CN108750934A - A kind of big quality concrete pipe fitting lifting means - Google Patents
A kind of big quality concrete pipe fitting lifting means Download PDFInfo
- Publication number
- CN108750934A CN108750934A CN201810959763.7A CN201810959763A CN108750934A CN 108750934 A CN108750934 A CN 108750934A CN 201810959763 A CN201810959763 A CN 201810959763A CN 108750934 A CN108750934 A CN 108750934A
- Authority
- CN
- China
- Prior art keywords
- pipe fitting
- concrete pipe
- big quality
- quality concrete
- grip block
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 75
- 230000007246 mechanism Effects 0.000 claims description 21
- 238000009434 installation Methods 0.000 claims description 17
- 238000007373 indentation Methods 0.000 claims description 2
- 230000033001 locomotion Effects 0.000 description 10
- 230000000694 effects Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 238000000034 method Methods 0.000 description 5
- 230000005540 biological transmission Effects 0.000 description 2
- 230000015271 coagulation Effects 0.000 description 2
- 238000005345 coagulation Methods 0.000 description 2
- 230000006378 damage Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 239000000523 sample Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/42—Gripping members engaging only the external or internal surfaces of the articles
- B66C1/44—Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces
- B66C1/445—Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces motor actuated
- B66C1/447—Gripping members engaging only the external or internal surfaces of the articles and applying frictional forces motor actuated by hydraulic or pneumatic motors
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Load-Engaging Elements For Cranes (AREA)
Abstract
The present invention relates to a kind of big quality concrete pipe fitting lifting means.The equipment includes mounting plate and the dual-rod hydraulic cylinder that is set on mounting plate, two piston rods of dual-rod hydraulic cylinder respectively with positioned at mounting plate both sides and the top vertical connection of two support plates that is vertically arranged, the first notch is offered in support plate along its length, two support plate bottoms are located at opposite direction on the plate body of the first bottom of the gap and are equipped with positioning sliding block, include the connecting rod being connect with support plate plate body fixed vertical and the vertically disposed strut of interlinking lever end;It offers fitting groove on the extrados of grip block, offers limiting slot on the side adjacent with extrados on grip block, limiting slot is connected to fitting groove.The configuration of the present invention is simple, it is ingenious in design, effectively big quality concrete pipe fitting can be clamped, promote operation, on the basis of ensureing job safety, increase substantially working efficiency.
Description
Technical field
The invention belongs to machinery equipment field more particularly to a kind of big quality concrete pipe fitting lifting means.
Background technology
Currently, either building field or municipal administration and power engineering, is often related to some big quality concrete pipes
The transhipment and installing engineering of part, such as the pile pile of building field, municipal subsoil drain and electric stringing bar etc., due to these
Big quality concrete pipe fitting is due to being relatively large in diameter, also with certain length, so causing its weight that impersonal force is presented can carry
With the rank of promotion, this result in its carry, the operation of hoist links it is very difficult, for example loading on transport vehicle and unload
Goods process, its shape is cylindrical in addition, when being carried using tools such as fork trucks, is susceptible to the phenomenon that rolling is landed, not only can
The damage for causing big quality concrete pipe fitting, also easily causes personal injury.Lifting mode pair is mostly used in currently available technology
These big big quality concrete pipe fittings of weight carry out, i.e., coordinate multiple tracks hawser to carry out big quality concrete pipe fitting by lifting machine
Lifting and transhipment.But this mode is not only cumbersome, and working efficiency is very low, especially when several big quality concretes
When pipe fitting mutually laminates, it is difficult to which hawser to be sleeved on to the outer wall of these pipes, column.
Invention content
The object of the present invention is to provide a kind of big quality concrete pipe fitting lifting means, the configuration of the present invention is simple, design is skilful
It is wonderful, effectively big quality concrete pipe fitting can be clamped, promote operation, on the basis of ensureing job safety, substantially
Degree improves working efficiency.
In order to solve the above technical problems, the technical solution adopted by the present invention is as follows:
A kind of big quality concrete pipe fitting transloading equipment, the equipment include mounting plate and the double rod liquid being set on mounting plate
Cylinder pressure, mounting plate length direction both ends bottom are respectively equipped with clamping mechanism, two piston rods of dual-rod hydraulic cylinder respectively with positioned at
Mounting plate both sides and the top vertical connection of two support plates being vertically arranged offer first in support plate and lack along its length
Mouthful, two support plate bottoms are located at opposite direction on the plate body of the first bottom of the gap and are equipped with slidable holding member, and the slidable holding member includes
The grip block of arc-shaped semicircular and the positioning sliding block being fixedly connected with support plate plate body;The positioning sliding block includes and support
The connecting rod and the vertically disposed strut of interlinking lever end of plate plate body fixed vertical connection;
The grip block is slidably matched with the first notch, and fitting groove is offered on the extrados of grip block, on grip block with outside
Limiting slot is offered on the adjacent side of cambered surface, limiting slot is connected to fitting groove and limiting slot is arranged concentrically with grip block, described
Fitting groove and connecting rod clearance fit, limiting slot and strut clearance fit;
The clamping mechanism includes the column for being fixedly installed on the motor of mounting plate bottom surface and being set to motor both sides, is stood
The second notch is offered on column, the second indentations bottom axis pin is hinged with screens bar, and the output end of motor is equipped with drive sprocket, main
Movable sprocket is connect with the driven sprocket being arranged below by chain drive, and driven sprocket, which is fixed, is set in the outer of internal thread cylinder
Wall, the threaded rod opposite with two hand of spiral is threadedly coupled respectively at internal thread cylinder both ends, and two threaded rods are each passed through corresponding column
On the second notch after contacted with the body of rod at the top of screens bar.
Preferably, the strut both ends are pierced by limiting slot and are equipped with external screw thread, positioning screw cap and strut both ends screw-thread fit.
Preferably, the slidable holding member being arranged in two support plate and the first notch are located in same perpendicular.
Preferably, the positioning sliding block in every piece of support plate includes the first positioning cunning that structure is identical and is arranged above and below
Block and the second positioning sliding block, the length of connecting rod of the second positioning sliding block are more than the length of connecting rod of the first positioning sliding block, and first, second
Positioning sliding block interlinking lever end is located on same circumference.
Preferably, the extrados bottom end of the grip block is equipped with installation notch, installation notch and limiting slot and fitting groove
Connection.
Preferably, plugging block, plugging block and installation notch clearance fit are detachably equipped at the installation notch.
Preferably, the plate face that two support plate mutually deviates from is equipped with guiding mechanism, and guiding mechanism includes both ends difference
The U-shaped frame being connect with the first notch both sides plate body is vertically equipped with guide rod on U-shaped frame, and guide rod one end is filled on grip block
Slot allocation clearance sliding fit, the other end connect with top plate after passing through U-shaped frame, are arranged on the guide rod between top plate and U-shaped frame
Spring, both ends of the spring are connect with top plate and U-shaped frame respectively.
Preferably, the intrados of two grip block is in frosted structure.
It should be noted that the present invention pertains only to the lift structure on basis, it, can will be of the present invention when specifically used
Equipment of the equipment cooperation with transport function uses.
Working principle of the invention is as follows:
The present invention is moved at big quality concrete pipe fitting first so that big quality concrete pipe fitting be located at two grip blocks it
Between.The present invention is in elongation state now at original state, i.e. the two of dual-rod hydraulic cylinder piece piston rod, and grip block is not yet this moment
Big quality concrete pipe fitting is contacted, so grip block is located at vertical height lowest point in its own gravity state.
Then dual-rod hydraulic cylinder controls two piston rod retractions, and drives two support plates and two grip block out movements, when
Two grip blocks are clamped it after contacting big quality concrete pipe fitting, but two support plates are still in out movement this moment, in addition
Grip block is to be slidably matched with positioning sliding block, so two grip blocks can be in the opposite effect of support plate and big quality concrete pipe fitting
Under moved up, i.e., grip block can relative positioning sliding block moved up, and grip block can move into corresponding branch in this process
In first notch of fagging.The moving up of two grip blocks can so that realization moves up work simultaneously by the big quality concrete pipe fitting of its clamping
Industry, until grip block is moved to positioning sliding block and contacts plugging block at its installation notch.In this way, realizing big quality concrete pipe
Part, when needing operating, it is only necessary to which the equipment with the function of motion being used cooperatively with the present invention is operated.It is described to have
The equipment of the function of motion can be small-sized lifting machine etc..
It should be noted that the present invention is using tool, there are one the power take-off mechanisms acted can be realized to big quality coagulation
The radial of native pipe fitting is clamped and vertically to two actions of promotion.Although and the artificial mobility of hawser in the prior art binding compared with
By force, but operation is complex, especially when big quality concrete tubing circumference does not have the space of hawser nesting, such as water
The big quality concrete pipe fitting of big quality placed on muddy ground face, staff can only be by the way of stretching the meaning by round hawser
Big quality concrete pipe fitting both ends are sleeved on, not only work consuming takes, but also the labor intensity of staff is very big, also easily wears cable
Rope, ground and big quality concrete pipe fitting.Meanwhile on the basis of the present invention states function in realization, use very simple
Structure does not use direction-changing drive mechanisms, the transmissions for relying solely on support plate and grip block such as connecting rod, the rocking arm of any complexity to match
It closes, maintenance rate is very low, and service life is only limited by its founding materials performance itself.
The present invention may be implemented to carry out clamping promotion to the big quality concrete pipe fitting of big quality, while in order to improve to big
Quality concrete pipe fitting, which is promoted, to be stablized, and prevents big quality concrete pipe fitting from falling off from grip block, the present invention also uses screens machine
Structure limits the initial and end both ends of big quality concrete pipe fitting:When big quality concrete pipe fitting is during being elevated, meeting
Two screens bar bottom ends are contacted, since screens bar and column are hinged, so screens bar does not interfere with the upper of big quality concrete pipe fitting
It rises, but can contact and present rotation by big quality concrete pipe fitting, after big quality concrete pipe fitting promotes operation in place, open
Dynamic motor, motor move riffled tube by pulley-sprocket-belt and rotate, since the hand of spiral of two threaded rods is on the contrary, within institute
The rotation of screwed pipe can make two threaded rods backwards to movement, and the end of two threaded rods is due to contacting two screens bars, so threaded rod
The mobile bottom that two screens bars can be pushed to rotate up to two screens bars be in contact and realize close conflict, such two screens bar
The load-bearing to big quality concrete pipe fitting can be realized under the case where big quality concrete pipe fitting falls off from grip block, prevented
The only generation of safety accident.Certainly, two complete equipments can be arranged to improve to big quality concrete pipe in the present invention on a mounting board
The clamping effect of part.The clamping mechanism play as security protection project and measures in emergency circumstances.
More preferably, the present invention also provides more remarkable technical solution to ensure the safety of operation process:
1)In order to ensure that grip block drove big quality concrete pipe fitting moves up operation without deviation, thus the application using first,
Second liang of set positioning sliding block to grip block move up the limit of glide direction, while first, second liang of set positioning sliding block can
To carry out the drawing of both direction to grip block, prevent grip block from being rotated around the strut of positioning sliding block;
2)The first notch in support plate and grip block clearance fit, not the process that moves up of only grip block provide displacement and sky
Between compensate, while limit operation further also is carried out to the action that moves up of grip block;
3)Also for preventing grip block from being rotated around the strut of positioning sliding block, the present invention coordinates two sets of positioning by guiding mechanism
Sliding block is limited and is oriented to grip block:When moved on grip block its top contact the guide rod of guiding mechanism when, guide rod
It can be moved outwardly until that guide rod contacts with the fitting groove on grip block and realizes cooperation to overcoming spring force.Due to clamping
The arc-shaped semicircular of block, so it is during moving up or can persistently be contacted to guide rod, so that the spring moment
Remain substantially stretched state, and drive guide rod to grip block carry out continue compressing contact, and then realize limition orientation effect and
Improve clamping effect of the grip block to big quality concrete pipe fitting.
Meanwhile for grip block and positioning sliding block assembly consider, the present invention in grip block bottom be equipped with installation
Notch so that the connecting rod and strut of positioning sliding block can probe into from installation notch and be matched respectively with fitting groove and limiting slot
It closes, while strut both ends is blocked by limit screw cap, prevent grip block from shaking phenomenon occur.When positioning sliding block and clamping
It is packaged match after the completion of, installation notch can be fixed by plugging block or detachable closure.
The intrados of grip block uses frosted architecture basics, can improve between grip block and big quality concrete pipe fitting
Frictional force.
Compared with prior art, the present invention having the following advantages that:The configuration of the present invention is simple, it is ingenious in design, it can be effectively
Big quality concrete pipe fitting is clamped, promotes operation, on the basis of ensureing job safety, increases substantially work effect
Rate.
Description of the drawings
Fig. 1 is the off working state structural schematic diagram of big quality concrete pipe fitting lifting means in specific implementation mode;
Fig. 2 is the working state structure schematic diagram of the equipment of big quality concrete pipe fitting lifting means in specific implementation mode;
Fig. 3 is the off working state structural schematic diagram of the equipment of big quality concrete pipe fitting lifting means in specific implementation mode;
Fig. 4 is the supporting plate structure schematic diagram of big quality concrete pipe fitting lifting means in specific implementation mode;
Fig. 5 is the structural schematic diagram of clamping mechanism in specific implementation mode.
Note:Plugging block is not drawn into Fig. 3.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right
The present invention is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, and
It is not used in the restriction present invention.
As shown in Figs. 1-3, a kind of big quality concrete pipe fitting lifting means, the equipment include mounting plate 1 and setting
In the dual-rod hydraulic cylinder 11 on mounting plate 1, two piston rods of dual-rod hydraulic cylinder 11 respectively with positioned at 1 both sides of mounting plate and vertical
The top vertical connection for two support plates 12 being arranged offers the first notch 13, two supports in support plate 12 along its length
12 bottom of plate is located at opposite direction on the plate body of the first bottom of the gap and is equipped with slidable holding member, the slidable holding member being arranged in two support plates
And first notch 13 be located in same perpendicular.The slidable holding member include arc-shaped semicircular grip block 4 and
The positioning sliding block being fixedly connected with support plate plate body;
The positioning sliding block includes the connecting rod 23 being connect with 12 plate body fixed vertical of support plate and the setting of 23 end vertical of connecting rod
Strut 24;Positioning sliding block in every piece of support plate includes the first positioning sliding block 21 and second that structure is identical and is arranged above and below
Positioning sliding block 22,23 length of connecting rod of the second positioning sliding block 22 are more than 23 length of connecting rod of the first positioning sliding block 21, and first, the
The interlinking lever end of two positioning sliding blocks is located on same circumference.
The grip block 4 is slidably matched with the first notch 13, and fitting groove 41 is offered on the extrados of grip block 4, folder
Hold and offer limiting slot 42 on side adjacent with extrados on block 4, limiting slot 42 be connected to fitting groove 41 and limiting slot 42 with
Grip block 4 is arranged concentrically, the fitting groove 41 and 23 clearance fit of connecting rod, limiting slot 42 and 24 clearance fit of strut, strut 24
Both ends are pierced by limiting slot 42 and are equipped with external screw thread, positioning screw cap 25 and 24 both ends screw-thread fit of strut.The outer arc of the grip block 4
Face bottom end is equipped with installation notch 44, and installation notch 44 are connected to limiting slot 42 and fitting groove 41.It can at the installation notch 14
Dismounting is equipped with plugging block 43, plugging block 43 and installation notch clearance fit.The intrados of two grip blocks 4 is in frosted structure.
The plate face that two support plate mutually deviates from is equipped with guiding mechanism 3, and guiding mechanism 3 includes both ends respectively with first
The U-shaped frame 31 of 13 both sides plate bodys connection of notch is vertically equipped with guide rod 34,34 one end of guide rod and grip block on U-shaped frame 31
41 clearance sliding fit of upper fitting groove, the other end are connect after passing through U-shaped frame with top plate 32, leading between top plate 32 and U-shaped frame 31
Spring 33 is arranged on bar 34,33 both ends of spring are connect with top plate 32 and U-shaped frame 31 respectively.
1 length direction both ends bottom of mounting plate is respectively equipped with clamping mechanism 5, and the clamping mechanism 5 includes being fixedly installed on
The motor 51 of 1 bottom surface of mounting plate and the column 56 for being set to 51 both sides of motor offer the second notch 57 on column 56,
Second notch, 57 bottom axis pin is hinged with screens bar 59, and the output end of motor 51 is equipped with drive sprocket 52, drive sprocket 52 with
The driven sprocket 54 being arranged below is sequentially connected by chain 53, and driven sprocket 54, which is fixed, is set in the outer of internal thread cylinder 55
Wall, the threaded rod 58 opposite with two hand of spiral is threadedly coupled respectively at internal thread cylinder 55 both ends, and two threaded rods 58 are each passed through pair
It is contacted with the 59 top body of rod of screens bar after answering the second notch 57 on column 56.
The present invention is moved at big quality concrete pipe fitting first so that big quality concrete pipe fitting is located at two clampings
Between block.The present invention is in elongation state now at original state, i.e. the two of dual-rod hydraulic cylinder piece piston rod, this moment grip block
Big quality concrete pipe fitting is not yet contacted, so grip block is located at vertical height lowest point in its own gravity state.
Then dual-rod hydraulic cylinder controls two piston rod retractions, and drives two support plates and two grip block out movements, when
Two grip blocks are clamped it after contacting big quality concrete pipe fitting, but two support plates are still in out movement this moment, in addition
Grip block is to be slidably matched with positioning sliding block, so two grip blocks can be in the opposite effect of support plate and big quality concrete pipe fitting
Under moved up, i.e., grip block can relative positioning sliding block moved up, and grip block can move into corresponding branch in this process
In first notch of fagging.The moving up of two grip blocks can so that realization moves up work simultaneously by the big quality concrete pipe fitting of its clamping
Industry, until grip block is moved to positioning sliding block and contacts plugging block at its installation notch.In this way, realizing big quality concrete pipe
Part, when needing operating, it is only necessary to which the equipment with the function of motion being used cooperatively with the present invention is operated.It is described to have
The equipment of the function of motion can be small-sized lifting machine etc..
It should be noted that the present invention is using tool, there are one the power take-off mechanisms acted can be realized to big quality coagulation
The radial of native pipe fitting is clamped and vertically to two actions of promotion.Although and the artificial mobility of hawser in the prior art binding compared with
By force, but operation is complex, especially when big quality concrete tubing circumference does not have the space of hawser nesting, such as water
The big quality concrete pipe fitting of big quality placed on muddy ground face, staff can only be by the way of stretching the meaning by round hawser
Big quality concrete pipe fitting both ends are sleeved on, not only work consuming takes, but also the labor intensity of staff is very big, also easily wears cable
Rope, ground and big quality concrete pipe fitting.Meanwhile on the basis of the present invention states function in realization, use very simple
Structure does not use direction-changing drive mechanisms, the transmissions for relying solely on support plate and grip block such as connecting rod, the rocking arm of any complexity to match
It closes, maintenance rate is very low, and service life is only limited by its founding materials performance itself.
The present invention may be implemented to carry out clamping promotion to the big quality concrete pipe fitting of big quality, while in order to improve to big
Quality concrete pipe fitting, which is promoted, to be stablized, and prevents big quality concrete pipe fitting from falling off from grip block, the present invention also uses screens machine
Structure limits the initial and end both ends of big quality concrete pipe fitting:When big quality concrete pipe fitting is during being elevated, meeting
Two screens bar bottom ends are contacted, since screens bar and column are hinged, so screens bar does not interfere with the upper of big quality concrete pipe fitting
It rises, but can contact and present rotation by big quality concrete pipe fitting, after big quality concrete pipe fitting promotes operation in place, open
Dynamic motor, motor move riffled tube by pulley-sprocket-belt and rotate, since the hand of spiral of two threaded rods is on the contrary, within institute
The rotation of screwed pipe can make two threaded rods backwards to movement, and the end of two threaded rods is due to contacting two screens bars, so threaded rod
The mobile bottom that two screens bars can be pushed to rotate up to two screens bars be in contact and realize close conflict, such two screens bar
The load-bearing to big quality concrete pipe fitting can be realized under the case where big quality concrete pipe fitting falls off from grip block, prevented
The only generation of safety accident.Certainly, two complete equipments can be arranged to improve to big quality concrete pipe in the present invention on a mounting board
The clamping effect of part.The clamping mechanism play as security protection project and measures in emergency circumstances.
Claims (8)
1. a kind of big quality concrete pipe fitting transloading equipment, which is characterized in that the equipment includes mounting plate and is set to peace
Dual-rod hydraulic cylinder in loading board, mounting plate length direction both ends bottom are respectively equipped with clamping mechanism, two work of dual-rod hydraulic cylinder
Stopper rod respectively with the side along its length in mounting plate both sides and the top vertical connection of two support plates that is vertically arranged, support plate
To the first notch is offered, two support plate bottoms are located at opposite direction on the plate body of the first bottom of the gap and are equipped with slidable holding member, described
Slidable holding member includes the grip block of arc-shaped semicircular and the positioning sliding block that is fixedly connected with support plate plate body;The positioning
Sliding block includes the connecting rod being connect with support plate plate body fixed vertical and the vertically disposed strut of interlinking lever end;
The grip block is slidably matched with the first notch, and fitting groove is offered on the extrados of grip block, on grip block with outside
Limiting slot is offered on the adjacent side of cambered surface, limiting slot is connected to fitting groove and limiting slot is arranged concentrically with grip block, described
Fitting groove and connecting rod clearance fit, limiting slot and strut clearance fit;
The clamping mechanism includes the column for being fixedly installed on the motor of mounting plate bottom surface and being set to motor both sides, is stood
The second notch is offered on column, the second indentations bottom axis pin is hinged with screens bar, and the output end of motor is equipped with drive sprocket, main
Movable sprocket is connect with the driven sprocket being arranged below by chain drive, and driven sprocket, which is fixed, is set in the outer of internal thread cylinder
Wall, the threaded rod opposite with two hand of spiral is threadedly coupled respectively at internal thread cylinder both ends, and two threaded rods are each passed through corresponding column
On the second notch after contacted with the body of rod at the top of screens bar.
2. big quality concrete pipe fitting lifting means as described in claim 1, which is characterized in that the strut both ends are pierced by limit
Position slot is simultaneously equipped with external screw thread, positioning screw cap and strut both ends screw-thread fit.
3. big quality concrete pipe fitting lifting means as described in claim 1, which is characterized in that be arranged in two support plate
Slidable holding member and the first notch be located in same perpendicular.
4. big quality concrete pipe fitting lifting means as described in claim 1, which is characterized in that in every piece of support plate
Positioning sliding block includes the first positioning sliding block and the second positioning sliding block that structure is identical and is arranged above and below, the company of the second positioning sliding block
Pole length is more than the length of connecting rod of the first positioning sliding block, and the first, second positioning sliding block interlinking lever end is located on same circumference.
5. big quality concrete pipe fitting lifting means as described in claim 1, which is characterized in that the extrados of the grip block
Bottom end is equipped with installation notch, and installation notch are connected to limiting slot and fitting groove.
6. big quality concrete pipe fitting lifting means as claimed in claim 5, which is characterized in that removable at the installation notch
It unloads and is equipped with plugging block, plugging block and installation notch clearance fit.
7. big quality concrete pipe fitting lifting means as described in claim 1, which is characterized in that two support plate is mutually carried on the back
From plate face be equipped with guiding mechanism, guiding mechanism includes the U-shaped frame that both ends are connect with the first notch both sides plate body respectively, U-shaped
Guide rod, guide rod one end and fitting groove clearance sliding fit on grip block are vertically equipped on frame, after the other end passes through U-shaped frame
It is connect with top plate, spring is arranged on the guide rod between top plate and U-shaped frame, both ends of the spring is connect with top plate and U-shaped frame respectively.
8. big quality concrete pipe fitting lifting means as described in claim 1, which is characterized in that the inner arc of two grip block
Face is in frosted structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810959763.7A CN108750934A (en) | 2018-08-22 | 2018-08-22 | A kind of big quality concrete pipe fitting lifting means |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810959763.7A CN108750934A (en) | 2018-08-22 | 2018-08-22 | A kind of big quality concrete pipe fitting lifting means |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108750934A true CN108750934A (en) | 2018-11-06 |
Family
ID=63967389
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810959763.7A Withdrawn CN108750934A (en) | 2018-08-22 | 2018-08-22 | A kind of big quality concrete pipe fitting lifting means |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108750934A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111039157A (en) * | 2019-12-23 | 2020-04-21 | 钟志练 | Container lifting protection transportation equipment for suspension type rail transit transportation |
CN111847228A (en) * | 2020-07-02 | 2020-10-30 | 中交路桥建设有限公司 | A large diameter concrete pipe hanger |
-
2018
- 2018-08-22 CN CN201810959763.7A patent/CN108750934A/en not_active Withdrawn
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111039157A (en) * | 2019-12-23 | 2020-04-21 | 钟志练 | Container lifting protection transportation equipment for suspension type rail transit transportation |
CN111847228A (en) * | 2020-07-02 | 2020-10-30 | 中交路桥建设有限公司 | A large diameter concrete pipe hanger |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207402529U (en) | A kind of switching mechanism | |
CN202729631U (en) | Mobile gantry crane | |
CN106041903A (en) | Pipeline moving device based on fastness improving | |
CN108750934A (en) | A kind of big quality concrete pipe fitting lifting means | |
CN203998768U (en) | For the tightening device of steel rope | |
CN108858178A (en) | A kind of telescopic magic hand being machined adjustable-angle in production | |
CN108750930A (en) | Gravity self-locking mechanism and the self-locking pipe fitting fixture for using the mechanism | |
CN103233752A (en) | Material hoisting device for tunnel boring machine | |
CN117162074A (en) | Industrial robot and control system of weight-bearing type | |
CN208883303U (en) | A kind of big quality concrete pipe fitting lifting means | |
CN111453398B (en) | Pipeline carrying device | |
CN201002955Y (en) | Lifting mechanism | |
CN221587174U (en) | Flange plate conveying device | |
CN203214074U (en) | Material hoisting device for tunnel borer | |
CN205953442U (en) | Female wire sleeve lifting device of GIS | |
CN102966318B (en) | Marine riser hoisting device | |
CN218879190U (en) | Small-size travelling crane of pipeline construction | |
CN209742855U (en) | non-beam hydraulic pumping unit | |
CN209367731U (en) | A kind of portable cord adjustment device for wirerope adjustment mechanism | |
CN212863788U (en) | Hoisting accessory is used in installation of oil field pipeline laying | |
CN108892031A (en) | A kind of cylinder, pipe fitting lifting device | |
CN106986279B (en) | A kind of braking clutch structure of Lever Blocks | |
CN208883304U (en) | A kind of cylinder, pipe fitting lifting device | |
CN114906242B (en) | Intelligent anchor cable installation method | |
CN206509679U (en) | The mounting and positioning device of cast pipe union |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181106 |
|
WW01 | Invention patent application withdrawn after publication |