CN108590005A - 一种装配整体式暗梁空心双向楼盖及装配方法 - Google Patents
一种装配整体式暗梁空心双向楼盖及装配方法 Download PDFInfo
- Publication number
- CN108590005A CN108590005A CN201810362012.7A CN201810362012A CN108590005A CN 108590005 A CN108590005 A CN 108590005A CN 201810362012 A CN201810362012 A CN 201810362012A CN 108590005 A CN108590005 A CN 108590005A
- Authority
- CN
- China
- Prior art keywords
- prefabricated
- prefabricated board
- hollow
- cast
- way
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/04—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement
- E04B5/043—Load-carrying floor structures formed substantially of prefabricated units with beams or slabs of concrete or other stone-like material, e.g. asbestos cement having elongated hollow cores
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/10—Load-carrying floor structures formed substantially of prefabricated units with metal beams or girders, e.g. with steel lattice girders
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/02—Load-carrying floor structures formed substantially of prefabricated units
- E04B5/023—Separate connecting devices for prefabricated floor-slabs
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/18—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly cast between filling members
- E04B5/19—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly cast between filling members the filling members acting as self-supporting permanent forms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
- E04B5/26—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with filling members between the beams
- E04B5/261—Monolithic filling members
- E04B5/265—Monolithic filling members with one or more hollow cores
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
- E04B5/23—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated
- E04B5/26—Floor structures partly formed in situ with stiffening ribs or other beam-like formations wholly or partly prefabricated with filling members between the beams
- E04B5/266—Filling members covering the undersurface of the beams
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
- Bridges Or Land Bridges (AREA)
- Joining Of Building Structures In Genera (AREA)
Abstract
本发明一种装配整体式暗梁空心双向楼盖及装配方法,楼盖实现双向力学性能接近,楼板与周边构件可靠连接,消除板缝开裂隐患,提升装配效率。所述的楼盖包括预制板、蜂窝钢梁和现浇混凝土;预制板一侧表面呈一体设置有若干矩阵排列的箱体,另一侧表面四周设置有连接凹槽;连接凹槽内设置有贯穿预制板的预留螺栓孔;蜂窝钢梁用于楼盖钢结构的主梁和次梁;预制板无箱体表面搭接固定在次梁之间或主梁与次梁之间,相邻的预制板之间由穿过预留螺栓孔的U型抱箍连接固定形成拼缝;现浇混凝土包括在箱体之上浇注成型的面层,在相邻预制板的箱体之间,以及箱体与主梁或次梁之间浇注成型的现浇混凝土肋,面层和现浇混凝土肋呈一体结构。
Description
技术领域
本发明涉及土木建筑工程和装配结构,具体为一种装配整体式暗梁空心双向楼盖及装配方法。
背景技术
钢结构楼盖多为梁板式,占据一定层高,造成材料浪费;且钢梁裸露面积较大,增加防火防腐成本。楼承板底板为压型钢板,底面凹凸不平,需要再做吊顶,增加工序和成本。
现有装配式空心楼盖多用于混凝土框架中,钢结构中使用很少,主要问题是预制板与钢梁连接问题、预制板板缝连接问题。钢结构中预制板若仅搁置在钢梁翼缘,地震时容易脱落,不安全;若将预制板埋件焊接与钢梁,现场焊接量太大,施工效率低且质量不可靠;预制板尺寸不得过于宽大,否则运输、吊装难度较大,容易开裂;预制板之间的拼缝极易开裂,处理不当漏水掉灰,会严重影响使用。预制板一般为单向板,两个方向受力性能差别很大,不能充分发挥分布钢筋抗拉能力,造成材料浪费。
发明内容
针对现有技术中存在的问题,本发明提供一种装配整体式暗梁空心双向楼盖及装配方法,楼盖实现双向力学性能接近,楼板与周边构件可靠连接,消除板缝开裂隐患,提升装配效率。
本发明是通过以下技术方案来实现:
一种装配整体式暗梁空心双向楼盖,包括预制板、蜂窝钢梁和现浇混凝土;
所述的预制板一侧表面呈一体设置有若干矩阵排列的箱体,另一侧表面四周设置有连接凹槽;连接凹槽内设置有贯穿预制板的预留螺栓孔;
所述的蜂窝钢梁用于楼盖钢结构的主梁和次梁;
所述预制板无箱体表面搭接固定在次梁之间或主梁与次梁之间,相邻的预制板之间由穿过预留螺栓孔的U型抱箍连接固定形成拼缝;
所述现浇混凝土包括在箱体之上浇注成型的面层,在相邻预制板的箱体之间,以及箱体与主梁或次梁之间浇注成型的现浇混凝土肋,面层和现浇混凝土肋呈一体结构。
优选的,呈矩阵排列的箱体由凸起的板肋合围分隔形成。
进一步,预制板边缘厚度小于板肋高度,板肋靠近预制板边缘的一侧采用斜坡自然过渡。
优选的,还包括穿过蜂窝钢梁蜂窝孔洞,或者固定在蜂窝钢梁的上翼缘上的负弯矩区钢筋。
优选的,所述预制板无箱体表面搭接在次梁之间或主梁与次梁之间时,通过螺栓固定。
进一步,与预制板连接的主梁或次梁的蜂窝腹板上分别设置有与下翼缘平行的加劲板,预制板插接在下翼缘和加劲板之间且由螺栓贯穿连接固定。
优选的,U型抱箍由下向上穿过预留螺栓孔,与连板和螺母配合将相邻的预制板连接固定形成拼缝。
一种装配整体式暗梁空心双向楼盖的装配方法,包括如下步骤,
步骤1,采用倒置浇筑法一次成型双向肋箱体空心的预制板;先按预制板外轮廓支模,再按矩阵排列固定箱体,绑扎双向受力钢筋,固定预留螺栓孔,浇筑混凝土养护成型,在预制板无箱体的表面四周预留连接凹槽,养护完成后翻身即得预制板;
步骤2,楼盖钢结构加工安装;工厂加工制作钢结构的蜂窝钢梁,下翼缘上的预留螺栓孔,加工U型抱箍;运至现场并连接作为主梁和/或次梁;
步骤3,预制板安装,将预制板吊至蜂窝钢梁制成的次梁之间或主梁与次梁之间;连接处将预制板先搁置在下翼缘,两预制板端部依托下翼缘用螺栓连接;拼缝处两预制板侧边端部用U型抱箍连接;
步骤4,浇筑混凝土;清理杂物,清水浸润预制板表面,浇筑现浇混凝土,形成现浇混凝土肋和面层,养护成型,完成整体式暗梁空心双向楼盖装配。
进一步,预制板的板缝之间和螺栓孔间隙用环氧树脂砂浆密封处理。
进一步,步骤3和步骤4之间,利用两块预制板的板肋外侧的空位和蜂窝腹板的蜂窝铺设水电管线,然后再绑扎负弯矩区钢筋,负弯矩区钢筋穿过蜂窝钢梁的蜂窝孔洞,或固定在上翼缘上表面。
与现有技术相比,本发明具有以下有益的技术效果:
本发明所述的楼盖通过搭接固定和拼缝固定,实现楼板双向受力,使其双向的力学性能接近,提高受拉钢筋的材料利用率,通过蜂窝钢梁和预制板的工厂化定制,大幅提升钢结构装配效率,基本消除现场焊接工作;通过预支板和现浇混凝土的配合,充分利用混凝土包裹钢梁,减少钢结构的裸露面积,减低防腐防火费用,降低造价。预制板板件尺寸模数化、单元化,有利于建筑工业化生产,可以工厂预制运至现场,亦可现场就近制作。采用箱体可以减轻楼板自重,提高楼板的保温和隔声功能,方便预制板的施工和运输,有利于各类管线和楼板负弯矩区钢筋的定位。蜂窝梁钢梁可以有效减少钢梁腹板的钢材用量,进而减少结构自重,节省造价,而钢梁的承载力无明显下降;另外由于蜂窝钢梁腹板预设孔洞,方便钢筋或管线穿过,有利于现场施工;蜂窝钢梁的蜂窝孔和现浇混凝土通过嵌固、机械咬合和粘结摩擦提高二者协同工作的能力,加强楼板的整体性。
进一步的,通过U型抱箍螺栓连接和现浇混凝土增加楼盖整体性,满足结构安全和使用要求。
附图说明
图1为本发明实例中所述预制板截面示意图。
图2为本发明实例中所述预制板拼缝节点构造示意图。
图3为本发明实例中所述预制板连接节点构造示意图。
图4为本发明实例中所拼缝处整体装配效果示意图。
图5为本发明实例中所连接处整体装配效果示意图。
图中:1为预制板,11为板肋,12为箱体,13为预留螺栓孔,14为连接凹槽;2为U型抱箍,21为抱箍本体,22为连板,23为螺母;3为蜂窝钢梁,31为下翼缘,32为蜂窝腹板,33为上翼缘;4为现浇混凝土,41为现浇混凝土肋,5为螺栓,6为加劲板。
具体实施方式
下面结合具体的实施例对本发明做进一步的详细说明,所述是对本发明的解释而不是限定。
本发明一种装配整体式暗梁空心双向楼盖,包括呈双向肋箱体空心设置的预制板1,作为主梁或次梁的蜂窝钢梁3,通过螺栓5连接的U型抱箍2,以及现浇混凝土4。预制板1一侧表面呈一体设置有若干矩阵排列的箱体12,另一侧表面四周设置有连接凹槽14;连接凹槽14内设置有贯穿预制板1的预留螺栓孔13;蜂窝钢梁3用于楼盖钢结构的主梁和次梁;预制板1无箱体表面搭接固定在次梁之间或主梁与次梁之间,相邻的预制板1之间由穿过预留螺栓孔13的U型抱箍2连接固定形成拼缝;现浇混凝土4包括在箱体12之上浇注成型的面层,在相邻预制板1的箱体12之间,以及箱体12与主梁或次梁之间浇注成型的现浇混凝土肋41,面层和现浇混凝土肋41呈一体结构。
其中,呈矩阵排列的箱体12由凸起的板肋11合围分隔形成。预制板1边缘厚度小于板肋11高度,板肋11靠近预制板1边缘的一侧采用斜坡自然过渡,防止应力集中。优选地,如图3所示,蜂窝梁在工厂完成,为保证预制板1与蜂窝钢梁3的连接,可在主梁同次梁等标高处焊接加劲肋板6,并可设螺栓圆孔,焊接和开孔工作均在工厂完成。
本发明还包括穿过蜂窝钢梁3蜂窝孔洞,或者固定在蜂窝钢梁3的上翼缘33上的负弯矩区钢筋。所述预制板1无箱体表面搭接在次梁之间或主梁与次梁之间时,通过螺栓5固定。与预制板1连接的主梁或次梁的蜂窝腹板32上分别设置有与下翼缘31平行的加劲板6,预制板1插接在下翼缘31和加劲板6之间且由螺栓5贯穿连接固定。U型抱箍2由下向上穿过预留螺栓孔13,与连板22和螺母23配合将相邻的预制板1连接固定形成拼缝。
本发明所述的装配方法,具体包括如下步骤,
1、特制双向肋箱体空心的预制板1,如图1所示,采用倒置浇筑法一次成型。先按预制板1外轮廓支模,再按矩阵排列固定箱体12,绑扎双向受力钢筋,固定预留螺栓孔13,浇筑混凝土养护成型,注意在预制板1无箱体的表面四周预留连接凹槽14,保证螺栓5连接后整个板底为大平面。养护完成后翻身即得预制板1。
2、钢结构蜂窝梁加工安装:工厂加工制作钢结构的蜂窝钢梁3,下翼缘31上的预留螺栓孔13,加工U型抱箍2;运至现场并连接作为主梁和/或次梁的蜂窝钢梁3。
3、预制板1安装:将预制板1运至现场,吊至蜂窝钢梁3制成的次梁之间或主梁与次梁之间;如图3所示,连接处将预制板1先搁置在下翼缘31,两预制板1端部依托下翼缘31用螺栓5连接,优选的能够螺栓5紧固时配合固定在蜂窝腹板32上的加劲板6;如图2所示,拼缝处两预制板1侧边端部用U型抱箍2连接,具体的通过抱箍本体21通过连板22和螺母23连接,有效防止脱落并形成双向受力的整体板件。板缝之间用环氧树脂砂浆密封,防止浇筑混凝土时漏浆,螺栓孔间隙也同样处理。
4、利用两块预制板1的板肋11外侧的空位和蜂窝腹板32的蜂窝铺设水电管线,然后再绑扎负弯矩区钢筋,楼板负弯矩区钢筋可以穿过蜂窝钢梁3的蜂窝孔洞,亦可固定在上翼缘33上表面,保证负弯矩区钢筋位置符合设计要求。
5、如图4和图5所示,浇筑混凝土4,清理杂物,清水浸润预制板1表面,浇筑现浇混凝土4,形成现浇混凝土肋41和面层,养护成型,完成楼板施工;浇筑完成面标高可以与上翼缘33上表面平,亦可略高于钢梁上翼缘33上表面。
Claims (10)
1.一种装配整体式暗梁空心双向楼盖,其特征在于,包括预制板(1)、蜂窝钢梁(3)和现浇混凝土(4);
所述的预制板(1)一侧表面呈一体设置有若干矩阵排列的箱体(12),另一侧表面四周设置有连接凹槽(14);连接凹槽(14)内设置有贯穿预制板(1)的预留螺栓孔(13);
所述的蜂窝钢梁(3)用于楼盖钢结构的主梁和次梁;
所述预制板(1)无箱体表面搭接固定在次梁之间或主梁与次梁之间,相邻的预制板(1)之间由穿过预留螺栓孔(13)的U型抱箍(2)连接固定形成拼缝;
所述现浇混凝土(4)包括在箱体(12)之上浇注成型的面层,在相邻预制板(1)的箱体(12)之间,以及箱体(12)与主梁或次梁之间浇注成型的现浇混凝土肋(41),面层和现浇混凝土肋(41)呈一体结构。
2.根据权利要求1所述的一种装配整体式暗梁空心双向楼盖,其特征在于,呈矩阵排列的箱体(12)由凸起的板肋(11)合围分隔形成。
3.根据权利要求2所述的一种装配整体式暗梁空心双向楼盖,其特征在于,预制板(1)边缘厚度小于板肋(11)高度,板肋(11)靠近预制板(1)边缘的一侧采用斜坡自然过渡。
4.根据权利要求1所述的一种装配整体式暗梁空心双向楼盖,其特征在于,还包括穿过蜂窝钢梁(3)蜂窝孔洞,或者固定在蜂窝钢梁(3)的上翼缘(33)上的负弯矩区钢筋。
5.根据权利要求1所述的一种装配整体式暗梁空心双向楼盖,其特征在于,所述预制板(1)无箱体表面搭接在次梁之间或主梁与次梁之间时,通过螺栓(5)固定。
6.根据权利要求5所述的一种装配整体式暗梁空心双向楼盖,其特征在于,与预制板(1)连接的主梁或次梁的蜂窝腹板(32)上分别设置有与下翼缘(31)平行的加劲板(6),预制板(1)插接在下翼缘(31)和加劲板(6)之间且由螺栓(5)贯穿连接固定。
7.根据权利要求1所述的一种装配整体式暗梁空心双向楼盖,其特征在于,U型抱箍(2)由下向上穿过预留螺栓孔(13),与连板(22)和螺母(23)配合将相邻的预制板(1)连接固定形成拼缝。
8.一种装配整体式暗梁空心双向楼盖的装配方法,其特征在于,包括如下步骤,
步骤1,采用倒置浇筑法一次成型双向肋箱体空心的预制板(1);先按预制板(1)外轮廓支模,再按矩阵排列固定箱体(12),绑扎双向受力钢筋,固定预留螺栓孔(13),浇筑混凝土养护成型,在预制板(1)无箱体的表面四周预留连接凹槽(14),养护完成后翻身即得预制板(1);
步骤2,楼盖钢结构加工安装;工厂加工制作钢结构的蜂窝钢梁(3),下翼缘(31)上的预留螺栓孔(13),加工U型抱箍(2);运至现场并连接作为主梁和/或次梁;
步骤3,预制板(1)安装,将预制板(1)吊至蜂窝钢梁(3)制成的次梁之间或主梁与次梁之间;连接处将预制板(1)先搁置在下翼缘(31),两预制板(1)端部依托下翼缘(31)用螺栓(5)连接;拼缝处两预制板(1)侧边端部用U型抱箍(2)连接;
步骤4,浇筑混凝土(4);清理杂物,清水浸润预制板(1)表面,浇筑现浇混凝土(4),形成现浇混凝土肋(41)和面层,养护成型,完成整体式暗梁空心双向楼盖装配。
9.根据权利要求8所述的一种装配整体式暗梁空心双向楼盖的装配方法,其特征在于,预制板(1)的板缝之间和螺栓孔间隙用环氧树脂砂浆密封处理。
10.根据权利要求8所述的一种装配整体式暗梁空心双向楼盖的装配方法,其特征在于,步骤3和步骤4之间,利用两块预制板(1)的板肋(11)外侧的空位和蜂窝腹板(32)的蜂窝铺设水电管线,然后再绑扎负弯矩区钢筋,负弯矩区钢筋穿过蜂窝钢梁(3)的蜂窝孔洞,或固定在上翼缘(33)上表面。
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810362012.7A CN108590005B (zh) | 2018-04-20 | 2018-04-20 | 一种装配整体式暗梁空心双向楼盖及装配方法 |
| US16/981,271 US11306478B2 (en) | 2018-04-20 | 2018-12-29 | Integrally assembled hidden beam hollow two-way floor system and method for assembling the same |
| PCT/CN2018/125152 WO2019200969A1 (zh) | 2018-04-20 | 2018-12-29 | 一种装配整体式暗梁空心双向楼盖及装配方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810362012.7A CN108590005B (zh) | 2018-04-20 | 2018-04-20 | 一种装配整体式暗梁空心双向楼盖及装配方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108590005A true CN108590005A (zh) | 2018-09-28 |
| CN108590005B CN108590005B (zh) | 2019-05-24 |
Family
ID=63613800
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810362012.7A Active CN108590005B (zh) | 2018-04-20 | 2018-04-20 | 一种装配整体式暗梁空心双向楼盖及装配方法 |
Country Status (3)
| Country | Link |
|---|---|
| US (1) | US11306478B2 (zh) |
| CN (1) | CN108590005B (zh) |
| WO (1) | WO2019200969A1 (zh) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2019200969A1 (zh) * | 2018-04-20 | 2019-10-24 | 长安大学 | 一种装配整体式暗梁空心双向楼盖及装配方法 |
| CN112878567A (zh) * | 2021-03-11 | 2021-06-01 | 深圳华森建筑与工程设计顾问有限公司 | 一种组合楼盖及其施工方法 |
| CN113502960A (zh) * | 2021-06-23 | 2021-10-15 | 新余学院 | 一种暗梁式螺栓连接全预制钢筋混凝土板结构 |
| CN114852188A (zh) * | 2022-06-10 | 2022-08-05 | 常州市瑞悦车业有限公司 | 组合安装的运输用车辆地板总成 |
| CN115262832A (zh) * | 2022-08-15 | 2022-11-01 | 四川大学 | 一种螺栓连接装配式钢筋混凝土双向肋保温楼盖 |
Families Citing this family (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108691382A (zh) * | 2018-07-05 | 2018-10-23 | 中国建筑标准设计研究院有限公司 | 拼装式预制楼板及其施工方法 |
| CN111395620B (zh) * | 2020-04-22 | 2022-01-28 | 重庆海申应用技术研究院有限公司 | 一种模盒可重复利用的密肋楼盖施工方法 |
| CN111851267B (zh) * | 2020-08-06 | 2024-12-13 | 湖南大学 | Uhpc矮肋桥面板的接缝连接构造和钢-uhpc组合桥梁 |
| CN113175140B (zh) * | 2021-05-12 | 2022-08-09 | 国网河南省电力公司经济技术研究院 | 一种预制混凝土楼盖板及机械式板缝连接节点 |
| CN113250358B (zh) * | 2021-06-11 | 2024-05-07 | 西安建筑科技大学 | 一种钢筋混凝土拼装楼板 |
| CN113293904A (zh) * | 2021-06-23 | 2021-08-24 | 江西建工第二建筑有限责任公司 | 一种混凝土砌块组合保温楼屋面构造及施工方法 |
| CN113638532B (zh) * | 2021-08-24 | 2024-06-21 | 浙江亚厦装饰股份有限公司 | 一种具有防火性能的装配式楼板结构及安装方法 |
| CN113622571A (zh) * | 2021-09-02 | 2021-11-09 | 许昌学院 | 一种装配式混凝土空间组合楼板、装配方法及应用 |
| CN114381972B (zh) * | 2021-12-09 | 2025-07-29 | 中国铁路设计集团有限公司 | 一种云巴钢轨道梁与混凝土轨道梁连接的伸缩缝结构及施工方法 |
| CN114382172A (zh) * | 2021-12-27 | 2022-04-22 | 三能集成房屋股份有限公司 | 一种全装配式建筑及其建筑方法 |
| CN114737767A (zh) * | 2022-03-21 | 2022-07-12 | 五冶集团上海有限公司 | 一种预制叠合板安装施工方法 |
| CN114753534B (zh) * | 2022-05-07 | 2022-12-09 | 吉林大学 | 一种用于水暖型供热楼板拼接的连接件 |
| CN114963385B (zh) * | 2022-05-19 | 2024-04-30 | 武汉久弘建筑科技有限公司 | 地下室通风排烟系统与地下室 |
| CN114876124B (zh) * | 2022-05-29 | 2023-05-23 | 中国五冶集团有限公司 | 一种带有防水功能的装配式建筑预制板 |
| CN115162505A (zh) * | 2022-09-06 | 2022-10-11 | 中南大学 | 一种键槽连接的全装配整体式建筑体系及施工方法 |
| CN115324251B (zh) * | 2022-09-09 | 2024-06-18 | 河北省建筑科学研究院有限公司 | 一种低层装配式钢结构住宅用组合型预制楼板 |
| CN116104295B (zh) * | 2022-12-13 | 2025-03-07 | 范英杰 | 一种多高层装配式钢结构非组合楼板支撑体系及其施工方法 |
| CN117905213B (zh) * | 2024-03-06 | 2024-08-23 | 中交第三航务工程局有限公司 | 一种利用自承箱成型的混凝土空心楼盖施工方法 |
| CN118622003B (zh) * | 2024-06-06 | 2025-11-07 | 上海建工七建集团有限公司 | 一种钢结构下挂砼边梁施工构造及施工方法 |
| CN118911346A (zh) * | 2024-08-22 | 2024-11-08 | 重庆恒昇大业建筑科技集团有限公司 | 一种游牧式建筑预制构件及现场生产方法 |
| CN119321194B (zh) * | 2024-10-17 | 2025-11-21 | 中国十七冶集团有限公司 | 一种装配便捷式的暗梁楼板结构及施工方法 |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005325579A (ja) * | 2004-05-13 | 2005-11-24 | Sumitomo Metal Ind Ltd | 鋼製大引きおよび床下の断熱構造 |
| CN205024907U (zh) * | 2015-08-12 | 2016-02-10 | 浙江绿筑建筑系统集成有限公司 | 预应力空心楼板与翼缘不等宽工字钢梁的连接构造 |
| CN206233433U (zh) * | 2016-10-20 | 2017-06-09 | 江苏福久住宅工业制造有限公司 | 新型h+t形部件及其与楼板组合梁 |
| CN107700667A (zh) * | 2017-09-26 | 2018-02-16 | 中南大学 | 一种预制楼板与钢梁下翼缘连接节点 |
Family Cites Families (26)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| FR743691A (zh) * | 1933-04-03 | |||
| CH138799A (de) * | 1929-06-10 | 1930-03-31 | Heinrich Johann | Hohlsteindecke. |
| CH144514A (fr) * | 1930-02-18 | 1931-01-15 | Boillot Leon | Corps de remplissage pour planchers. |
| CH148397A (fr) * | 1930-06-06 | 1931-07-31 | Schmidt Alexandre | Plancher. |
| US1912429A (en) * | 1931-06-15 | 1933-06-06 | Smith Corp A O | Paving block and method of paving |
| CH160982A (de) * | 1932-01-25 | 1933-04-15 | Tuffwerk Surava A G | Hohlsteindecke. |
| DE632236C (de) * | 1934-07-18 | 1936-07-04 | Nicolas Daher | Hohlsteindecke mit zwischen Eisentraegern paarweise verlegten Formsteinen oder -platten |
| CH163208A (de) * | 1936-01-25 | 1933-08-15 | Weber Luethi E | Hohlsteindecke. |
| CH215876A (fr) * | 1938-05-30 | 1941-07-31 | F F A Societa Anonima Fabbrich | Plancher. |
| GB526235A (en) * | 1938-12-12 | 1940-09-13 | H J Baldwin & Company Ltd | Improvements in or relating to protective or warning tiles applicable for covering underground cables and the like |
| DE813589C (de) * | 1950-02-15 | 1951-09-13 | Fritz Schaefer | Schalungslose Decke aus Betonhohlsteinen |
| FR1155818A (fr) * | 1956-08-17 | 1958-05-08 | Plancher mixte fer, béton armé perfectionné | |
| JPS5948599A (ja) * | 1982-08-06 | 1984-03-19 | 都築 純一 | トンネル覆工構造 |
| DE3319745C2 (de) * | 1983-05-31 | 1985-09-05 | Linge, Walter, Dipl.-Ing., 2800 Bremen | Stahlblechträger |
| GB2342375A (en) * | 1998-10-06 | 2000-04-12 | L H Woodhouse & Co Ltd | A roadway, hardstand, floor or fence. |
| US6243994B1 (en) * | 1999-01-11 | 2001-06-12 | Bebo Of America, Inc. | Joint for pre-cast concrete twin-leaf arch sections |
| US6442908B1 (en) * | 2000-04-26 | 2002-09-03 | Peter A. Naccarato | Open web dissymmetric beam construction |
| DE10103883A1 (de) * | 2001-01-30 | 2002-08-08 | Leonhardt Andrae Und Partner B | Stahlverbunddecke |
| CN2663553Y (zh) * | 2003-08-26 | 2004-12-15 | 西安建筑科技大学 | 楼板位于钢梁下翼缘的组合梁 |
| BE1015755A3 (nl) * | 2003-10-28 | 2005-08-02 | Echo | Vloersysteem, geprefabriceerd element en werkwijze voor vervaardigen van geprefabriceerd element. |
| GB2477319B (en) * | 2010-01-29 | 2016-08-10 | Precast Advanced Track Ltd | Modular slab and modular surface system |
| US20180127968A1 (en) * | 2016-11-10 | 2018-05-10 | University Of South Carolina | Flange Connectors for Double Tee Beams |
| US20180298624A1 (en) * | 2017-04-17 | 2018-10-18 | Ilmar LAURINDO | Assembly of profiles for sustaining, molding and finishing the concrete of slab, beam and column |
| US10689839B2 (en) * | 2017-05-03 | 2020-06-23 | Donald E. Wheatley | Parking deck connecting system |
| EP3517698B1 (en) * | 2018-01-29 | 2024-05-29 | SBS Betoni Oy | Precast floor slab and method for forming a flooring deck and building formed of precast floor slabs |
| CN108590005B (zh) * | 2018-04-20 | 2019-05-24 | 长安大学 | 一种装配整体式暗梁空心双向楼盖及装配方法 |
-
2018
- 2018-04-20 CN CN201810362012.7A patent/CN108590005B/zh active Active
- 2018-12-29 WO PCT/CN2018/125152 patent/WO2019200969A1/zh not_active Ceased
- 2018-12-29 US US16/981,271 patent/US11306478B2/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2005325579A (ja) * | 2004-05-13 | 2005-11-24 | Sumitomo Metal Ind Ltd | 鋼製大引きおよび床下の断熱構造 |
| CN205024907U (zh) * | 2015-08-12 | 2016-02-10 | 浙江绿筑建筑系统集成有限公司 | 预应力空心楼板与翼缘不等宽工字钢梁的连接构造 |
| CN206233433U (zh) * | 2016-10-20 | 2017-06-09 | 江苏福久住宅工业制造有限公司 | 新型h+t形部件及其与楼板组合梁 |
| CN107700667A (zh) * | 2017-09-26 | 2018-02-16 | 中南大学 | 一种预制楼板与钢梁下翼缘连接节点 |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2019200969A1 (zh) * | 2018-04-20 | 2019-10-24 | 长安大学 | 一种装配整体式暗梁空心双向楼盖及装配方法 |
| US11306478B2 (en) | 2018-04-20 | 2022-04-19 | Chang'an University | Integrally assembled hidden beam hollow two-way floor system and method for assembling the same |
| CN112878567A (zh) * | 2021-03-11 | 2021-06-01 | 深圳华森建筑与工程设计顾问有限公司 | 一种组合楼盖及其施工方法 |
| CN113502960A (zh) * | 2021-06-23 | 2021-10-15 | 新余学院 | 一种暗梁式螺栓连接全预制钢筋混凝土板结构 |
| CN114852188A (zh) * | 2022-06-10 | 2022-08-05 | 常州市瑞悦车业有限公司 | 组合安装的运输用车辆地板总成 |
| CN114852188B (zh) * | 2022-06-10 | 2023-07-07 | 常州市瑞悦车业有限公司 | 组合安装的运输用车辆地板总成 |
| CN115262832A (zh) * | 2022-08-15 | 2022-11-01 | 四川大学 | 一种螺栓连接装配式钢筋混凝土双向肋保温楼盖 |
| CN115262832B (zh) * | 2022-08-15 | 2023-10-24 | 四川大学 | 一种螺栓连接装配式钢筋混凝土双向肋保温楼盖 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108590005B (zh) | 2019-05-24 |
| US11306478B2 (en) | 2022-04-19 |
| WO2019200969A1 (zh) | 2019-10-24 |
| US20210040740A1 (en) | 2021-02-11 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108590005A (zh) | 一种装配整体式暗梁空心双向楼盖及装配方法 | |
| CN103388357B (zh) | 耐震、预制的钢管剪力墙混合结构建筑物 | |
| CN103397696B (zh) | 耐震、预制的钢筋桁架剪力墙混合结构建筑物 | |
| CN101586366B (zh) | 预制混凝土板与梁的连接结构、施工方法及建筑 | |
| CN212957170U (zh) | 集成桁架钢筋及预应力钢丝网的预制混凝土底板 | |
| CN107542196A (zh) | 预应力混凝土双向叠合板及制作方法 | |
| CN105507470B (zh) | 一种周边叠合整体装配式楼板及其施工方法 | |
| CN105822000A (zh) | 一种钢板混凝土叠合梁板结构体系 | |
| CN106245753A (zh) | 一种装配式预制结构墙板的钢筋混凝土连接体系 | |
| CN110670770A (zh) | 实心剪力墙与叠合板式边缘构件组合结构及施工方法 | |
| CN105952044B (zh) | 一种全预制预应力混凝土楼板结构及预应力装配方法 | |
| CN205046669U (zh) | 装配整体式混凝土框架结构体系及其构成的框剪结构体系 | |
| CN105133726A (zh) | 装配整体式混凝土框架结构体系及其构成的框剪结构体系 | |
| CN110499858A (zh) | 免拆非金属底板固模叠合板、相应楼面结构及楼面施工方法 | |
| CN115095053A (zh) | 一种抗震叠合墙及其施工方法 | |
| CN112609883A (zh) | 一种四边不出筋且免支拆模的双向叠合楼板及其建造方法 | |
| CN106481006A (zh) | 装配式混凝土梁板榫槽式连接方法 | |
| CN106760036A (zh) | 一种预制钢板‑混凝土组合剪力墙 | |
| CN215167031U (zh) | 一种四边不出筋且免支拆模的双向叠合楼板 | |
| CN110644662A (zh) | 一种基于受力的预制无梁楼盖叠合板及其拆分方法 | |
| CN207686092U (zh) | 一种装配式叠合空心楼盖 | |
| CN212534652U (zh) | 一种钢混组合结构框架-现浇混凝土剪力墙结构体系 | |
| CN206267321U (zh) | 一种装配式混凝土梁板榫槽式连接节点 | |
| CN112982692A (zh) | 一种单向叠合板拼缝处连接构造和施工方法 | |
| CN217557315U (zh) | 一种抗震叠合墙 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |