CN108755416B - Bridge packaging technology - Google Patents
Bridge packaging technology Download PDFInfo
- Publication number
- CN108755416B CN108755416B CN201810448320.1A CN201810448320A CN108755416B CN 108755416 B CN108755416 B CN 108755416B CN 201810448320 A CN201810448320 A CN 201810448320A CN 108755416 B CN108755416 B CN 108755416B
- Authority
- CN
- China
- Prior art keywords
- girder steel
- longitudinal
- segment unit
- main body
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
The present invention relates to bridge packaging technologies, by means of bridge hauling construction system comprising the first starting segment unit and the second starting segment unit at bridge both ends to be onstructed is arranged in;First starting segment unit and the second the initial segment cellular construction are identical and arranged symmetrically;First starting segment unit include the assembled supporting support that bridge end is set, the gantry crane running track being arranged on assembled supporting support access bridge, ridden in left or right direction on gantry crane running track handling door machine, be arranged in assembled supporting support equipped main body girder steel, equipped main body girder steel left and right ends are set girder steel hole, be arranged in right end girder steel hole right end nose girder and adjacent equipped main body girder steel is set girder steel hole between interim bar;The branch trestle for supporting the nose girder of the first starting segment unit to connect with the nose girder of the second starting segment unit is provided in the middle part of bridge to be onstructed;The present invention has rational design, compact-sized and easy to use.
Description
Technical field
The present invention relates to bridge hauling construction system and bridge packaging technologies.
Background technique
Currently, with the rapid development of bridge technology, more and more long-span arch bridges are not due to can with other bridge types
The curve modeling and aesthetic feeling of analogy, and use is on water field of big area.But arch bridge main force structure -- arch rib is due to it
Weight is big, size is big, brings certain difficulty to construction, wherein it is that arch rib is applied that the arch rib of big segment, which is transported design position,
The key of work, specifically how by the entire arch rib being spliced on the bank or the arch rib fragmented transport being spliced into barge.
Currently, arch rib integral assembling is completed or, by after arch rib segmented assembly, using slide dilatory bracket delivery arch rib or
Arch rib segmentation, slippage bracket are set on slideway, are loaded with the slippage bracket of arch rib or arch rib segmentation by sliding on slideway, are moved
It moves on the barge equipped with slideway, then, barge drives to design together with the slippage bracket for being loaded with arch rib or arch rib segmentation
On navigation channel where position, achieve the purpose that transport arch rib.
Existing slippage bracket the problem is that, under walk leg bottom surface, ramp surface is plane, in slipping, sliding
Bracket easily slides out slideway, causes haulage time length, the low efficiency of arch rib, is unfavorable for the construction of arch rib.
Summary of the invention
The technical problems to be solved by the invention are generally speaking to provide a kind of bridge hauling construction system and bridge
Main bridge packaging technology;The technical issues of solving in detail and acquirement beneficial effect in aftermentioned content and combine specific embodiment
Middle content specifically describes.
To solve the above problems, the technical solution used in the present invention is:
Bridge packaging technology, by means of bridge hauling construction system comprising be arranged in bridge two to be onstructed
The first starting segment unit at end and the second starting segment unit;First starting segment unit and the second the initial segment cellular construction are identical and right
Claim setting;First starting segment unit includes the assembled supporting support that bridge end is arranged in, is arranged in assembled supporting support access bridge
On gantry crane running track, ridden in left or right direction on gantry crane running track handling door machine, matching in assembled supporting support is set
Dress main body girder steel, the girder steel hole that equipped main body girder steel left and right ends are set, be arranged in right end girder steel hole right end nose girder,
And the interim bar between the girder steel hole of adjacent equipped main body girder steel is set;It is provided in the middle part of bridge to be onstructed for branch
Hold the branch trestle that the nose girder of the first starting segment unit is connect with the nose girder of the second starting segment unit;Wherein, the first starting segment unit
Following technique is carried out simultaneously with the second starting segment unit;
The technique includes the following steps;
Step 1, firstly, drawing vehicle affects the single equipped main body girder steel for assembling Liang Chang from motor-car to be transported to gantry crane row
On the rotating device for walking track side, drawing parking stall on the first workbench, driven parking stall on the second workbench, meanwhile,
The front end of the equipped main body girder steel of forefront is installed by nose girder;Then, handling door machine is by equipped main body girder steel handling to towed equipment
Main longitudinal driving device on;Secondly, main longitudinal motor drives main zigzag tread patterns conveyer belt that equipped main body girder steel is driven to move ahead;
Step 2, when perceiving equipped main body girder steel from photoelectric sensor, firstly, longitudinal transfer moves vehicle in longitudinal movement rail
On be forwarded to it is corresponding from longitudinal sliding motion device;Then, driving clutch push rod driving driving clutch moves ahead and driven driving
Axis engagement, longitudinal auxiliary drive motor drive driven belts to move ahead;Secondly, equipped main body girder steel is forwarded to along end leading truck
It is next from longitudinal sliding motion device;
Step 3, firstly, locomotive electric screw drives mobile kickstand to retract;Then, main zigzag tread patterns hydraulic cylinder is stretched
It will be located in front of it out and push ahead a stroke from longitudinal sliding motion device;Secondly, side will be placed into from longitudinal sliding motion device
To on collet vehicle;Again, Hydraulic Cylinder is laterally pushed to a travel position;And then, lateral lifting hydraulic cylinder drives
Lateral collet vehicle simultaneously declines in from longitudinal sliding motion device;In next step, main zigzag tread patterns hydraulic cylinder drives lateral collet vehicle to return,
Meanwhile locomotive electric screw drives mobile kickstand decline to grab ground;
Step 4, firstly, adjacent main magnet base and adjacent left end magnet base are attracted;Secondly, by adjacent left end
Magnet base and right end magnet base are attracted;
It further include step A, after step 1, when equipped main body girder steel is hung away it from drawing vehicle by handling door machine
Afterwards, firstly, telescopic electric push rod drives the first workbench to retreat in rotating arm;Then, rotary support drives rotating arm rotation
Turn 180 degree;Secondly, drawing vehicle affects from motor-car and returns to Liang Chang.
Step 1 is repeated to connect to step 4, while by adjacent equipped main body girder steel by interim bar.
Step 5 installs branch trestle in the middle part of bridge to be onstructed;When the nose girder and the second the initial segment of the first starting segment unit
After the nose girder docking of unit, nose girder is removed, and the equipped main body girder steel and second of the first starting segment unit is originated into segment unit
Equipped main body girder steel docking.
It include following assembled supporting support installation procedure before step 1;
Firstly, installing built-in fitting on the ground;Then, bottom support bracket is mounted on built-in fitting;Secondly, in damping, buffering
Assembled supporting support is installed on device;Secondly, the two-way column plug cylinder intermediate cavity of groups of assembly supporting support passes through hydraulic earthen pipe
Road is in parallel;Again, hydraulic jack or hydraulic pump and hydraulic cylinder piping connection;And then, it is installed in assembled supporting support upper end
Girder steel bracket;In next step, it installs between girder steel bracket for placing longitudinal driving device and towed equipment girder steel pony sill.
When needing to install bridge in somewhere, the first starting segment unit and the second starting segment unit are installed from both ends respectively;Door
Hanging walks track and facilitates walking, realizes that transfer handling is equipped with main body girder steel by handling door machine, passes through assembled supporting support, nose girder
Convenient to move ahead, interim bar plays temporary support, after waiting main bridge assembling to finish, is dismantled, plays branch by branch trestle
Support, completes last splicing step.Equipped main body girder steel is realized by the drawing Che Yucong motor-car of second level;By rotary support,
Rotating arm realizes the rotation of the first workbench and the second workbench, to realize that drawing Che Yucong motor-car turns around.Telescopic electric
Push rod realizes the movement of the first workbench, so as to shorten rotation rotating arm, reduces torque, convenient preferably to turn around, and passes through first
Universal wheel and the second universal wheel support.With main longitudinal driving device, it will be promoted one by one from longitudinal sliding motion device, and then pass through magnetic force
Magnetic attraction connection between seat realization, or connected by connecting plate, to improve whole rigidity, main side centralizing bracket prevents from matching
It fills main body girder steel to roll, is dismantled and be attracted conveniently by magnet base.It is automatically controlled by being realized from photoelectric sensor, by longitudinal auxiliary
Driving motor is helped to play the role of auxiliary push, to reduce the stroke of conveyer belt, righting idler wheel in side reduces resistance, passes through movement
Vehicle electric screw and mobile kickstand realize supporting role, realize that conveniently moving passes through by driven universal rolling wheel, are led by end
It moves ahead to the conveniently assembled main body girder steel of frame, is moved easily by lateral pedestal.Loss of weight buffering is realized by shock absorption buffering mechanism, is led to
Bottom support bracket transverse shifting is crossed, is realized and is monitored by horizontal displacement sensors, hydraulic jack realizes angle by hydraulic cylinder pipeline
It spends beat sensor and realizes angle transverse shifting, facilitate bracket to go up and down in parallel by parallelogram lifting mechanism, pass through upper end
Reset spring, lower end reset spring realization automatically reset, pressure monitoring is facilitated by hydralic pressure gauge, thus be replenished in time hydraulic oil or
Butter.
Beneficial effects of the present invention description without being limited thereto, in order to preferably be easy to understand, specific embodiment part into
More detailed description is gone.
Detailed description of the invention
Fig. 1 is whole structural schematic diagram of the invention.
Fig. 2 is the structural schematic diagram of the present invention construction first step.
Fig. 3 is the structural schematic diagram of present invention construction second step.
Fig. 4 is the structural schematic diagram of present invention construction third step.
Fig. 5 is the structural schematic diagram of the present invention the 4th step of construction.
Fig. 6 is the structural schematic diagram of the present invention the 5th step of construction.
Fig. 7 is the structural schematic diagram of the present invention the 6th step of construction.
Fig. 8 is the structural schematic diagram of present invention construction nose girder.
Fig. 9 is the structural schematic diagram of handling door machine of the present invention.
Figure 10 is structural schematic diagram of the present invention from longitudinal sliding motion device.
Figure 11 is the structural schematic diagram of righting idler wheel in side of the present invention.
Figure 12 is the structural schematic diagram of the mobile kickstand of the present invention.
Figure 13 is the structural schematic diagram of shock absorption buffering mechanism of the present invention.
Wherein: 1, the first starting segment unit;2, the second starting segment unit;3, gantry crane running track;4, handling door machine;5, it spells
Fill supporting support;6, it is equipped with main body girder steel;7, girder steel hole;8, nose girder;9, interim bar;10, branch trestle;11, vehicle is pulled;12, from
Motor-car;13, rotary support;14, rotating arm;15, the second workbench;16, the first workbench;17, telescopic electric push rod;18,
First universal wheel;19, the second universal wheel;20, main longitudinal driving device;21, from longitudinal sliding motion device;22, main longitudinal motor;
23, main zigzag tread patterns conveyer belt;24, main side centralizing bracket;25, main zigzag tread patterns hydraulic cylinder;26, main magnet base;27, zigzag tread patterns
Device;28, longitudinal movement rail;29, longitudinal transfer moves vehicle;30, longitudinal auxiliary drive motor;31, clutch push rod is driven;32,
Drive clutch;33, driven support frame;34, driven belts;35, slave end centralizing bracket;36, from photoelectric sensor;37, from
Dynamic drive shaft;38, leading truck is held;39, left end magnet base;40, right end magnet base;41, lateral pedestal;42, lateral raise-lower hydraulic
Cylinder;43, hydraulic cylinder is laterally pushed;44, lateral collet vehicle;45, driven universal rolling wheel;46, side righting idler wheel;47, girder steel bracket;
48, girder steel pony sill;49, locomotive electric screw;50, mobile kickstand;51, built-in fitting;52, bottom support bracket;53, damping is slow
Flushing device;54, horizontal displacement sensors;55, two-way column plug cylinder intermediate cavity;56, lower end piston rod;57, upper end piston rod;58,
Upper end reset spring;59, lower end reset spring;60, hydraulic cylinder pipeline;61, hydralic pressure gauge;62, hydraulic jack;63, parallel four
Side shape elevating mechanism;64, angle beat sensor.
Specific embodiment
As shown in figures 1-13, the bridge hauling construction system of the present embodiment, including be arranged at bridge both ends to be onstructed
First starting segment unit 1 with second originate segment unit 2;First starting segment unit 1 with second originate 2 structure of segment unit it is identical and
It is symmetrical arranged;
First starting segment unit 1 includes the assembled supporting support 5 that bridge end is arranged in, is arranged in assembled supporting support 5
Handling door machine 4 on gantry crane running track 3 of gantry crane running track 3, ridden in left or right direction on access bridge is arranged in assembled supporting support
Equipped main body girder steel 6 on 5, the girder steel hole 7 that equipped 6 left and right ends of main body girder steel are set, the girder steel hole 7 that right end is set
The nose girder 8 of right end and the interim bar 9 being arranged between the girder steel hole 7 of adjacent equipped main body girder steel 6;
The nose girder 8 and the second starting segment unit 2 for supporting the first starting segment unit 1 are provided in the middle part of bridge to be onstructed
Nose girder 8 connect branch trestle 10.
Bridge end to be onstructed is provided with the Liang Chang for assembling single equipped main body girder steel 6;Liang Chang with it is corresponding
It is provided with the drawing vehicle 11 for transporting single equipped main body girder steel 6 between bridge end to be onstructed and is led by drawing vehicle 11
Dynamic slave motor-car 12;First starting segment unit 1 and the second starting 2 end of segment unit are provided with 3 side of gantry crane running track
Rotating device;
Rotating device includes rotary support 13, the rotating arm being rotatably provided on rotary support 13 14, is separately positioned on
First workbench 16 and the second workbench 15 at 14 both ends of rotating arm, one end is arranged on the second workbench 15 and other end band
Telescopic electric push rod 17 that dynamic first workbench 16 move on rotating arm 14, setting are in 14 lower end of rotating arm and positioned at the
The lower section of one workbench 16 and the first universal wheel 18 contact with ground surface and setting are in 14 lower end of rotating arm and positioned at the
The second universal wheel 19 two workbench 15 lower section and contacted with ground surface.
Towed equipment is respectively arranged on the first starting segment unit 1 and the second starting segment unit 2;Handling door machine 4 is being dragged
Between drawing device and rotating device;
Towed equipment includes that main longitudinal driving device 20 is arranged and is successively set on the right side of main longitudinal driving device 20
From longitudinal sliding motion device 21;
Main longitudinal driving device 20 include main longitudinal bracing frame, be arranged on main longitudinal bracing frame main longitudinal motor 22,
Be arranged on main longitudinal bracing frame and driven by main longitudinal motor 22 main zigzag tread patterns conveyer belt 23, be arranged in main zigzag tread patterns
The main side centralizing brackets 24 of 23 two sides of conveyer belt, setting are in main longitudinal bracing frame right end and for will be from longitudinal sliding motion device 21 to the right
The main zigzag tread patterns hydraulic cylinder 25 pushed and setting are in 24 right end of main side centralizing bracket and for being attracted from longitudinal sliding motion device 21
The main magnet base 26 of left end;
From longitudinal sliding motion device 21 include driven support frame 33, be arranged on driven support frame 33 driven belts 34,
The slave end centralizing bracket 35 of 34 two sides of driven belts is set, is arranged on driven support frame 33 and for detecting driven transmission
With the slave photoelectric sensor 36 for whether having equipped main body girder steel 6 on 34, it is arranged on driven support frame 33 and driven for driving
Driven drive shaft 37, the left low and right high of conveyer belt 34 are arranged in the end leading truck 38 of 34 left end of driven belts and set respectively
Set the left end magnet base 39 and right end magnet base 40 at end 38 both ends of leading truck;Left end magnet base 39 and adjacent right end magnet base
40 are attracted;
Towed equipment side is provided with lateral driving means;Lateral driving means includes lateral pedestal 41, is vertically arranged
In the lateral lifting hydraulic cylinder 42 on lateral pedestal 41, the lateral push hydraulic cylinder that is laterally positioned on lateral lifting hydraulic cylinder 42
43, it and laterally pushes the lateral collet vehicle 44 of 43 piston rod lateral connection of hydraulic cylinder, lateral 44 lower end surface of collet vehicle is set
Driven universal rolling wheel 45 and the side righting for being arranged on the inside of main side centralizing bracket 24 and being equipped with for righting 6 side of main body girder steel
Idler wheel 46;
It is vertically arranged with locomotive electric screw 49 on driven support frame 33, is arranged in 49 lower end of locomotive electric screw
There is mobile kickstand 50.
Longitudinal driving device 27 is arranged in parallel in towed equipment side;
Longitudinal driving device 27 includes longitudinal movement rail 28, the longitudinal direction transfer shifting vehicle being arranged on longitudinal movement rail 28
29, it is horizontally installed on longitudinal longitudinal auxiliary drive motor 30 transferred on vehicle 29, the drive that longitudinal transfer moves on vehicle 29 is set
Dynamic clutch push rod 31 and setting on driving 31 nut seat of clutch push rod and are sleeved on longitudinal 30 output shaft of auxiliary drive motor
Driving clutch 32 upper and for being sequentially connected with driven drive shaft 37.
Be provided with girder steel bracket 47 in assembled supporting support 5, between girder steel bracket 47 on be provided with girder steel pony sill
48, towed equipment is arranged on girder steel pony sill 48;
Assembled 5 lower end of supporting support is provided with shock absorption buffering mechanism 53, is provided in 53 lower end of shock absorption buffering mechanism
Built-in fitting 51 on ground;
Shock absorption buffering mechanism 53 includes the bottom support bracket 52 being arranged on built-in fitting 51, the water being arranged on bottom support bracket 52
Prosposition displacement sensor 54, is arranged in two-way column plug cylinder intermediate cavity the two-way column plug cylinder intermediate cavity 55 being arranged on bottom support bracket 52
55 lower ends and with 52 upper surface of bottom support bracket pressure contact lower end piston rod 56, be arranged in 55 upper end of two-way column plug cylinder intermediate cavity
Upper end piston rod 57, be arranged on lower end piston rod 56 lower end reset spring 59, be arranged in it is upper on upper end piston rod 57
The hydraulic earthen pipe that the two-way column plug cylinder intermediate cavity 55 of end reset spring 58, the outlet assembled supporting support 5 ipsilateral with difference is connected to
Road 60 and the hydralic pressure gauge 61 being arranged on hydraulic cylinder pipeline 60.
Parallelogram lifting mechanism 63 between 5 both ends of corresponding assembled supporting support, in assembled supporting support 5
Angled beat sensor 64 is set.
The import of hydraulic cylinder pipeline 60 is connected with hydraulic jack 62 or hydraulic pump.
The bridge packaging technology of the present embodiment, by means of bridge hauling construction system comprising setting to
The first starting segment unit 1 at construction bridge both ends and the second starting segment unit 2;First starting segment unit 1 and the second the initial segment list
First 2 structures are identical and arranged symmetrically;First starting segment unit 1 exists including the assembled supporting support 5 of bridge end is arranged in, is arranged
Handling door machine 4 on gantry crane running track 3 of gantry crane running track 3, ridden in left or right direction on assembled 5 access bridge of supporting support, setting
Equipped main body girder steel 6 in assembled supporting support 5, the girder steel hole 7 that equipped 6 left and right ends of main body girder steel are arranged in, setting exist
The nose girder 8 of 7 right end of girder steel hole of right end and the interim bar being arranged between the girder steel hole 7 of adjacent equipped main body girder steel 6
9;The nose girder of the nose girder 8 and the second starting segment unit 2 for supporting the first starting segment unit 1 is provided in the middle part of bridge to be onstructed
The branch trestle 10 of 8 connections;Wherein, the first starting segment unit 1 and the second starting segment unit 2 carry out following technique simultaneously;
The technique includes the following steps;
Step 1, firstly, drawing vehicle 11 affects the single equipped main body girder steel 6 for assembling Liang Chang from motor-car 12 to be transported to door
Hanging is walked on the rotating device of 3 side of track, and drawing vehicle 11 is located on the first workbench 16, is located at the second workbench from motor-car 12
On 15, meanwhile, nose girder 8 is installed in the front end of the equipped main body girder steel 6 of forefront;Then, handling door machine 4 is by equipped main body girder steel
In 6 handlings to the main longitudinal driving device 20 of towed equipment;Secondly, main longitudinal motor 22 drives main 23 band of zigzag tread patterns conveyer belt
Dynamic equipped main body girder steel 6 moves ahead;
Step 2, when perceiving equipped main body girder steel 6 from photoelectric sensor 36, firstly, longitudinal transfer moves vehicle 29 in longitudinal shifting
It is forwarded on dynamic guide rail 28 corresponding from longitudinal sliding motion device 21;Then, driving clutch push rod 31 driving driving clutch 32
It moves ahead and is engaged with driven drive shaft 37, longitudinal auxiliary drive motor 30 drives driven belts 34 to move ahead;Secondly, equipped main body steel
Beam 6 is forwarded to next from longitudinal sliding motion device 21 along end leading truck 38;
Step 3, firstly, locomotive electric screw 49 drives mobile kickstand 50 to retract;Then, main zigzag tread patterns are hydraulic
Cylinder 25, which stretches out to be located in front of it, pushes ahead a stroke from longitudinal sliding motion device 21;Secondly, will be from longitudinal sliding motion device
21 are placed on lateral collet vehicle 44;Again, laterally push hydraulic cylinder 43 is pushed to a travel position;And then, laterally
Lifting hydraulic cylinder 42 drives lateral collet vehicle 44 and declines in from longitudinal sliding motion device 21;In next step, main zigzag tread patterns are hydraulic
Cylinder 25 drives lateral collet vehicle 44 to return, meanwhile, locomotive electric screw 49 drives the mobile decline of kickstand 50 to grab ground;
Step 4, firstly, adjacent main magnet base 26 and adjacent left end magnet base 39 are attracted;Secondly, by adjacent
Left end magnet base 39 and right end magnet base 40 are attracted;
It further include step A, after step 1, when handling door machine 4 hangs away equipped main body girder steel 6 from drawing vehicle 11
Later, firstly, telescopic electric push rod 17 drives the first workbench 16 to retreat in rotating arm 14;Then, rotary support 13 drives
Rotating arm 14 rotates 180 degree;Secondly, drawing vehicle 11 affects from motor-car 12 and returns to Liang Chang.
Step 1 is repeated to step 4, while adjacent equipped main body girder steel 6 being connected by interim bar 9.
Step 5 installs branch trestle 10 in the middle part of bridge to be onstructed;When the nose girder 8 of the first starting segment unit 1 and second
After the nose girder 8 of beginning segment unit 2 docks, nose girder 8 is removed, and the equipped main body girder steel 6 and second of the first starting segment unit 1 is originated
The equipped main body girder steel 6 of segment unit 2 docks.
It include 5 installation procedure of following assembled supporting support before step 1;
Firstly, installing built-in fitting 51 on the ground;Then, bottom support bracket 52 is mounted on built-in fitting 51;Secondly, subtracting
It shakes and assembled supporting support 5 is installed on buffer unit 53;Secondly, the two-way column plug cylinder intermediate cavity 55 of groups of assembly supporting support 5
It is in parallel by hydraulic cylinder pipeline 60;Again, hydraulic jack 62 or hydraulic pump are connect with hydraulic cylinder pipeline 60;And then, it is spelling
It fills 5 upper end of supporting support and girder steel bracket 47 is installed;In next step, it installs between girder steel bracket 47 for placing longitudinal driving device
27 with towed equipment girder steel pony sill 48.
When needing to install bridge in somewhere, the first starting segment unit 1 and the second starting segment unit 2 are installed from both ends respectively;
Gantry crane running track 3 facilitates walking, realizes that transfer handling is equipped with main body girder steel 6 by handling door machine 4, passes through assembled supporting support
5, nose girder 8 is convenient to move ahead, and interim bar 9 plays temporary support, after waiting main bridge assembling to finish, is dismantled, passes through branch stack
Bridge 10 plays support, completes last splicing step.Equipped main body girder steel is realized with from motor-car 12 by the drawing vehicle 11 of second level
6;The rotation that the first workbench 16 and the second workbench 15 are realized by rotary support 13, rotating arm 14, to realize drawing
Vehicle 11 turns around with from motor-car 12.Telescopic electric push rod 17 realizes the movement of the first workbench 16, so as to shorten rotation rotating arm, subtracts
Few torque, it is convenient preferably to turn around, it is supported by the first universal wheel 18 and the second universal wheel 19.With main longitudinal driving device 20,
It will promote one by one, then be connected by the magnetic attraction between magnet base realization, or pass through connecting plate from longitudinal sliding motion device 21
Connection, to improve whole rigidity, main side centralizing bracket 24 prevents equipped main body girder steel 6 from rolling, and is dismantled and is attracted by magnet base
It is convenient.It is automatically controlled by being realized from photoelectric sensor 36, auxiliary push is played the role of by longitudinal auxiliary drive motor 30,
To reduce the stroke of conveyer belt, side righting idler wheel 46 reduces resistance, passes through locomotive electric screw 49 and mobile kickstand 50
It realizes supporting role, realizes that conveniently moving passes through by driven universal rolling wheel 45, by holding the conveniently assembled main body steel of leading truck 38
Beam 6 moves ahead, and is moved easily by lateral pedestal 41.Loss of weight buffering is realized by shock absorption buffering mechanism 53, passes through bottom support bracket 52
Transverse shifting realizes by horizontal displacement sensors 54 and monitors that hydraulic jack 62 realizes that angle is inclined by hydraulic cylinder pipeline 60
Pendulous sensor 64 realizes angle transverse shifting, facilitates bracket to go up and down in parallel by parallelogram lifting mechanism 63, passes through upper end
Reset spring 58, the realization of lower end reset spring 59 automatically reset, and facilitate pressure monitoring by hydralic pressure gauge 61, so that liquid be replenished in time
Pressure oil or butter.
The present invention has rational design, it is low in cost, durable, safe and reliable, easy to operate, time saving and energy saving, save fund,
It is compact-sized and easy to use.
It is to disclose in order to more clear, and the prior art is just no longer enumerated that the present invention, which fully describes,.
Finally, it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although
Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that: it still may be used
To modify to technical solution documented by previous embodiment or equivalent replacement of some of the technical features;Make
It is obvious for being combined for those skilled in the art to multiple technical solutions of the invention.And these are modified or replace
It changes, the spirit and scope for technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution.
Claims (5)
1. a kind of bridge packaging technology, it is characterised in that: by means of bridge hauling construction system comprising setting exists
First starting segment unit (1) at bridge both ends to be onstructed and the second starting segment unit (2);First starting segment unit (1) and second
It is identical and arranged symmetrically to originate segment unit (2) structure;First starting segment unit (1) includes that the assembled support of bridge end is arranged in
Bracket (5), the gantry crane running track (3) being arranged on assembled supporting support (5) access bridge, ridden in left or right direction are in gantry crane running track
(3) handling door machine (4) on, is arranged in equipped main body steel the equipped main body girder steel (6) being arranged on assembled supporting support (5)
The girder steel hole (7) of beam (6) left and right ends, be arranged in right end girder steel hole (7) right end nose girder (8) and be arranged adjacent
Equipped main body girder steel (6) girder steel hole (7) between interim bar (9);It is provided in the middle part of bridge to be onstructed for supporting the
The branch trestle (10) that the nose girder (8) of one starting segment unit (1) is connect with the nose girder (8) of the second starting segment unit (2);To be onstructed
Bridge end is provided with the Liang Chang for assembling single equipped main body girder steel (6);In Liang Chang and corresponding bridge end to be onstructed
Between be provided with the drawing vehicle (11) for transporting single equipped main body girder steel (6) and affected by drawing vehicle (11) driven
Vehicle (12);First starting segment unit (1) and second starting segment unit (2) end are provided with gantry crane running track (3) side
Rotating device;Rotating device includes rotary support (13), the rotating arm (14) being rotatably provided on rotary support (13), difference
It is arranged and is arranged in first workbench (16) at rotating arm (14) both ends and the second workbench (15), one end in the second workbench
(15) on and the other end drives the first workbench (16) telescopic electric push rod (17) for moving on rotating arm (14);First
Towed equipment is respectively arranged in starting segment unit (1) and the second starting segment unit (2);Handling door machine (4) towed equipment with
Between rotating device;Towed equipment includes that main longitudinal driving device (20) is arranged and is successively set on main longitudinal driving device
(20) on the right side of from longitudinal sliding motion device (21);Main longitudinal driving device (20) includes main longitudinal bracing frame, is arranged in main longitudinal direction
Main longitudinal motor (22), setting on support frame is on main longitudinal bracing frame and by main longitudinal drive of main longitudinal motor (22) driving
Dynamic conveyer belt (23), setting main zigzag tread patterns conveyer belt (23) two sides main side centralizing bracket (24), be arranged in main longitudinal bracing
Frame right end and the main zigzag tread patterns hydraulic cylinder (25) for being used to push to the right from longitudinal sliding motion device (21) and setting are in main side
Centralizing bracket (24) right end and for being attracted main magnet base (26) from longitudinal sliding motion device (21) left end;From longitudinal sliding motion device
(21) include driven support frame (33), the driven belts (34) being arranged on driven support frame (33), be arranged in driven support
On frame (33) and for detecting the slave photoelectric sensor (36) for whether having equipped main body girder steel (6) on driven belts (34), setting
Set on driven support frame (33) and for drive the driven drive shafts (37) of driven belts (34), left low and right high setting from
The end leading truck (38) of dynamic conveyer belt (34) left end and the left end magnet base (39) for being separately positioned on end leading truck (38) both ends
With right end magnet base (40);Left end magnet base (39) and adjacent right end magnet base (40) are attracted;It is arranged in towed equipment side
There is lateral driving means;The lateral liter that lateral driving means includes lateral pedestal (41), is vertically arranged on lateral pedestal (41)
Descending liquid cylinder pressure (42), the lateral push hydraulic cylinder (43) being laterally positioned on lateral lifting hydraulic cylinder (42) push liquid with lateral
The lateral collet vehicle (44) of cylinder pressure (43) piston rod lateral connection;It is electronic that locomotive is vertically arranged on driven support frame (33)
Screw rod (49) is provided with mobile kickstand (50) in locomotive electric screw (49) lower end;It is arranged in parallel in towed equipment side
There are longitudinal driving device (27);Longitudinal driving device (27) includes longitudinal movement rail (28), is arranged in longitudinal movement rail
(28) longitudinal transfer on move vehicle (29), be horizontally installed on longitudinal auxiliary drive motor (30) that longitudinal transfer moves on vehicle (29),
It is arranged and is longitudinally transferring the driving clutch push rod (31) on vehicle (29) and be arranged on driving clutch push rod (31) nut seat
And it is sleeved on the driving clutch on longitudinal auxiliary drive motor (30) output shaft and for being sequentially connected with driven drive shaft (37)
Device (32);Girder steel bracket (47) are provided on assembled supporting support (5), between girder steel bracket (47) on be provided with girder steel bottom
Mounting (48), towed equipment are arranged on girder steel pony sill (48);Assembled supporting support (5) lower end is provided with damping, buffering dress
(53) are set, shock absorption buffering mechanism (53) lower end is provided with built-in fitting (51) on the ground;Shock absorption buffering mechanism (53) includes
Be arranged on built-in fitting (51) bottom support bracket (52), be arranged two-way column plug cylinder intermediate cavity (55) on bottom support bracket (52),
Export the hydraulic cylinder pipeline (60) that the two-way column plug cylinder intermediate cavity (55) of the assembled supporting support (5) ipsilateral with difference is connected to;
Wherein, the first starting segment unit (1) carries out following technique with the second starting segment unit (2) simultaneously;
The technique includes the following steps;
Step 1, firstly, drawing vehicle (11) affects single equipped main body girder steel (6) that assemble Liang Chang from motor-car (12) to be transported to
On the rotating device of gantry crane running track (3) side, drawing vehicle (11) is located on the first workbench (16), is located at from motor-car (12)
On second workbench (15), meanwhile, nose girder (8) are installed in the front end of the equipped main body girder steel (6) of forefront;Then, handling door
Machine (4) will be on the main longitudinal driving device (20) of equipped main body girder steel (6) handling to towed equipment;Secondly, main longitudinal motor
(22) drive main zigzag tread patterns conveyer belt (23) that equipped main body girder steel (6) is driven to move ahead;
Step 2, when perceiving equipped main body girder steel (6) from photoelectric sensor (36), firstly, longitudinal transfer moves vehicle (29) in longitudinal direction
It is forwarded on moving guide rail (28) corresponding from longitudinal sliding motion device (21);Then, driving clutch push rod (31) driving driving
Clutch (32) moves ahead and engages with driven drive shaft (37), before longitudinal auxiliary drive motor (30) drives driven belts (34)
Row;Secondly, equipped main body girder steel (6) are next from longitudinal sliding motion device (21) along holding leading truck (38) to be forwarded to;
Step 3, firstly, locomotive electric screw (49) drives mobile kickstand (50) to retract;Then, main zigzag tread patterns are hydraulic
Cylinder (25), which stretches out to be located in front of it, pushes ahead a stroke from longitudinal sliding motion device (21);Secondly, will be from longitudinal sliding motion
Device (21) is placed on lateral collet vehicle (44);Again, laterally push hydraulic cylinder (43) is pushed to a travel position;Tightly
Then, lateral lifting hydraulic cylinder (42) drives lateral collet vehicle (44) and declines in from longitudinal sliding motion device (21);In next step,
Main zigzag tread patterns hydraulic cylinder (25) drives lateral collet vehicle (44) to return, meanwhile, locomotive electric screw (49) drives locomotive
Bracket (50) decline grabs ground;
Step 4, firstly, adjacent main magnet base (26) and adjacent left end magnet base (39) are attracted;Secondly, by adjacent
Left end magnet base (39) and right end magnet base (40) are attracted.
2. bridge packaging technology according to claim 1, it is characterised in that: further include step A, finished in step 1
Afterwards, after handling door machine (4) hangs away equipped main body girder steel (6) from drawing vehicle (11), firstly, telescopic electric push rod (17)
The first workbench (16) is driven to retreat in rotating arm (14);Then, rotary support (13) drives rotating arm (14) rotation one
180 degree;Secondly, drawing vehicle (11), which is affected from motor-car (12), returns to Liang Chang.
3. bridge packaging technology according to claim 2, it is characterised in that: repeat step 1 to step 4, simultaneously
Adjacent equipped main body girder steel (6) is connected by interim bar (9).
4. bridge packaging technology according to claim 3, it is characterised in that: step 5, in the middle part of bridge to be onstructed
It installs branch trestle (10);When the nose girder (8) of the first starting segment unit (1) is docked with the nose girder (8) of the second starting segment unit (2)
Afterwards, nose girder (8) are removed, and the equipped main body girder steel (6) of the first starting segment unit (1) is originated into matching for segment unit (2) with second
Fill main body girder steel (6) docking.
5. bridge packaging technology according to claim 1, it is characterised in that: include following assembly before step 1
Supporting support (5) installation procedure;
Firstly, installing built-in fitting (51) on the ground;Then, bottom support bracket (52) is mounted on built-in fitting (51);Secondly,
Assembled supporting support (5) is installed on shock absorption buffering mechanism (53);Secondly, the two-way column plug cylinder of groups of assembly supporting support (5)
Intermediate cavity (55) is in parallel by hydraulic cylinder pipeline (60);Again, hydraulic jack (62) or hydraulic pump and hydraulic cylinder pipeline (60)
Connection;And then, girder steel bracket (47) are installed in assembled supporting support (5) upper end;In next step, pacify between girder steel bracket (47)
Dress is for placing longitudinal driving device (27) and towed equipment girder steel pony sill (48).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810448320.1A CN108755416B (en) | 2018-05-11 | 2018-05-11 | Bridge packaging technology |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810448320.1A CN108755416B (en) | 2018-05-11 | 2018-05-11 | Bridge packaging technology |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108755416A CN108755416A (en) | 2018-11-06 |
CN108755416B true CN108755416B (en) | 2019-08-20 |
Family
ID=64010102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810448320.1A Active CN108755416B (en) | 2018-05-11 | 2018-05-11 | Bridge packaging technology |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108755416B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006028881A (en) * | 2004-07-15 | 2006-02-02 | Oriental Construction Co Ltd | Self-propelled pc floor slab erecting machine and pc floor slab erecting method |
CN101929129A (en) * | 2010-09-06 | 2010-12-29 | 中铁大桥局集团有限公司 | Novel slipway beam for incremental launching construction |
CN103161127A (en) * | 2013-03-05 | 2013-06-19 | 中铁二十一局集团有限公司 | Steel truss girder dragging construction intelligent measure and control method and system |
CN105274942A (en) * | 2015-11-23 | 2016-01-27 | 柳州欧维姆工程有限公司 | Large-span continuous steel truss multi-point synchronous automatic cyclic alternating sliding shoe push system and construction method thereof |
CN105908627A (en) * | 2016-04-22 | 2016-08-31 | 上海市机械施工集团有限公司 | Wholly roll-roll launching device for steel truss bridge and construction method of wholly roll-roll launching device |
-
2018
- 2018-05-11 CN CN201810448320.1A patent/CN108755416B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2006028881A (en) * | 2004-07-15 | 2006-02-02 | Oriental Construction Co Ltd | Self-propelled pc floor slab erecting machine and pc floor slab erecting method |
CN101929129A (en) * | 2010-09-06 | 2010-12-29 | 中铁大桥局集团有限公司 | Novel slipway beam for incremental launching construction |
CN103161127A (en) * | 2013-03-05 | 2013-06-19 | 中铁二十一局集团有限公司 | Steel truss girder dragging construction intelligent measure and control method and system |
CN105274942A (en) * | 2015-11-23 | 2016-01-27 | 柳州欧维姆工程有限公司 | Large-span continuous steel truss multi-point synchronous automatic cyclic alternating sliding shoe push system and construction method thereof |
CN105908627A (en) * | 2016-04-22 | 2016-08-31 | 上海市机械施工集团有限公司 | Wholly roll-roll launching device for steel truss bridge and construction method of wholly roll-roll launching device |
Also Published As
Publication number | Publication date |
---|---|
CN108755416A (en) | 2018-11-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105113983B (en) | Intelligent oil rig | |
WO2020224543A1 (en) | Straddle type track beam transporter and use method thereof | |
CN106477244B (en) | Automatic telescopic belt conveyor | |
CN102278131B (en) | Duct piece conveying device for shield construction of tunnel with diameter of less than 6 meters and operation method | |
CN103696710B (en) | Aboveground working string conveying device | |
CN203903821U (en) | Straddle carrier for pipeline construction | |
CN105084218A (en) | Pipeline construction straddle carrier and straddling method | |
CN103790525A (en) | Oil cylinder lifting type drilling rig power catwalk | |
CN103726421A (en) | Height and span adjustable track paver for metro construction | |
CN104652888A (en) | Multilayer avoidance-free vertical garage | |
CN204212473U (en) | For the portable access device of multi-storied garage | |
CN206091465U (en) | Intelligent stereo garage | |
CN102704725B (en) | Two-layer inclined lifting and transferring parking device | |
CN108755416B (en) | Bridge packaging technology | |
CN203684019U (en) | Height and span adjustable track laying machine for subway construction | |
CN206358762U (en) | Automatic telescopic belt conveyer | |
CN108342991B (en) | Bridge hauling construction system | |
CN204475932U (en) | A kind of multilayer is without dodging multi-storied garage | |
CN204728770U (en) | Go in ring bracing wire reciprocating rotary ascending/decending without dodging garage | |
CN206128754U (en) | Vehicle fixture for intelligent stereo garage | |
CN206128757U (en) | Vehicle fixture for intelligent stereo garage | |
CN206128755U (en) | Vehicle fixture for intelligent stereo garage | |
CN105923541B (en) | The handling apparatus and rock tunnel(ling) machine of rock tunnel(ling) machine | |
CN205574940U (en) | Prefab conveyer | |
CN205876351U (en) | Automatic walking shifting formwork transposition framework landing stage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 250000 No. 1 Peace Road, Lixia District, Jinan City, Shandong Province Applicant after: Tiezheng Testing Technology Co., Ltd. Address before: 250000 No. 1 Peace Road, Lixia District, Jinan City, Shandong Province Applicant before: Shandong Tiezheng Project Experiment and Inspection Center Co.,Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |