CN108571161A - A kind of constructing tunnel scaffold surface concrete and clod remove equipment - Google Patents

A kind of constructing tunnel scaffold surface concrete and clod remove equipment Download PDF

Info

Publication number
CN108571161A
CN108571161A CN201810385531.5A CN201810385531A CN108571161A CN 108571161 A CN108571161 A CN 108571161A CN 201810385531 A CN201810385531 A CN 201810385531A CN 108571161 A CN108571161 A CN 108571161A
Authority
CN
China
Prior art keywords
shaft
framework
scaffold
bearing seat
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810385531.5A
Other languages
Chinese (zh)
Inventor
舒润潭
曹幸
Original Assignee
舒润潭
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 舒润潭 filed Critical 舒润潭
Priority to CN201810385531.5A priority Critical patent/CN108571161A/en
Publication of CN108571161A publication Critical patent/CN108571161A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G5/00Component parts or accessories for scaffolds
    • E04G5/005Devices for cleaning or repairing scaffold tubes

Abstract

The present invention relates to a kind of removing equipment more particularly to a kind of constructing tunnel scaffold surface concrete and clod to remove equipment.Therefore, technical problem of the invention is:A kind of high elimination efficiency, the thorough constructing tunnel scaffold surface concrete of removing and clod are provided and remove equipment.Technical solution is as follows:A kind of constructing tunnel scaffold surface concrete and clod remove equipment, include bottom plate, the first framework, first motor, first rotating shaft, sector gear, sliding rail, sliding block, movable plate etc.;The top center of bottom plate is connected with the first framework, and the upper right quarter of the interior rear side of the first framework is equipped with first motor, and the output shaft of first motor is connected with first rotating shaft.The present invention is rotated by first motor drives arc scraper plate to move left and right, to which the concrete on scaffold surface and clod be scraped, and first motor rotation is rotated with electric brush, to carry out brush to scaffold surface, traction wheel drives scaffold movement, has reached elimination efficiency height, has removed thorough effect.

Description

A kind of constructing tunnel scaffold surface concrete and clod remove equipment
Technical field
It is clear with scaffold surface concrete and clod that the present invention relates to a kind of removing equipment more particularly to a kind of constructing tunnel Except equipment.
Background technology
Tunnel is to be built in underground or underwater or in massif, places an iron railway or builds highway and passes through for motor vehicles Building.It can be divided into mountain tunnel, submerged tunnel and city tunnel three categories according to its position.To shorten distance and avoiding Steep gradient and passed through under the mountain ridge or hills be known as mountain tunnel;For river crossing or straits under river or seabed by Referred to as submerged tunnel;City tunnel is known as what Urban Underground passed through by metropolitan need to adapt to railway.This three classes It is mountain tunnel to be built in tunnel most.
Scaffold is to ensure each work progress is smoothed out and is set up workbench.It is divided by the position set up outer Scaffold, internal scaffolding;It can be divided into timber scaffolding, bamboo scaffolding, steel pipe scaffold by material difference;It is divided by structural form vertical Rod-type scaffold, door-type scaffold, swinging scaffold, suspended scaffold, chooses formula scaffold, climbs formula foot hand bridge scaffold Frame.
It needs to use scaffold when constructing tunnel, and scaffold is in use, surface can be stained with concrete and mud The concrete on scaffold surface and clod are such as removed, the service life of scaffold can be reduced, at present to scaffold by block not in time The concrete and clod elimination efficiency on surface are relatively low, it is not thorough enough to remove, therefore a kind of elimination efficiency is high, it is thorough to remove there is an urgent need for researching and developing The constructing tunnel at bottom scaffold surface concrete and clod remove equipment.
Invention content
In order to overcome, the concrete to scaffold surface at present and clod elimination efficiency are relatively low, it is not thoroughly scarce enough to remove Point, therefore, technical problem of the invention is:There is provided that a kind of elimination efficiency is high, removes thorough constructing tunnel scaffold surface Concrete and clod remove equipment.
Technical solution is as follows:A kind of constructing tunnel scaffold surface concrete and clod remove equipment, include bottom plate, First framework, first motor, first rotating shaft, sector gear, sliding rail, sliding block, movable plate, rack, the first spring, arc scraper plate, First pulley, first bearing seat, the second shaft, the second belt wheel, belt, first bevel gear, second bearing seat, third shaft, The top center of two bevel gears and hairbrush, bottom plate is connected with the first framework, and the upper right quarter of the interior rear side of the first framework is equipped with first The output shaft of motor, first motor is connected with first rotating shaft, and sector gear, the first framework top are equipped in the middle part of first rotating shaft Right side is provided with opening, and sector gear passes through opening, the front and rear sides of the first framework top right to be mounted on sliding rail, set on sliding rail There are sliding block, sliding block to be in sliding fit with sliding rail, movable plate is connected at the top of front and back sliding block, is connected among the bottom of movable plate Rack, rack are engaged with sector gear, and the first spring, the top of movable plate are connected between inside on the right side of the right side of sliding block and sliding rail It is connected with arc scraper plate among portion, the front end of first rotating shaft is equipped with first pulley, the front and rear sides of upper left quarter in the first framework It is mounted on first bearing seat, the second shaft, the second shaft and the axis in first bearing seat are equipped between front and back first bearing seat Interference connection is held, the front of the second shaft is equipped with the second belt wheel, is connected with belt between first pulley and the second belt wheel, and second First bevel gear is installed, the top left installation by adhering of the first framework has second bearing seat, second bearing in the middle part of shaft Bearing interference in seat is connected with third shaft, and the bottom of third shaft is equipped with second bevel gear, first bevel gear and second Bevel gear engages, and hairbrush is connected at the top of third shaft.
Further, further include having second framework, 3rd bearing seat, the 4th shaft, traction wheel and the second motor, the first frame The top left side of body is connected with second framework, and second framework is located on the left of hairbrush, and the front and rear sides lower part of second framework is embedded Formula is equipped with 3rd bearing seat, and the 4th shaft, the 4th shaft and the axis in 3rd bearing seat are equipped between front and back 3rd bearing seat Interference connection is held, traction wheel is installed in the middle part of the 4th shaft, the lower front of second framework is equipped with the second motor, the second electricity The output shaft of machine is connect with the front end of the 4th shaft.
Further, further include having second spring and idler wheel, second framework inner top is connected with second spring, second spring Bottom end be connected with idler wheel, idler wheel is located at the surface of traction wheel.
Further, further include having strut and roller, the top right side of bottom plate is connected with strut, the top rotary type of strut Roller is installed.
In use, operating personnel pick up scaffold and one end is placed on arc scraper plate, then start first motor It rotates counterclockwise, to drive first rotating shaft to rotate, and then sector gear and first pulley is driven to rotate counterclockwise, work as sector When wheel and rack engages, sector gear band carry-over bar is moved to the left, to drive movable plate and arc scraper plate to be moved to the left, first Spring is stretched, and when sector wheel and rack does not engage, under the action of the first spring, sliding block drives arc by movable plate Scraper plate and rack move right, and repeatedly, arc scraper plate moves left and right, to scrape the concrete on scaffold surface and clod It falls, and first pulley rotation drives the rotation of the second belt wheel by belt, to drive the rotation of the second shaft, and then passes through the first cone Gear and second bevel gear drive the rotation of third shaft, and third shaft rotation band electric brush rotates, during use, operating personnel It pushes to the left and rotates scaffold so that arc scraper plate strikes off the concrete on scaffold surface and clod comprehensively, works as scaffold When moving to above hairbrush, hairbrush carries out brush to scaffold surface, to further remove the concrete and mud on scaffold surface Block, so improve elimination efficiency and remove it is more thorough, after the completion of removing, operating personnel close first motor.
Because further including having second framework, 3rd bearing seat, the 4th shaft, traction wheel and the second motor, the first framework Top left side is connected with second framework, and second framework is located on the left of hairbrush, the embedded peace in front and rear sides lower part of second framework Equipped with 3rd bearing seat, the 4th shaft, the 4th shaft and the bearing mistake in 3rd bearing seat are equipped between front and back 3rd bearing seat It is full of connection, traction wheel is installed, the lower front of second framework is equipped with the second motor, the second motor in the middle part of the 4th shaft Output shaft is connect with the front end of the 4th shaft.So when operating personnel push scaffold to the left so that the left end of scaffold passes through Second framework is placed on traction wheel, then manually starts the second motor slow rotation counterclockwise, to drive the 4th shaft to turn It is dynamic, and then traction wheel is driven to rotate counterclockwise, traction wheel drives scaffold to be slowly moved to the left, to improve scaffold surface Concrete and clod elimination efficiency, close the second motor after the completion.
Because further including having second spring and idler wheel, second framework inner top is connected with second spring, the bottom of second spring End is connected with idler wheel, and idler wheel is located at the surface of traction wheel.So when use by one end of scaffold from traction wheel and idler wheel it Between pass through, under the action of second spring, scaffold is pressed on traction wheel by idler wheel so that traction wheel rotate when can be effective Scaffold is driven to be moved to the left, to further increase efficiency.
Because further including having strut and roller, the top right side of bottom plate is connected with strut, the top rotary type installation of strut There is roller.So scaffold is placed on roller when use, roller rotation is driven when scaffold is moved to the left, so that It is more smooth when scaffold is moved to the left.
The present invention is rotated by first motor drives arc scraper plate to move left and right, to by the concrete on scaffold surface and Clod scrapes, and first motor rotation is rotated with electric brush, and to carry out brush to scaffold surface, traction wheel drives foot hand Frame moves, and has reached elimination efficiency height, has removed thorough effect.
Description of the drawings
Fig. 1 is the schematic cross-sectional view of the first front view of the invention.
Fig. 2 is the schematic cross-sectional view of left view of the present invention.
Fig. 3 is the schematic cross-sectional view of vertical view of the present invention.
Fig. 4 is the schematic cross-sectional view of second of front view of the invention.
Fig. 5 is the left view structural representation of second framework of the present invention.
In figure:1 bottom plate, 2 first frameworks, 3 first motors, 4 first rotating shafts, 5 sector gears, 6 openings, 7 sliding rails, 8 slide Block, 9 movable plates, 10 racks, 11 first springs, 12 arc scraper plates, 13 first pulleys, 14 first bearing seats, 15 second shafts, 16 Second belt wheel, 17 belts, 18 first bevel gears, 19 second bearing seats, 20 third shafts, 21 second bevel gears, 22 hairbrush, 23 Two frameworks, 24 3rd bearing seats, 25 the 4th shafts, 26 traction wheels, 27 second motors, 28 second springs, 29 idler wheels, 30 struts, 31 rollers.
Specific implementation mode
The invention will be further described for embodiment shown in below in conjunction with the accompanying drawings.
Embodiment 1
A kind of constructing tunnel scaffold surface concrete and clod remove equipment, as shown in Figs. 1-5, include bottom plate 1, First framework 2, first motor 3, first rotating shaft 4, sector gear 5, sliding rail 7, sliding block 8, movable plate 9, rack 10, the first spring 11, arc scraper plate 12, first pulley 13, first bearing seat 14, the second shaft 15, the second belt wheel 16, belt 17, first bevel gear 18, the top center of second bearing seat 19, third shaft 20, second bevel gear 21 and hairbrush 22, bottom plate 1 is connected with the first framework 2, the upper right quarter of 2 interior rear side of the first framework is equipped with first motor 3, and the output shaft of first motor 3 is connected with first rotating shaft 4, the The middle part of one shaft 4 is equipped with sector gear 5, and 2 top right side of the first framework is provided with opening 6, and sector gear 5 passes through opening 6, the The front and rear sides of one framework, 2 top right are mounted on sliding rail 7, and sliding rail 7 is equipped with sliding block 8, and sliding block 8 is matched with 7 slidingtype of sliding rail It closes, the top of front and back sliding block 8 is connected with movable plate 9, rack 10, rack 10 and sector are connected among the bottom of movable plate 9 Wheel 5 engages, and the first spring 11, the top center connection of movable plate 9 are connected between the 7 right side inside of right side and sliding rail of sliding block 8 There is an arc scraper plate 12, the front end of first rotating shaft 4 is equipped with first pulley 13, and the front and rear sides of upper left quarter are pacified in the first framework 2 Equipped with first bearing seat 14, the second shaft 15, the second shaft 15 and first bearing seat 14 are equipped between front and back first bearing seat 14 Interior bearing interference connection, the front of the second shaft 15 is equipped with the second belt wheel 16, between first pulley 13 and the second belt wheel 16 It is connected with belt 17, the middle part of the second shaft 15 is equipped with first bevel gear 18, the top left installation by adhering of the first framework 2 There is second bearing seat 19, the bearing interference in second bearing seat 19 is connected with third shaft 20, the bottom installation of third shaft 20 There are second bevel gear 21, first bevel gear 18 to be engaged with second bevel gear 21, the top of third shaft 20 is connected with hairbrush 22.
Embodiment 2
A kind of constructing tunnel scaffold surface concrete and clod remove equipment, as shown in Figs. 1-5, include bottom plate 1, First framework 2, first motor 3, first rotating shaft 4, sector gear 5, sliding rail 7, sliding block 8, movable plate 9, rack 10, the first spring 11, arc scraper plate 12, first pulley 13, first bearing seat 14, the second shaft 15, the second belt wheel 16, belt 17, first bevel gear 18, the top center of second bearing seat 19, third shaft 20, second bevel gear 21 and hairbrush 22, bottom plate 1 is connected with the first framework 2, the upper right quarter of 2 interior rear side of the first framework is equipped with first motor 3, and the output shaft of first motor 3 is connected with first rotating shaft 4, the The middle part of one shaft 4 is equipped with sector gear 5, and 2 top right side of the first framework is provided with opening 6, and sector gear 5 passes through opening 6, the The front and rear sides of one framework, 2 top right are mounted on sliding rail 7, and sliding rail 7 is equipped with sliding block 8, and sliding block 8 is matched with 7 slidingtype of sliding rail It closes, the top of front and back sliding block 8 is connected with movable plate 9, rack 10, rack 10 and sector are connected among the bottom of movable plate 9 Wheel 5 engages, and the first spring 11, the top center connection of movable plate 9 are connected between the 7 right side inside of right side and sliding rail of sliding block 8 There is an arc scraper plate 12, the front end of first rotating shaft 4 is equipped with first pulley 13, and the front and rear sides of upper left quarter are pacified in the first framework 2 Equipped with first bearing seat 14, the second shaft 15, the second shaft 15 and first bearing seat 14 are equipped between front and back first bearing seat 14 Interior bearing interference connection, the front of the second shaft 15 is equipped with the second belt wheel 16, between first pulley 13 and the second belt wheel 16 It is connected with belt 17, the middle part of the second shaft 15 is equipped with first bevel gear 18, the top left installation by adhering of the first framework 2 There is second bearing seat 19, the bearing interference in second bearing seat 19 is connected with third shaft 20, the bottom installation of third shaft 20 There are second bevel gear 21, first bevel gear 18 to be engaged with second bevel gear 21, the top of third shaft 20 is connected with hairbrush 22.
Further include having second framework 23,3rd bearing seat 24, the 4th shaft 25, traction wheel 26 and the second motor 27, first The top left side of framework 2 is connected with second framework 23, and second framework 23 is located at 22 left side of hairbrush, the front and rear sides of second framework 23 The equal installation by adhering in lower part has 3rd bearing seat 24, and the 4th shaft 25, the 4th shaft 25 are equipped between front and back 3rd bearing seat 24 It is connect with the bearing interference in 3rd bearing seat 24, the middle part of the 4th shaft 25 is equipped with traction wheel 26, before second framework 23 Side lower part is equipped with the second motor 27, and the output shaft of the second motor 27 is connect with the front end of the 4th shaft 25.
Embodiment 3
A kind of constructing tunnel scaffold surface concrete and clod remove equipment, as shown in Figs. 1-5, include bottom plate 1, First framework 2, first motor 3, first rotating shaft 4, sector gear 5, sliding rail 7, sliding block 8, movable plate 9, rack 10, the first spring 11, arc scraper plate 12, first pulley 13, first bearing seat 14, the second shaft 15, the second belt wheel 16, belt 17, first bevel gear 18, the top center of second bearing seat 19, third shaft 20, second bevel gear 21 and hairbrush 22, bottom plate 1 is connected with the first framework 2, the upper right quarter of 2 interior rear side of the first framework is equipped with first motor 3, and the output shaft of first motor 3 is connected with first rotating shaft 4, the The middle part of one shaft 4 is equipped with sector gear 5, and 2 top right side of the first framework is provided with opening 6, and sector gear 5 passes through opening 6, the The front and rear sides of one framework, 2 top right are mounted on sliding rail 7, and sliding rail 7 is equipped with sliding block 8, and sliding block 8 is matched with 7 slidingtype of sliding rail It closes, the top of front and back sliding block 8 is connected with movable plate 9, rack 10, rack 10 and sector are connected among the bottom of movable plate 9 Wheel 5 engages, and the first spring 11, the top center connection of movable plate 9 are connected between the 7 right side inside of right side and sliding rail of sliding block 8 There is an arc scraper plate 12, the front end of first rotating shaft 4 is equipped with first pulley 13, and the front and rear sides of upper left quarter are pacified in the first framework 2 Equipped with first bearing seat 14, the second shaft 15, the second shaft 15 and first bearing seat 14 are equipped between front and back first bearing seat 14 Interior bearing interference connection, the front of the second shaft 15 is equipped with the second belt wheel 16, between first pulley 13 and the second belt wheel 16 It is connected with belt 17, the middle part of the second shaft 15 is equipped with first bevel gear 18, the top left installation by adhering of the first framework 2 There is second bearing seat 19, the bearing interference in second bearing seat 19 is connected with third shaft 20, the bottom installation of third shaft 20 There are second bevel gear 21, first bevel gear 18 to be engaged with second bevel gear 21, the top of third shaft 20 is connected with hairbrush 22.
Further include having second framework 23,3rd bearing seat 24, the 4th shaft 25, traction wheel 26 and the second motor 27, first The top left side of framework 2 is connected with second framework 23, and second framework 23 is located at 22 left side of hairbrush, the front and rear sides of second framework 23 The equal installation by adhering in lower part has 3rd bearing seat 24, and the 4th shaft 25, the 4th shaft 25 are equipped between front and back 3rd bearing seat 24 It is connect with the bearing interference in 3rd bearing seat 24, the middle part of the 4th shaft 25 is equipped with traction wheel 26, before second framework 23 Side lower part is equipped with the second motor 27, and the output shaft of the second motor 27 is connect with the front end of the 4th shaft 25.
Further include having second spring 28 and idler wheel 29,23 inner top of second framework is connected with second spring 28, second spring 28 bottom end is connected with idler wheel 29, and idler wheel 29 is located at the surface of traction wheel 26.
Embodiment 4
A kind of constructing tunnel scaffold surface concrete and clod remove equipment, as shown in Figs. 1-5, include bottom plate 1, First framework 2, first motor 3, first rotating shaft 4, sector gear 5, sliding rail 7, sliding block 8, movable plate 9, rack 10, the first spring 11, arc scraper plate 12, first pulley 13, first bearing seat 14, the second shaft 15, the second belt wheel 16, belt 17, first bevel gear 18, the top center of second bearing seat 19, third shaft 20, second bevel gear 21 and hairbrush 22, bottom plate 1 is connected with the first framework 2, the upper right quarter of 2 interior rear side of the first framework is equipped with first motor 3, and the output shaft of first motor 3 is connected with first rotating shaft 4, the The middle part of one shaft 4 is equipped with sector gear 5, and 2 top right side of the first framework is provided with opening 6, and sector gear 5 passes through opening 6, the The front and rear sides of one framework, 2 top right are mounted on sliding rail 7, and sliding rail 7 is equipped with sliding block 8, and sliding block 8 is matched with 7 slidingtype of sliding rail It closes, the top of front and back sliding block 8 is connected with movable plate 9, rack 10, rack 10 and sector are connected among the bottom of movable plate 9 Wheel 5 engages, and the first spring 11, the top center connection of movable plate 9 are connected between the 7 right side inside of right side and sliding rail of sliding block 8 There is an arc scraper plate 12, the front end of first rotating shaft 4 is equipped with first pulley 13, and the front and rear sides of upper left quarter are pacified in the first framework 2 Equipped with first bearing seat 14, the second shaft 15, the second shaft 15 and first bearing seat 14 are equipped between front and back first bearing seat 14 Interior bearing interference connection, the front of the second shaft 15 is equipped with the second belt wheel 16, between first pulley 13 and the second belt wheel 16 It is connected with belt 17, the middle part of the second shaft 15 is equipped with first bevel gear 18, the top left installation by adhering of the first framework 2 There is second bearing seat 19, the bearing interference in second bearing seat 19 is connected with third shaft 20, the bottom installation of third shaft 20 There are second bevel gear 21, first bevel gear 18 to be engaged with second bevel gear 21, the top of third shaft 20 is connected with hairbrush 22.
Further include having second framework 23,3rd bearing seat 24, the 4th shaft 25, traction wheel 26 and the second motor 27, first The top left side of framework 2 is connected with second framework 23, and second framework 23 is located at 22 left side of hairbrush, the front and rear sides of second framework 23 The equal installation by adhering in lower part has 3rd bearing seat 24, and the 4th shaft 25, the 4th shaft 25 are equipped between front and back 3rd bearing seat 24 It is connect with the bearing interference in 3rd bearing seat 24, the middle part of the 4th shaft 25 is equipped with traction wheel 26, before second framework 23 Side lower part is equipped with the second motor 27, and the output shaft of the second motor 27 is connect with the front end of the 4th shaft 25.
Further include having second spring 28 and idler wheel 29,23 inner top of second framework is connected with second spring 28, second spring 28 bottom end is connected with idler wheel 29, and idler wheel 29 is located at the surface of traction wheel 26.
Further include having strut 30 and roller 31, the top right side of bottom plate 1 is connected with strut 30, the top rotary type of strut 30 Roller 31 is installed.
In use, operating personnel pick up scaffold and one end is placed on arc scraper plate 12, then start the first electricity Machine 3 rotates counterclockwise, and to drive first rotating shaft 4 to rotate, and then sector gear 5 and first pulley 13 is driven to rotate counterclockwise, When sector gear 5 is engaged with rack 10, sector gear 5 is moved to the left with carry-over bar 10, to drive movable plate 9 and arc to scrape Plate 12 is moved to the left, and the first spring 11 is stretched, when sector gear 5 is not engaged with rack 10, in the effect of the first spring 11 Under, sliding block 8 drives arc scraper plate 12 and rack 10 to move right by movable plate 9, and repeatedly, arc scraper plate 12 or so moves Dynamic, to scrape the concrete on scaffold surface and clod, and the rotation of first pulley 13 drives the second belt wheel by belt 17 16 rotations to drive the rotation of the second shaft 15, and then drive third shaft by first bevel gear 18 and second bevel gear 21 20 rotations, the rotation band electric brush 22 of third shaft 20 rotate, and during use, operating personnel push and rotate scaffold to the left, So that arc scraper plate 12 strikes off the concrete on scaffold surface and clod comprehensively, and when scaffold moves to 22 top of hairbrush, hair 22 pairs of scaffold surfaces of brush carry out brush, to further remove the concrete and clod on scaffold surface, and then improve and remove Efficiency and remove it is more thorough, after the completion of removing, operating personnel close first motor 3.
Because further including having second framework 23,3rd bearing seat 24, the 4th shaft 25, traction wheel 26 and the second motor 27, The top left side of first framework 2 is connected with second framework 23, and second framework 23 is located at 22 left side of hairbrush, second framework 23 it is front and back The equal installation by adhering of two side lower parts has a 3rd bearing seat 24, is equipped with the 4th shaft 25 between front and back 3rd bearing seat 24, the 4th turn Axis 25 is connect with the bearing interference in 3rd bearing seat 24, and the middle part of the 4th shaft 25 is equipped with traction wheel 26, second framework 23 Lower front the second motor 27 is installed, the output shaft of the second motor 27 is connect with the front end of the 4th shaft 25.So operation When personnel push scaffold to the left so that the left end of scaffold is placed in across second framework 23 on traction wheel 26, then manually Start 27 slow rotation counterclockwise of the second motor, to drive the rotation of the 4th shaft 25, and then traction wheel 26 is driven to turn counterclockwise Dynamic, traction wheel 26 drives scaffold to be slowly moved to the left, complete to improve the concrete and clod elimination efficiency on scaffold surface At the second motor 27 of rear closing.
Because further including having second spring 28 and idler wheel 29,23 inner top of second framework is connected with second spring 28, second The bottom end of spring 28 is connected with idler wheel 29, and idler wheel 29 is located at the surface of traction wheel 26.So by one end of scaffold when use It is passed through between traction wheel 26 and idler wheel 29, under the action of second spring 28, scaffold is pressed on traction wheel 26 by idler wheel 29 On so that traction wheel 26 effectively can drive scaffold to be moved to the left when rotating, to further increase efficiency.
Because further including having strut 30 and roller 31, the top right side of bottom plate 1 is connected with strut 30, and the top of strut 30 turns Dynamic formula is equipped with roller 31.So scaffold is placed on roller 31 when use, roller 31 is driven when scaffold is moved to the left Rotation, so that more smooth when scaffold is moved to the left.
Although the disclosure, art technology has shown and described with reference to the certain exemplary embodiments of the disclosure Personnel it should be understood that in the case of the spirit and scope of the present disclosure limited without departing substantially from the following claims and their equivalents, A variety of changes in form and details can be carried out to the disclosure.Therefore, the scope of the present disclosure should not necessarily be limited by above-described embodiment, But should be not only determined by appended claims, also it is defined by the equivalent of appended claims.

Claims (4)

1. a kind of constructing tunnel scaffold surface concrete and clod remove equipment, which is characterized in that include bottom plate (1), First framework (2), first motor (3), first rotating shaft (4), sector gear (5), sliding rail (7), sliding block (8), movable plate (9), tooth Article (10), the first spring (11), arc scraper plate (12), first pulley (13), first bearing seat (14), the second shaft (15), Two belt wheels (16), belt (17), first bevel gear (18), second bearing seat (19), third shaft (20), second bevel gear (21) It is connected with the first framework (2) with the top center of hairbrush (22), bottom plate (1), the upper right quarter of the interior rear side of the first framework (2) is equipped with The output shaft of first motor (3), first motor (3) is connected with first rotating shaft (4), and first rotating shaft is equipped with sector in the middle part of (4) Gear (5), the first framework (2) top right side are provided with opening (6), and sector gear (5) passes through opening (6), the first framework (2) top The front and rear sides of right are mounted on sliding rail (7), and sliding rail (7) is equipped with sliding block (8), and sliding block (8) is matched with sliding rail (7) slidingtype It closes, is connected with movable plate (9) at the top of front and back sliding block (8), rack (10), rack are connected among the bottom of movable plate (9) (10) it is engaged with sector gear (5), the first spring (11) is connected between inside on the right side of the right side of sliding block (8) and sliding rail (7), it is living The top center of movable plate (9) is connected with arc scraper plate (12), and the front end of first rotating shaft (4) is equipped with first pulley (13), and first The front and rear sides of framework (2) interior upper left quarter are mounted on first bearing seat (14), and the is equipped between front and back first bearing seat (14) Two shafts (15), the second shaft (15) are connect with the bearing interference in first bearing seat (14), the front peace of the second shaft (15) Equipped with the second belt wheel (16), belt (17) is connected between first pulley (13) and the second belt wheel (16), the second shaft (15) Middle part is equipped with first bevel gear (18), and the top left installation by adhering of the first framework (2) has a second bearing seat (19), and second Bearing interference in bearing block (19) is connected with third shaft (20), and the bottom of third shaft (20) is equipped with second bevel gear (21), first bevel gear (18) is engaged with second bevel gear (21), and hairbrush (22) is connected at the top of third shaft (20).
2. a kind of constructing tunnel according to claim 1 scaffold surface concrete and clod remove equipment, feature It is, further includes having second framework (23), 3rd bearing seat (24), the 4th shaft (25), traction wheel (26) and the second motor (27), the top left side of the first framework (2) is connected with second framework (23), and second framework (23) is located on the left of hairbrush (22), the The equal installation by adhering in front and rear sides lower part of two frameworks (23) has 3rd bearing seat (24), is set between front and back 3rd bearing seat (24) There are the 4th shaft (25), the 4th shaft (25) to be connect with the bearing interference in 3rd bearing seat (24), in the 4th shaft (25) Portion is equipped with traction wheel (26), and the lower front of second framework (23) is equipped with the second motor (27), the second motor (27) it is defeated Shaft is connect with the front end of the 4th shaft (25).
3. a kind of constructing tunnel according to claim 2 scaffold surface concrete and clod remove equipment, feature It is, further includes having second spring (28) and idler wheel (29), second framework (23) inner top is connected with second spring (28), and second The bottom end of spring (28) is connected with idler wheel (29), and idler wheel (29) is located at the surface of traction wheel (26).
4. a kind of constructing tunnel according to claim 3 scaffold surface concrete and clod remove equipment, feature It is, further includes having strut (30) and roller (31), the top right side of bottom plate (1) is connected with strut (30), the top of strut (30) Portion's rotary type is equipped with roller (31).
CN201810385531.5A 2018-04-26 2018-04-26 A kind of constructing tunnel scaffold surface concrete and clod remove equipment Pending CN108571161A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810385531.5A CN108571161A (en) 2018-04-26 2018-04-26 A kind of constructing tunnel scaffold surface concrete and clod remove equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810385531.5A CN108571161A (en) 2018-04-26 2018-04-26 A kind of constructing tunnel scaffold surface concrete and clod remove equipment

Publications (1)

Publication Number Publication Date
CN108571161A true CN108571161A (en) 2018-09-25

Family

ID=63575358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810385531.5A Pending CN108571161A (en) 2018-04-26 2018-04-26 A kind of constructing tunnel scaffold surface concrete and clod remove equipment

Country Status (1)

Country Link
CN (1) CN108571161A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111571397A (en) * 2020-05-26 2020-08-25 孙凰阐 Scaffold processing apparatus
CN112176831A (en) * 2020-10-08 2021-01-05 杨桂香 Building concrete pouring jolter
CN113351688A (en) * 2021-07-06 2021-09-07 江苏盛浩工程科技有限公司 Renovating device for building climbing frame

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107042457A (en) * 2017-05-12 2017-08-15 采泉 A kind of reinforced bar rust cleaning equipment for bridge construction
CN107165429A (en) * 2017-06-15 2017-09-15 惠安普科优利网络科技有限公司 A kind of building implement rapid cleaning device
CN107476228A (en) * 2017-08-26 2017-12-15 南昌首诺科技有限公司 A kind of earthquake disaster road surface barrier clearing device
CN107671676A (en) * 2017-09-21 2018-02-09 程新锋 A kind of bridge construction scaffold derusting device
CN207054177U (en) * 2017-07-11 2018-03-02 厦门路亨园景观艺术有限公司 A kind of municipal administration is repaired facility with afforestation vegetation
CN107869125A (en) * 2017-11-20 2018-04-03 王静娴 A kind of leaf sweeping device car

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107042457A (en) * 2017-05-12 2017-08-15 采泉 A kind of reinforced bar rust cleaning equipment for bridge construction
CN107165429A (en) * 2017-06-15 2017-09-15 惠安普科优利网络科技有限公司 A kind of building implement rapid cleaning device
CN207054177U (en) * 2017-07-11 2018-03-02 厦门路亨园景观艺术有限公司 A kind of municipal administration is repaired facility with afforestation vegetation
CN107476228A (en) * 2017-08-26 2017-12-15 南昌首诺科技有限公司 A kind of earthquake disaster road surface barrier clearing device
CN107671676A (en) * 2017-09-21 2018-02-09 程新锋 A kind of bridge construction scaffold derusting device
CN107869125A (en) * 2017-11-20 2018-04-03 王静娴 A kind of leaf sweeping device car

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111571397A (en) * 2020-05-26 2020-08-25 孙凰阐 Scaffold processing apparatus
CN112176831A (en) * 2020-10-08 2021-01-05 杨桂香 Building concrete pouring jolter
CN113351688A (en) * 2021-07-06 2021-09-07 江苏盛浩工程科技有限公司 Renovating device for building climbing frame

Similar Documents

Publication Publication Date Title
CN108571161A (en) A kind of constructing tunnel scaffold surface concrete and clod remove equipment
CN107185871A (en) A kind of municipal works guard bar washing device
CN107457669A (en) A kind of oil drill rocker derusting is cleaned and dried all-in-one
CN109396088A (en) PC component die station clearing apparatus and its working method
CN107719314A (en) A kind of radioactivity rare earth waste transport vehicle cleaning equipment
CN104276146A (en) Full automation cleaning machine
CN107472109A (en) A kind of automobile washing goods box-type carrier vehicle
CN209157906U (en) A kind of road construction ground Plane surface grinding machine
CN107497729A (en) A kind of slide measure equipment for quick washing being used in detection device
CN106733973A (en) A kind of bag of cement cleaning type processing unit
CN204248594U (en) Burr removal apparatus for wheel gear
CN205074274U (en) Cleaning device is stroked soon in centrifugation of solar photovoltaic base plate planer -type
CN208466695U (en) A kind of automobile brake pump automatic flushing device
CN108247501B (en) Surface polishing treatment system for nodular cast iron platform
CN108608294A (en) A kind of constructing tunnel anchor pole rust removalling equipment
CN108176638A (en) A kind of surface treatment platform of the black cast iron part of ash
CN208303446U (en) A kind of industrial goods cleaning machine
CN203330850U (en) Angle steel deruster
CN108797264A (en) Equipment is collected in a kind of construction site with antiskid plate
CN111958446B (en) Derusting method for recycling waste chains
CN212801138U (en) Highway crack processing apparatus that highway engineering was used
CN111005344B (en) Railway sand removing device for desert zone
CN209649049U (en) Aerated-block cleaning mold device
CN105234110B (en) Photovoltaic substrate planer-type centrifugal rotary strokes clearing apparatus
CN210765524U (en) Automatic cover curtain device of acid tank

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180925

RJ01 Rejection of invention patent application after publication