CN108643588A - Wallboard installation exercise frame and its installation method - Google Patents

Wallboard installation exercise frame and its installation method Download PDF

Info

Publication number
CN108643588A
CN108643588A CN201810517883.1A CN201810517883A CN108643588A CN 108643588 A CN108643588 A CN 108643588A CN 201810517883 A CN201810517883 A CN 201810517883A CN 108643588 A CN108643588 A CN 108643588A
Authority
CN
China
Prior art keywords
hook
frame body
frame
montant
bayonet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810517883.1A
Other languages
Chinese (zh)
Inventor
李明
刘金辉
张光严
王海
位英超
崔爱珍
张涛
党伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Eighth Engineering Division Co Ltd
Original Assignee
China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Eighth Engineering Division Co Ltd filed Critical China Construction Eighth Engineering Division Co Ltd
Priority to CN201810517883.1A priority Critical patent/CN108643588A/en
Publication of CN108643588A publication Critical patent/CN108643588A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Abstract

The present invention relates to a kind of wallboard installation exercise frame and its installation methods, including branch to be set to the frame body on the outside of building;And it is detachably mounted on the hook at the top of the frame body, the height that the hook is installed on the frame body is adjustable, and a bayonet for adapting to top of building purlin is formed on the hook, the bayonet makes the hook hook in the purlin to limit the frame body downward, by the bayonet.Beneficial effects of the present invention are:It is linked up with using being arranged at the top of frame body, is hooked on the purlin of top of building by linking up with, to provide fixed point for frame body so that the setting of frame body is more firm, promotes the safety of operation frame.

Description

Wallboard installation exercise frame and its installation method
Technical field
The present invention relates to technical field of building construction, a kind of wallboard installation exercise frame and its installation method are refered in particular to.
Background technology
Existing wallboard installation exercise frame only erects on the outside of building, without fixed point, climbs up the construction of operation frame Personnel fix difficulty, and security risk is larger.
Invention content
It is an object of the invention to overcome the deficiencies of existing technologies, a kind of wallboard installation exercise frame and its installation side are provided Method can solve the problems, such as that existing wallboard installation exercise frame security risk is larger.
Realizing the technical solution of above-mentioned purpose is:
The present invention provides a kind of wallboard installation exercise framves, including:
Branch is set to the frame body on the outside of building;And
The hook being detachably mounted at the top of the frame body, the height being installed on the frame body of linking up with is adjustable, And a bayonet for adapting to top of building purlin is formed on the hook, the bayonet makes institute downward, by the bayonet Hook is stated to hook in the purlin to limit the frame body.
The invention has the advantages that being linked up with using being arranged at the top of frame body, hooked in top of building by linking up with On purlin, to provide fixed point for frame body so that the setting of frame body is more firm, promotes the safety of operation frame.In addition, hanging Hook is detachable and height is adjustable, is had enough to meet the need convenient for operation frame and using on the different building of height.
Wallboard installation exercise frame of the present invention further improvement lies in that, at least two first bolts are offered on the hook Hole, correspondence offers multiple second bolts hole on the frame body, the hook is fixed on the frame body by bolt, and pass through The second bolt hole blending bolt connection that first bolt hole is aligned to different height is installed in the frame to adjust the hook Height on body.
Wallboard installation exercise frame of the present invention further improvement lies in that, it is described hook be E types hook, including a cross bar, It is fixedly arranged on the fixed link of described cross bar one end, the first montant of the cross bar other end is fixedly arranged on and is fixedly arranged in the cross bar Second montant in portion, the fixed link, the first montant and the second montant are vertically arranged, and the fixed link is fixed on the frame Body forms the bayonet between first montant and the second montant.
Wallboard installation exercise frame of the present invention further improvement lies in that, the frame body includes at least two branch being vertically arranged Dagger and the tie-beam between the two neighboring support column.
Wallboard installation exercise frame of the present invention further improvement lies in that, the quantity of the support column is three, is placed in positive three Angular apex.
Wallboard installation exercise frame of the present invention further improvement lies in that, the bottom end of each support column is equipped with a support Plate.
Wallboard installation exercise frame of the present invention further improvement lies in that, the frame body further include it is oblique be set to two neighboring company Connect the reinforcing bar between beam.
The present invention also provides a kind of installation methods of wallboard installation exercise frame, including:Frame is made according to depth of building Body and hook so that a bayonet for adapting to top of building purlin is formed on the hook, and the bayonet is downward;
The hook is installed in the suitable position in top of the frame body according to the height of the purlin;
By frame body branch set on the outside of building, and by the bayonet hook hooked in the purlin thus Limit the frame body.
The installation method of wallboard installation exercise frame of the present invention further improvement lies in that, by it is described hook be installed in the frame The top of body includes:
At least two first bolts hole are opened up on the hook;
Correspondence opens up multiple second bolts hole on the frame body, and the hook is fixed on the frame body by bolt, And the second bolt hole blending bolt connection by the way that the first bolt hole to be aligned to different height is installed in adjust the hook Height on the frame body.
The installation method of wallboard installation exercise frame of the present invention further improvement lies in that, it is described hook be E types hook, system Making hook includes:
Cross bar, fixed link, the first montant and the second montant are provided, the fixed link is fixed on to one end of the cross bar, First montant is fixed on to the other end of the cross bar, and second montant is fixed on to the middle part of the cross bar, institute It states and forms the bayonet between the first montant and the second montant, to which the hook be made.
The installation method of wallboard installation exercise frame of the present invention further improvement lies in that, make frame body include:
At least two support columns and multiple tie-beams are provided, and by the tie-beam be set to the two neighboring support column it Between, to which the frame body be made.
The installation method of wallboard installation exercise frame of the present invention further improvement lies in that, the quantity of the support column is three A, making frame body further includes:
The support column is placed in the apex of equilateral triangle.
Description of the drawings
Fig. 1 is the side view of wallboard installation exercise frame of the present invention.
Fig. 2 is the front view of wallboard installation exercise frame of the present invention.
Fig. 3 is the vertical view of wallboard installation exercise frame of the present invention.
Fig. 4 is the structural schematic diagram linked up in wallboard installation exercise frame of the present invention.
Fig. 5 is that wallboard installation exercise hanger of the present invention is hooked in the schematic diagram of purlin.
Reference sign:
10- frame bodies;11- support columns;The second bolts hole of 111-;12- tie-beams;13- support plates;14- reinforcing bars;20- is hung Hook;21- cross bars;22- fixed links;The first bolts hole of 221-;The first montants of 23-;The second montants of 24-;25- bayonets.
Specific implementation mode
The invention will be further described in the following with reference to the drawings and specific embodiments.
Refering to fig. 1, it the present invention provides a kind of wallboard installation exercise frame, is hooked in top of building purlin by linking up with, from And fixed point is provided to operation frame, increase the safety of operation frame, solves the problems, such as that existing operation frame security risk is larger. Wallboard installation exercise frame of the present invention is illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 5, wallboard installation exercise frame of the present invention includes:Branch is set to the frame body 10 on the outside of building and can Releasably it is installed in the hook 20 at 10 top of frame body, wherein the height that hook 20 is installed on frame body 10 is adjustable, and links up on 20 Be formed with a bayonet 25 for adapting to top of building purlin, bayonet 25 downward, by bayonet 25 make hook hook in purlin to Limit frame body 10.
In conjunction with Fig. 1 to Fig. 3, frame body 10 including frame body include at least two support columns 11 being vertically arranged and be set to adjacent two Tie-beam 12 between a support column 11, tie-beam 12 are spaced setting on the extending direction of support column 11.It is preferably real one It applies in example, the quantity of support column 11 is three, and is placed in the apex of equilateral triangle, makes frame body using stable triangular structure 10 is more firm.Preferably, support column 11 selects the rectangular steel pipe of 40mm*20mm*1.2mm, and length is according to the height of building It spends to set;Tie-beam 12 selects the rectangular steel pipe of 20mm*10mm*1.2mm, the length of 100cm, and upper and lower two tie-beams 12, at a distance of 50cm, are located at the tie-beam 12 at top and the top of supporting rod 11 at a distance of 20cm.
Frame body 10 further includes the support plate 13 set on 11 bottom end of support column, and 11 bottom end of each support column is equipped with a support plate 13, increase the contact area of frame body 10 and ground by support plate 13, keeps frame body 10 more firm.Preferably, support plate 13 is selected With the steel plate of 100mm*100mm*4mm.
Frame body 10 further includes the oblique reinforcing bar 14 between neighbouring two tie-beams 12, is increased by reinforcing bar 14 The stability of strong frame body 10.Preferably, reinforcing bar 14 is set between two rows of tie-beams 12 of bottommost, to increase frame body The stability of 10 bottoms achievees the purpose that keep frame body 10 more firm using material as few as possible.
In conjunction with Fig. 3 to Fig. 5, hook 20 is provided close to the top of the support column 11 of construction surface, in the present embodiment, close to apply There are two the support columns 11 in work face, and the quantity for linking up with 20 is also two and is corresponded with support column 11.Hook 20 is the extension of E types Hook, including a cross bar 21, be fixedly arranged on 21 one end of cross bar fixed link 22, be fixedly arranged on the first montant 23 of the cross bar other end and solid The second montant 24 in the middle part of cross bar.Wherein, fixed link 22, the first montant 23 and the second montant 24 is vertically arranged and cross bar 21 bottom surface forms bayonet 25 between the first montant 23 and the second montant 24, which adapts to the purlin of top of building, For making hook 20 hook the purlin in top of building to limit operation frame, prevent operation frame from being applied too close to or far from wallboard Work face constructs convenient for staff, and prevents operation frame incidence fall, lifting construction safety.Preferably, cross bar 21, first Montant 23 and the second montant 24 select the round steel pipe of diameter 18mm, the first montant 23 and 24 length of the second montant to be 300mm。
The length of fixed link 22 is more than the length of the first montant 23 and the second montant 24, and at least two are offered in fixed link 22 A first bolt hole 221 is fixed on frame body for that will link up with 20.Preferably, fixed link 22 includes being fixed on the upper boom of cross bar 21 Body and the lower body of rod for being arranged and being fixed on upper body of rod, the upper body of rod is identical as cross bar 21, the first montant 23 and the second montant 24, For the round steel pipe of diameter 18mm, lower body of rod selects rectangular steel pipe identical with supporting rod, length 300mm, and upper body of rod under The long 100mm in part of body of rod overlapping.Since lower body of rod is to open up the part of the first bolt hole 221, made by the setting of lower body of rod Obtaining fixed link 22 can be bonded with the surface of support column 11, enhance the bonding strength of the two.
The first bolt hole 221, which is corresponded to, close to the top of the support column 11 of construction surface offers multiple second bolts hole 111, the Spacing between two bolts hole 111 is identical as the spacing between the first bolt hole 221, is fixed on support by linking up with 20 by bolt Column 11, and 111 blending bolt of the second bolt hole by the way that the first bolt hole 221 to be aligned to different height connects, and is hung to adjust Hook 20 is installed in the height on frame body 10.Preferably, the first bolt hole 221 and the second bolt hole 111 are the spiral shell of diameter 20mm Keyhole, bolt select M16 high-strength bolts.
As shown in figure 5, when using wallboard installation exercise frame of the present invention, hook 20 is hooked by bayonet 25 in top of building Purlin, staff climbs to wallboard construction surface from the inside of frame body 10 and carries out construction operation.
The installation method of wallboard installation exercise frame of the present invention is illustrated below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 5, a kind of installation method of wallboard installation exercise frame, includes the following steps:
Frame body 10 and hook 20 are made according to depth of building.
Specifically, as shown in Figure 1 to Figure 3, making frame body 10 includes:
At least two support columns 11 and multiple tie-beams 12 are provided, by tie-beam 12 be set to two neighboring support column 11 it Between, and tie-beam 12 is spaced to setting on the extending direction of support column 11.In a preferable embodiment, support column 11 Quantity is three, and support column 11 is placed in the apex of equilateral triangle, keeps frame body 10 more steady using stable triangular structure Gu.And open up multiple the second bolts hole for installing hook 20 at the top of two support columns 11 close to wallboard construction surface 111。
Preferably, also providing support plate 13, the quantity of support plate 13 is consistent with the quantity of support column 11, and support plate 13 is consolidated It is scheduled on the bottom end of corresponding support column 11, to increase the contact area of frame body and ground.
Preferably, reinforcing bar 14 is also provided, reinforcing bar 14 is oblique between neighbouring two tie-beams 12, to Enhance the stability of frame body.
As shown in Figure 4 and Figure 5, hook 20 is the hook of E types, makes hook 20 and includes:
Cross bar 21, fixed link 22, the first montant 23 and the second montant 24 are provided, fixed link 22 is fixed on 21 one end of cross bar Bottom surface, the first montant 23 is fixed on to the bottom surface of 21 other end of cross bar, and the second montant 24 is fixed on 21 middle part of cross bar Bottom surface so that bayonet 25 is formed between the first montant 23 and the second montant 24, which downward and adapts to top of building Purlin.And at least two first bolts hole 221 are opened up in fixed link 22, and make spacing between the first bolt hole 221 and the Spacing between two bolts hole 111 is identical.
At this point, the frame body 10 made is horizontal positioned, according to the height of the purlin of top of building, hook 20 is installed in The first bolt hole 221 on hook 20 is specifically directed at suitable second bolt hole 111 by the 10 suitable position in top of frame body Blending bolt connects.When adjusting hook 20 being needed to be installed in the height on frame body, by the way that the first bolt hole 221 is directed at different height 111 blending bolt of the second bolt hole connection of degree.
After installing hook 20, frame body 10 is erected, stands on the outside of building, and will by the bayonet of hook 25 Hook 20 is hooked in the purlin of top of building, to limit frame body 10.
Wallboard installation exercise frame and its installation method of the present invention have the beneficial effect that:
It is linked up with using being arranged at the top of frame body, is hooked on the purlin of top of building by linking up with, to be carried for frame body For fixed point so that the setting of frame body is more firm, promotes the safety of operation frame.In addition, hook is detachable and height is adjustable, It is had enough to meet the need convenient for operation frame and using on the different building of height.
The present invention has been described in detail with reference to the accompanying drawings, those skilled in the art can be according to upper It states and bright many variations example is made to the present invention.Thus, certain details in embodiment should not constitute limitation of the invention, this Invention will be using the range that the appended claims define as protection scope of the present invention.

Claims (10)

1. a kind of wallboard installation exercise frame, which is characterized in that including:
Branch is set to the frame body on the outside of building;And
The hook being detachably mounted at the top of the frame body, the height being installed on the frame body of linking up with is adjustable, and institute It states and is formed with a bayonet for adapting to top of building purlin on hook, the bayonet makes the extension downward, by the bayonet Hook is hooked in the purlin to limit the frame body.
2. wallboard installation exercise frame as described in claim 1, which is characterized in that offer at least two first on the hook Bolt hole, correspondence offers multiple second bolts hole on the frame body, and the hook is fixed on the frame body by bolt, and The second bolt hole blending bolt connection by the way that the first bolt hole to be aligned to different height is installed in institute to adjust the hook State the height on frame body.
3. wallboard installation exercise frame as described in claim 1, which is characterized in that the hook is the hook of E types, including a cross Bar, the fixed link for being fixedly arranged on described cross bar one end, the first montant for being fixedly arranged on the cross bar other end and it is fixedly arranged on the cross The second montant in the middle part of bar, the fixed link, the first montant and the second montant are vertically arranged, and the fixed link is fixed on described Frame body forms the bayonet between first montant and the second montant.
4. the wallboard installation exercise frame as described in claim 1 or 3, which is characterized in that the frame body includes at least two vertical The support column of setting and the tie-beam between the two neighboring support column.
5. wallboard installation exercise frame as claimed in claim 4, which is characterized in that the quantity of the support column is three, is placed in The apex of equilateral triangle.
6. a kind of installation method of wallboard installation exercise frame, which is characterized in that including:
Frame body and hook are made according to depth of building so that are formed with one on the hook and are adapted to top of building purlin Bayonet, and the bayonet is downward;
The hook is installed in the suitable position in top of the frame body according to the height of the purlin;
By frame body branch set on the outside of building, and the hook is hooked in the purlin to limit by the bayonet The frame body.
7. the installation method of wallboard installation exercise frame as claimed in claim 6, which is characterized in that the hook is installed in institute The top for stating frame body includes:
At least two first bolts hole are opened up on the hook;
Correspondence opens up multiple second bolts hole on the frame body, the hook is fixed on the frame body by bolt, and logical Cross the first bolt hole is aligned different height the second bolt hole blending bolt connect to adjust the hook be installed in it is described Height on frame body.
8. the installation method of wallboard installation exercise frame as claimed in claim 6, which is characterized in that the hook is the extension of E types Hook, making hook includes:
Cross bar, fixed link, the first montant and the second montant are provided, the fixed link is fixed on to one end of the cross bar, by institute The other end that the first montant is fixed on the cross bar is stated, and second montant is fixed on to the middle part of the cross bar, described The bayonet is formed between one montant and the second montant, to which the hook be made.
9. the installation method of wallboard installation exercise frame as claimed in claim 6, which is characterized in that making frame body includes:
At least two support columns and multiple tie-beams are provided, and by the tie-beam between the two neighboring support column, To which the frame body be made.
10. the installation method of wallboard installation exercise frame as claimed in claim 9, which is characterized in that the quantity of the support column It it is three, making frame body further includes:
The support column is placed in the apex of equilateral triangle.
CN201810517883.1A 2018-05-25 2018-05-25 Wallboard installation exercise frame and its installation method Pending CN108643588A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810517883.1A CN108643588A (en) 2018-05-25 2018-05-25 Wallboard installation exercise frame and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810517883.1A CN108643588A (en) 2018-05-25 2018-05-25 Wallboard installation exercise frame and its installation method

Publications (1)

Publication Number Publication Date
CN108643588A true CN108643588A (en) 2018-10-12

Family

ID=63758253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810517883.1A Pending CN108643588A (en) 2018-05-25 2018-05-25 Wallboard installation exercise frame and its installation method

Country Status (1)

Country Link
CN (1) CN108643588A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202430978U (en) * 2011-11-22 2012-09-12 广东省第四建筑工程公司 Removable scaffold
CN203878958U (en) * 2014-04-15 2014-10-15 中国建筑第八工程局有限公司 Hanging basket
CN204826589U (en) * 2015-06-03 2015-12-02 中国建筑第八工程局有限公司 Folding suspension type operation platform
CN105715057A (en) * 2016-02-17 2016-06-29 浙江远大钢构实业有限公司 Triangular frame for hoisting color plate
CN105986664A (en) * 2016-07-20 2016-10-05 中国建筑局(集团)有限公司 Hanging basket and roof reverse-hanging plate work platform including same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202430978U (en) * 2011-11-22 2012-09-12 广东省第四建筑工程公司 Removable scaffold
CN203878958U (en) * 2014-04-15 2014-10-15 中国建筑第八工程局有限公司 Hanging basket
CN204826589U (en) * 2015-06-03 2015-12-02 中国建筑第八工程局有限公司 Folding suspension type operation platform
CN105715057A (en) * 2016-02-17 2016-06-29 浙江远大钢构实业有限公司 Triangular frame for hoisting color plate
CN105986664A (en) * 2016-07-20 2016-10-05 中国建筑局(集团)有限公司 Hanging basket and roof reverse-hanging plate work platform including same

Similar Documents

Publication Publication Date Title
CN201581623U (en) Novel bowl-type steel tube scaffold
WO2020098394A1 (en) Gob-side entry confined concrete supporting construction device and mechanized construction method
CN107761570A (en) It is a kind of to be accurately positioned suspension bracket for longspan steel truss girder
CN211341686U (en) Hanging basket support system
CN206319609U (en) A kind of adjustable molding bed for making steel reinforcement cage
CN211173007U (en) Novel tripod of encorbelmenting
CN106558855A (en) Drive cable saddle rack in top
CN108643588A (en) Wallboard installation exercise frame and its installation method
CN206844431U (en) A kind of curtain wall construction support
CN101723240B (en) Special fixture for hoisting rectangular section steel column and hoisting method by using same
CN207878284U (en) Bailey beam cable saddle hoisting bracket
CN109132839B (en) The boom hoisting of building block unit
CN207294093U (en) A kind of large span steel truss integral lifting apparatus
CN110778009A (en) Suspended ceiling structure
CN208668903U (en) A kind of fabricated scaffold
CN206233600U (en) Overlength super large beams of concrete installs the apparatus capable of fluctuating of reinforcing bar
CN106704333B (en) Bolt mounting structure and the top drive cable saddle rack for using the bolt mounting structure
CN215802687U (en) Auxiliary tool for placing lower ribs and waist ribs of beam
CN208440242U (en) A kind of hanger platform of T beam maintenance and reinforcement
CN213268686U (en) Indoor single-upright-rod double-sided dry hanging structure
CN211286560U (en) Spherical node suspension adjustable operation platform
CN212002164U (en) A operation platform that is used for unilateral to hang template construction certainly
CN212027058U (en) Building movable hanging flower basket
CN107060230A (en) A kind of oblique outer reverse erecting device of eaves panel of large cantilever and preparation method
CN211945907U (en) Stable slag pot hoist of handling

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181012

RJ01 Rejection of invention patent application after publication