CN108556121A - The Modularized vertical steel die and its operating method of prefabricated pipe gallery - Google Patents

The Modularized vertical steel die and its operating method of prefabricated pipe gallery Download PDF

Info

Publication number
CN108556121A
CN108556121A CN201711431340.XA CN201711431340A CN108556121A CN 108556121 A CN108556121 A CN 108556121A CN 201711431340 A CN201711431340 A CN 201711431340A CN 108556121 A CN108556121 A CN 108556121A
Authority
CN
China
Prior art keywords
external mold
internal model
mold
pedestal
pipe gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711431340.XA
Other languages
Chinese (zh)
Inventor
姜云龙
柳旭
刘铭君
许坤
姜圣公
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MCC Tiangong Group Corp Ltd
Original Assignee
MCC Tiangong Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MCC Tiangong Group Corp Ltd filed Critical MCC Tiangong Group Corp Ltd
Priority to CN201711431340.XA priority Critical patent/CN108556121A/en
Publication of CN108556121A publication Critical patent/CN108556121A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/04Producing shaped prefabricated articles from the material by tamping or ramming
    • B28B1/045Producing shaped prefabricated articles from the material by tamping or ramming combined with vibrating or jolting
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B1/00Producing shaped prefabricated articles from the material
    • B28B1/14Producing shaped prefabricated articles from the material by simple casting, the material being neither forcibly fed nor positively compacted
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/0002Auxiliary parts or elements of the mould
    • B28B7/0014Fastening means for mould parts, e.g. for attaching mould walls on mould tables; Mould clamps
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/16Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes
    • B28B7/18Moulds for making shaped articles with cavities or holes open to the surface, e.g. with blind holes the holes passing completely through the article
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B7/00Moulds; Cores; Mandrels
    • B28B7/28Cores; Mandrels
    • B28B7/30Cores; Mandrels adjustable, collapsible, or expanding

Abstract

A kind of Modularized vertical steel die of prefabricated pipe gallery, is made of pedestal, external mold and internal model three parts;The pedestal is made of the splicing of four right-angle modules, four T-shaped mould blocks and several pedestal standard module modules, the surrounding of pedestal and internal respectively external mold track and internal model track;The external mold includes that external mold panel, the module layer being made of four right-angle modules and several external mold standard module modules and external mold mobile system form;The internal model is made of the connection of multiple rectangle cabins, and the four side internal model panels in each cabin are partly therefrom two movable interior molds, are spliced by oblique type interface between two movable interior molds, the movable hydraulic screw rod of the double groups of connected double-layer on four side internal model panels.The mold solves the problems, such as that prefabricated comprehensive pipe gallery die size is single and large area occupies engineering processing site, is suitable for standard chemical plant, different size, two or more box-structure concrete component process equipments.

Description

The Modularized vertical steel die and its operating method of prefabricated pipe gallery
Technical field
The invention belongs to municipal administration synthesis pipe gallery engineering field, more particularly to a kind of Modularized vertical steel of prefabricated pipe gallery Molding jig and its operating method.
Background technology
As country vigorously supports civilian infrastructure construction, one pipe gallery construction fever has been started in China Tide.In the construction process, prefabricated assembled pipe gallery is gradually known because of its duration superiority, traditional integrated pipe Prefabricated corridor is mostly prefabricated, the prefabricated integrated pipe in mainly single cabin for obtaining pilot at present, promoting and applying for being derived from box culvert tube coupling Corridor, in the prefabricated pipe gallery for also occurring two cabins, three cabins in the recent period.
The prefabricated processing of pipe gallery has two kinds of vertical processing and horizontal processing mold at present.Horizontal processing mold is in reality During use, pipe gallery internal model complex procedures, operating difficulties are removed in installation, seriously reduce production efficiency, while mold Lower concrete vibrates there are difficulties in quality control, influences the final product quality of precast concrete.And vertical processing at this stage Mold in actual use, generally requires larger construction site, while gantry crane or other big machineries being needed to set Standby cooperation, place inner orbit layout density is big, seriously reduces production efficiency, improves construction cost.In addition, both add The size and specification of tool and mould are fixed, can not independently meet the market demand of existing pipe gallery.
Invention content
The object of the present invention is to provide a kind of Modularized vertical steel dies of prefabricated pipe gallery, which solves pre- The problem of comprehensive pipe gallery die size processed is single and large area occupies engineering processing site is suitable for standard chemical plant, different rule Lattice, two or more box-structure concrete component process equipments.
It is a further object of the present invention to provide the operating methods of the Modularized vertical steel die of above-mentioned prefabricated pipe gallery.
As above design, the technical scheme is that:A kind of Modularized vertical steel die of prefabricated pipe gallery, it is special Sign is:It is made of pedestal, external mold and internal model three parts;If the pedestal is by four right-angle modules, four T-shaped mould blocks and butt The quasi- modulus module splicing composition of coordinate, the surrounding of pedestal and internal respectively external mold track and internal model track, external mold track side It is welded on pedestal outer rim, the other side is welded with adjustable leading screw bearing up and down, and internal model track is level of the system on pedestal bottom plate Guide groove, positioning of the guide groove for internal model connection axis pin;If the external mold includes external mold panel, by four right-angle modules and The module layer and external mold mobile system composition, external mold panel of dry external mold standard module module composition are made of square tube and steel plate And the socket joint module layer on the affixed socket mold in the top of panel, socket mold, external mold panels outside are equipped with external mold mobile system, Floor is housed between above-mentioned square tube, wedge-shaped rubber groove is set on socket mold;The internal model is by multiple rectangle cabin connection groups At by spigot-and-socket hinge connection between each cabin, the hinge of axis pin is reserved in bottom setting, for connecting and controlling interior die face The running orbit of plate;The four side internal model panels in each cabin use square tube and hot rolled steel plate welding production, lead between square tube Floor connection is crossed, four side internal model panels are partly therefrom two movable interior molds, by oblique between two movable interior molds Type interface splices, and passes through the movable hydraulic screw rod of the double-deck double groups of weld horizontal Bolted angle connection on four side internal model panels.
The operating method of the Modularized vertical steel die of above-mentioned prefabricated pipe gallery, includes the following steps:
1. when mold in opened condition when, adjust internal model movable hydraulic elongate screw, so that interior mold is installed in place and lead to Bolt hole progress bolt is crossed to fix;
2. having bound framework of steel reinforcement in precasting yard fixed position and will be on its hoisting transportation to pedestal;
3. pushing on multiple modular external molds to pedestal, to be installed in place when being blocked by gear bank, then connected by bolt The module of multiple modularization external molds is connect, ensures size distortion do not occur in concreting process;
4. pouring commerical ready-mixed concrete, attached vibrator vibrated concrete is used at side wall position, utilizes the socket at top Mold carries out top concrete and vibrates;
5. adjusting internal model movable hydraulic screw rod to shorten, internal model mold is opened;Then the screw rod for removing external mold intermodule, beats Over mould mold be inserted into vertical loading board by reserved hole for hoist, pipe gallery hung out into mold;
6. overturning pipe gallery on cushion to horizontal;
It is stored 7. stacking and unifying place to pipe gallery, and carries out maintenance work.
Above-mentioned external mold and the boundary position of internal model setting gear bank.
0.65 meter of the right angle length of side of right-angle module in above-mentioned external mold, size datum are the external sideline in corridor;External mold master die Digital-to-analogue block length is the classification length of modulus processing dimension between 1.3 meters~1.6 meters, per 0.1m.
Above-mentioned external mold track is formed by the double button welding productions of 20#b channel steels.
A length of 1 meter of the right-angle side of right-angle module in said base, size datum are the external sideline in corridor;The two of T-shaped mould block Side wing edge is each 1 meter of partition wall center both sides, and web length is 1 meter, and web size datum is the external sideline in corridor;Pedestal standard module Block length is the classification length of modulus processing dimension between 1.5m~2.5m, per 0.1m.
The beneficial effects of the invention are as follows:1, a whole set of steel die is assembled by several different standardized modules, overcomes The single problem of traditional processing die size, it is assembled by different standardized modules, cope with the integrated pipe of different size sections Corridor, and then effectively control operating cost;2, using the external mold track and internal model track on pedestal, coordinate vertical pouring structure, it can Reduce operating space, avoids the transport for carrying out finished product pipe gallery using long range sliding rail or trolley, track, reduce steel die Floor space, and then lay the foundation for the prefabricated place of the multiple pipe galleries of reasonable Arrangement;3, pipe gallery steel die can be unified Modulus, push fast-ripenin and the development of prefabricated assembled pipe gallery each side surface technology.
Description of the drawings:
Fig. 1 is that internal model of the present invention opens schematic diagram;
Fig. 2 is the floor map of pedestal;
Fig. 3 is the A-A sectional views of Fig. 2;
Fig. 4 is pedestal and internal model track and external mold track connection diagram;
Fig. 5 is the floor map of external mold;
Fig. 6 is the side view of external mold;
Fig. 7 is external mold mobile system schematic diagram;
Fig. 8 is the flat casting area schematic diagram of internal model;
Fig. 9 is internal model panel and movable hydraulic screw rod connection diagram;
Figure 10 is molding sectional schematic diagram.
In figure:1-pedestal;2-external molds;3-internal models;4-standard module modules;1-1-right-angle module;1-2-T-shaped mould Block;1-3-pedestal standard module module;1-4-external mold track;1-5-internal model track;1-6-leading screw bearing;1-7-gear bank; 1-8-is hot rolled H-shaped;1-9-steel plate;1-10-modular demarcation lines;1-11-water-stop glue bar groove;1-12-slip casting groove;1- 13-bellmouth molds;
2-1-right-angle module;2-1-external mold standard module module;2-3-external mold mobile system;2-4-operating platform; 2-5-floor;2-6-supporting and mounting bracket;2-7-idler wheel;2-8-bellmouth socket;2-9-wedge-shaped rubber groove;2-10-side Pipe;2-11-steel plate;2-12-modular demarcation lines;
The movable interior molds of 3-1-;3-2-movable hydraulic screw rod;3-3-square tube;3-4-floor;The interior molds of 3-5- Connect axis pin;3-6-angle steel;3-7-steel plate.
Specific implementation mode:
As shown in Figure 1:A kind of Modularized vertical steel die of prefabricated pipe gallery, using shaped steel and hot rolled steel plate Seiko It forms, whole to be made of 3 three pedestal 1, external mold 2, internal model parts, pedestal 1 is for external mold 2, the horizontal sliding and support of internal model 3 The effect of entire template and the prefabricated piping lane of single-unit.External mold 2, internal model 3 have the function of assembly, sliding, modularization assembling etc..
As shown in Figure 2,3, 4:Pedestal 1 is by four right-angle module 1-1, four T-shaped mould block 1-2 and several pedestal standard modules Module 1-3 splicing compositions.A length of 1 meter of the right-angle side of wherein four right-angle module 1-1, size datum are the external sideline in corridor;Four T Two side wing edges of pattern block 1-2 are each 1 meter of partition wall center both sides, and web length is 1 meter, and web size datum is the external side in corridor Line;Pedestal standard module module 1-3 is that 1.5m~2.5m length differs, and is the classification length of modulus processing dimension per 0.1m.
Pedestal 1 is put along the lifting of the bottom of prefabricated comprehensive pipe gallery structure wall, fixes hot rolled H-shaped H300 × 200 × 8, The finishing hot rolled steel plate that 15mm is welded at the top of shaped steel, is welded and fixed the bellmouth mold of prefabricated pipe gallery on hot rolled steel plate Water-swellable water-stop glue bar groove 1-11 with holes is arranged on bellmouth and forms second waterproof, is arranged among twice waterproof by 1-13 Slip casting groove 1-12, makes waterproof effect reach best.In the external mold 2 of pedestal 1 and the boundary position setting gear bank 1-7 of internal model 3, energy Enough ensure the size precision of inner and outer template, the effect of similar guiding ruler, while the filleting mouth mold as prefabricated pipe gallery has.
In 1 surrounding of pedestal and the internal track existed for external mold 2,3 sliding and running of internal model.External mold track 1-4 is by 20#b The double button welding productions of channel steel form, and side is welded on 1 outer rim of pedestal, and the other side is welded with 1-6 in adjustable leading screw bearing up and down; Internal model track 1-5 is the horizontal guide slot being especially tailored on bottom plate, and the positioning of axis pin is connected for internal model 3, while making side Internal model 3 can be displaced outwardly, and not scrape piping lane inner wall, destroy piping lane presentation quality.
As shown in Fig. 5,6,7:External mold 2 by external mold panel, by four right-angle module 2-1 and several external mold standard module modules The module layer and external mold mobile system 2-3 compositions that 2-2 is spliced into.Wherein, external mold panel uses 80mm × 160mm × side 5mm Pipe and 10mm steel plates are made and four right-angle modules of socket joint and several external molds on the affixed bell and spigot in the top of panel, socket mold Standard module module;0.65 meter of the right angle length of side of four right-angle modules, size datum are the external sideline in corridor, external mold master die digital-to-analogue Block length is 1.3 meters~1.6 meters and differs, and is the classification length of modulus processing dimension per 0.1m.External mold mobile system is mounted on outer The outside of die face plate is made of operating platform, supporting and mounting bracket and idler wheel.
160mm × 10mm strip floors are housed, setting wedge-shaped rubber groove 2-9 forms the on bell and spigot between above-mentioned square tube One of waterproof.
Plate vibrator is installed on the bell and spigot mold on 2 top of external mold, drives top shutter vibration, can fully be excluded interior Portion's air reduces bubble and generates.
As shown in Figure 8,9:Internal model 3 is made of the connection of multiple rectangle cabins, is connected by spigot-and-socket hinge between each cabin It connects, running orbit of the hinge of axis pin 3-5 for connecting and controlling internal model panel is reserved in bottom setting.The four of each cabin Side internal model panel uses 80mm × 160mm × 5mm square tube 3-3 and 10mm hot rolled steel plate 3-7 welding productions, passes through between square tube 160mm × 10mm strip floor 3-4 connections, four side internal model panels are partly therefrom two movable interior mold 3-1, two activities Spliced by oblique type interface between mold in formula, passes through the double groups of weld horizontal angle steel 3-6 connected double-layers on four side internal model panels Movable hydraulic screw rod 3-2.
Assemble method of the present invention is:
1, modularization steel die group pair selects the straight of the pedestal of mold according to prefabricated comprehensive pipe gallery structure wall thickness is designed Corner Block List Representation, T-shaped mould block select pedestal standard module module according to each chamber size;The right angle mould of simultaneous selection mold external mold Block judges that external mold standard module module forms, and configure external mold mobile system according to prefabricated pipe gallery external dimensions;Then Select mold internal model assembling module, and configuration activities formula hydraulic pressure screw rod.
2, vertically and horizontally contracting seam 1~2, surface smoothness are arranged on bed course for the casting concrete bed course in factory for prefabrication 10mm, absolute altitude ± 10mm, the gradient and thickness are met the requirements.
3, mold base is installed.Along the bottom of prefabricated comprehensive pipe gallery structure wall, lifting puts, fixes hot rolled H-shaped H300 × 200 × 8, the finishing hot rolled steel plate of 15mm is welded at the top of shaped steel, and prefabricated pipe gallery is welded and fixed on hot rolled steel plate Bellmouth mold 1-13, be finally welded and fixed gear bank in the external mold of pedestal, internal model boundary position, it is desirable that processing and fabricating precision meet It is required that ensure the size precision of inner and outer template, while the filleting mouth mold as prefabricated pipe gallery has.In H profile steel surrounding External mold track is welded, external mold track is formed by the double button welding productions of 20#b channel steels in advance, and outer end is welded with adjustable leading screw up and down Bearing, adjusting screw bearing keep pedestal horizontal, meet construction requirement;In H profile steel internal model undertaking site, corresponding internal model axis pin position Trepanning parallel along side wall vertical direction is set, internal model track is used to form.
4, internal model is installed.It first uses square tube, hot rolled steel plate welding production at internal model panel, is welded on the outer keel of internal model Horizontal corner steel, for connecting movable hydraulic screw rod;By the hinge connection of spigot-and-socket, bottom needs to be arranged internal model modular unit The hinge of reserved axis pin, for connecting and controlling interior mold running orbit.
5, external mold is installed.It first uses square tube, hot rolled steel plate welding production at external mold panel, socket has been welded and fixed at top Mold welds operating platform, supporting and mounting bracket and idler wheel in outer keel, checks verticality and flatness, then by lifting, make Idler wheel enters the external mold track on pedestal, after external mold fully enters track, you can completes prefabricated pipe gallery modularization steel The assembling of mold.
The present invention operating method be:
As shown in Figure 10, this technology technological process:Interior mold assembly molds, and → checking mold cavity size → is put into reinforcing bar Skeleton → molding has external mold → casting concrete → die sinking → depanning → inspection → overturning → stacking to unified place and conserves.
1, when mold in opened condition when, adjust internal model movable hydraulic elongate screw, so that interior mold is installed in place, pacifying During dress, there need to be skilled worker to carry out check at any time internal model, it is ensured that piece position no-sundries, device run well, and lead to Bolt hole progress bolt is crossed to fix.
2, skilled worker is according to design drawing size, checks whether dies cavity size meets design requirement, and by error Precision controlling is within specification allowable range.
3, framework of steel reinforcement has been bound in precasting yard fixed position, by the way that special framework of steel reinforcement suspension centre is arranged, has ensured reinforcing bar Skeleton is not threaded off, deforms or is destroyed, on hoisting transportation to pedestal.
4, thickness of concrete cover is controlled by the way that cement mortar bedding block is arranged on framework of steel reinforcement, is checked after the completion of lifting The protective layer thickness of top plate and bottom plate, side wall.Then skilled worker pushes multiple modular external molds to base respectively by manpower On seat, to be installed in place when being blocked by gear bank, the module of multiple modularization external molds is then bolted, ensures that concrete pours There is not size distortion during building.
5, commerical ready-mixed concrete is poured, attached vibrator vibrated concrete is used at side wall position, utilizes the socket at top Mold carries out top concrete and vibrates.
6, adjustment internal model movable hydraulic screw rod shortens, and opens internal model mold;Then the screw rod for removing external mold intermodule, beats Over mould mold be inserted into vertical loading board by reserved hole for hoist, pipe gallery hung out into mold.
7, pipe gallery is overturn on cushion to horizontal.
8, it stacks to pipe gallery and unifies place storage, and carry out maintenance work.

Claims (6)

1. a kind of Modularized vertical steel die of prefabricated pipe gallery, it is characterised in that:By pedestal, external mold and internal model three parts Composition;The pedestal is made of the splicing of four right-angle modules, four T-shaped mould blocks and several pedestal standard module modules, pedestal Surrounding is welded on pedestal outer rim with internal respectively external mold track and internal model track, external mold track side, and the other side is welded with Under adjustable leading screw bearing, internal model track is horizontal guide slot of the system on pedestal bottom plate, which is used for internal model connecting pin The positioning of axis;The module that the external mold includes external mold panel, is made of four right-angle modules and several external mold standard module modules Layer and external mold mobile system composition, external mold panel are made of square tube and steel plate and in the affixed socket molds in the top of panel, Socket joint module layer on socket mold, external mold panels outside are equipped with external mold mobile system, floor, socket mould are housed between above-mentioned square tube Wedge-shaped rubber groove is set on tool;The internal model is made of the connection of multiple rectangle cabins, is closed by spigot-and-socket between each cabin The hinge of axis pin, the running orbit for connecting and controlling internal model panel are reserved in page connection, bottom setting;Each cabin Four side internal model panels use square tube and hot rolled steel plate welding production, are connected by floor between square tube, four side internal model panels are therefrom Part is two movable interior molds, is spliced by oblique type interface between two movable interior molds, is led on four side internal model panels Cross the movable hydraulic screw rod of the double-deck double groups of weld horizontal Bolted angle connection.
2. a kind of operating method of the Modularized vertical steel die of prefabricated pipe gallery according to claim 1, special Sign is:Include the following steps:
1. when mold in opened condition when, adjust internal model movable hydraulic elongate screw, so that interior mold is installed in place and pass through spiral shell Keyhole carries out bolt and fixes;
2. having bound framework of steel reinforcement in precasting yard fixed position and will be on its hoisting transportation to pedestal;
3. pushing on multiple modular external molds to pedestal, to be installed in place when being blocked by gear bank, then it is bolted more The module of a modularization external mold ensures size distortion do not occur in concreting process;
4. pouring commerical ready-mixed concrete, attached vibrator vibrated concrete is used at side wall position, utilizes the socket mold at top Top concrete is carried out to vibrate;
5. adjusting internal model movable hydraulic screw rod to shorten, internal model mold is opened;Then the screw rod for removing external mold intermodule is opened outer Mould mold is inserted into vertical loading board, pipe gallery is hung out mold by reserved hole for hoist;
6. overturning pipe gallery on cushion to horizontal;
It is stored 7. stacking and unifying place to pipe gallery, and carries out maintenance work.
3. the Modularized vertical steel die of prefabricated pipe gallery according to claim 1, it is characterised in that:Above-mentioned external mold With the boundary position setting gear bank of internal model.
4. the Modularized vertical steel die of prefabricated pipe gallery according to claim 1, it is characterised in that:Above-mentioned external mold In right-angle module 0.65 meter of the right angle length of side, size datum be the external sideline in corridor;External mold standard module block length is at 1.3 meters It is the classification length of modulus processing dimension per 0.1m between~1.6 meters.
5. the Modularized vertical steel die of prefabricated pipe gallery according to claim 1, it is characterised in that:Above-mentioned external mold Track is formed by the double button welding productions of 20#b channel steels.
6. the Modularized vertical steel die of prefabricated pipe gallery according to claim 1, it is characterised in that:Said base In right-angle module a length of 1 meter of right-angle side, size datum be the external sideline in corridor;Two side wing edges of T-shaped mould block are partition wall center Each 1 meter of both sides, web length are 1 meter, and web size datum is the external sideline in corridor;Pedestal standard module block length 1.5m~ It is the classification length of modulus processing dimension per 0.1m between 2.5m.
CN201711431340.XA 2017-12-26 2017-12-26 The Modularized vertical steel die and its operating method of prefabricated pipe gallery Pending CN108556121A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711431340.XA CN108556121A (en) 2017-12-26 2017-12-26 The Modularized vertical steel die and its operating method of prefabricated pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711431340.XA CN108556121A (en) 2017-12-26 2017-12-26 The Modularized vertical steel die and its operating method of prefabricated pipe gallery

Publications (1)

Publication Number Publication Date
CN108556121A true CN108556121A (en) 2018-09-21

Family

ID=63529427

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711431340.XA Pending CN108556121A (en) 2017-12-26 2017-12-26 The Modularized vertical steel die and its operating method of prefabricated pipe gallery

Country Status (1)

Country Link
CN (1) CN108556121A (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111705835A (en) * 2020-06-19 2020-09-25 中交第三航务工程局有限公司 Vertical prefabricating process for underground comprehensive pipe gallery
CN111730727A (en) * 2020-06-19 2020-10-02 中交第三航务工程局有限公司 Manufacturing method of vertical prefabricated template of underground comprehensive pipe gallery
CN111923201A (en) * 2020-07-03 2020-11-13 山东泰迅装配式建筑科技有限公司 Automatic change PPVC centre form structure
CN112092181A (en) * 2020-09-10 2020-12-18 连云港市成盛混凝土构件有限责任公司 Assembly type prefabricated square culvert forming device and manufacturing process thereof
WO2021051429A1 (en) * 2019-09-16 2021-03-25 长沙远大住宅工业集团股份有限公司 Die assembly for producing prefabricated parts and production method
CN113107006A (en) * 2021-04-25 2021-07-13 中化学交通建设集团市政工程有限公司 Light movable integrated pipe gallery formwork
CN113199602A (en) * 2021-06-04 2021-08-03 中冶交投善筑成都装配式建筑科技发展有限公司 Cambered surface prefabricated part mold and manufacturing method of prefabricated part
CN113319983A (en) * 2021-06-01 2021-08-31 浙江庄辰建筑科技有限公司 Vertical column die convenient to replace quickly and based on prefabricated bridge hollow core
CN114102816A (en) * 2021-11-19 2022-03-01 长安大学 Polygonal prefabricated thin-shell three-dimensional structure modular mold

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011034593A1 (en) * 2009-09-18 2011-03-24 Rotondo Weirich, Inc. System and method for the rapid manufacturing of concrete modular housing units
CN204919605U (en) * 2015-08-18 2015-12-30 湖南东方红建设集团有限公司 Prefabricated assembled reinforced concrete utility tunnel and production mould thereof
CN205415956U (en) * 2015-11-20 2016-08-03 周瑞华 A combination die block for prefabricating utility tunnel
CN106346595A (en) * 2016-08-31 2017-01-25 长沙楚鸿机械有限公司 Vertical molding mold and system and application method for concrete utility tunnel
CN106426525A (en) * 2016-11-15 2017-02-22 湖南三筑工有限公司 Prefabricated pipe rack mold
CN205969436U (en) * 2016-08-31 2017-02-22 山东天马新型建材有限公司 Horizontal many storekeepers corridor mould

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2011034593A1 (en) * 2009-09-18 2011-03-24 Rotondo Weirich, Inc. System and method for the rapid manufacturing of concrete modular housing units
CN204919605U (en) * 2015-08-18 2015-12-30 湖南东方红建设集团有限公司 Prefabricated assembled reinforced concrete utility tunnel and production mould thereof
CN205415956U (en) * 2015-11-20 2016-08-03 周瑞华 A combination die block for prefabricating utility tunnel
CN106346595A (en) * 2016-08-31 2017-01-25 长沙楚鸿机械有限公司 Vertical molding mold and system and application method for concrete utility tunnel
CN205969436U (en) * 2016-08-31 2017-02-22 山东天马新型建材有限公司 Horizontal many storekeepers corridor mould
CN106426525A (en) * 2016-11-15 2017-02-22 湖南三筑工有限公司 Prefabricated pipe rack mold

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2021051429A1 (en) * 2019-09-16 2021-03-25 长沙远大住宅工业集团股份有限公司 Die assembly for producing prefabricated parts and production method
CN111705835A (en) * 2020-06-19 2020-09-25 中交第三航务工程局有限公司 Vertical prefabricating process for underground comprehensive pipe gallery
CN111730727A (en) * 2020-06-19 2020-10-02 中交第三航务工程局有限公司 Manufacturing method of vertical prefabricated template of underground comprehensive pipe gallery
CN111705835B (en) * 2020-06-19 2021-08-03 中交第三航务工程局有限公司 Vertical prefabricating process for underground comprehensive pipe gallery
CN111923201A (en) * 2020-07-03 2020-11-13 山东泰迅装配式建筑科技有限公司 Automatic change PPVC centre form structure
CN112092181A (en) * 2020-09-10 2020-12-18 连云港市成盛混凝土构件有限责任公司 Assembly type prefabricated square culvert forming device and manufacturing process thereof
CN113107006A (en) * 2021-04-25 2021-07-13 中化学交通建设集团市政工程有限公司 Light movable integrated pipe gallery formwork
CN113319983A (en) * 2021-06-01 2021-08-31 浙江庄辰建筑科技有限公司 Vertical column die convenient to replace quickly and based on prefabricated bridge hollow core
CN113199602A (en) * 2021-06-04 2021-08-03 中冶交投善筑成都装配式建筑科技发展有限公司 Cambered surface prefabricated part mold and manufacturing method of prefabricated part
CN114102816A (en) * 2021-11-19 2022-03-01 长安大学 Polygonal prefabricated thin-shell three-dimensional structure modular mold

Similar Documents

Publication Publication Date Title
CN108556121A (en) The Modularized vertical steel die and its operating method of prefabricated pipe gallery
CN105908777B (en) A kind of pipe gallery sliding mould and its application method
CN112060307B (en) Segment box girder short line matching control and prefabricating construction method
CN102146796B (en) Construction technology for inverted arch of two-track tunnel of high-speed railway
CN108487630B (en) Concrete sill prefabricated assembly construction method
CN106150079A (en) Make building machine in the air
CN109487814A (en) Cast-in-place piping lane integrated moveable formwork jumbo construction method
CN107700648A (en) Prefabricated component and cast-in-place post assembled integral concrete frame structure construction
CN106827193B (en) Multiple box culvert makes mold and the method using three hole box culvert molds production box culvert
CN102720137B (en) Prefabrication construction method for trough girder sections of track traffic high-level bridge
CN111911194A (en) Multifunctional two-lining trolley construction equipment and method for long and wide tunnel
CN104727226A (en) Construction method for steel-concrete composite girder
CN107599149A (en) Template method of adjustment when a kind of curved section is immersed tube prefabricated
CN111139868B (en) Complete construction method for comprehensive pipe gallery
CN105201107A (en) Construction method for stacked plate type shear wall of underground garage
CN212176540U (en) Hydraulic climbing formwork system formwork
CN108748626A (en) Precast wall body formwork erection pours device
CN110318427A (en) A kind of prefabricated pipe gallery construction method of segmentation
CN202064281U (en) Slip form frame
CN113463683A (en) Double-pipe gallery slip form trolley and double-pipe gallery construction method
CN210263131U (en) Assembled is from stagnant water underground pipe gallery structure
CN206035507U (en) Rectangle box culvert and for tunnel construction platform truck
CN111676848A (en) Fully prefabricated assembled platform structure for subway station
CN108978699B (en) Land integral prefabricated bearing platform and production and installation method thereof
CN207109854U (en) Prefabricated box culvert installs car

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180921