CN108711778A - Six strain insulator of 550kN grades replaces tool and method - Google Patents

Six strain insulator of 550kN grades replaces tool and method Download PDF

Info

Publication number
CN108711778A
CN108711778A CN201810517220.XA CN201810517220A CN108711778A CN 108711778 A CN108711778 A CN 108711778A CN 201810517220 A CN201810517220 A CN 201810517220A CN 108711778 A CN108711778 A CN 108711778A
Authority
CN
China
Prior art keywords
insulator
fixture
cross
class
arm side
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810517220.XA
Other languages
Chinese (zh)
Inventor
陶留海
李忠民
樊建军
沈军
郝曙光
张露江
郭文博
尹飞
孙超
李景昊
秦岭
陈雷
吴小磊
刘维
陈鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Maintenance Co of State Grid Henan Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Maintenance Co of State Grid Henan Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Maintenance Co of State Grid Henan Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Maintenance Co of State Grid Henan Electric Power Co Ltd
Priority to CN201810517220.XA priority Critical patent/CN108711778A/en
Publication of CN108711778A publication Critical patent/CN108711778A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Insulators (AREA)

Abstract

本发明公开了一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,包括横担侧翻板卡具、联板、绝缘子闭式卡具和两根八吨液压丝杠,横担侧翻板卡具安装在联板上,横担侧翻板卡具通过连接机轴、两根液压丝杠与绝缘子闭式卡具的两端进行联接,绝缘子闭式卡具另一侧吊装于直流输电线路绝缘子串上,绝缘子闭式卡具安装到绝缘子前卡钢帽上,使之与绝缘子钢帽连为一体,该更换工具填补了国内±1100千伏特高压直流线路带电作业领域六联耐张单片绝缘子更换工器具的空白。

The invention discloses a replacement tool for 550kN class six-connected tension insulators of ±1100 kV UHV DC transmission line, which includes a cross-arm side turning plate clamp, connecting plate, insulator closed clamp and two eight-ton hydraulic screw screws. The cross-arm side flap fixture is installed on the connecting plate, and the cross-arm side flap fixture is connected with the two ends of the insulator closed fixture through the connecting machine shaft, two hydraulic screw screws, and the other side of the insulator closed fixture It is hoisted on the insulator string of the DC transmission line, and the insulator closed clamp is installed on the steel cap of the front clamp of the insulator, so that it is integrated with the steel cap of the insulator. The blank of Lianai Zhang monolithic insulator replacement tool.

Description

550kN级六联耐张绝缘子更换工具及方法550kN class six-connected tension insulator replacement tool and method

技术领域technical field

本发明涉及电力系统维修技术领域,尤其是涉及一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具及方法。The invention relates to the technical field of power system maintenance, in particular to a replacement tool and method for 550kN level six-connected tension insulators of a ±1100 kV UHV DC transmission line.

背景技术Background technique

昌吉线输电线路±1100KV为特高压输电线路,更换具有缺陷的绝缘子大都采用断电式,即在停电条件下进行检修及更换,传统的高空带电作业更换单片绝缘子劳动强度大,而且效率比较低,耐张六联横担端绝缘子的更换目前尚无带电作业方法及工器具相关的研究。The ±1100KV transmission line of the Changji Line is an UHV transmission line. Most defective insulators are replaced by power-off methods, that is, maintenance and replacement are performed under power outage conditions. The traditional high-altitude live work to replace single-piece insulators is labor-intensive and relatively low efficiency. , There is no research on live working methods and tools related to the replacement of tension-resistant six-unit cross-arm end insulators.

公开号为CN 105337216 A的文献公开了一种带电更换特高压接地极线路耐张绝缘子的工具及其方法,包括前卡部、丝杠、绝缘拉板和后卡部,所述前卡部采用弯板卡,所述前卡部与所述丝杠的一端连接,所述丝杠的另一端与所述绝缘拉板的一端连接,所述绝缘拉板的另一端与所述后卡部连接,所述绝缘拉板长度可调,所述绝缘拉板上均匀布置有调节孔,在利用所述工具更换耐张绝缘子的过程中,电工的身体部位不应超过横担侧第一片耐张绝缘子,并保持 0.6m 的最小安全距离,地面电工用温度测量仪表检测导线表面温度,一旦发现温度持续上升,并超过 60 摄氏度,及时提醒等电位处的二号电工,避免其长时间接触高温导线造成人身伤害,保证了作业人员的人身安全,但该文献需要2-3人配合操作,劳动强度大,效率较低,而且操作过程比较麻烦,使用起来不够方便。The document with publication number CN 105337216 A discloses a tool and method for live replacement of tension insulators of UHV grounding pole lines, including a front clamping part, a lead screw, an insulating puller and a rear clamping part. The front clamping part adopts Bending card, the front clamping part is connected to one end of the screw, the other end of the screw is connected to one end of the insulating pull plate, and the other end of the insulating pull plate is connected to the rear clamping part , the length of the insulating pull plate is adjustable, and adjustment holes are evenly arranged on the insulating pull plate. During the process of using the tool to replace the tension insulator, the body part of the electrician should not exceed the first tension insulator on the side of the cross arm. Insulators, and keep a minimum safety distance of 0.6m. The ground electrician uses a temperature measuring instrument to detect the surface temperature of the wire. Once the temperature continues to rise and exceeds 60 degrees Celsius, promptly remind the No. 2 electrician at the equipotential place to avoid long-term contact with the high-temperature wire. Causing personal injury and ensuring the personal safety of the operating personnel, but this document requires 2-3 people to cooperate with the operation, the labor intensity is high, the efficiency is low, and the operation process is cumbersome, and it is not convenient enough to use.

公开号为CN 105098655 A的文献公开了一种耐张绝缘子更换工具,包括第一绝缘端板、第二绝缘端板、卡线器、至少两块卡板和至少两根能够伸缩的绝缘拉杆,绝缘拉杆上设有控制伸缩的控制把手 ;第一绝缘端板和第二绝缘端板分别设置在绝缘拉杆的两端,与至少两根绝缘拉杆共同构成绝缘紧线架 ;卡板架设在至少两根绝缘拉杆上,卡板上设有内凹的用于支撑耐张绝缘子的弧形缺口,相邻两卡板之间穿设有连接杆,至少两块卡板与连接杆共同构成能够放置绝缘子的托架 ;卡线器设置在第一绝缘端板上,虽然该文献具有带电更换耐张绝缘子、便于操作、安全性高的特点但该文献仅适用于普通输电线路的耐张绝缘子的更换,无法适用于特高压直流输电线路的耐张绝缘子的更换,而且该文献的更换工具材质采用普通的绝缘端板,无法在减轻重量的同时,提升工具的机械强度。The document with the publication number CN 105098655 A discloses a strain insulator replacement tool, which includes a first insulating end plate, a second insulating end plate, a wire gripper, at least two clamping plates and at least two stretchable insulating pull rods, The insulating pull rod is provided with a control handle for controlling expansion and contraction; the first insulating end plate and the second insulating end plate are respectively arranged at both ends of the insulating pull rod, and together with at least two insulating pull rods constitute an insulating tensioning frame; the clamping plate is erected on at least two On the first insulating rod, there is a concave arc-shaped gap for supporting the tension insulator on the clamping plate, and a connecting rod is pierced between two adjacent clamping plates. At least two clamping plates and the connecting rod together form a space for placing insulators. The bracket; the wire gripper is set on the first insulating end plate. Although this document has the characteristics of live replacement of tensile insulators, easy operation and high safety, this document is only applicable to the replacement of tensile insulators of ordinary transmission lines. It cannot be applied to the replacement of tension insulators of UHV DC transmission lines, and the material of the replacement tool in this document is an ordinary insulating end plate, which cannot improve the mechanical strength of the tool while reducing the weight.

发明内容Contents of the invention

有鉴于此,本发明的目的是针对现有技术的不足,提供一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具及方法,在停电状态下,用于更换±1100KV输电线路耐张六联绝缘子串中的一串和绝缘子闭式卡具配合更换横担端第一片绝缘子,填补了国内±1100千伏特高压直流线路带电作业领域六联耐张单片绝缘子更换工器具的空白。In view of this, the object of the present invention is to address the deficiencies in the prior art, and provide a replacement tool and method for 550kN class six-connected tension insulators of ±1100 kV UHV DC transmission lines, which are used to replace ±1100KV power transmission in a power failure state. One string of the line tension six-unit insulator string and the insulator closed clamp are used to replace the first insulator at the cross-arm end, which fills the domestic ±1100 kV UHV DC line live work field of six-unit tension single-piece insulator replacement tools Whitespace.

为达到上述目的,本发明采用以下技术方案:To achieve the above object, the present invention adopts the following technical solutions:

一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,包括横担侧翻板卡具、联板、绝缘子闭式卡具和两根八吨液压丝杠,所述横担侧翻板卡具安装在所述联板上,所述横担侧翻板卡具通过所述两根液压丝杠与所述绝缘子闭式卡具的两端进行联接,所述绝缘子闭式卡具另一侧吊装于直流输电线路绝缘子串上,所述绝缘子闭式卡具安装到绝缘子前卡钢帽上,与绝缘子钢帽连为一体。A replacement tool for 550kN class six-connection tensile insulators of ±1100 kV UHV DC transmission lines, including cross-arm side-turning clamps, connecting plates, insulator closed clamps and two eight-ton hydraulic screw screws, the cross-arm The side flap fixture is installed on the connecting plate, and the cross-arm side flap fixture is connected with the two ends of the insulator closed fixture through the two hydraulic screw screws, and the insulator closed fixture The other side of the tool is hoisted on the insulator string of the direct current transmission line, and the insulator closed clamp is installed on the front clamping steel cap of the insulator, and is connected with the insulator steel cap as a whole.

进一步的,所述联板包括三角联板和与三角板转动连接的直角挂板,所述三角板、所述直角挂板、所述横担侧翻板卡具通过螺栓连接,所述横担侧翻板卡具通过所述直角挂板与所述绝缘子钢帽连接。Further, the connecting plate includes a triangular connecting plate and a right-angle hanging plate rotatably connected with the triangular plate, the triangular plate, the right-angle hanging plate, and the cross-arm side flap clamp are connected by bolts, and the cross-arm rollover The board fixture is connected with the steel cap of the insulator through the right-angle hanging board.

进一步的, 所述横担侧翻板卡具和所述绝缘子闭式卡具的额定工作负荷均为150kN,试验负荷均为225KN,安全系数均为2.5。Further, the rated working load of the cross-arm side flap fixture and the closed insulator fixture are both 150kN, the test load is 225KN, and the safety factor is 2.5.

进一步的, 所述横担侧翻板卡具通过所述螺栓在所述联板上形成一个锚固点,所述绝缘子钢帽为绝缘子端的锚固点。Further, the cross-arm side flap fixture forms an anchor point on the connecting plate through the bolt, and the insulator steel cap is the anchor point of the insulator end.

进一步的, 所述横担侧翻板卡具和绝缘子闭式卡具材质均为钛合金材料。Further, the materials of the cross-arm side flap clamp and the insulator closed clamp are titanium alloy materials.

一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换方法,包括以下步骤:A method for replacing 550kN class six-connected tension insulators of ±1100 kV UHVDC transmission lines, comprising the following steps:

步骤1:组装 550kN级六联耐张绝缘子更换工具;Step 1: Assemble the replacement tool for 550kN class six-connected tension insulators;

步骤2:收紧液压丝杠使导线提升一定高度,松弛绝缘子串;Step 2: Tighten the hydraulic screw to raise the wire to a certain height, and loosen the insulator string;

步骤3:用取销夹摘取绝缘子下螺帽内的弹簧销,更换不良的绝缘子;Step 3: Use a pin removal clip to remove the spring pin in the lower nut of the insulator, and replace the defective insulator;

步骤4:更换掉不良绝缘子完毕后,放松液压丝杠,使所述横担侧翻板卡具上的水平载荷转移到绝缘子上;Step 4: After replacing the defective insulator, loosen the hydraulic screw to transfer the horizontal load on the cross-arm side flap fixture to the insulator;

步骤5:拆除550kN级六联耐张绝缘子更换工具。Step 5: Remove the replacement tool for 550kN class six-gang tension insulators.

进一步的,所述步骤1中组装 550kN级六联耐张绝缘子更换工具包括以下四个步骤:Further, the assembly of the 550kN class six-connected tension insulator replacement tool in step 1 includes the following four steps:

A、在地面将所述绝缘子闭式卡具与液压丝杠试装,确定无误;A. Trial install the insulator closed fixture and hydraulic screw on the ground, and make sure it is correct;

B、通过滑车绳索辅助工具将所述绝缘子闭式卡具吊装于直流输电线路绝缘子串;B. Hoist the insulator closed fixture on the insulator string of the direct current transmission line through the pulley rope auxiliary tool;

C、将横担端翻板卡具下部的螺栓卸下,将横担端翻板卡具安装到直角挂板及三角联板上,将所述螺栓安装上使横担端翻板卡具和联板连接为一体;C. Remove the bolts on the lower part of the cross-arm end flap fixture, install the cross-arm end flap fixture on the right-angle hanging plate and the triangular joint plate, install the bolts so that the cross-arm end flap fixture and The joint plate is connected as one;

D、将绝缘子的上盖打开,将所述绝缘子闭式卡具安装到绝缘子的钢帽上,将绝缘子上盖合上使绝缘子闭式卡与绝缘子钢帽连为一体。D. Open the upper cover of the insulator, install the closed clamp of the insulator on the steel cap of the insulator, and close the upper cover of the insulator to connect the closed clamp of the insulator with the steel cap of the insulator.

本发明的有益效果是:The beneficial effects of the present invention are:

1. 本发明提供一种±1100千伏特高压直流输电线路550kN级耐张六联横担侧绝缘子更换工具,一端利用横担侧连扳为横担侧翻板卡具的锚固点,将横担端卡具安装到Z-55150直角挂板及L-110J-300/1000三角联板上,将螺钉装上使之与横担侧翻板卡具连接为一体,另一端利用绝缘子钢帽为绝缘子端的锚固点,收紧液压丝杠后,将绝缘子的水平荷载转移到本装置上,此时进行可拆除和更换单片绝缘子作业。使用本装置后,大大降低了高空带电更换单片绝缘子的劳动强度,缩短作业时间,提高工作效率。1. The present invention provides a tool for replacing insulators on the 550kN level tension-resistant six-connected cross-arm side of a ±1100 kV UHV DC transmission line. The end fixture is installed on the Z-55150 right-angle hanging plate and the L-110J-300/1000 triangular joint plate, and the screw is installed to connect it with the cross-arm side flap fixture as a whole, and the other end uses the insulator steel cap as an insulator After the hydraulic screw is tightened, the horizontal load of the insulator is transferred to the device, and the operation of removing and replacing the single-piece insulator is performed at this time. After the device is used, the labor intensity of replacing a single-piece insulator with live electricity at high altitude is greatly reduced, the working time is shortened, and the working efficiency is improved.

2.绝缘子更换工具的横担侧翻板卡具、绝缘子闭式卡具均采用钛合金制造,在缩减了工具自身的体积的同时提高了工具的机械强度,减轻了工具的重量,降低了作业风险,提高工作的安全性。2. The insulator replacement tool’s cross-arm side flap fixture and insulator closed fixture are all made of titanium alloy, which not only reduces the volume of the tool itself, but also improves the mechanical strength of the tool, reduces the weight of the tool, and reduces the operation risk. Improve job security.

3.本发明的绝缘子更换工具中的横担侧翻板卡具、绝缘子闭式卡具额定工作负荷为150kN,试验负荷225KN,安全系数2.5倍,8吨液压丝杠,从以上主要技术指标看,目前均位居我国同类带电作业工器具首位。3. The rated working load of the cross-arm side flap fixture and insulator closed fixture in the insulator replacement tool of the present invention is 150kN, the test load is 225KN, the safety factor is 2.5 times, and the hydraulic screw screw is 8 tons. From the above main technical indicators , are currently ranked first in my country's similar live working tools.

4. 本卡具设计理念独特,构思新颖,具有专用部件少,容易组合、方便携带、使用简单、重量轻等优点,使用安全系数高,填补了国内±1100千伏特高压直流线路带电作业领域550kN级六联耐张单片绝缘子更换工器具的空白。4. The design concept of this jig is unique, the concept is novel, it has the advantages of few special parts, easy to assemble, easy to carry, simple to use, light in weight, etc., and has a high safety factor in use. The blank of replacement tools for grade six-connected tension single-piece insulators.

附图说明Description of drawings

图1:本发明一种±1100千伏特高压直流输电线路550kN级耐张六联横担侧绝缘子更换工具的总装图;Figure 1: The general assembly diagram of a 550kN class tension-resistant six-connector cross-arm side insulator replacement tool for a ±1100 kV UHV DC transmission line according to the present invention;

图2:本发明一种±1100千伏特高压直流输电线路550kN级耐张六联横担侧绝缘子更换工具的横担侧翻板卡具与联板装配立体图;Figure 2: A three-dimensional view of the cross-arm side turning board clamp and connecting board assembly of a 550kN-class tension-resistant six-connected cross-arm side insulator replacement tool for a ±1100 kV UHV DC transmission line according to the present invention;

图3:本发明一种±1100千伏特高压直流输电线路550kN级耐张六联横担侧绝缘子更换工具的横担侧翻板卡具与联板装配工装图;Figure 3: A cross-arm side-turning clamp and connecting plate assembly tooling of a 550kN-class tension-resistant six-connected cross-arm side insulator replacement tool for a ±1100 kV UHV DC transmission line according to the present invention;

图4:本发明一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换步骤。Figure 4: Replacement steps of a 550kN class six-connected tension insulator for a ±1100 kV UHV DC transmission line according to the present invention.

附图标记说明 :Explanation of reference signs:

1、横担侧翻板卡具,2、绝缘子闭式卡具,3、液压丝杠,4、钢帽,5、三角联板,6、直角挂板,7、螺栓。1. Fixture for cross-arm side flap, 2. Closed fixture for insulator, 3. Hydraulic screw, 4. Steel cap, 5. Triangular connecting plate, 6. Right-angle hanging plate, 7. Bolt.

具体实施方式Detailed ways

为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例的附图,对本发明实施例的技术方案进行清楚、完整地描述。显然,所描述的实施例是本发明的一部分实施例,而不是全部的实施例。基于所描述的本发明的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本发明保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the present invention more clear, the following will clearly and completely describe the technical solutions of the embodiments of the present invention in conjunction with the drawings of the embodiments of the present invention. Apparently, the described embodiments are some, not all, embodiments of the present invention. All other embodiments obtained by those skilled in the art based on the described embodiments of the present invention belong to the protection scope of the present invention.

如图1所示,一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,包括横担侧翻板卡具1、联板、绝缘子闭式卡具2和两根八吨液压丝杠3,所述横担侧翻板卡具1安装在所述联板上,所述横担侧翻板卡具1通过所述两根液压丝杠3与所述绝缘子闭式卡具2的两端进行联接,所述绝缘子闭式卡具2另一侧吊装于直流输电线路绝缘子串上,所述绝缘子闭式卡具2安装到绝缘子前卡钢帽4上,与绝缘子钢帽4连为一体。As shown in Figure 1, a replacement tool for 550kN class six-connected tension insulators of ±1100 kV UHV DC transmission line, including cross-arm side-turn plate clamp 1, connecting plate, insulator closed clamp 2 and two eight-ton The hydraulic screw 3, the cross-arm side flap fixture 1 is installed on the connecting plate, the cross-arm side flap fixture 1 passes through the two hydraulic screw screws 3 and the insulator closed fixture The two ends of the insulator 2 are connected, and the other side of the insulator closed fixture 2 is hoisted on the DC transmission line insulator string. The insulator closed fixture 2 is installed on the insulator front clamping steel cap 4, and the insulator steel cap 4 connected as one.

如图2-3所示,所述联板包括三角联板5和与三角板转动连接的直角挂板6,其中:所述三角联板型号为L-110J-300/1000,直角挂板采用的型号为金具Z-55150,所述三角联板5、所述直角挂板6、所述横担侧翻板卡具1通过螺栓7连接,所述横担侧翻板卡具1通过所述直角挂板6与所述绝缘子钢帽连接。As shown in Figure 2-3, the connecting plate includes a triangular connecting plate 5 and a right-angle hanging plate 6 that is rotatably connected to the triangular plate, wherein: the model of the triangular connecting plate is L-110J-300/1000, and the The model is the fitting Z-55150, the triangular connecting plate 5, the right-angle hanging plate 6, and the cross-arm side flap fixture 1 are connected by bolts 7, and the cross-arm side flap fixture 1 passes through the right-angle Hanging plate 6 is connected with the steel cap of the insulator.

所述横担侧翻板卡具1和所述绝缘子闭式卡具2的额定工作负荷均为150kN,试验负荷均为225KN,安全系数均为2.5。横担侧翻板卡具和绝缘子闭式卡具采用上述技术参数大大提高了绝缘子更换工具的安全操作性能,目前均位居我国同类带电作业工器具首位。作业时应严格按照DL5009.2电力建设安全工作规程进行安全作业。Both the rated working load of the cross-arm side flap fixture 1 and the closed insulator fixture 2 are 150kN, the test load is 225KN, and the safety factor is 2.5. The above-mentioned technical parameters have greatly improved the safe operation performance of the insulator replacement tool for the cross-arm side-turning clamp and the insulator closed clamp, and are currently ranked first in the same kind of live working tools in my country. During operation, safe operation shall be carried out in strict accordance with DL5009.2 electric power construction safety work regulations.

所述横担侧翻板卡具1通过所述螺栓在所述联板上形成一个锚固点,所述绝缘子钢帽为绝缘子端的锚固点。收紧液压丝杠后,将绝缘子的水平荷载转移到横担侧翻板卡具1上,此时便于拆除和更换单片绝缘子作业,拆除和更换不良后,放松液压丝杠,水平荷载重新转移到绝缘子上,便于进行工具的拆除,The cross-arm side flap clamp 1 forms an anchor point on the connecting plate through the bolt, and the insulator steel cap is the anchor point of the insulator end. After tightening the hydraulic screw, the horizontal load of the insulator is transferred to the cross-arm side flap clamp 1. At this time, it is convenient to remove and replace the single-piece insulator. After the removal and replacement are defective, loosen the hydraulic screw, and the horizontal load is transferred again to the insulator for easy tool removal,

所述横担侧翻板卡具1和绝缘子闭式卡具2材质均为钛合金材料。钛合金材料采用的型号为TC4,采用该型号钛合金材料在缩减了工具自身的体积的同时提高了工具的机械强度,减轻了工具的重量,降低了作业风险,提高工作的安全性。The cross-arm side flap clamp 1 and the insulator closed clamp 2 are made of titanium alloy. The type of titanium alloy material used is TC4. The use of this type of titanium alloy material not only reduces the volume of the tool itself, but also improves the mechanical strength of the tool, reduces the weight of the tool, reduces the operation risk, and improves the safety of the work.

如图4所示, 一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换方法,包括以下步骤:As shown in Figure 4, a method for replacing 550kN class six-connected tension insulators of ±1100 kV UHVDC transmission lines includes the following steps:

步骤1:组装 550kN级六联耐张绝缘子更换工具;Step 1: Assemble the replacement tool for 550kN class six-connected tension insulators;

步骤2:收紧液压丝杠使导线提升一定高度,松弛绝缘子串,此时,绝缘子的水平荷载转移到横担侧翻板卡具上;Step 2: Tighten the hydraulic lead screw to lift the wire to a certain height, and loosen the insulator string. At this time, the horizontal load of the insulator is transferred to the cross-arm side flap fixture;

步骤3:用取销夹摘取绝缘子下螺帽内的弹簧销,更换绝缘子串中不良的绝缘子;Step 3: Remove the spring pin in the lower nut of the insulator with a pin removal clip, and replace the defective insulator in the insulator string;

步骤4:更换掉不良绝缘子完毕后,放松液压丝杠,使所述横担侧翻板卡具上的水平载荷转移到绝缘子上,此时所述横担侧翻板卡具侧不受力,便于进行更换工具的拆除作业;Step 4: After replacing the defective insulator, loosen the hydraulic screw to transfer the horizontal load on the side flap fixture of the cross-arm to the insulator. At this time, the side of the side flap fixture of the cross-arm is not stressed. Facilitate the dismantling operation of changing tools;

步骤5:拆除550kN级六联耐张绝缘子更换工具,其中,拆除步骤与组装步骤过程相反。Step 5: Remove the replacement tool for the 550kN class six-connected tension insulator, where the removal step is opposite to the assembly step.

所述步骤1中组装 550kN级六联耐张绝缘子更换工具包括以下四个步骤:Assembling the replacement tool for 550kN class six-connected tension insulators in step 1 includes the following four steps:

A、在地面将所述绝缘子闭式卡具与液压丝杠试装,确定无误;A. Trial install the insulator closed fixture and hydraulic screw on the ground, and make sure it is correct;

B、通过滑车绳索辅助工具将所述绝缘子闭式卡具吊装于直流输电线路绝缘子串;B. Hoist the insulator closed fixture on the insulator string of the direct current transmission line through the pulley rope auxiliary tool;

C、将横担端翻板卡具下部的螺栓卸下,将横担端翻板卡具安装到直角挂板及三角联板上,将所述螺栓安装上使横担端翻板卡具和联板连接为一体;C. Remove the bolts on the lower part of the cross-arm end flap fixture, install the cross-arm end flap fixture on the right-angle hanging plate and the triangular joint plate, install the bolts so that the cross-arm end flap fixture and The joint plate is connected as one;

D、将绝缘子的上盖打开,将所述绝缘子闭式卡具安装到绝缘子的钢帽上,将绝缘子上盖合上使绝缘子闭式卡与绝缘子钢帽连为一体。D. Open the upper cover of the insulator, install the closed clamp of the insulator on the steel cap of the insulator, and close the upper cover of the insulator to connect the closed clamp of the insulator with the steel cap of the insulator.

最后说明的是,以上实施例仅用以说明本发明的技术方案而非限制,本领域普通技术人员对本发明的技术方案所做的其他修改或者等同替换,只要不脱离本发明技术方案的精神和范围,均应涵盖在本发明的权利要求范围当中。Finally, it is noted that the above embodiments are only used to illustrate the technical solution of the present invention without limitation, other modifications or equivalent replacements made by those skilled in the art to the technical solution of the present invention, as long as they do not depart from the spirit and spirit of the technical solution of the present invention All should be included in the scope of the claims of the present invention.

Claims (8)

1.一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,其特征在于:包括横担侧翻板卡具、联板、绝缘子闭式卡具和两根八吨液压丝杠,所述横担侧翻板卡具安装在所述联板上,所述横担侧翻板卡具通过所述两根液压丝杠与所述绝缘子闭式卡具的两端进行联接,所述绝缘子闭式卡具另一侧吊装于直流输电线路绝缘子串上,所述绝缘子闭式卡具安装到绝缘子前卡钢帽上,与绝缘子钢帽连为一体。1. A replacement tool for 550kN-class six-connection tension insulators of ±1100 kV UHV DC transmission line, characterized in that it includes a cross-arm side-turn plate fixture, connecting plate, insulator closed fixture and two eight-ton hydraulic wires The cross-arm side flap fixture is installed on the connecting plate, and the cross-arm side flap fixture is connected to both ends of the insulator closed fixture through the two hydraulic screw screws. The other side of the insulator closed fixture is hoisted on the DC transmission line insulator string, and the insulator closed fixture is installed on the front clamping steel cap of the insulator and connected with the insulator steel cap as a whole. 2.根据权利要求1所述的一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,其特征在于:所述联板包括三角联板和与三角板转动连接的直角挂板,所述三角板、所述直角挂板、所述横担侧翻板卡具通过螺栓连接,所述横担侧翻板卡具通过所述直角挂板与所述绝缘子钢帽连接。2. A replacement tool for 550kN class six-connection tensile insulators of ±1100 kV UHVDC transmission line according to claim 1, characterized in that: the connecting plate includes a triangular connecting plate and a right-angle hanging plate that is rotatably connected to the triangular plate , the triangular plate, the right-angle hanging plate, and the cross-arm side flap fixture are connected by bolts, and the cross-arm side flap fixture is connected to the insulator steel cap through the right-angle hanging plate. 3.根据权利要求1所述的一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,其特征在于:所述横担侧翻板卡具和所述绝缘子闭式卡具的额定工作负荷均为150kN,试验负荷均为225KN,安全系数均为2.5。3. A replacement tool for 550kN class six-connected tension insulators of ±1100 kV UHVDC transmission line according to claim 1, characterized in that: the cross-arm side flap fixture and the insulator closed fixture The rated working load is 150kN, the test load is 225KN, and the safety factor is 2.5. 4.根据权利要求2所述的一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,其特征在于:所述横担侧翻板卡具通过所述螺栓在所述联板上形成一个锚固点,所述绝缘子钢帽为绝缘子端的锚固点。4. A replacement tool for 550kN class six-connected tension insulators of ±1100 kV UHVDC transmission line according to claim 2, characterized in that: the cross-arm side flap clamp is connected to the connecting member through the bolt. An anchor point is formed on the plate, and the insulator steel cap is the anchor point of the insulator end. 5.根据权利要求1所述的一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,其特征在于:所述横担侧翻板卡具和绝缘子闭式卡具材质均为钛合金材料。5. A replacement tool for 550kN class six-connected tension insulators of ±1100 kV UHVDC transmission line according to claim 1, characterized in that: the material of the cross-arm side flap clamp and the insulator closed clamp are both For titanium alloy material. 6.根据权利要求1所述的一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换工具,其特征在于:所述绝缘子螺帽内设有弹簧销。6. The tool for replacing 550kN class six-connected tension insulators of ±1100 kV UHVDC transmission lines according to claim 1, wherein a spring pin is arranged inside the insulator nut. 7.一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换方法,其特征在于:包括以下步骤:7. A method for replacing 550kN class six-connected tension insulators of ±1100 kV UHVDC transmission lines, characterized in that it comprises the following steps: 步骤1:组装 550kN级六联耐张绝缘子更换工具;Step 1: Assemble the replacement tool for 550kN class six-connected tension insulators; 步骤2:收紧液压丝杠使导线提升一定高度,松弛绝缘子串;Step 2: Tighten the hydraulic screw to raise the wire to a certain height, and loosen the insulator string; 步骤3:用取销夹摘取绝缘子下螺帽内的弹簧销,更换不良的绝缘子;Step 3: Use a pin removal clip to remove the spring pin in the lower nut of the insulator, and replace the defective insulator; 步骤4:更换掉不良绝缘子完毕后,放松液压丝杠,使所述横担侧翻板卡具上的水平载荷转移到绝缘子上;Step 4: After replacing the defective insulator, loosen the hydraulic screw to transfer the horizontal load on the cross-arm side flap fixture to the insulator; 步骤5:拆除550kN级六联耐张绝缘子更换工具。Step 5: Remove the replacement tool for 550kN class six-gang tension insulators. 8.根据权利要求7所述的一种±1100千伏特高压直流输电线路550kN级六联耐张绝缘子更换方法,其特征在于:所述步骤1中组装 550kN级六联耐张绝缘子更换工具包括以下四个步骤:8. A method for replacing 550kN class six-unit tension insulators of ±1100 kV UHVDC transmission lines according to claim 7, characterized in that: the assembly of the 550kN class six-unit tension insulator replacement tool in the step 1 includes the following Four steps: A、在地面将所述绝缘子闭式卡具与液压丝杠试装,确定无误;A. Trial install the insulator closed fixture and hydraulic screw on the ground, and make sure it is correct; B、通过滑车绳索辅助工具将所述绝缘子闭式卡具吊装于直流输电线路绝缘子串;B. Hoist the insulator closed fixture on the insulator string of the direct current transmission line through the pulley rope auxiliary tool; C、将横担端翻板卡具下部的螺栓卸下,将横担端翻板卡具安装到直角挂板及三角联板上,将所述螺栓安装上使横担端翻板卡具和联板连接为一体;C. Remove the bolts on the lower part of the cross-arm end flap fixture, install the cross-arm end flap fixture on the right-angle hanging plate and the triangular joint plate, install the bolts so that the cross-arm end flap fixture and The joint plate is connected as one; D、将绝缘子的上盖打开,将所述绝缘子闭式卡具安装到绝缘子的钢帽上,将绝缘子上盖合上使绝缘子闭式卡与绝缘子钢帽连为一体。D. Open the upper cover of the insulator, install the closed clamp of the insulator on the steel cap of the insulator, and close the upper cover of the insulator to connect the closed clamp of the insulator with the steel cap of the insulator.
CN201810517220.XA 2018-05-25 2018-05-25 Six strain insulator of 550kN grades replaces tool and method Pending CN108711778A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810517220.XA CN108711778A (en) 2018-05-25 2018-05-25 Six strain insulator of 550kN grades replaces tool and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810517220.XA CN108711778A (en) 2018-05-25 2018-05-25 Six strain insulator of 550kN grades replaces tool and method

Publications (1)

Publication Number Publication Date
CN108711778A true CN108711778A (en) 2018-10-26

Family

ID=63870588

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810517220.XA Pending CN108711778A (en) 2018-05-25 2018-05-25 Six strain insulator of 550kN grades replaces tool and method

Country Status (1)

Country Link
CN (1) CN108711778A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109193533A (en) * 2018-10-29 2019-01-11 国网黑龙江省电力有限公司检修公司 Transmission line of electricity suspension string overhang insulation subcard tool and installation method
CN110190558A (en) * 2019-07-09 2019-08-30 云南电网有限责任公司带电作业分公司 A kind of operational method for charged for replacement 550kN large-tonnage strain insulator side of wire monolithic insulator

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012120357A (en) * 2010-12-02 2012-06-21 Asahi Tec Corp Lifting metal fitting and insulator device
CN202997422U (en) * 2012-12-13 2013-06-12 云南电网公司带电作业分公司 Replacing device of high altitude 500KV strain fourfold insulator string
CN204424804U (en) * 2015-03-12 2015-06-24 国家电网公司 Equipotential changes the instrument of the two soft bus strain insulator of simply connected
CN105337215A (en) * 2015-11-26 2016-02-17 国网河南省电力公司检修公司 Tool and method for replacing earth electrode circuit corner tension-resistant hardware fitting

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012120357A (en) * 2010-12-02 2012-06-21 Asahi Tec Corp Lifting metal fitting and insulator device
CN202997422U (en) * 2012-12-13 2013-06-12 云南电网公司带电作业分公司 Replacing device of high altitude 500KV strain fourfold insulator string
CN204424804U (en) * 2015-03-12 2015-06-24 国家电网公司 Equipotential changes the instrument of the two soft bus strain insulator of simply connected
CN105337215A (en) * 2015-11-26 2016-02-17 国网河南省电力公司检修公司 Tool and method for replacing earth electrode circuit corner tension-resistant hardware fitting

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109193533A (en) * 2018-10-29 2019-01-11 国网黑龙江省电力有限公司检修公司 Transmission line of electricity suspension string overhang insulation subcard tool and installation method
CN110190558A (en) * 2019-07-09 2019-08-30 云南电网有限责任公司带电作业分公司 A kind of operational method for charged for replacement 550kN large-tonnage strain insulator side of wire monolithic insulator

Similar Documents

Publication Publication Date Title
CN202014054U (en) Overhaul tool for dead end insulator on +/- 660kV DC power transmission line
CN105914646B (en) Working method for replacing 35kV tension insulator strings with power on
CN202059096U (en) Tool component capable of replacing insulator string electrically
CN203456796U (en) Broadsword fixture for replacing single insulator of duplex insulator string during power failure
WO2012088986A1 (en) Maintenance tool used for direct current transmission line
CN106451214B (en) A kind of combination tool of charged for replacement extra-high voltage same tower double circuit strain insulator
CN104505766A (en) Tool and method for live replacement of 500kV strain insulator strings in substations
CN103326304B (en) 10kV charged drainage wire supporting device
CN102661057B (en) Power angle tower pull leg main material changing method and special main material clamp
CN108711778A (en) Six strain insulator of 550kN grades replaces tool and method
CN101814707B (en) Tool for live replacement of 220kV line 'V' string insulator and method
CN203367880U (en) 760kN disk-shaped insulator holder
CN108448488A (en) 840kN grades of tension resistant four cross-arm side insulator replacement tools and method
CN208522354U (en) 840kN Class Tension Quadruple Cross Arm Side Insulator Replacement Tool
CN210779825U (en) Device for replacing the entire string of tensile insulators at the cross arm end and wire end of DC transmission lines
CN206099164U (en) Change combination tool of extra -high voltage with two dead end insulator of returning of tower with electricity
CN203813330U (en) Tool for live-line replacement of 500 kV strain insulator strings
CN206211407U (en) The fixture of charged for replacement double bundle conductor strain list insulator string
CN105790158B (en) Special tools for live replacement of 35kV tension insulator strings
CN108847617A (en) The device and method of UHV transmission line live-line replacing strain wire jumper insulator chain
CN203582376U (en) Slidably mounting and lifting structure
CN201518397U (en) 220kV line conductor live replacement linear insulator string tool
CN205724648U (en) A kind of charged for replacement 35kV strain insulator string specific purpose tool
CN207542669U (en) It replaces tangent tower list and hangs the multipurpose instrument (tool) that the twin insulator period of the day from 11 p.m. to 1 a.m fixes three yoke plates
CN207926066U (en) A kind of simple replacement gold utensil string devices

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181026