CN108755683A - A kind of two-stage level land for building piling equipment - Google Patents
A kind of two-stage level land for building piling equipment Download PDFInfo
- Publication number
- CN108755683A CN108755683A CN201810788091.8A CN201810788091A CN108755683A CN 108755683 A CN108755683 A CN 108755683A CN 201810788091 A CN201810788091 A CN 201810788091A CN 108755683 A CN108755683 A CN 108755683A
- Authority
- CN
- China
- Prior art keywords
- plate
- lifting
- rotation
- mounting plate
- centre position
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/20—Placing by pressure or pulling power
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
The invention discloses a kind of two-stage level land for building piling equipments,Including the symmetrical support mounting plate being vertically arranged,The upper end of the support mounting plate is horizontally disposed installation top plate,The centre position of support mounting plate guiding mounting plate horizontally disposed in opposite directions,Rotation moving structure is both provided with before and after the lower end of the support mounting plate,The centre position of installation top plate coordinates guiding mounting plate to be provided with two-stage lift work structure straight down,The rotation moving structure includes the symmetrical rotation-limited mounting post for partly inlaying rotation setting straight down before and after support mounting plate lower end,Half section of the lower end level of rotation-limited mounting post is provided through rotation-limited axis,The two-stage lift work structure includes being oriented to the centre position of mounting plate vertically through the guiding lifting mounting cylinder of setting,The present invention has structure design compact,Conveniently moving,Two-stage step operation structure,It is efficient,It is high-quality,The advantages that noise is small.
Description
Technical field
The present invention relates to building machinery field, specifically a kind of two-stage level land for building piling equipment.
Background technology
Piling, refers to and stake is thrown into ground, keep building basis firm, if because above ground structure will be built on the ground,
Ground will bear prodigious pressure, it is necessary that there is enough renitent intensity on ground, this is difficult often to accomplish, institute
Must just the ground for bearing building be reinforced or be improved in a manner of the bearing of ground, so just expecting beating on ground
Stake, allows most of weight of building to pass to the very deep position of below ground by stake, because the ground of this position compares ground
Ability to bear is much bigger, but currently used piling equipment, not perfect due to designing, and occurs various ask in actual use
Topic.
To solve the above-mentioned problems, it proposes the present invention, overcomes currently used pile driving equipment, due to being turned using potential energy
It changes, inertia impact structure causes device build huge, and transport installation and debugging difficulty is big, and time-consuming, and piling needs repetition same
Operation carries out, and solves currently used pile driving equipment, and noise is big when due to impact, and the consumption of device original paper itself is high, cost
The problems such as high so that the present invention has structure design compact, and conveniently moving, two-stage step operation structure is efficient, high-quality,
The advantages that noise is small.
Invention content
The purpose of the present invention is to provide a kind of two-stage level land for building piling equipments, to solve to carry in above-mentioned background technology
The problem of going out.
To achieve the above object, the present invention provides the following technical solutions:
A kind of two-stage level land for building piling equipment, including the symmetrical support mounting plate being vertically arranged, the support installation
The upper end of plate is horizontally disposed to have installation top plate, the centre position guiding mounting plate horizontally disposed in opposite directions of support mounting plate described
Rotation moving structure is both provided with before and after the lower end of support mounting plate, the centre position for installing top plate coordinates guiding to pacify straight down
Loading board is provided with two-stage lift work structure, the rotation moving structure include before and after support mounting plate lower end it is symmetrical straight down
The rotation-limited mounting post of rotation setting is partly inlayed, half section of the lower end level of rotation-limited mounting post is provided through rotation-limited
Axis, the two-stage lift work structure include that the guiding lifting mounting cylinder of setting is run through in the centre position of guiding mounting plate vertically,
The upper end of guiding lifting mounting cylinder is horizontally disposed extruding lifter plate, and the lower end centre position for squeezing lifter plate is straight down
It is inlayed by motor mounting cylinder and is provided with driving motor, the bosom position of guiding lifting mounting cylinder is horizontally disposed to have lifting to lead
To plate, the lower end centre position of driving motor is stretched out straight down is provided with rotation lifting stud, the lower end of rotation lifting stud
Through lifting guide plate, the upper end centre position level of the installation top plate, which is inlayed, to be provided with hydraulic pressure and flows cover.
As a further solution of the present invention:The left and right ends of the rotation-limited axis are stretched out rotation-limited mounting post and are set
It is equipped with supporting wheel, the outside of supporting wheel is provided with elastic shock attenuation tire by several support Rotational Cylindricals being angularly arranged,
Facilitate the steering of device to move, improves mobility.
As a further solution of the present invention:The centre position cooperation rotation lifting stud of the lifting guide plate erects vertically
Straight to be provided through lifting internal thread guide cylinder, the lower end of lifting internal thread guide cylinder is horizontally disposed lift work plate, described
The lower end level welding of lift work plate is provided with hard alloy layer.
As a further solution of the present invention:Implement the upper end cooperation lifting internal thread guide cylinder of lift work plate angularly
Run through lifting guide plate straight up and be provided with lifting guide post, the lifting between the lifting guide plate and lift work plate is led
Resetting spring column is both provided on column.
As a further solution of the present invention:The lifting guide post of the lifting guide plate upper end is respectively provided with guiding and is equipped with
Several clump weights, and adherency rubber is provided between clump weight, the outside for being oriented to lifting mounting cylinder is angularly vertically arranged
It is oriented to lifting groove, guiding mounting plate obtains centre position cooperation guiding lifting groove and is vertically arranged with operation guide post, passes through screw thread
Level-one operation, pressurization leveling operation face.
As a further solution of the present invention:Cooperation support mounting plate in described upper end for being oriented to mounting plate or so is symmetrical arranged
There are hydraulic oil container, the upper end of hydraulic oil container to be both provided with hydraulic pump, the lower end of hydraulic pump is provided with the liquid suction pipe for stretching into bottom end, liquid
The upper end of press pump, which is provided with to stretch into installation top plate and flow with hydraulic pressure, covers the hydraulic pressure diversion pipe that is connected to.
As further scheme of the invention:The lower end homogeneous vertical that the hydraulic pressure flows cover is vertically provided with several limits
Position hydraulic cylinder, interior extended downwardly by horizontally disposed synchronous piston for limiting hydraulic cylinder is provided with telescopic hydraulic column, and stretches
The lower end of contracting hydraulic column is connect by synchronization job plate with the upper end for squeezing lifter plate, hydraulic pressure two level operation, completes two-stage step
Rapid operation structure, efficient, high-quality, noise is small.
Compared with prior art, the beneficial effects of the invention are as follows:Currently used pile driving equipment is overcome, due to using gesture
It can convert, inertia impact structure causes device build huge, and transport installation and debugging difficulty is big, and time-consuming, and piling needs to repeat
Same operation carries out, and solves currently used pile driving equipment, and noise is big when due to impact, and the consumption of device original paper itself is high,
The problems such as of high cost so that the present invention has structure design compact, conveniently moving, two-stage step operation structure, efficient, quality
Well, the advantages that noise is small.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of two-stage level land for building piling equipment.
Fig. 2 is a kind of structural schematic diagram of two-stage lift work structure in two-stage level land for building piling equipment.
Fig. 3 is the sectional view that guide plate is lifted in a kind of two-stage level land for building piling equipment.
Fig. 4 is a kind of structural schematic diagram of elastic cushion tyre in two-stage level land for building piling equipment.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, in the embodiment of the present invention, a kind of two-stage level land for building piling equipment, including it is symmetrical vertical
The support mounting plate 5 of setting, the upper end of the support mounting plate 5 is horizontally disposed installation top plate 11, the centre of support mounting plate 5
The opposite horizontally disposed guiding mounting plate 6 in position is both provided with rotation moving structure before and after the lower end of the support mounting plate 5,
The centre position of installation top plate 11 coordinates guiding mounting plate 6 to be provided with two-stage lift work structure straight down;
Refering to fig. 1, Fig. 4, in the embodiment of the present invention, the rotation moving structure includes symmetrically erecting before and after 5 lower end of support mounting plate
The rotation-limited mounting post 4 of rotation setting is directly inlayed to lower half, half section of the lower end level of rotation-limited mounting post 4 is provided through
Rotation-limited axis 1, the left and right ends of rotation-limited axis 1 stretch out rotation-limited mounting post 4 and are provided with supporting wheel 2, the branch
The outside of support turntable 2 is provided with elastic shock attenuation tire 3 by several support Rotational Cylindricals being angularly arranged, and facilitates the steering of device
It is mobile, improve mobility;
Refering to fig. 1, Fig. 2, Fig. 3, in the embodiment of the present invention, the two-stage lift work structure includes being oriented to the centre of mounting plate 6
The guiding that setting is run through in position vertically lifts mounting cylinder 18, and the upper end of guiding lifting mounting cylinder 18 is horizontally disposed extruding lifter plate
16, the lower end centre position for squeezing lifter plate 16 is inlayed vertically down through motor mounting cylinder is provided with driving motor 17,
The bosom position of guiding lifting mounting cylinder 18 is horizontally disposed lifting guide plate 27, the lower end centre position of driving motor 17
It stretches out straight down and is provided with rotation lifting stud 25, the lower end of rotation lifting stud 25 is lifted through lifting guide plate 27
The centre position cooperation rotation lifting stud 25 of guide plate 27 is vertical to be provided through lifting internal thread guide cylinder 24, lifting vertically
The lower end of internal thread guide cylinder 24 is horizontally disposed lift work plate 22, the lower end level welding setting of the lift work plate 22
There is hard alloy layer, and the upper end cooperation lifting internal thread guide cylinder 24 of lift work plate 22 angularly runs through lifting straight up
Guide plate 27, which is provided with, lifts guide post 26, in the lifting guide post 26 between the lifting guide plate 27 and lift work plate 22
It is both provided with resetting spring column 23, the lifting guide post 26 of 27 upper end of lifting guide plate is respectively provided with guiding and is equipped with several clump weights
20, and adherency rubber is provided between clump weight 20, the outside for being oriented to lifting mounting cylinder 18 is angularly vertically arranged guiding
Lifting groove 19, guiding mounting plate 6 obtain centre position cooperation guiding lifting groove 19 and are vertically arranged with operation guide post 21, the peace
The upper end centre position level of dress top plate 11, which inlays to be provided with hydraulic pressure and flow, covers 12, is oriented to upper end of mounting plate 6 or so cooperation branch
Support mounting plate 5 is symmetrically arranged with hydraulic oil container 8, and the upper end of hydraulic oil container 8 is both provided with hydraulic pump 9, the lower end setting of hydraulic pump 9
There is the liquid suction pipe 7 for stretching into bottom end, the upper end of hydraulic pump 9, which is provided with to stretch into installation top plate 11 and flow with hydraulic pressure, covers 12 hydraulic pressure being connected to
Diversion pipe 10, the lower end homogeneous vertical that the hydraulic pressure flows cover 12 are vertically provided with several limit hydraulic cylinders 14, limit hydraulic cylinder
14 interior extended downwardly by horizontally disposed synchronous piston 13 is provided with telescopic hydraulic column, and the lower end of telescopic hydraulic column is equal
It is connect with the upper end for squeezing lifter plate 16 by synchronization job plate 15,.
The present invention operation principle be:By the pulling equipment of outside setting by device tethered sliding, coordinate rotation-limited
The rotation of axis 1 and elastic shock attenuation tire 3 is moved to target location, and starting driving motor 17 makes it act on rotation lifting stud 25
Cooperation lifting internal thread guide cylinder 24 is so that at the same time the decline of lift work plate 22 is oriented in lifting guide post 26 and lifting
Stable lifting is realized under the guiding role of plate 27 so that lift work plate 22 carries out primary pressing operation, Ke Yitian with work surface
The clump weight 20 in lifting guide post 26, subsequent start-up hydraulic pump 9 is added to be carried out by flowing conveying hydraulic oil in cover 12 to hydraulic pressure
Pressurization so that hydraulic pressure push telescopic hydraulic column move downward so that squeeze lifter plate 16 together with lift work plate 22 further under
Pressure completes the operation of piling, overcomes currently used pile driving equipment, and due to being converted using potential energy, inertia impact structure causes
Device build is huge, and transport installation and debugging difficulty is big, and time-consuming, and piling needs to repeat same operation progress, solves current
The pile driving equipment used, noise is big when due to impact, and the consumption of device original paper itself is high, it is of high cost the problems such as so that the present invention
It is compact with structure design, the advantages that conveniently moving, two-stage step operation structure is efficient, high-quality, and noise is small.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie
In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter
From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power
Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims
Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiment being appreciated that.
Claims (7)
1. a kind of two-stage level land for building piling equipment, including the symmetrical support mounting plate being vertically arranged(5), the support
Mounting plate(5)Upper end horizontally disposed have installation top plate(11), support mounting plate(5)Centre position opposite horizontally disposed lead
To mounting plate(6), the support mounting plate(5)Lower end before and after be both provided with rotation moving structure, top plate is installed(11)In
Between position coordinate straight down be oriented to mounting plate(6)It is provided with two-stage lift work structure, which is characterized in that the rotation movement
Structure includes support mounting plate(5)The symmetrical rotation-limited mounting post for partly inlaying rotation setting straight down before and after lower end(4), limit
Position rotational installation column(4)Half section of lower end level be provided through rotation-limited axis(1), the two-stage lift work structure includes
It is oriented to mounting plate(6)Centre position vertically run through setting guiding lift mounting cylinder(18), it is oriented to lifting mounting cylinder(18)'s
Upper end is horizontally disposed extruding lifter plate(16), the extruding lifter plate(16)Lower end centre position vertically down through motor
Mounting cylinder, which is inlayed, is provided with driving motor(17), it is oriented to lifting mounting cylinder(18)Bosom position horizontally disposed there is lifting to lead
To plate(27), driving motor(17)Lower end centre position stretch out straight down be provided with rotation lifting stud(25), rotation liter
Stud drops(25)Lower end through lifting guide plate(27), the installation top plate(11)Upper end centre position level inlay setting
There is hydraulic pressure to flow cover(12).
2. a kind of two-stage level land for building piling equipment according to claim 1, which is characterized in that the rotation-limited axis
(1)Left and right ends stretch out rotation-limited mounting post(4)It is provided with supporting wheel(2), supporting wheel(2)Outside pass through
Several support Rotational Cylindricals of angle setting are provided with elastic shock attenuation tire(3).
3. a kind of two-stage level land for building piling equipment according to claim 1, which is characterized in that the lifting guide plate
(27)Centre position cooperation rotation lifting stud(25)It is vertical to be provided through lifting internal thread guide cylinder vertically(24), lifting
Internal thread guide cylinder(24)Lower end horizontally disposed have lift work plate(22), the lift work plate(22)Lower end horizontal welding
It connects and is provided with hard alloy layer.
4. a kind of two-stage level land for building piling equipment according to claim 1 or 3, which is characterized in that implement lifting and make
Industry plate(22)Upper end cooperation lifting internal thread guide cylinder(24)Angularly run through lifting guide plate straight up(27)It is provided with
Lift guide post(26), the lifting guide plate(27)With lift work plate(22)Between lifting guide post(26)On be respectively provided with
There is resetting spring column(23).
5. a kind of two-stage level land for building piling equipment according to claim 1 or 4, which is characterized in that the lifting is led
To plate(27)The lifting guide post of upper end(26)It is respectively provided with guiding and several clump weights is installed(20), and clump weight(20)Between set
It is equipped with adherency rubber, the guiding lifts mounting cylinder(18)Outside be angularly vertically arranged guiding lifting groove(19), it is oriented to peace
Loading board(6)It obtains centre position cooperation and is oriented to lifting groove(19)It is vertically arranged with operation guide post(21).
6. a kind of two-stage level land for building piling equipment according to claim 1, which is characterized in that the guiding mounting plate
(6)Upper end or so cooperation support mounting plate(5)It is symmetrically arranged with hydraulic oil container(8), hydraulic oil container(8)Upper end be both provided with
Hydraulic pump(9), hydraulic pump(9)Lower end be provided with the liquid suction pipe for stretching into bottom end(7), hydraulic pump(9)Upper end be provided with and stretch into
Top plate is installed(11)Cover is flowed with hydraulic pressure(12)The hydraulic pressure diversion pipe of connection(10).
7. a kind of two-stage level land for building piling equipment according to claim 1 or 6, which is characterized in that the hydraulic pressure is equal
Stream cover(12)Lower end homogeneous vertical be vertically provided with several limit hydraulic cylinders(14), limit hydraulic cylinder(14)Interior pass through water
The synchronous piston of flat setting(13)It extends downwardly and is provided with telescopic hydraulic column, and the lower end of telescopic hydraulic column passes through synchronization job
Plate(15)With extruding lifter plate(16)Upper end connection.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810788091.8A CN108755683A (en) | 2018-07-18 | 2018-07-18 | A kind of two-stage level land for building piling equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810788091.8A CN108755683A (en) | 2018-07-18 | 2018-07-18 | A kind of two-stage level land for building piling equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108755683A true CN108755683A (en) | 2018-11-06 |
Family
ID=63970477
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810788091.8A Withdrawn CN108755683A (en) | 2018-07-18 | 2018-07-18 | A kind of two-stage level land for building piling equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108755683A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113250194A (en) * | 2021-05-17 | 2021-08-13 | 陈小丰 | Progressive piling device for building construction |
-
2018
- 2018-07-18 CN CN201810788091.8A patent/CN108755683A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113250194A (en) * | 2021-05-17 | 2021-08-13 | 陈小丰 | Progressive piling device for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108755683A (en) | A kind of two-stage level land for building piling equipment | |
CN104310270A (en) | Multistage piston lifting frame | |
CN206031709U (en) | Gasbag formula platform | |
CN107724659A (en) | One kind can transverse shifting stable type building hanging basket | |
CN102303821A (en) | Luffing tower crane with balanced type suspension arm based on traction luffing of steel rope | |
CN204625014U (en) | Deviated wells rig blowout preventer hydraulic hanging apparatus | |
CN211154411U (en) | Dress designing platform based on angle adjusting technology | |
CN202379600U (en) | X type support leg of crane and crane provided with support leg | |
CN205421033U (en) | Public road bridge roof beam hydraulic pressure heel post | |
CN209011129U (en) | A kind of two-stage level land for building piling equipment | |
CN202279649U (en) | Perpendicular landing leg and hoist with same | |
CN102431915B (en) | X-shaped outrigger for crane and crane with X-shaped outrigger | |
CN203998731U (en) | Three oil cylinder centre lifting-up creeping devices | |
CN205822185U (en) | A kind of the frame mechanism of piling machine column | |
CN207736228U (en) | A kind of Simple hydraulic upright post jack guide sleeve dismounting device | |
CN210888089U (en) | Distributing rod for concrete construction | |
CN104988921B (en) | Multifunction guard rail breakdown van | |
CN204753587U (en) | Diesel hammer pile driver frame | |
CN108793025A (en) | A kind of arm-type high-altitude operation vehicle of mixing | |
CN209778185U (en) | Hot galvanizing production line hydraulic lifting station | |
CN206337551U (en) | A kind of jack up broken stone pile ocean experiment porch | |
CN201087701Y (en) | Foldable derrick of exploratory drilling rig | |
CN207536013U (en) | A kind of leg mechanism of robot | |
CN202212952U (en) | Self-adapting intelligent levelling workbench | |
CN205558953U (en) | Hydraulic bracket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181106 |
|
WW01 | Invention patent application withdrawn after publication |