearing 3
The mode of connection of being full of is equipped with first rotating shaft 2, and wheel 1 is equipped in first rotating shaft 2, and 4 inside top of pedestal is installed from left to right
It is sequentially installed with first support bar 11 and first motor 6, the first belt pulley 5, the first support are installed on 6 output shaft of first motor
11 lower end of bar is equipped with second bearing 60, is equipped with the second shaft 9 in second bearing 60 by way of interference connection, second turn
The second belt pulley 10 and reel 8 have been pounded on axis 9, and the first connection skin is installed between the second belt pulley 10 and the first belt pulley 5
Band 7 is wound with rope 12 on reel 8, and 13 top of sliding rail is equipped with second support bar 14, and 14 top of second support bar is equipped with
3rd bearing 15,3rd bearing 15 is interior to be equipped with third shaft 16 by way of interference connection, is equipped in third shaft 16
Directive wheel 17, rope 12 bypass directive wheel 17, and slidingtype is equipped with sliding block 18 on sliding rail 13, and rope 12 is connected with sliding block 18, sliding
18 right part of block is equipped with the second motor 19, and third belt pulley 20 is equipped on the second motor 19, and 18 right part of sliding block is also equipped with
Four supporting rods 21,21 right part of the 4th supporting rod are equipped with fourth bearing 24, are pacified by way of interference connection in fourth bearing 24
Equipped with hollow rotating shaft 25, the 4th belt pulley 23 and disk hairbrush 26, the 4th belt pulley 23 and third are installed on hollow rotating shaft 25
Second connection belt 22 is installed, 25 front end of hollow rotating shaft is equipped with connecting tube 27 between belt pulley 20.
Further include having the 5th supporting rod 29, the 5th belt pulley 30,5th bearing 31, the 5th shaft 32, cam 33, link block
34, spring 35, mobile bar 36, cylinder body 37, piston 38, third connection belt 28, the first check valve 39, feed pipe 40, second are single
To valve 41 and water tank 42, the 5th supporting rod 29 is installed among 4 inside top of pedestal, 29 lower end of the 5th supporting rod is equipped with the 5th
Bearing 31,5th bearing 31 is interior to be equipped with the 5th shaft 32 by way of interference connection, and the 5th is equipped in the 5th shaft 32
Belt pulley 30 and cam 33 are equipped with third connection belt 28,4 inside of pedestal between the 5th belt pulley 30 and the first belt pulley 5
Upper right quarter is equipped with cylinder body 37, and 37 inner sliding type of cylinder body is equipped with piston 38, and 38 left part of piston is equipped with mobile bar 36, mobile bar
36 left ends are equipped with link block 34, and link block 34 is contacted with cam 33, and spring 35, cylinder are equipped between link block 34 and cylinder body 37
37 top of body is connected with connecting tube 27, and the second check valve 41 is equipped in connecting tube 27, and 37 right part of cylinder body is equipped with feed pipe 40,
First check valve 39 is installed, 4 top of pedestal is equipped with water tank 42, and water tank 42 is connected with feed pipe 40 in feed pipe 40.
Further include having the 7th shaft 43, stirring rod 44, the 7th supporting rod 45, the 8th supporting rod 46, third motor 47 and
Seven bearings 48,4 top of pedestal are equipped with the 8th supporting rod 46, and 46 upper right quarter of the 8th supporting rod is equipped with third motor 47, and the 8th
46 right part of supporting rod is equipped with the 7th supporting rod 45, and 45 right end of the 7th supporting rod is equipped with 7th bearing 48, in 7th bearing 48
The 7th shaft 43 is installed by way of interference connection, the 7th shaft 43 is connected with third motor 47, pacifies in the 7th shaft 43
Equipped with stirring rod 44.
Further include having lid 49 and felt circle 51,42 top of water tank is equipped with lid 49, and through-hole 50 is equipped among lid 49,
7th shaft 43 passes through through-hole 50, and felt circle 51 is equipped in through-hole 50.
Further include having vomit pipe 52, rubber pad 53 and threaded cap 54,42 upper right quarter of water tank is equipped with vomit pipe 52, vomit pipe
52 tops are equipped with threaded cap 54, and rubber pad 53 is equipped between threaded cap 54 and connecting tube 27.
Connecting tube 27 is connected with painting paint vehicle manually, the second constantly rotation of motor 19 is manually started, makes third belt pulley
20 constantly rotations make the 4th constantly rotation of belt pulley 23 by the second connection belt 22, disk hair are driven by hollow rotating shaft 25
The constantly rotation of brush 26, paints wall, and it is constantly clockwise and reverse to manually start first motor 6, makes the first belt pulley 5 constantly
Clockwise and reverse makes the 10 constantly clockwise and reverse of the second belt pulley by the first connection belt 7, makes coiling by the second shaft 9
Wheel 8 is constantly clockwise and reverses, and rope 12 is made constantly to be moved up and down with movable slider 18, and disk hairbrush 26 is driven constantly to move up and down,
Increase painting area.
Because further including having the 5th supporting rod 29, the 5th belt pulley 30,5th bearing 31, the 5th shaft 32, cam 33, connecting
Connect block 34, spring 35, mobile bar 36, cylinder body 37, piston 38, the first check valve 39, third connection belt 28, feed pipe 40, the
Two check valves 41 and water tank 42 are equipped with the 5th supporting rod 29 among 4 inside top of pedestal, and 29 lower end of the 5th supporting rod is equipped with
5th bearing 31,5th bearing 31 is interior to be equipped with the 5th shaft 32 by way of interference connection, is equipped in the 5th shaft 32
5th belt pulley 30 and cam 33 are equipped with third connection belt 28, pedestal 4 between the 5th belt pulley 30 and the first belt pulley 5
Inside upper right quarter is equipped with cylinder body 37, and 37 inner sliding type of cylinder body is equipped with piston 38, and 38 left part of piston is equipped with mobile bar 36, moves
36 left end of lever is equipped with link block 34, and link block 34 is contacted with cam 33, and spring is equipped between link block 34 and cylinder body 37
35,37 top of cylinder body is connected with connecting tube 27, and the second check valve 41 is equipped in connecting tube 27, and 37 right part of cylinder body is equipped with charging
Pipe 40 is equipped with the first check valve 39 in feed pipe 40, and 4 top of pedestal is equipped with water tank 42, and water tank 42 is connected with feed pipe 40,
Suitable painting paint vehicle is manually put into water tank 42, the first constantly rotation of belt pulley 5, connecting belt 28 by third makes the 5th
Belt pulley 30 constantly rotates, and so that cam 33 is constantly rotated by the 5th shaft 32, so that link block 34 is constantly moved left and right, pass through shifting
Lever 36 is constantly moved left and right with piston 38, and painting paint vehicle is made to enter cylinder body 37 from feed pipe 40, is flowed into and is justified from connecting tube 27
It is easy to use in disk hairbrush 26.
Because further including having the 7th shaft 43, stirring rod 44, the 7th supporting rod 45, the 8th supporting rod 46, third motor 47
With 7th bearing 48,4 top of pedestal is equipped with the 8th supporting rod 46, and 46 upper right quarter of the 8th supporting rod is equipped with third motor 47,
8th supporting rod, 46 right part is equipped with the 7th supporting rod 45, and 45 right end of the 7th supporting rod is equipped with 7th bearing 48,7th bearing
The 7th shaft 43 is installed by way of interference connection in 48, the 7th shaft 43 is connected with third motor 47, the 7th shaft 43
On stirring rod 44 is installed, manually start third motor 47 and constantly rotate, drive the constantly rotation of the 7th shaft 43, make stirring rod 44
Constantly rotation is stirred painting paint vehicle, prevents paint vehicle from drying.
Because further including having lid 49 and felt circle 51,42 top of water tank is equipped with lid 49, is equipped among lid 49 logical
Hole 50, the 7th shaft 43 pass through through-hole 50, are equipped with felt circle 51 in through-hole 50, lid 49 and felt circle 51 can increase water tank 42
Air-tightness, prevent internal paint vehicle from drying.
Because further including having vomit pipe 52, rubber pad 53 and threaded cap 54,42 upper right quarter of water tank is equipped with vomit pipe 52, puts
52 top of expects pipe is equipped with threaded cap 54, and rubber pad 53 is equipped between threaded cap 54 and connecting tube 27, threaded cap is opened manually
54, paint vehicle is added into water tank 42, rubber pad 53 can increase air-tightness.
Finally it should be noted that:The foregoing is only a preferred embodiment of the present invention, is not intended to restrict the invention,
Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used
With technical scheme described in the above embodiments is modified or equivalent replacement of some of the technical features,
All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in the present invention's
Within protection domain.
Claims (5)
1. a kind of wall plastering device for building, which is characterized in that include wheel, first rotating shaft, first bearing, pedestal,
One belt pulley, first motor, the first connection belt, reel, the second shaft, the second belt pulley, first support bar, rope, cunning
Rail, second support bar, 3rd bearing, third shaft, directive wheel, sliding block, the second motor, third belt pulley, the 4th supporting rod,
Two connection belts, the 4th belt pulley, fourth bearing, hollow rotating shaft, disk hairbrush, connecting tube and second bearing, pedestal lower part peace
Equipped with first bearing, first rotating shaft is installed by way of interference connection in first bearing, wheel is installed in first rotating shaft,
The installation of pedestal inside top is from left to right sequentially installed with first support bar and first motor, is equipped on first motor output shaft
First belt pulley, first support bar lower end are equipped with second bearing, and the is equipped with by way of interference connection in second bearing
Two shafts have pounded the second belt pulley and reel in the second shaft, first are equipped between the second belt pulley and the first belt pulley
Belt is connected, rope is wound on reel, second support bar is installed at the top of sliding rail, third is installed at the top of second support bar
Bearing is equipped with third shaft in 3rd bearing by way of interference connection, is equipped with directive wheel in third shaft, rope around
Directive wheel is crossed, slidingtype is equipped with sliding block on sliding rail, and rope is connected with sliding block, and sliding block right part is equipped with the second motor, the second electricity
Third belt pulley is installed on machine, sliding block right part is also equipped with the 4th supporting rod, and the 4th supporting rod right part is equipped with fourth bearing,
Hollow rotating shaft is installed by way of interference connection in fourth bearing, the 4th belt pulley and disk hair are installed on hollow rotating shaft
Brush, is equipped with the second connection belt, hollow rotating shaft front end is equipped with connecting tube between the 4th belt pulley and third belt pulley.
2. a kind of wall plastering device for building according to claim 1, which is characterized in that further include having the 5th support
Bar, the 5th belt pulley, 5th bearing, the 5th shaft, cam, link block, spring, mobile bar, cylinder body, piston, third connect skin
Band, the first check valve, feed pipe, the second check valve and water tank, are equipped with the 5th supporting rod among pedestal inside top, the 5th
Strut lower end is equipped with 5th bearing, is equipped with the 5th shaft in 5th bearing by way of interference connection, in the 5th shaft
5th belt pulley and cam are installed, third connection belt, pedestal inside are installed between the 5th belt pulley and the first belt pulley
Upper right quarter is equipped with cylinder body, and cylinder body inner sliding type is equipped with piston, and piston left part is equipped with mobile bar, and mobile bar left end is equipped with
Link block, link block and cam contact are equipped with spring between link block and cylinder body, cylinder body top is connected with connecting tube, connection
Second check valve is installed, cylinder body right part is equipped with feed pipe, and the first check valve, pedestal top peace are equipped in feed pipe in pipe
Equipped with water tank, water tank is connected with feed pipe.
3. a kind of wall plastering device for building according to claim 2, which is characterized in that further include have the 7th shaft,
Stirring rod, the 7th supporting rod, the 8th supporting rod, third motor and 7th bearing, pedestal top are equipped with the 8th supporting rod, and the 8th
Supporting rod upper right quarter is equipped with third motor, and the 8th supporting rod right part is equipped with the 7th supporting rod, the installation of the 7th supporting rod right end
There is 7th bearing, the 7th shaft is installed by way of interference connection in 7th bearing, the 7th shaft is connected with third motor,
Stirring rod is installed in 7th shaft.
4. a kind of wall plastering device for building according to claim 3, which is characterized in that further include having lid and felt
Circle, water tank upper are equipped with lid, and through-hole is equipped among lid, and the 7th shaft passes through through-hole, felt circle is equipped in through-hole.
5. a kind of wall plastering device for building according to claim 4, which is characterized in that further include having vomit pipe, rubber
Rubber cushion and threaded cap, water tank upper right quarter are equipped with vomit pipe, and vomit pipe top is equipped with threaded cap, between threaded cap and connecting tube
Rubber pad is installed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810874573.5A CN108756168A (en) | 2018-08-03 | 2018-08-03 | A kind of wall plastering device for building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810874573.5A CN108756168A (en) | 2018-08-03 | 2018-08-03 | A kind of wall plastering device for building |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108756168A true CN108756168A (en) | 2018-11-06 |
Family
ID=63968890
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810874573.5A Pending CN108756168A (en) | 2018-08-03 | 2018-08-03 | A kind of wall plastering device for building |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108756168A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113338585A (en) * | 2021-06-15 | 2021-09-03 | 石求明 | Coating equipment for plastering building wall |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107983591A (en) * | 2017-12-22 | 2018-05-04 | 黄跃 | A kind of mathematical education Mathematics toy mopping equipment |
CN108035519A (en) * | 2017-12-22 | 2018-05-15 | 深圳市晟弘企业管理有限公司 | A kind of metope mopping device for interior decoration |
CN108086649A (en) * | 2017-12-25 | 2018-05-29 | 浙江乐科文化发展有限公司 | A kind of coating material device that can intelligently smear for indoor decoration |
CN108080188A (en) * | 2018-02-12 | 2018-05-29 | 沈忠亮 | A kind of automobile making piece surface spray-painting plant |
CN108158517A (en) * | 2017-12-12 | 2018-06-15 | 李四英 | A kind of environment-friendly spray coating lower metope wiping device |
-
2018
- 2018-08-03 CN CN201810874573.5A patent/CN108756168A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108158517A (en) * | 2017-12-12 | 2018-06-15 | 李四英 | A kind of environment-friendly spray coating lower metope wiping device |
CN107983591A (en) * | 2017-12-22 | 2018-05-04 | 黄跃 | A kind of mathematical education Mathematics toy mopping equipment |
CN108035519A (en) * | 2017-12-22 | 2018-05-15 | 深圳市晟弘企业管理有限公司 | A kind of metope mopping device for interior decoration |
CN108086649A (en) * | 2017-12-25 | 2018-05-29 | 浙江乐科文化发展有限公司 | A kind of coating material device that can intelligently smear for indoor decoration |
CN108080188A (en) * | 2018-02-12 | 2018-05-29 | 沈忠亮 | A kind of automobile making piece surface spray-painting plant |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113338585A (en) * | 2021-06-15 | 2021-09-03 | 石求明 | Coating equipment for plastering building wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201692960U (en) | Passenger car bearing cleaning unit | |
CN208131361U (en) | A kind of surface lacquer mechanical device of part easy to setup | |
CN108756168A (en) | A kind of wall plastering device for building | |
CN107969324A (en) | A kind of quick water injector in gardens | |
CN107442346A (en) | A kind of high-voltage line erection construction steelframe antirust paint painting device | |
CN106311695B (en) | A kind of high school chemical experiment container washing apparatus | |
CN205663817U (en) | Damping device of printing and dyeing cloth hydroextractor | |
CN106640553A (en) | Cleaning radius-variable fan tower cylinder cleaning equipment | |
CN208045193U (en) | A kind of electric power cable recycling cleaning device | |
CN109700394A (en) | Glass curtain wall cleaning device | |
CN107790321A (en) | Suitcase oiling device is used in a kind of leatherware production | |
CN108869184A (en) | It is a kind of with dust-proof and wind power generation function communication base station | |
CN205933082U (en) | Auto repair tilting gearing for auto repair | |
CN207154229U (en) | A kind of steel wire rope cleaning equipment | |
CN204778072U (en) | Cable coiling mechanism | |
CN108179904A (en) | Centralization quick charge station used for electric vehicle | |
CN213162288U (en) | Pipeline cleaning device for hydraulic engineering | |
CN211043363U (en) | Underground water monitoring probe protection device | |
CN207748648U (en) | A kind of colour-spun yarns retracting device | |
CN209049801U (en) | A kind of hawser cleaning device | |
CN210138898U (en) | Auto-parts cleaning device | |
CN210434778U (en) | Outer ring rust prevention mechanism for rotary bearing machining | |
CN210507426U (en) | Triaxial mixing pile machine | |
CN207935726U (en) | A kind of lubrication device for wire cables | |
CN210187811U (en) | Extreme cleaning cabin is dredged to hawse |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181106 |
|
RJ01 | Rejection of invention patent application after publication |