CN108520309A CN201810168041.XA CN201810168041A CN108520309A CN 108520309 A CN108520309 A CN 108520309A CN 201810168041 A CN201810168041 A CN 201810168041A CN 108520309 A CN108520309 A CN 108520309A
Authority
CN
China
Prior art keywords
trip
module
vehicles
pedestrian
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810168041.XA
Other languages
Chinese (zh)
Inventor
郜春海
张强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Traffic Control Technology TCT Co Ltd
Original Assignee
Traffic Control Technology TCT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Traffic Control Technology TCT Co Ltd filed Critical Traffic Control Technology TCT Co Ltd
Priority to CN201810168041.XA priority Critical patent/CN108520309A/en
Publication of CN108520309A publication Critical patent/CN108520309A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06312Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/40Business processes related to the transportation industry

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Tourism & Hospitality (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Business, Economics & Management (AREA)
  • Marketing (AREA)
  • Physics & Mathematics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Traffic Control Systems (AREA)

Abstract

The embodiment of the invention discloses a kind of rail traffic Unmanned Systems based on selection trip, including trip comprehensive platform, rail traffic scheduling system, aircraft scheduling system, bus scheduling system and taxi dispatching system;Trip comprehensive platform include:Go out pedestrian's information collection module, vehicle status enquiry module and vehicles scheduler module;Go out pedestrian's information collection module for obtain it is each go out pedestrian trip information and merge;Vehicle status enquiry module is used to record the operating status and maintenance situation of each vehicles, and allocates the corresponding vehicles according to dispatch command;Vehicles scheduler module obtains dispatch command for being integrated to the information of reception.It by three interactions between module and four systems, not only realizes the vehicles and goes out the information exchange between pedestrian, but also realize the flexible dispatching to interconnect with the vehicles service time between the vehicles.

Description

A kind of rail traffic Unmanned Systems based on selection trip
Technical field
The present embodiments relate to technical field of rail traffic, and in particular to it is a kind of based on selection trip rail traffic without People's control loop.
Background technology
Modern rail traffic is quickly grown, and mileage constantly extends, and the travel time of people is greatly saved, facilitates people Life.But rail traffic is run according to operation timetable, and the variation of peak traffic and low ebb is coped with not Foot.Meanwhile rail traffic is city large electricity consumer, dispatches a car excessive, is unfavorable for energy saving;It dispatches a car very few, is unfavorable for quickly going on a journey.More Importantly, the variation of departure interval can not notify out pedestrian, causes to lack communication between departure plan and trip requirements, go out Pedestrian can not accurately arrange the travel time of oneself.In addition, rail line is fixed, the transfer time is in track traffic trip In the ratio that occupies increase, change to distance travelled length, the transfer experience for going out pedestrian is general, changing when especially carrying heavy luggage It is poor to multiply experience.Meanwhile independent operating between the various vehicles, the service time is limited and lacks and interconnects.
Therefore, there are the following problems in existing Rail Transit System:The vehicles and goes out pedestrian and lack except booking Information exchange lacks between the vehicles and interconnects, and the vehicles service time is limited.
Invention content
Since existing method is there are the above problem, the embodiment of the present invention propose it is a kind of based on selection trip rail traffic without People's control loop, including trip comprehensive platform, rail traffic are dispatched system, aircraft scheduling system, bus scheduling system and are gone out It hires a car scheduling system;
The trip comprehensive platform includes:Go out pedestrian's information collection module, vehicle status enquiry module and traffic work Has scheduler module;
It is described go out pedestrian's information collection module connect with the vehicles scheduler module, for obtain it is each go out pedestrian Trip information, by it is multiple go out pedestrian trip information merge, obtain trip requirements, and the trip requirements are sent to institute State vehicles scheduler module;The trip information includes beginning and end information, trip preference information;
The vehicle status enquiry module is connect with the vehicles scheduler module, for recording each traffic work The operating status and maintenance situation of tool, the traffic work is sent to by the operating status of each vehicles and maintenance situation Have scheduler module, receives the dispatch command of the vehicles scheduler module, and corresponding friendship is allocated according to the dispatch command Logical tool, the maintenance time of each vehicles of Dynamic Arrangement and prediction need to purchase the time of the new vehicles;
The vehicles scheduler module be used for the trip information for going out pedestrian of reception, the operating status of the vehicles and Maintenance situation is integrated, and obtains dispatch command, and the dispatch command is sent to the vehicle status enquiry module.
Optionally, the vehicles scheduler module includes timetable fine tuning module and temporary line module;
Timetable fine tuning module is used for during daily operation processing because a vehicles are late or morning is to leading The case where needs of cause several vehicles cooperation adjustment;
The temporary line module is used to arrange the temporary line of the specific time caused by large-scale activity.
Optionally, the rail traffic Unmanned Systems further include:Trip scheme proposals module;
The trip scheme proposals module respectively with it is described go out pedestrian's information collection module and the vehicles dispatch mould Block connects, and the trip route side of suggestion is calculated in the trip information for going out the transmission of pedestrian's information collection module according to Case, and according to trip route described in the real-time running state real-time update of the vehicles of vehicles scheduler module transmission Scheme.
Optionally, the trip comprehensive platform further includes:Trip route logging modle;
The trip route logging modle determines whether pedestrian catches up with for being recorded to the trip information for going out pedestrian It gone up required train number, whether changed trip scheme.
Optionally, the trip comprehensive platform further includes:Advertising broadcast point broadcasting module;
The advertising broadcast point broadcasting module respectively with it is described go out pedestrian's information collection module and the vehicle status look into Ask module connection, for according to described in go out pedestrian's information collection module transmission trip information to go out pedestrian provide advertisement and/or Broadcast, and the operating status of the vehicles sent according to the vehicle status enquiry module plays extensively in a vehicle It accuses and/or broadcasts.
Optionally, the trip comprehensive platform further includes:Time dynamic computing module;
The time dynamic computing module respectively with the vehicle status enquiry module and it is described go out pedestrian information receive Collect module connection, the operating status of the vehicles for being sent according to the vehicle status enquiry module calculates simultaneously in real time The arrival time of each vehicles in back-to-back running, and according to it is described go out pedestrian's information collection module send go out pedestrian's Trip information calculates and feeds back the travel time of at least one feasible travel route in real time.
Optionally, the trip comprehensive platform further includes:Expense dynamic computing module;
The expense dynamic computing module and the trip route logging modle and it is described go out pedestrian's information collection module connect It connects, the trip information for going out pedestrian for going out the transmission of pedestrian's information collection module according to calculates and feeds back pedestrian's in real time The expense of several feasible travel routes is estimated, and real according to the trip information for going out pedestrian that the trip route logging modle is sent When calculate and feed back the disbursement and sattlements of each vehicles.
Optionally, the trip comprehensive platform further includes:Priority match module;
The priority match module is connect with the modules of the trip comprehensive platform, for comprehensive according to the trip The priority for closing the modules of platform is coordinated, and high level interrupt function is given to the information processing of high priority.
Optionally, the trip comprehensive platform further includes:Game reward module;
The game reward module respectively with it is described go out pedestrian's information collection module and the vehicle status inquire mould Block connects, the trip information for going out the transmission of pedestrian's information collection module according to and the vehicle status enquiry module The operating status of the vehicles of transmission determines bonus policy so as to time demand can be changed go out pedestrian rush hour more Change travel time or traffic path.
Optionally, the trip route logging modle is connect with company attendance checking system, for physical record to be gone out pedestrian Trip information be sent to company's attendance checking system so that company's attendance checking system goes out pedestrian according to the physical record Trip information determine pedestrian caused by extraneous factor be late situation.
As shown from the above technical solution, the embodiment of the present invention by going out pedestrian's information collection module, vehicle status is looked into The interaction between module and vehicles scheduler module and four systems is ask, the vehicles is not only realized and goes out between pedestrian Information exchange, and realize the flexible dispatching to interconnect with the vehicles service time between the vehicles.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with Other attached drawings are obtained according to these figures.
Fig. 1 is a kind of structure for rail traffic Unmanned Systems based on selection trip that one embodiment of the invention provides Schematic diagram;
Fig. 2 is the interaction schematic diagram gone out between pedestrian and the vehicles that one embodiment of the invention provides;
Fig. 3 is a kind of structural schematic diagram for trip comprehensive platform that another embodiment of the present invention provides.
Specific implementation mode
Below in conjunction with the accompanying drawings, the specific implementation mode of the present invention is further described.Following embodiment is only used for more Technical scheme of the present invention is clearly demonstrated, and not intended to limit the protection scope of the present invention.
Fig. 1 shows that the structure of rail traffic Unmanned Systems based on selection trip provided in this embodiment a kind of is shown It is intended to, including trip comprehensive platform, rail traffic scheduling system 201, aircraft scheduling system 202,203 and of bus scheduling system Taxi dispatching system 204;
The trip comprehensive platform includes:Go out pedestrian's information collection module 101, vehicles scheduler module 102 and traffic Tool state enquiry module 103;
It is described go out pedestrian's information collection module 101 connect with the vehicles scheduler module 102, for obtain it is each go out The trip information of pedestrian, by it is multiple go out pedestrian trip information merge, obtain trip requirements, and the trip requirements are sent out Give the vehicles scheduler module 102;The trip information includes beginning and end information, trip preference information.
The vehicle status enquiry module 103 is connect with the vehicles scheduler module 102, each for recording The operating status of each vehicles and maintenance situation are sent to described by the operating status and maintenance situation of the vehicles Vehicles scheduler module 102 receives the dispatch command of the vehicles scheduler module 102, and according to the dispatch command The maintenance time and prediction for allocating each vehicles of the corresponding vehicles, Dynamic Arrangement need to purchase new traffic The time of tool.
Operation shape of the vehicles scheduler module 102 for the trip information for going out pedestrian, the vehicles to reception State and maintenance situation are integrated, and obtain dispatch command, and the dispatch command is sent to the vehicle status and is inquired Module 103.
Wherein, go out the module that pedestrian's information collection module 101 is and goes out pedestrian's interface, receive out starting point and the end of pedestrian Point, trip preference (time priority, least cost priority scheduling);The module be responsible for it is multiple go out pedestrian trip information fusion, and And the trip requirements after fusion are sent to corresponding module.
Vehicles scheduler module 102 integrates the scheduling system of each vehicles so that about all of the vehicles Information obtains big data integration in the module.
Vehicle status enquiry module 103 records the operating status of each vehicles, maintenance situation, dynamically arranges The maintenance time, and to the state of the scheduling notifications vehicles, to dispatch the system rational allocation vehicles, also The precise time of the new vehicles can be predicted to need to purchase.
Specifically, in order to realize the purpose of " system adapts to people ", the information exchange for paying close attention to both direction is needed, such as Fig. 2 institutes Show:First, arrange train number according to trip Man's Demands;Second, the Bus Schedules of a traffic system dynamic generation are passed to Go out pedestrian, wherein traffic system may include that system 201, aircraft scheduling system 202, bus are dispatched in the rail traffic in Fig. 2 Scheduling system 203 and taxi dispatching system 204.
The information exchange for realizing system side and trip side needs trip comprehensive platform provided in this embodiment, as double The integration of square information and distribution platform.As shown in Fig. 2, instead of the prior art by going out pedestrian's passive adaptation rail traffic, largely Go out pedestrian by going on a journey comprehensive platform to inquire and select the trip route of oneself.In addition, rail traffic and other public transport Scheduling system, be linked into trip comprehensive platform, on the one hand by the information such as the freight volume of oneself system, run time and trip it is humanoid At dynamic interaction, it is shared on the other hand so that the information of oneself system and the information of other systems are formed, optimizes the scheme of through transport.
The present embodiment can realize following functions by comprehensive platform of going on a journey:
(1) information processing based on big data and information fusion
Information processing based on big data and information fusion, are the core technologies gone on a journey needed for comprehensive platform.Based on big number According to processing, can make originally it is unordered and it is difficult to predict travel behaviour become orderly.
Specifically, passenger can preengage one day, one week, plan of travel even monthly or per year, so as to rail traffic Dispatch the corresponding train of system arrangement.Going out pedestrian can select to be suitble to the trip requirements of oneself (Price Range the travel time, is No carrying heavy luggage etc.), issue the trip needs of oneself on the trip comprehensive platform based on cloud network, platform is by the trip The trip requirements that demand goes out pedestrian with other merge, and at least one trip scheme are provided by platform, for trip person It selects.Since what trip comprehensive platform had collected magnanimity goes out pedestrian information, for be not in contact with mutually it is multiple go out pedestrian provide Shared, specific circuit appearance scheme is possibly realized.
For example, early 7 points it is pervious go out pedestrian based on long range, can stop once every several stations, morning train can divide three Group stops a secondary every two stations respectively, by reducing the dwell time, to promote overall operation efficiency;8 points of morning goes out pedestrian with short distance From based on, can stand parking passenger up and down, and the passenger stopped by morning train every station can both wait before the station of destination It waits for the train to stop of subsequently standing, other vehicles can also be changed to.
Collection based on big data releases main station express bus convenient for Rail Transit System (passing through price adjustment etc.), difference arrives Up to the differentiated service in path etc..By taking the station to the north of Foundation of Beijing Metro Line 5 is from Song Jiazhuan to Yonghe Palace Temple as an example, goes out pedestrian and both may be used To be reached by No. 5 lines, can also be reached by changing to No. 2 lines twice in Chongwenmen and Yonghe Palace Temple.In this way, actively change to Passenger's (such as not carrying heavy luggage) can obtain travel allowance, and pursue the passenger that efficiency is not changed to can obtain it is shorter Travel time and more smooth trip experience.
(2) increase between track vehicle and interconnect
By taking orbit traffic transfer as an example, Duo Jia track traffic signals company meets the letter for the standard of interconnecting in jointly exploitation Number system is provided infrastructures for the cross-line operation of train.For example, Foundation of Beijing Metro Line 5 is connected to Beijing Metro 2 Line, transfer pressure is huge in the station of Chongwenmen station, according to passenger demand, it may be considered that morning peak opens the village Ji Liesongjia on weekdays To Chaoyang Men special line, Song Jiazhuan to door special line etc. is revived, pressure is changed in transfer stop to reduce, while improving passenger experience, contracting The short travel time.In addition, such as No. 2 alignment vehicle relative surplus of morning peak and No. 5 alignment vehicles are insufficient, interconnect demand in satisfaction In the case of, the operating line of No. 5 lines can also be added in the train of No. 2 lines, to alleviate the problem of No. 5 alignment vehicle deficiencies, especially Be the problem due to No. 5 line parking lots have been saturated and in the case of train can not being increased newly.
In addition, rail traffic scheduling system is interconnected with bus dispatching system, taxi dispatching system, once rail traffic event Barrier or traffic above-ground failure, another vehicles can act as good alternative system.For example, if certain section in the afternoon 14 Severe blockage occurs for point, and after which is sent to rail traffic scheduling system, system is dispatched in rail traffic can be with Jia Pailie as early as possible Nearby route is run vehicle, and due to afternoon, 14 points are inoperative peak periods, and it is exactly feasible to send train.It is such mutual Dynamic information provides pedestrian by comprehensive platform notice of going on a journey, and plans advising property opinion to the trip for going out pedestrian, by going out Pedestrian selects according to conditions such as time, expenses.
(3) unmanned/to run within 24 hours
Current rail line, operation in rare 24 hours, this aspect is that idle passenger is few, and more crucially The overtime work or break tour of dispatcher, driver for operating service etc. were not only with high costs, but also there is security risk caused by fatigue.Nothing People drives so that operation in 24 hours utilizes unpiloted train so that go out the night of pedestrian as the technical solution of cost effective Between go on a journey more convenient, while the intelligent operation cost for also farthest reducing operator of shift.Further, since improving The intelligence degree of train, is also easier to be arranged in traffic idle period and carries out to the maintenance of train, to not Influence the quantity of dispatching a car of heavy traffic period.For example, 23 points of airport line terminates to run, the aircraft of this 22 points landing is late originally 2 hours, the pedestrian that goes out for intending to take airport line originally so then had to change plan, and taking taxi (may face taxi The problem of vehicle lazy weight) it reaches city or is detained on airport.And have unmanned, it is only necessary to airdrome control notifications rail The scheduling system of road traffic so that the train of airport line arranges last operation plan according to the landing times of late aircraft, To solve this predicament.
The present embodiment is by going out pedestrian's information collection module, vehicle status enquiry module and vehicles scheduler module Between interaction, not only realize the vehicles and go out the information exchange between pedestrian, but also realize between the vehicles The flexible dispatching to interconnect with the vehicles service time.
Further, on the basis of the above embodiments, the vehicles scheduler module 102 includes that timetable finely tunes mould Block and temporary line module;
Timetable fine tuning module is used for during daily operation processing because a vehicles are late or morning is to leading The case where needs of cause several vehicles cooperation adjustment;
The temporary line module is used to arrange the temporary line of the specific time caused by large-scale activity.
Specifically, timetable fine tuning module for handled during daily operation it is above-mentioned because a vehicles are late or It early arrives, the case where other vehicles need to coordinate adjustment, for example, when the Train delay 1 minute of circuit A, can be changed to it The train of circuit B can slow down the speed of service so that the transfer passenger of circuit A and circuit B can maximumlly complete to change to.
Temporary line module is for arranging temporary line, such as big sport event, concert etc., end time to be often Non- rush hour at night, temporary line can be issued in advance using playground as starting point, multiple melt so that mass viewer audiences are scheduled Close a plurality of tracks traffic route that terminal is terminal.Since tours start here is predictable, can be carried in tours start here and subsequent section Preceding arrangement a lot of train number, to improve the evacuation efficiency of spectators.
Further, on the basis of the above embodiments, as shown in figure 3, the trip comprehensive platform further includes:Trip side Case suggestion module 104, advertising broadcast point broadcasting module 106, time dynamic computing module 107, is taken at trip route logging modle 105 With dynamic computing module 108, priority match module 109 and game reward module 110;
The trip scheme proposals module 104 respectively with it is described go out pedestrian's information collection module 101 and the vehicles Scheduler module 102 connects, and suggestion is calculated in the trip information for going out the transmission of pedestrian's information collection module 101 according to Trip route scheme, and the real-time running state of the vehicles sent according to the vehicles scheduler module 102 is in real time more The new trip route scheme.
The trip route logging modle 105 determines that pedestrian is for being recorded to the trip information for going out pedestrian It is no to have caught up with required train number, whether changed trip scheme.
The advertising broadcast point broadcasting module 106 respectively with it is described go out pedestrian's information collection module 101 and the vehicles State-query module 103 connects, and the trip information for going out the transmission of pedestrian's information collection module 101 according to is carried to pedestrian is gone out For advertisement and/or broadcast, and the operating status of the vehicles sent according to the vehicle status enquiry module 103 is being handed over Advertisement and/or broadcast are played in logical tool.
The time dynamic computing module 107 respectively with the vehicle status enquiry module 103 and it is described go out pedestrian Information collection module 101 connects, the operation shape of the vehicles for being sent according to the vehicle status enquiry module 103 State in real time calculate and back-to-back running in each vehicles arrival time, and according to it is described go out pedestrian's information collection module 101 trip informations for going out pedestrian sent calculate and feed back the travel time of at least one feasible travel route in real time.
The expense dynamic computing module 108 and the trip route logging modle 105 and it is described go out pedestrian information collect Module 101 connects, and the trip information for going out pedestrian for going out the transmission of pedestrian's information collection module 101 according to calculates simultaneously in real time The expense for feeding back several feasible travel routes of pedestrian is estimated, and is gone out according to what the trip route logging modle 105 was sent The trip information of pedestrian calculates and feeds back the disbursement and sattlement of each vehicles in real time.
The priority match module 109 is connect with the modules of the trip comprehensive platform, for going out according to The priority of the modules of row comprehensive platform is coordinated, and high level interruption work(is given to the information processing of high priority Energy.
The game reward module 110 respectively with it is described go out pedestrian's information collection module 101 and the vehicle status Enquiry module 103 connects, the trip information for going out the transmission of pedestrian's information collection module 101 according to and the vehicles The operating status for the vehicles that state-query module is sent determines bonus policy, so that the pedestrian that goes out that can be changed to time demand exists Rush hour, changes travel time or traffic path.
Wherein, trip scheme proposals module 104 is the external output module of trip comprehensive platform, according to trip comprehensive platform Big data calculate, to go out pedestrian export suggest trip route scheme.It is comprehensive that the trip scheme proposals module receives trip at any time The variation message for closing other modules in platform notifies the information such as accident such as fire or road control to correspond in time Go out pedestrian on walking along the street diameter, to go out the decision that pedestrian is made whether change plan of travel as early as possible.
Advertising broadcast point broadcasting module 106 provide advertisement, on the one hand to trip comprehensive platform branch pay off advertising, on the other hand to Watch that the pedestrian that goes out of advertisement subsidizes transport cost.Interaction according to the reading viewing preference and specific ad content that go out pedestrian is deep Degree, to going out pedestrian's advertisement or advertisement link.By being presented to out the interactive advertisement of the display screen terminal plays of pedestrian, according to Go out pedestrian to the concern time of advertisement, attentinal contents, interactive degree of participation etc., trip people's trip is directly given by advertiser and is mended Patch.For example, the destination outbound according to pedestrian is gone out, the information such as push lunch discount coupon.
Coordinate priority between the modules that priority match module 109 is used for inside trip comprehensive platform, to height High level interrupt function is given in the information processing of priority, the conflict occurred to avoid competitive resource or deadlock etc..
For each vehicles, time dynamic computing module 107 calculates in real time and each traffic in back-to-back running The arrival time of tool;For going out pedestrian, time dynamic computing module calculate in real time and feed back at least one it is feasible go out line The travel time on road.
For going out pedestrian, expense dynamic computing module 108 calculate in real time and feed back several of pedestrian it is feasible go out line The expense on road is estimated, and can be a value can also be a range.For each vehicles, expense dynamic computing module can Hourly or daily to calculate the contribution of each vehicles, thus by the travel cost received in each vehicles Between settle accounts, wherein the clearing can be transparent for going out pedestrian.
The game reward module 110 can adjust expense and have an impact:From pedestrian's angle on and off duty is gone out, daily Transportation expenses are all identical, lack the power gone out or avoided the peak hour ahead of time and go out naturally, cause expense to reduce if gone out ahead of time, that trip People can go out more dynamic morning.In addition, if as treasure hunt game, go out ahead of time can also on the way certain random site points and Random time point obtains probabilistic expense and rewards income, and it is anti-to go out the uncertainty that pedestrian is more willing to experience as game Feedback so that the more element of entertainment in daily road on and off duty.For example, it is also possible to swipe the card the additional prize entered the station and brought plus integer minute Some enjoyment gone out of avoiding the peak hour such as encourage.
In addition, the game reward module 110 can save the arrangement expense and maintenance expense of ground installation:It is as much as possible go out The networking of pedestrian and trip tool so that each going out pedestrian and every trip tool becomes the " sensing of trip comprehensive platform Device ", the information such as road conditions, accident can be acquired by these " sensors " and be uploaded to trip comprehensive platform, in this way can be with Maximumlly reduce the surface-monitoring equipments such as camera, inductive coil.There is arrangement trouble, safeguard and be stranded in these surface-monitoring equipments Various problems such as difficult, wired power supply (usually needing to excavate road surface arrangement), high, the monitoring dead angle of energy consumption, later maintenance cost Even higher than early period sets up cost.Have up to ten million dynamic change positions, artificial intelligence even human intelligence itself makees " sensor " can maximumlly save the arrangement and maintenance cost of ground monitoring.
In practical applications, government is typically all to have subsidy for public transport.This subsidy does not implement to trip Person is personal, but implements to public transport operation department, traveler for transportation allowance there is no personal impression, when rise in price It has been also easy to complaint.There is trip comprehensive platform, the government that is more convenient for calculates the subsidy amount of money of single trip, also allows for government's displaying This subsidy, such as " thank you to take Beijing Rail Transit, your this government subsidy for taking each rail traffic is 1.2 Member ".This not only improves the visual results that government is served the people, and is also beneficial to out approval and reason of the pedestrian to government services Solution.
For it is each go out pedestrian and every trip tool information provide, the game that the game reward module 110 provides Reward mechanism carries out reward Feedback Design to informant, improves enthusiasm and initiative that information uploads.
Further, on the basis of the above embodiments, the trip route logging modle 105 and company's attendance checking system 301 connections, for the trip information for going out pedestrian of physical record to be sent to company's attendance checking system 301, so that the public affairs Department's attendance checking system 301 determines that pedestrian is late caused by extraneous factor according to the trip information for going out pedestrian of the physical record Situation.
Specifically, trip route logging modle 105 is connect with company attendance checking system 301, for pedestrian is gone out, part is gone on a journey Main cause there are two people's working is late, when late personal reason of oneself going out, second is that the vehicles reason such as road traffic congestion. Under present mode, company be difficult consider employee be caused by personal reason or outside cause be late, and it is also difficult to difference pair It waits for.There is time dynamic computing module, the pedestrian that goes out as employee can be registered using trip comprehensive platform to check card, and profit is passed through With trip comprehensive platform at the beginning of and the exception information of end time and same day public transport, you can illustrate employee's Late is individual factor or extraneous factor.It is common to employee's travel allowance from the angle of inaugural company.However, due to The expense expenditure of employee is not known about, therefore is typically all to the travel allowance of a Flat Amount.There is trip comprehensive platform, it is public Department can be best understood from the traffic expenditure of employee, give personalized travel allowance.
Specifically, Fig. 3 shows the module composition figure of the trip comprehensive platform of rail traffic.In addition to go out pedestrian, its The scheduling system of its public transport carries out except information exchange and information fusion, and trip comprehensive platform can also stop with congestion expense Take regulating system 302, road condition monitoring reponse system 303, accident notice system 304 and carries out information exchange.It needs to illustrate It is that Fig. 3 is a framework of this interaction, as other frameworks, these are located at the system outside trip comprehensive platform It can be included among trip comprehensive platform.These systems can both be integrated into a system, can also be divided into more subsystems System is flexibly changed according to integrated demands such as policy, technical feasibility degree, budget limit, duration limitations.
Trip comprehensive platform provided in this embodiment provides a kind of rail vehicle transportation mode adapting to people so that trip People is more predictable for the travel time of oneself, operator due to having grasped a large amount of plan of travel in advance, it is also possible that The train number of oneself is more flexible.For subway of the short distance transport such as city so that going out pedestrian can more accurately select It selects and the travel time of oneself and trip is suitble to plan, improve the choice for traveling richness and predictability of most passengers. For long-distance transportation such as inter-city passenger rail, booking locking train number and seat need not be shifted to an earlier date by going out pedestrian, but can be certain (for example, 30 minutes) accomplish that " arriving to walk " (needs 1 hour evening to go on a journey, there is 28 for example, there is 30 to go out pedestrian in time range Going out pedestrian needs go on a journey for 1 hour in advance, so that it may dynamically to arrange these to go out the train number of pedestrian, improve this 58 spirits for going out pedestrian Activity and satisfaction).According to the dynamic change for going out pedestrian in the same period, the train number of train can adjust in a certain range (for example, shift to an earlier date or delay 5-30 minutes).Efficiency of operation, service satisfaction, trip flexibility ratio can be maximumlly improved in this way.
Further, since the operation of rail traffic is no longer according to fixed timetable, but according to trip Man's Demands and It dynamically dispatches a car, therefore can be efficient energy saving, reduces the operation cost of operator, also reduce the power load of urban distribution network, Reduce carbon emission.Simultaneously as the dynamic of the operation plan of rail traffic, thus cannot simply using in station gate as charge Channel, but to go out the practical trip scheme of pedestrian as expenses standard.Each go out the row that the mobile terminal of pedestrian is taken to it Vehicle carries out near-field communication, the information such as get off of getting on the bus of oneself is confirmed, to avoid lining up for tickets, lack local mass transit card, segmentation The trouble such as clearing, promote travel cost is adjusted flexibly that (subsidy of avoiding the peak hour, random award, advertising subsidy etc., will be in next portion Divide expansion description).
Because of trip comprehensive platform information exchange, originally it is unordered and it is difficult to predict travel behaviour become orderly, And be more convenient for predicting and guide, pass through the shortening of total travel time, the raising for going out line efficiency, the differentiation of travel cost, operation The items factor such as increase of service resiliency, can bring the comprehensive improvement of rail traffic trip service.
The Rail Transit System that pedestrian is adapted to out with system, using the trip comprehensive platform for incorporating big data, for city Trip requirements in city's circle (for example, Beijing and male peace) range have a better understanding, so as to provide better service.For city The development of city's circle improves out line efficiency, reduces Trip Costs, optimizes trip experience, and country can be promoted for each The implementation of a urban agglomeration long-term plan.
The apparatus embodiments described above are merely exemplary, wherein the unit illustrated as separating component can It is physically separated with being or may not be, the component shown as unit may or may not be physics list Member, you can be located at a place, or may be distributed over multiple network units.It can be selected according to the actual needs In some or all of module achieve the purpose of the solution of this embodiment.Those of ordinary skill in the art are not paying creativeness Labour in the case of, you can to understand and implement.
Through the above description of the embodiments, those skilled in the art can be understood that each embodiment can It is realized by the mode of software plus required general hardware platform, naturally it is also possible to pass through hardware.Based on this understanding, on Stating technical solution, substantially the part that contributes to existing technology can be expressed in the form of software products in other words, should Computer software product can store in a computer-readable storage medium, such as ROM/RAM, magnetic disc, CD, including several fingers It enables and using so that a computer equipment (can be personal computer, server or the network equipment etc.) executes each implementation Method described in certain parts of example or embodiment.
It should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although reference Invention is explained in detail for previous embodiment, it will be understood by those of ordinary skill in the art that:It still can be right Technical solution recorded in foregoing embodiments is modified or equivalent replacement of some of the technical features;And this A little modification or replacements, the spirit and model of various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution It encloses.

Claims (10)

1. a kind of rail traffic Unmanned Systems based on selection trip, which is characterized in that including trip comprehensive platform, track Traffic dispatching system, aircraft scheduling system, bus scheduling system and taxi dispatching system;
The trip comprehensive platform includes:Go out pedestrian's information collection module, vehicle status enquiry module and vehicles tune Spend module;
It is described go out pedestrian's information collection module connect with the vehicles scheduler module, for obtain it is each go out pedestrian trip Information, by it is multiple go out pedestrian trip information merge, obtain trip requirements, and the trip requirements are sent to the friendship Logical tool scheduler module;The trip information includes beginning and end information, trip preference information;
The vehicle status enquiry module is connect with the vehicles scheduler module, for recording each vehicles The operating status of each vehicles and maintenance situation are sent to the vehicles tune by operating status and maintenance situation Module is spent, receives the dispatch command of the vehicles scheduler module, and corresponding traffic work is allocated according to the dispatch command Tool, the maintenance time of each vehicles of Dynamic Arrangement and prediction need to purchase the time of the new vehicles;
The vehicles scheduler module is used for the trip information for going out pedestrian of reception, the operating status of the vehicles and maintenance Situation is integrated, and obtains dispatch command, and the dispatch command is sent to the vehicle status enquiry module.
2. rail traffic Unmanned Systems according to claim 1, which is characterized in that the vehicles scheduler module Module and temporary line module are finely tuned including timetable;
The timetable fine tuning module is used to handle during daily operation caused by a vehicles are late or early arrive The case where needing the cooperation adjustment of several vehicles;
The temporary line module is used to arrange the temporary line of the specific time caused by large-scale activity.
3. rail traffic Unmanned Systems according to claim 1, which is characterized in that the trip comprehensive platform also wraps It includes:Trip scheme proposals module;
The trip scheme proposals module respectively with it is described go out pedestrian's information collection module and the vehicles scheduler module connect It connecing, the trip route scheme of suggestion is calculated in the trip information for going out the transmission of pedestrian's information collection module according to, and According to trip route scheme described in the real-time running state real-time update of the vehicles of vehicles scheduler module transmission.
4. rail traffic Unmanned Systems according to claim 1, which is characterized in that the trip comprehensive platform also wraps It includes:Trip route logging modle;
The trip route logging modle determines whether pedestrian catches up with for being recorded to the trip information for going out pedestrian Whether required train number changes trip scheme.
5. rail traffic Unmanned Systems according to claim 1, which is characterized in that the trip comprehensive platform also wraps It includes:Advertising broadcast point broadcasting module;
The advertising broadcast point broadcasting module respectively with it is described go out pedestrian's information collection module and the vehicle status inquire mould Block connects, and the trip information for going out the transmission of pedestrian's information collection module according to provides advertisement and/or broadcast to pedestrian is gone out, And according to the vehicle status enquiry module send the vehicles operating status play in a vehicle advertisement and/ Or broadcast.
6. rail traffic Unmanned Systems according to claim 1, which is characterized in that the trip comprehensive platform also wraps It includes:Time dynamic computing module;
The time dynamic computing module respectively with the vehicle status enquiry module and it is described go out pedestrian information collect mould Block connects, and the operating status of the vehicles for being sent according to the vehicle status enquiry module is calculated and fed back in real time The arrival time of running each vehicles, and according to it is described go out pedestrian's information collection module send the trip for going out pedestrian Information calculates and feeds back the travel time of at least one feasible travel route in real time.
7. rail traffic Unmanned Systems according to claim 4, which is characterized in that the trip comprehensive platform also wraps It includes:Expense dynamic computing module;
The expense dynamic computing module and the trip route logging modle and it is described go out pedestrian's information collection module connect, use Several of pedestrian are calculated in real time and feed back in the trip information for going out pedestrian for going out the transmission of pedestrian's information collection module according to The expense of feasible travel route is estimated, and is counted in real time according to the trip information for going out pedestrian that the trip route logging modle is sent Calculate and feed back the disbursement and sattlement of each vehicles.
8. rail traffic Unmanned Systems according to claim 1, which is characterized in that the trip comprehensive platform also wraps It includes:Priority match module;
The priority match module is connect with the modules of the trip comprehensive platform, for comprehensive flat according to the trip The priority of the modules of platform is coordinated, and high level interrupt function is given to the information processing of high priority.
9. according to any rail traffic Unmanned Systems of claim 1-8, which is characterized in that the trip is comprehensive flat Platform further includes:Game reward module;
The game reward module respectively with it is described go out pedestrian's information collection module and the vehicle status enquiry module connect It connects, the trip information and the vehicle status enquiry module for going out the transmission of pedestrian's information collection module according to are sent The operating statuses of the vehicles determine bonus policy so that the pedestrian that goes out that can be changed to time demand more changes in rush hour Row time or traffic path.
10. rail traffic Unmanned Systems according to claim 4, which is characterized in that the trip route records mould Block is connect with company attendance checking system, for the trip information for going out pedestrian of physical record to be sent to company's attendance checking system, So that company's attendance checking system determines that pedestrian leads because of extraneous factor according to the trip information for going out pedestrian of the physical record The late situation caused.
CN201810168041.XA 2018-02-28 2018-02-28 A kind of rail traffic Unmanned Systems based on selection trip Pending CN108520309A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810168041.XA CN108520309A (en) 2018-02-28 2018-02-28 A kind of rail traffic Unmanned Systems based on selection trip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810168041.XA CN108520309A (en) 2018-02-28 2018-02-28 A kind of rail traffic Unmanned Systems based on selection trip

Publications (1)

Publication Number Publication Date
CN108520309A true CN108520309A (en) 2018-09-11

Family

ID=63433338

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810168041.XA Pending CN108520309A (en) 2018-02-28 2018-02-28 A kind of rail traffic Unmanned Systems based on selection trip

Country Status (1)

Country Link
CN (1) CN108520309A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112414420A (en) * 2020-08-13 2021-02-26 腾讯科技(深圳)有限公司 Navigation method based on traffic flow and related device
CN113407281A (en) * 2021-06-23 2021-09-17 重庆卡歌科技有限公司 Dynamic visual three-dimensional display method for new land and sea channel service based on data application

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1758775A (en) * 2004-10-08 2006-04-12 丛繁滋 Public transit service system and method of relative positioning of vehicle distribution
CN101799981A (en) * 2010-02-09 2010-08-11 华南理工大学 Multi-mode public transport region scheduling control method
CN105513400A (en) * 2015-12-03 2016-04-20 四川长虹电器股份有限公司 Method for dynamically planning travel route
CN106127325A (en) * 2016-05-03 2016-11-16 易通创新科技(大连)有限公司 A kind of dynamic public traffic network system based on user's request
CN106373384A (en) * 2016-09-26 2017-02-01 福州大学 Remote area passenger transport regular bus route real-time generation method
CN106570265A (en) * 2016-10-31 2017-04-19 东南大学 Measurement method of transferring punishment coefficient between urban mass transit railway transportation and connection modes
CN107238393A (en) * 2017-06-14 2017-10-10 赵宇航 It is a kind of to be gone on a journey Intelligent planning method based on shared economic personnel
CN107392357A (en) * 2017-06-30 2017-11-24 安徽四创电子股份有限公司 A kind of public transport based on big data platform is precisely gone on a journey service system and method

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1758775A (en) * 2004-10-08 2006-04-12 丛繁滋 Public transit service system and method of relative positioning of vehicle distribution
CN101799981A (en) * 2010-02-09 2010-08-11 华南理工大学 Multi-mode public transport region scheduling control method
CN105513400A (en) * 2015-12-03 2016-04-20 四川长虹电器股份有限公司 Method for dynamically planning travel route
CN106127325A (en) * 2016-05-03 2016-11-16 易通创新科技(大连)有限公司 A kind of dynamic public traffic network system based on user's request
CN106373384A (en) * 2016-09-26 2017-02-01 福州大学 Remote area passenger transport regular bus route real-time generation method
CN106570265A (en) * 2016-10-31 2017-04-19 东南大学 Measurement method of transferring punishment coefficient between urban mass transit railway transportation and connection modes
CN107238393A (en) * 2017-06-14 2017-10-10 赵宇航 It is a kind of to be gone on a journey Intelligent planning method based on shared economic personnel
CN107392357A (en) * 2017-06-30 2017-11-24 安徽四创电子股份有限公司 A kind of public transport based on big data platform is precisely gone on a journey service system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
何承等: "《城市交通大数据》", 31 January 2015, 上海科学技术出版社 *
田晓等: "《城市公共交通运营管理》", 31 May 2015, 北京:中国财富出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112414420A (en) * 2020-08-13 2021-02-26 腾讯科技(深圳)有限公司 Navigation method based on traffic flow and related device
CN113407281A (en) * 2021-06-23 2021-09-17 重庆卡歌科技有限公司 Dynamic visual three-dimensional display method for new land and sea channel service based on data application
CN113407281B (en) * 2021-06-23 2022-11-11 重庆卡歌科技有限公司 Dynamic visual three-dimensional display method for new land and sea channel service based on data application

Similar Documents

Publication Publication Date Title
Kuo et al. Public transport for smart cities: Recent innovations and future challenges
CN105575108A (en) Intelligent bus dispatching operation method
Budd et al. Improving the environmental performance of airport surface access in the UK: The role of public transport
CN105913653A (en) Public transport intelligent vehicle planning and scheduling system and public transport intelligent vehicle planning and scheduling method under cloud platform environment
Bie et al. Bus scheduling of overlapping routes with multi-vehicle types based on passenger OD data
Androshchuk et al. Optimizing the route network of the city
Csiszár et al. Demand-capacity coordination method in autonomous public transportation
CN108520309A (en) A kind of rail traffic Unmanned Systems based on selection trip
CN109523064B (en) Intelligent micro-hub based on multi-network fusion
Dinh Managing traffic congestion in a city: A study of Singapore’s experiences
Kaysi et al. Rapid transit service in the unique context of Holy Makkah: assessing the first year of operation during the 2010 pilgrimage season
Sharma et al. Timetable rationalization & operational improvements by human intervention in an urban rail transit system: An exploratory study
Aziz et al. Public transport planning: Local bus service integration and improvements in Penang, Malaysia
Lee et al. Planning and design of a taxipooling dispatching system
Jansson et al. Public Transport in the era of ITS: Forms of Public Transport
Salin et al. Appraisal on Malaysian Rural Rail Transit Operation & Management System: Issues & Solution In Integration
Friman et al. Moving towards sustainable consumption: A psychological perspective on improvement of public transport
CN116011600B (en) Reservation method, device and system for congestion-free travel, electronic equipment and medium
Levinson Bus transit in the 21st century: some perspectives and prospects
Zhu et al. Algorithm for Headway of Fixed Route Buses in Bus Stations Based on Bus Big Data
Bais et al. Optimal schedule modeling for public transportation system
JP2014089618A (en) Different transportation system cooperative charging management system
Haider et al. Alleviating Transportation System Problems by Providing Public Transit Integration in High-Density Metropolitan Cities
Voronov et al. Increasing the level of automation of dispatch control when regulating at the end stops of public transport routes
Bludyan Global problems of development of the agglomeration transport systems

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180911

RJ01 Rejection of invention patent application after publication