CN108755926B - 干湿式复合连接拼装式构建物施工方法 - Google Patents
干湿式复合连接拼装式构建物施工方法 Download PDFInfo
- Publication number
- CN108755926B CN108755926B CN201810527007.7A CN201810527007A CN108755926B CN 108755926 B CN108755926 B CN 108755926B CN 201810527007 A CN201810527007 A CN 201810527007A CN 108755926 B CN108755926 B CN 108755926B
- Authority
- CN
- China
- Prior art keywords
- reinforcing bars
- cross beam
- floor
- upright
- construction
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/21—Connections specially adapted therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/20—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
- E04B1/22—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material with parts being prestressed
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810527007.7A CN108755926B (zh) | 2018-05-29 | 2018-05-29 | 干湿式复合连接拼装式构建物施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810527007.7A CN108755926B (zh) | 2018-05-29 | 2018-05-29 | 干湿式复合连接拼装式构建物施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108755926A CN108755926A (zh) | 2018-11-06 |
CN108755926B true CN108755926B (zh) | 2021-01-19 |
Family
ID=64003175
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810527007.7A Active CN108755926B (zh) | 2018-05-29 | 2018-05-29 | 干湿式复合连接拼装式构建物施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108755926B (zh) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
MY171088A (en) * | 2010-08-11 | 2019-09-24 | Univ Malaysia Teknologi | Building assembly system |
CN204901129U (zh) * | 2015-08-18 | 2015-12-23 | 吉林钰翎珑钢管钢构制造有限公司 | 一种承插连接式内平波纹钢管 |
CN105369892B (zh) * | 2015-09-23 | 2017-10-17 | 清华大学 | 一种钢管混凝土叠合框架结构体系 |
CN107190884A (zh) * | 2017-06-09 | 2017-09-22 | 东南大学 | 一种新型多高层热轧型钢‑复合轻钢剪力墙组合结构体系 |
CN108060746B (zh) * | 2017-10-30 | 2023-08-01 | 中国建筑股份有限公司 | 一种装配式预应力混凝土大跨度框架体系及其施工方法 |
-
2018
- 2018-05-29 CN CN201810527007.7A patent/CN108755926B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN108755926A (zh) | 2018-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107938835B (zh) | 一种采用型钢混凝土柱和钢梁组合的预制装配式框架 | |
CN109252727B (zh) | 隔震层橡胶支座与柱、梁板体系一体化装配节点与方法 | |
CN111576619B (zh) | 高强混凝土后浇的装配式框架体系生产方法 | |
CN109469204B (zh) | 基于叠合梁的装配式型钢混凝土混合框架结构及施工方法 | |
CN111877546A (zh) | 一种带屈曲约束支撑的装配式框架梁柱湿节点及施工方法 | |
JP5217428B2 (ja) | 橋梁の柱頭部または桁端部の複合中空構造 | |
CN108729544B (zh) | 干湿式复合连接拼装式构建物 | |
CN108316150B (zh) | 斜拉桥主塔及钢锚梁的施工系统和施工方法 | |
CN212656384U (zh) | 高强混凝土连接件、高强混凝土后浇的装配式框架体系及支撑架 | |
CN108678164B (zh) | 连接梁式拼装建筑结构 | |
CN112681514A (zh) | 一种装配式节点套筒及其安装方法 | |
KR100747665B1 (ko) | 슬래브용 거푸집 및 이를 이용한 슬래브 시공 방법 | |
CN108755939B (zh) | 复合连接拼装式建筑结构 | |
CN108755926B (zh) | 干湿式复合连接拼装式构建物施工方法 | |
CN212426706U (zh) | 全预制轻型大悬臂预弯组合盖梁结构 | |
KR101150369B1 (ko) | 건축물의 복합보 구조 | |
CN103061444B (zh) | 自承式异形外包钢-混凝土组合梁 | |
CN108755944B (zh) | 复合连接拼装式建筑结构施工方法 | |
CN213927614U (zh) | 一种剪力墙混凝土置换加固结构 | |
CN210976062U (zh) | 一种装配式框架结构组合体系 | |
CN212129915U (zh) | 填充墙系梁浇筑模具 | |
CN210458906U (zh) | 隧道内装配式桥梁结构 | |
CN111719417A (zh) | 全预制轻型大悬臂预弯组合盖梁结构及施工方法 | |
CN111101617A (zh) | 填充墙组合抗裂结构及施工方法 | |
CN114319583B (zh) | 预制框架梁与预制框架柱的连接构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201021 Address after: 430100 South taizihu innovation Valley, Caidian economic and Technological Development Zone, Wuhan City, Hubei Province Applicant after: Songta intellectual property operation Wuhan Co.,Ltd. Address before: 443518 59 ha Jia Ping Road, he Jia Ping Town, Changyang Tujia Autonomous County, Yichang, Hubei Applicant before: HUBEI PEIHAN CONSTRUCTION Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201228 Address after: 401120 no.2-1, building 1-2, No.6 Xinnan Road, Longxi street, Yubei District, Chongqing Applicant after: Chongqing Jikai Technology Service Co.,Ltd. Address before: 430100 South Taizi Lake innovation Valley, Caidian District, Wuhan City, Hubei Province (qdxx-q2007) Applicant before: Songta intellectual property operation Wuhan Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |