CN108648099A CN201810846801.8A CN201810846801A CN108648099A CN 108648099 A CN108648099 A CN 108648099A CN 201810846801 A CN201810846801 A CN 201810846801A CN 108648099 A CN108648099 A CN 108648099A
Authority
CN
China
Prior art keywords
module
data
application server
aided design
design system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810846801.8A
Other languages
Chinese (zh)
Inventor
李晨
高海洋
陈文君
朱英杰
王梦蔚
陈丽
卫茹
李响
叶子
陈祥宏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Ningenergy Electric Power Design Co Ltd
Original Assignee
Nanjing Ningenergy Electric Power Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Ningenergy Electric Power Design Co Ltd filed Critical Nanjing Ningenergy Electric Power Design Co Ltd
Priority to CN201810846801.8A priority Critical patent/CN108648099A/en
Publication of CN108648099A publication Critical patent/CN108648099A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Geometry (AREA)
  • Economics (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Computational Mathematics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Water Supply & Treatment (AREA)
  • General Business, Economics & Management (AREA)
  • Public Health (AREA)
  • Marketing (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Human Resources & Organizations (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

A kind of intelligent aided design system of distribution planning, it is characterized in that, database server including application server, for providing from the processing data using data and the preservation application server to the application server and the client for accessing the application server, the application server is by data processing unit, image-drawing unit, achievement statistic unit.The intelligent aided design system of distribution planning of the present invention can specification plotting mode and requirement, can ensure data consistency, and the adjustment that can conveniently do over again, greatly improve distribution management working efficiency and quality.

Description

The intelligent aided design system of distribution planning
Technical field
The present invention relates to a kind of distribution network planning methods, and in particular to a kind of intelligent aided design system of distribution planning.
Background technology
With the quickening of urban development and pace of construction, the electricity consumptions such as urban life, business, industry, amusement are year by year Increase.In order to keep up with urban planning to power demand, various regions require higher and higher, the work of planning and designing to power planning Amount is also increasing.And the system chambers that main undertaking unit-major design institute of prefectures and cities is designed as distribution network planning are corresponding Workload and operating pressure are consequently increased.
During planning and designing, planning and designing personnel need to refine the basic information of different plot properties, various regions Block carry calculation and data statistics, intricate operation, it is computationally intensive, be susceptible to data and omit and artificial mistake of statistics, need anti- Review is looked into and adjustment of doing over again, the extensive work time in occupancy planning and designing, the manpower and materials of input also more come it is also more, while can It can cause planning and designing personnel that can not separate more times for studying rational grid structure, powering mode, supply path On.
In order to enable designing unit planning and designing personnel to free from cumbersome datamation, more times are spent It studies on rational grid structure and powering mode, now intends advising the extraction of distribution planning and designing data, data operation, path It draws, the several aspects of achievement statistics are analyzed, the quasi- a set of intelligent aided design system of distribution planning of research and development, reduction planning and designing people Member's workload, promotes data accuracy, improves working efficiency.
Invention content
To achieve the above object, the invention discloses a kind of distributions to plan intelligent aided design system, can ensure data Consistency, and the adjustment that can conveniently do over again, greatly improve distribution management working efficiency and quality.
To achieve the above object, the present invention is achieved through the following technical solutions:
A kind of intelligent aided design system of distribution planning, which is characterized in that including application server, be used for the application service Device provides the database server of the processing data using data and the preservation application server and for accessing described answer With the client of server, the application server is by data processing unit, image-drawing unit, achievement statistic unit, the data Processing module intelligently replaces mould by CAD diagram paper read module, markup information extraction module, plot load computing module, CAD diagram paper Block is constituted, and the image-drawing unit is by overloaded partition module, geographical wiring diagram module, electrical wiring module, nearly perspective long-term plan figure Module composition to switching station, path, pipeline on the transformed CAD diagram of drawing data converting unit for carrying out Fast Drawing;Institute It states achievement statistic unit and accumulation calculating and quickly is carried out by each basic data identical entry for being obtained to drawing data converting unit Summarize to generate every report.
Further, summarize including appearance statistical table, drawing in the report, costimating.
Further, the CAD diagram paper read module is used to extract required object information from CAD base maps;The mark Information extraction modules are for by each markup information in CAD base maps block number, land used code, land character, land area, appearance Product rate, construction area, building height etc. extract;Total load and planning of the plot load computing module for statistical rules area Region load density, is powered region division, CAD diagram paper intelligence replacement module uses former data to be used as base map, using being total to The mode for enjoying business object realizes that linkage refreshes.
Advantageous effect:According to the CAD diagram paper information of city plan, automatically extracting for various regions block number evidence is realized, reduce number According to collection and sum time;It realizes that each plot information on load calculates and quickly summarizes automatically according to basic data, removes artificial fortune Evaluation time improves data statistics efficiency;Realize switching station, path, pipeline Fast Drawing, specification plotting mode and requirement carry High quality of achievement;The quick output for realizing each drawing, report, document, provides into figure efficiency, and building materials timing statistics improve Achievement accuracy.
Description of the drawings
Fig. 1 is the structure chart that intelligent aided design system is planned in a kind of distribution;
Fig. 2 is that intelligent aided design system application server structure chart is planned in a kind of distribution.
Specific implementation mode
Below by embodiment and attached drawing, the invention will be further described.
A kind of intelligent aided design system of distribution planning, which is characterized in that including application server 1, for being answered to described The database server 2 of the processing data using data and the preservation application server is provided with server and for accessing The client 3 of the application server, the application server is by data processing unit, image-drawing unit, achievement statistic unit, institute Data processing module is stated by CAD diagram paper read module, markup information extraction module, plot load computing module, CAD diagram paper intelligence Replacement module is constituted, and the image-drawing unit is by overloaded partition module, geographical wiring diagram module, electrical wiring module, nearly distant view Planning chart module composition to switching station, path, pipeline on the transformed CAD diagram of drawing data converting unit for carrying out rapid drawing System;The achievement statistic unit by each basic data identical entry that drawing data converting unit is obtained carry out accumulation calculating and Quickly summarize to generate every report.Summarize including appearance statistical table, drawing in the report, costimating.The CAD diagram paper Read module is used to extract required object information from CAD base maps;The markup information extraction module is used for will be in CAD base maps The progress such as block number, land used code, land character, land area, plot ratio, construction area, building height of each markup information ground Extraction;Total load and planning region load density of the plot load computing module for statistical rules area, are powered region Division, CAD diagram paper intelligence replacement module use former data as base map, and linkage brush is realized by the way of shared service object Newly.
It is several key technology points in the system design process below:
(1)DWG plans drawing data identification and update:Based on business diagnosis, software needs the control detail drawing imported according to user, knows Do not go out ground block message, the base map as subsequent operation;By multiple copies base map function complete overloaded partition, geographical wiring diagram, The follow-up works such as electric hookup need the ground block message updated in all base maps that links when local block message changes;When Control detail drawing needs that user is supported to import refreshing accordingly block message again when changing.2, data identify:According to business rule It identifies the common CAD entities in drawing, is converted into corresponding business object.Such as identification drawing in all closures it is more Section line is converted to specific plot business object;The enhanced properties for reading block are converted to the service attribute in plot.Attribute and plot letter Whether be folder point by decision block the envelope frame of closed area in, put not in this area or plot area when pressing from both sides if ceasing correspondence Domain it is not fully closed when can not Auto-matching ground block message, need user's manual operation, matching.3, linkage refreshes:Linkage refreshes After referring to ground block message modification, the refreshing of associated drawing business datum.After the planning chart Auto-matching imported with user For data as base map, it is all first to copy the bottom to be inserted into plot load, geographical wiring diagram, geographical wiring diagram, electric hookup thereafter Corresponding operation (replicating plot information map function) is done after figure again.It to link when a plot information change and refresh other Ground block message (service attribute and markup information) in base map.By the way of shared service object, i.e., each plot only creates One business object, and plot entity and unique ID of the object are bound, business object has modified, according to unique ID lookups pair The entity answered is refreshed.4, data update:In view of user is controlled in detail drawing, to certain planning ground, block message carries out the adjustment of part, Other unadjusted plot still retain the result of design completed, only the update of local data, it is therefore desirable to compare Control detail drawing through importing and whether identical for newer control detail drawing.5, dynamic generation electric hookup:It is drawn according on interface Geographical wiring diagram, automatically generate the wiring diagram of substation and switchyard.Electric hookup is without the concern for transformer, switchyard Physical location, the connection relation between only showing.
The principle that detours as few as possible is required based on demand, when placing associated substation, is needed according under substation The contact quantity of switchyard is preferentially arranged, and placement order is right, left, upper and lower.
In view of associated substation is also possible to the relationship mutually got in touch with, if without preferentially placing, circuit meeting Have it is more detour or intersect, so often increasing substation need that position is also preferentially preferentially placed by its associated substation It sets.The sequence of placement is to be placed on the position not conflicted according to right, left, upper and lower sequence in orientation in addition to the substation, If conflicted, does and extend in the same orientation of the substation.After placing good position, the interconnection between switchyard Road is attached using the algorithm of collision detection equidistantly translated.
When there are a substations with other be more than 4 or more substation is relevant or a switchyard and 2 When the switchyard of a other above substations has communication relationship, the electric hookup of generation just has intersection, needs hand Dynamic adjustment.

Claims (3)

1. a kind of intelligent aided design system of distribution planning, which is characterized in that including application server, for being taken to the application Business device provides database server using data and the processing data for preserving the application server and for described in accessing The client of application server, the application server is by data processing unit, image-drawing unit, achievement statistic unit, the number It is intelligently replaced by CAD diagram paper read module, markup information extraction module, plot load computing module, CAD diagram paper according to processing unit Module composition;The image-drawing unit is mainly used on the transformed CAD diagram of drawing data converting unit to switching station, path, pipe Road carries out Fast Drawing, by overloaded partition module, geographical wiring diagram module, electrical wiring module, nearly perspective long-term plan module It constitutes;The achievement statistic unit carries out accumulation calculating by each basic data identical entry obtained to drawing data converting unit And quickly summarize to generate every report.
2. a kind of intelligent aided design system of distribution planning according to claim 1, which is characterized in that packet in the report Include appearance statistical table, drawing summarizes, costimating.
3. a kind of intelligent aided design system of distribution planning according to claim 1, which is characterized in that the CAD diagram paper Read module is used to extract required object information from CAD base maps;The markup information extraction module is used for will be in CAD base maps The progress such as block number, land used code, land character, land area, plot ratio, construction area, building height of each markup information ground Extraction;Total load and planning region load density of the plot load computing module for statistical rules area, are powered region It divides and determines that the geographical location of switchyard and substation, CAD diagram paper intelligence replacement module use former data the bottom of as in one's power for opening and closing Figure realizes that linkage refreshes by the way of shared service object.
CN201810846801.8A 2018-07-27 2018-07-27 The intelligent aided design system of distribution planning Pending CN108648099A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810846801.8A CN108648099A (en) 2018-07-27 2018-07-27 The intelligent aided design system of distribution planning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810846801.8A CN108648099A (en) 2018-07-27 2018-07-27 The intelligent aided design system of distribution planning

Publications (1)

Publication Number Publication Date
CN108648099A true CN108648099A (en) 2018-10-12

Family

ID=63760392

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810846801.8A Pending CN108648099A (en) 2018-07-27 2018-07-27 The intelligent aided design system of distribution planning

Country Status (1)

Country Link
CN (1) CN108648099A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110851504A (en) * 2019-11-20 2020-02-28 国网江苏省电力有限公司南通供电分公司 Power transmission and transformation planning data auxiliary statistical system
CN115098495A (en) * 2022-05-27 2022-09-23 广东顺德电力设计院有限公司 Power distribution network planning data method and equipment
CN117011543A (en) * 2023-10-08 2023-11-07 杭州筑峰科技有限公司 Drawing identification method based on section bar

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110851504A (en) * 2019-11-20 2020-02-28 国网江苏省电力有限公司南通供电分公司 Power transmission and transformation planning data auxiliary statistical system
CN115098495A (en) * 2022-05-27 2022-09-23 广东顺德电力设计院有限公司 Power distribution network planning data method and equipment
CN117011543A (en) * 2023-10-08 2023-11-07 杭州筑峰科技有限公司 Drawing identification method based on section bar
CN117011543B (en) * 2023-10-08 2024-01-12 杭州筑峰科技有限公司 Drawing identification method based on section bar

Similar Documents

Publication Publication Date Title
CN107092680B (en) Government affair information resource integration method based on geographic grids
Börner et al. Mapping the diffusion of scholarly knowledge among major US research institutions
CN100454317C (en) Electrified wire netting layout computer auxiliary decision-making support system
CN103970887B (en) A kind of information flow display system and method based on GIS power distribution network figures
Hülk et al. Allocation of annual electricity consumption and power generation capacities across multiple voltage levels in a high spatial resolution
CN112507499B (en) GIS-based power distribution network line loss data acquisition method and related device
Cheng et al. Urban land administration and planning in China: Opportunities and constraints of spatial data models
CN108648099A (en) The intelligent aided design system of distribution planning
CN103336894B (en) A kind of city plot ratio automatic Mesh Partition Method
Liu et al. Regional land-use allocation with a spatially explicit genetic algorithm
Breuer et al. Determination of alternative bidding areas based on a full nodal pricing approach
CN107909098A (en) A kind of city dweller's anchor point computational methods based on big data
CN106294484B (en) A kind of method and device updating electronic map data
CN107220758A (en) A kind of Electric Power Network Planning accessory system
CN114187420A (en) Real-time online city planning sand table simulation method
CN111861825A (en) Construction method and system of rail transit industry vocational training system model
Cader et al. Overcoming data scarcity for energy access planning with open data–the example of Tanzania
Bakalov et al. A network model for the utility domain
CN108345688A (en) A kind of digitlization translation of urban design and application process
CN114818632B (en) Method and device for compiling power limit sequence table for super-planning
CN106934538A (en) A kind of electric network data fusion method compared based on data blood relationship and gene
Yin et al. Research on network topology analysis method of distribution management based on gis
Ponjavic et al. Spatial data integration in heterogeneous information systems’ environment
Ajebon et al. Geographical analysis of smoking in Leeds: A GIS-based location-allocation technique for the optimal location of smoking cessation services
Najafi et al. Investigation and analysis of the urban development of premature cities in the spatial organization of Semnan province

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
CB02 Change of applicant information

Address after: No.16 Longfei Road, Yuhuatai District, Nanjing City, Jiangsu Province

Applicant after: Nanjing Electric Power Design and Research Institute Co.,Ltd.

Address before: 210009 14, 14 lung yin Plaza, Zhongshan North Road tower, Gulou District, Nanjing, Jiangsu.

Applicant before: NANJING NINGNENG POWER DESIGN Co.,Ltd.

CB02 Change of applicant information
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination