CN108625398A - 一种城市综合管廊顶板叠合施工方法 - Google Patents
一种城市综合管廊顶板叠合施工方法 Download PDFInfo
- Publication number
- CN108625398A CN108625398A CN201810834070.5A CN201810834070A CN108625398A CN 108625398 A CN108625398 A CN 108625398A CN 201810834070 A CN201810834070 A CN 201810834070A CN 108625398 A CN108625398 A CN 108625398A
- Authority
- CN
- China
- Prior art keywords
- top plate
- channel
- construction
- piping lane
- truss
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/10—Tunnels or galleries specially adapted to house conduits, e.g. oil pipe-lines, sewer pipes ; Making conduits in situ, e.g. of concrete ; Casings, i.e. manhole shafts, access or inspection chambers or coverings of boreholes or narrow wells
Abstract
本发明涉及一种城市综合管廊顶板叠合施工方法,首先设置综合管廊顶板,该顶板为预制件,在工厂进行设置,采用桁架结构处理,桁架的底部设置预埋挂钩件,预埋挂挂钩件的底部预制混凝土,顶板为上部采用桁架并且底部采用混凝土结构制成预制件结构;安装结构简单,施工快速高效,不需要再使用脚手架就可以实现整个管廊的封闭施工作业,大大提高了工作和运行的效率,省去了脚手架铺设顶板的繁琐步骤,施工进度快,方法简答高效,可以持续高效的进行长距离施工作业,省力省时,并且能够保证施工高质量的进行。
Description
技术领域
本发明涉及一种城市综合管廊顶板叠合施工方法。
背景技术
综合管廊就是地下城市管道综合走廊。即在城市地下建造一个隧道空间,将电力、通信,燃气、供热、给排水等各种工程管线集于一体,设有专门的检修口、吊装口和监测系统,实施统一规划、统一设计、统一建设和管理,是保障城市运行的重要基础设施和生命线。
传统的城市综合管廊铺设需要按部就班的实施,首先开设地下通道,然后再地下通道上设置侧面防护措施,一般采用混凝土结构设置纵向承重,最后在顶面利用脚手架铺设顶板,这种方式施工进度较慢,方法笨重,严重影响工期的进行,一次只能设置小范围和短距离机构的设置,费力费时,工作和运行效率低,并且方法实施起来操作难度大,利用脚手架安装顶板很难掌控后期质量,弊端较多。
因此,生产一种结构简单,操作方便,连接稳定,运行效率高,承载力大,安装方便,性能稳定,施工快速高效,节省工期,方法简单的城市综合管廊顶板叠合施工方法,具有广泛的市场前景。
发明内容
本发明提供一种结构简单,操作方便,连接稳定,运行效率高,承载力大,安装方便,性能稳定,施工快速高效,节省工期,方法简单的城市综合管廊顶板叠合施工方法,用于克服现有技术中的诸多缺陷。
本发明的技术方案是这样实现的:一种城市综合管廊顶板叠合施工方法,其方法包括如下步骤:
1)首先设置综合管廊顶板,该顶板为预制件,在工厂进行设置,采用桁架结构处理,桁架的底部设置预埋挂钩件,预埋挂挂钩件的底部预制混凝土,顶板为上部采用桁架并且底部采用混凝土结构制成预制件结构;
2)在施工现场实施城市综合管廊通道处理,根据施工需求和进度要求,一次开设固定长度的通道,一段通道开设完毕后,通道开设施工作业人员可继续开设下一段通道,已经开设好的通道进行加固和顶板铺设作业;
3)在上述步骤2)中,开设好的通道进行顶板铺设作业,首先在通道的两侧设置混凝土承重墙体,在墙体构建完成后,将步骤1)中设置好的顶板直接安放在承重墙体上,保证桁架顶板底部与承重墙体的顶部连接接触;
4)如上述步骤2)中所述,通道开设施工作业人员在顶板铺设人员铺设顶板的同时已经开设好下一段通道,顶板铺设人员直接顺延至下一段的通道中持续进行顶板铺设作业,依次循环作业,直至整个城市综合管廊施工作业的完成。
本发明具有如下的积极效果:本发明结构简单,操作方便,改变了传统的城市综合管廊铺设需要按部就班实施的现状和缺陷,在开设地下通道的同时,采取分段处理循环作业的方式,通道开设作业和顶板铺设作业分开实施,在开设第一通道后,通道开设人员可持续进行通道开设作业,顶板铺设人员循环作业,持续向下一个开设好的通道中进行顶板铺设作业,顶板为上部采用桁架并且底部采用混凝土结构制成预制件结构,安装结构简单,施工快速高效,不需要再使用脚手架就可以实现整个管廊的封闭施工作业,大大提高了工作和运行的效率,省去了脚手架铺设顶板的繁琐步骤,施工进度快,方法简答高效,可以持续高效的进行长距离施工作业,省力省时,并且能够保证施工高质量的进行。
具体实施方式
一种城市综合管廊顶板叠合施工方法,其方法包括如下步骤:
1)首先设置综合管廊顶板,该顶板为预制件,在工厂进行设置,采用桁架结构处理,桁架的底部设置预埋挂钩件,预埋挂挂钩件的底部预制混凝土,顶板为上部采用桁架并且底部采用混凝土结构制成预制件结构;
2)在施工现场实施城市综合管廊通道处理,根据施工需求和进度要求,一次开设固定长度的通道,一段通道开设完毕后,通道开设施工作业人员可继续开设下一段通道,已经开设好的通道进行加固和顶板铺设作业;
3)在上述步骤2)中,开设好的通道进行顶板铺设作业,首先在通道的两侧设置混凝土承重墙体,在墙体构建完成后,将步骤1)中设置好的顶板直接安放在承重墙体上,保证桁架顶板底部与承重墙体的顶部连接接触;
4)如上述步骤2)中所述,通道开设施工作业人员在顶板铺设人员铺设顶板的同时已经开设好下一段通道,顶板铺设人员直接顺延至下一段的通道中持续进行顶板铺设作业,依次循环作业,直至整个城市综合管廊施工作业的完成。
本发明具有如下的积极效果:本发明结构简单,操作方便,改变了传统的城市综合管廊铺设需要按部就班实施的现状和缺陷,在开设地下通道的同时,采取分段处理循环作业的方式,通道开设作业和顶板铺设作业分开实施,在开设第一通道后,通道开设人员可持续进行通道开设作业,顶板铺设人员循环作业,持续向下一个开设好的通道中进行顶板铺设作业,顶板为上部采用桁架并且底部采用混凝土结构制成预制件结构,安装结构简单,施工快速高效,不需要再使用脚手架就可以实现整个管廊的封闭施工作业,大大提高了工作和运行的效率,省去了脚手架铺设顶板的繁琐步骤,施工进度快,方法简答高效,可以持续高效的进行长距离施工作业,省力省时,并且能够保证施工高质量的进行。
Claims (1)
1.一种城市综合管廊顶板叠合施工方法,其特征在于,其方法包括如下步骤:
1)首先设置综合管廊顶板,该顶板为预制件,在工厂进行设置,采用桁架结构处理,桁架的底部设置预埋挂钩件,预埋挂挂钩件的底部预制混凝土,顶板为上部采用桁架并且底部采用混凝土结构制成预制件结构;
2)在施工现场实施城市综合管廊通道处理,根据施工需求和进度要求,一次开设固定长度的通道,一段通道开设完毕后,通道开设施工作业人员可继续开设下一段通道,已经开设好的通道进行加固和顶板铺设作业;
3)在上述步骤2)中,开设好的通道进行顶板铺设作业,首先在通道的两侧设置混凝土承重墙体,在墙体构建完成后,将步骤1)中设置好的顶板直接安放在承重墙体上,保证桁架顶板底部与承重墙体的顶部连接接触;
4)如上述步骤2)中所述,通道开设施工作业人员在顶板铺设人员铺设顶板的同时已经开设好下一段通道,顶板铺设人员直接顺延至下一段的通道中持续进行顶板铺设作业,依次循环作业,直至整个城市综合管廊施工作业的完成。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810834070.5A CN108625398A (zh) | 2018-07-26 | 2018-07-26 | 一种城市综合管廊顶板叠合施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810834070.5A CN108625398A (zh) | 2018-07-26 | 2018-07-26 | 一种城市综合管廊顶板叠合施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108625398A true CN108625398A (zh) | 2018-10-09 |
Family
ID=63689184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810834070.5A Pending CN108625398A (zh) | 2018-07-26 | 2018-07-26 | 一种城市综合管廊顶板叠合施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108625398A (zh) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205530344U (zh) * | 2016-03-30 | 2016-08-31 | 阜阳金谷快宜居住工科技有限公司 | 一种分体式无模浇筑地下综合管廊 |
CN106836280A (zh) * | 2017-02-08 | 2017-06-13 | 大连三川建筑科技有限公司 | 一种装配整体式综合管廊、排水沟渠或洪沟渠 |
KR101772941B1 (ko) * | 2016-08-18 | 2017-09-12 | 전종환 | 합성 pc 벽체를 이용한 프리캐스트 구조물 및 이의 시공 방법 |
CN107268675A (zh) * | 2016-04-07 | 2017-10-20 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种组合式多仓地下综合管廊的铺设方法及结构 |
-
2018
- 2018-07-26 CN CN201810834070.5A patent/CN108625398A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN205530344U (zh) * | 2016-03-30 | 2016-08-31 | 阜阳金谷快宜居住工科技有限公司 | 一种分体式无模浇筑地下综合管廊 |
CN107268675A (zh) * | 2016-04-07 | 2017-10-20 | 中国电建集团贵阳勘测设计研究院有限公司 | 一种组合式多仓地下综合管廊的铺设方法及结构 |
KR101772941B1 (ko) * | 2016-08-18 | 2017-09-12 | 전종환 | 합성 pc 벽체를 이용한 프리캐스트 구조물 및 이의 시공 방법 |
CN106836280A (zh) * | 2017-02-08 | 2017-06-13 | 大连三川建筑科技有限公司 | 一种装配整体式综合管廊、排水沟渠或洪沟渠 |
Non-Patent Citations (1)
Title |
---|
张波等: "《装配式混凝土结构工程》", 30 September 2016, 北京理工大学出版社 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10808396B2 (en) | Building based on large-space structure and freestanding external envelope as well as construction method | |
CN101864842B (zh) | 一种核电厂工程的施工方法 | |
CN108677922B (zh) | 一种钢筋笼制作及安装方法 | |
CN104131704A (zh) | 一种钢管柱混凝土的侧浇方法及所用的钢管柱结构 | |
CN105863317A (zh) | 一种基于快速构建技术的节能环保型配电室 | |
CN105544605A (zh) | 模块化装配式综合管廊 | |
CN105350581A (zh) | 一种地下室顶板沉降后浇带提前封闭构造 | |
CN112431416A (zh) | 一种有效缩短工期的厂房建造方法及采用该法建造的厂房 | |
CN208415305U (zh) | 一种预制拼装整体式综合管廊及组件与单元 | |
CN104975614A (zh) | 型钢组合式单侧支模加固施工工法 | |
CN108625398A (zh) | 一种城市综合管廊顶板叠合施工方法 | |
CN205901241U (zh) | 一种电缆沟预制模块 | |
CN202865996U (zh) | 一种核电厂房间模块结构 | |
CN103276840B (zh) | 核电厂复合楼板模块及其施工方法 | |
CN108625399A (zh) | 一种城市综合管廊顶板钢筋桁架施工方法 | |
CN203834809U (zh) | 一种用于钢管柱混凝土侧浇方法的钢管柱结构 | |
CN110984224A (zh) | 一种地铁车站的预制轨顶风道及其吊运安装方法 | |
CN215978040U (zh) | 预制装饰保温结构一体化墙板单元及其连接结构 | |
CN102733614A (zh) | 一种核电厂房间模块的施工方法 | |
CN108755757A (zh) | 基于预制装配叠合式地下综合管廊的快速混合施工方法 | |
CN105421780B (zh) | 一种装配式混凝土结构的施工方法 | |
CN213572042U (zh) | 一种半预制带暗柱双面叠合式综合管廊侧墙的定位装置 | |
CN208857841U (zh) | 一种用于管廊的拼接式管廊底板 | |
CN105735547B (zh) | 一种墙体砌块及基于该墙体砌块的墙体装配式施工方法 | |
CN204491661U (zh) | 上拱形预应力结构拼装式地下管廊 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181009 |