CN108756070A - 一种提高建筑搭建效率的方法 - Google Patents
一种提高建筑搭建效率的方法 Download PDFInfo
- Publication number
- CN108756070A CN108756070A CN201810633581.0A CN201810633581A CN108756070A CN 108756070 A CN108756070 A CN 108756070A CN 201810633581 A CN201810633581 A CN 201810633581A CN 108756070 A CN108756070 A CN 108756070A
- Authority
- CN
- China
- Prior art keywords
- steel bar
- clamping
- cylindrical hole
- cylindrical
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C5/00—Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
- E04C5/16—Auxiliary parts for reinforcements, e.g. connectors, spacers, stirrups
- E04C5/162—Connectors or means for connecting parts for reinforcements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Reinforcement Elements For Buildings (AREA)
- Clamps And Clips (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810633581.0A CN108756070B (zh) | 2018-06-20 | 2018-06-20 | 一种提高建筑搭建效率的方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810633581.0A CN108756070B (zh) | 2018-06-20 | 2018-06-20 | 一种提高建筑搭建效率的方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108756070A true CN108756070A (zh) | 2018-11-06 |
| CN108756070B CN108756070B (zh) | 2020-12-18 |
Family
ID=63979191
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810633581.0A Active CN108756070B (zh) | 2018-06-20 | 2018-06-20 | 一种提高建筑搭建效率的方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108756070B (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110439187A (zh) * | 2019-08-01 | 2019-11-12 | 河南海威路桥工程咨询有限公司 | 一种便捷式钢筋对接设备 |
| CN111321884A (zh) * | 2020-03-23 | 2020-06-23 | 杭州操订科技有限公司 | 一种基于连杆挤压的建筑钢管拼接用连接装置 |
| CN112031280A (zh) * | 2020-09-09 | 2020-12-04 | 福州鼓楼纹英建筑工程有限责任公司 | 钢筋搭连可滑移控位扣件 |
| CN116905731A (zh) * | 2023-07-25 | 2023-10-20 | 江西东方豹紧固件有限公司 | 一种方便更换快接套筒的多维度钢筋快接装置 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1424453B1 (de) * | 2002-11-26 | 2009-10-21 | Pfeifer Holding GmbH & Co. KG | Verbindungsmuffe |
| CN201530453U (zh) * | 2009-11-20 | 2010-07-21 | 吴金海 | 螺旋压紧自行车手把倾角可调装置 |
| CN103397667A (zh) * | 2013-07-09 | 2013-11-20 | 北京筑福国际工程技术有限责任公司 | 既有建筑直接增层基础结构及其施工方法 |
| CN206800804U (zh) * | 2017-06-12 | 2017-12-26 | 上海宝冶集团有限公司 | 建筑钢筋机械连接的连接结构 |
| CN207044010U (zh) * | 2017-03-08 | 2018-02-27 | 冷传刚 | 一种新型钢筋夹 |
-
2018
- 2018-06-20 CN CN201810633581.0A patent/CN108756070B/zh active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| EP1424453B1 (de) * | 2002-11-26 | 2009-10-21 | Pfeifer Holding GmbH & Co. KG | Verbindungsmuffe |
| CN201530453U (zh) * | 2009-11-20 | 2010-07-21 | 吴金海 | 螺旋压紧自行车手把倾角可调装置 |
| CN103397667A (zh) * | 2013-07-09 | 2013-11-20 | 北京筑福国际工程技术有限责任公司 | 既有建筑直接增层基础结构及其施工方法 |
| CN207044010U (zh) * | 2017-03-08 | 2018-02-27 | 冷传刚 | 一种新型钢筋夹 |
| CN206800804U (zh) * | 2017-06-12 | 2017-12-26 | 上海宝冶集团有限公司 | 建筑钢筋机械连接的连接结构 |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110439187A (zh) * | 2019-08-01 | 2019-11-12 | 河南海威路桥工程咨询有限公司 | 一种便捷式钢筋对接设备 |
| CN111321884A (zh) * | 2020-03-23 | 2020-06-23 | 杭州操订科技有限公司 | 一种基于连杆挤压的建筑钢管拼接用连接装置 |
| CN111321884B (zh) * | 2020-03-23 | 2021-07-23 | 安徽同济水电建安有限公司 | 一种基于连杆挤压的建筑钢管拼接用连接装置 |
| CN112031280A (zh) * | 2020-09-09 | 2020-12-04 | 福州鼓楼纹英建筑工程有限责任公司 | 钢筋搭连可滑移控位扣件 |
| CN116905731A (zh) * | 2023-07-25 | 2023-10-20 | 江西东方豹紧固件有限公司 | 一种方便更换快接套筒的多维度钢筋快接装置 |
| CN116905731B (zh) * | 2023-07-25 | 2025-10-28 | 江西东方豹紧固件有限公司 | 一种方便更换快接套筒的多维度钢筋快接装置 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108756070B (zh) | 2020-12-18 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108756070A (zh) | 一种提高建筑搭建效率的方法 | |
| CN108756073B (zh) | 一种角度可调节的钢筋快速连接套筒 | |
| CN110344411B (zh) | 一种建筑施工地下支护锚固设备 | |
| CN104532860A (zh) | 可回收土钉 | |
| CN108756071B (zh) | 一种建筑用直螺纹套筒 | |
| CN114086755A (zh) | 一种可调式脚手架连墙件及其方法 | |
| CN216239757U (zh) | 一种用于建筑工程的模板固定连接结构 | |
| CN215717491U (zh) | 伞型外墙预留洞口便捷式加固装置 | |
| CN108266204B (zh) | 装配式约束混凝土拱架核心混凝土灌注设备及工艺 | |
| CN203475819U (zh) | 组合式建筑模板 | |
| CN116607833A (zh) | 一种装配式剪力墙的耗能减震连接节点施工装置 | |
| CN206844636U (zh) | 墙体和楼盖现浇铝模板支撑体系 | |
| CN116716810A (zh) | 现浇箱梁支模架结构及施工方法 | |
| CN221663584U (zh) | 一种水渠凹槽模具铺设装置 | |
| CN113622516A (zh) | 一种用于装配式混凝土建筑的十字形连接组件 | |
| CN210396131U (zh) | 一种新型机电洞口套管加固装置 | |
| CN217298789U (zh) | 一种施工重力坝加固装置 | |
| CN210164220U (zh) | 一种铝合金爬架用底脚固定装置 | |
| CN108756069B (zh) | 一种提高建筑钢筋骨架连接效率的方法 | |
| CN223388166U (zh) | 一种水管穿楼板堵漏结构 | |
| CN222575503U (zh) | 一种预制装配式基坑支护结构 | |
| CN222065188U (zh) | 一种桥梁承插式预制立柱拼装定位装置 | |
| CN115110768B (zh) | 一种电力承载墙施工中的钢模板拆除机构及使用方法 | |
| CN223269214U (zh) | 一种预应力抗浮锚杆的顶部锁定结构 | |
| CN216766768U (zh) | 一种后浇带早拆模板生产用成型夹持机构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20201126 Address after: 330200 Zhongjian building, No. 398, Nanchang County River Chau Road, Nanchang, Jiangxi Applicant after: Built in the city to open the Environment Construction Co.,Ltd. Address before: 310018 Hangzhou University of Electronic Science and Technology, No. 1158, No. 2 Main Street, Baiyang Street, Jingkai District, Hangzhou City, Zhejiang Province Applicant before: Xiao Chengmei |
|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 330200 Zhongjianchengkai Building, 398 Hezhou Road, Nanchang County, Nanchang City, Jiangxi Province Patentee after: Jiangxi No.10 Construction Engineering Co.,Ltd. Country or region after: China Address before: 330200 Zhongjianchengkai Building, 398 Hezhou Road, Nanchang County, Nanchang City, Jiangxi Province Patentee before: Built in the city to open the Environment Construction Co.,Ltd. Country or region before: China |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A method to improve the efficiency of building construction Granted publication date: 20201218 Pledgee: Bank of China Nanchang West Lake Branch Pledgor: Jiangxi No.10 Construction Engineering Co.,Ltd. Registration number: Y2025980008297 |