CN108519537B - 一种电缆金属护套多点接地下大地漏电流计算方法 - Google Patents

一种电缆金属护套多点接地下大地漏电流计算方法 Download PDF

Info

Publication number
CN108519537B
CN108519537B CN201810170545.5A CN201810170545A CN108519537B CN 108519537 B CN108519537 B CN 108519537B CN 201810170545 A CN201810170545 A CN 201810170545A CN 108519537 B CN108519537 B CN 108519537B
Authority
CN
China
Prior art keywords
cable
earth
ground
multipoint earthing
metal sheath
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810170545.5A
Other languages
English (en)
Other versions
CN108519537A (zh
Inventor
杨帆
刘刚
朱宁西
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN201810170545.5A priority Critical patent/CN108519537B/zh
Publication of CN108519537A publication Critical patent/CN108519537A/zh
Application granted granted Critical
Publication of CN108519537B publication Critical patent/CN108519537B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • G01R31/50Testing of electric apparatus, lines, cables or components for short-circuits, continuity, leakage current or incorrect line connections
    • G01R31/58Testing of lines, cables or conductors

Abstract

本发明公开了一种电缆金属护套多点接地下大地漏电流计算方法,该方法包括下列步骤:S1、测量电缆两端接地电阻R1和R2,计算大地漏电阻Re;S2、三相电缆金属护套依次发生(s‑1)、(m‑1)、(n‑1)个故障接地,将各故障接地支路依次排开,计算任意相邻接地支路间距占线路总长度比例αλ;S3、计算各分段大地漏电阻R;S4、测量(s+m+n‑3)个故障接地电阻Rki、Rgj、Rft;S5、确定系数矩阵A;S6、计算各段大地漏电流向量Ie。本发明切实可行的提出了一种电缆金属护套多点接地下大地漏电流的计算方法,可方便计算多点接地状况下各段大地漏电流。

Description

一种电缆金属护套多点接地下大地漏电流计算方法
技术领域
本发明涉及电力电缆技术领域,具体涉及一种电缆金属护套多点接地下大地漏电流计算方法。
背景技术
高压电缆金属护套在交叉互联接线方式下,电缆首末两端是通过接地箱直接接地。当电缆正常载流运行时,由于电磁感应原理,在电缆金属护套与大地共同构建的回路中形成感应电动势,在此电动势作用下流经大地的电流即为大地漏电流。
目前,国内外学者求取大地漏电流的模型是将大地回路等价为与电缆护套平行且等长的良导体,由此建立集中参数电路模型,并罗列方程求解。
然而该方法仅适用于在电缆正常载流运行状况下的大地漏电流的计算,当电缆外护套破损、金属护套发生多点接地时,大地漏电流不能再等价为一长段导体,而是被多个接地点分割成若干段的导体。因此,该计算方法不再适用。
发明内容
本发明的目的是为了克服上述现有技术的不足,提供一种电缆金属护套多点接地下大地漏电流计算方法,以解决无法求解该故障状态下大地漏电流大小的窘态,利用该模型计算多点接地状况下的大地漏电流大小,可为计算该故障状况下的护套环流提供求解条件。
本发明的目的可以通过采取如下技术方案达到:
一种电缆金属护套多点接地下大地漏电流计算方法,所述的大地漏电流计算方法包含以下步骤:
S1、使用仪器测量电缆两端接地电阻R1和R2,计算大地漏电阻Re
S2、三相电缆金属护套依次发生(s-1)、(m-1)、(n-1)个故障接地,将各故障接地支路依次排开,计算任意相邻接地支路间距占线路总长度比例αλ,s>1,m>1,n>1,λ=1,2,…,s+m+n-2;
S3、计算各分段大地漏电阻R
S4、使用仪器测量(s+m+n-3)个故障接地电阻Rki、Rgj、Rft
S5、根据三相支路各故障点距电缆首端距离确定系数矩阵A;
S6、计算各段大地漏电流向量Ie
进一步地,所述的大地漏电阻Re的计算公式为:
Re=π2Lf×10-7 (1)
式中,L为护套长度;f为输电线路运行频率。
进一步地,所述的长度比例αλ根据以下公式计算:
式中,lλ为第λ段大地回路长度,L为电缆线路总长度,且满足
进一步地,所述的各分段大地漏电阻Re根据以下公式计算:
R=Re×αλ (4)。
进一步地,所述的系数矩阵A可表达为以下公式:
其中,系数矩阵A的第λ行对应第λ段大地回路,若第λ段大地回路前三相支路金属护套分别发生i、j、t个接地故障,则矩阵中的元素数值可由以下公式确定:
I=Iki+Igj+Ift (6)
其中,Iki、Igj、Ift为三相支路金属护套第i、j、t个故障处的接地电流,0<i<s,0<j<m,0<t<n;此时,对应系数矩阵A的λ行元素aλi、aλj、aλt数值为1,其它元素为0。
进一步地,所述的各段大地漏电流向量Ie根据以下公式计算:
AI=Ie (7)
其中,I向量为三相支路护套环流,且I=(Ik1…IksIg1…IgmIf1…Ifn)T;Ie=(Ie1Ie2…Ie(s+m+n-2))T
本发明相对于现有技术具有如下的优点及效果:
本发明公开了一种电缆金属护套多点接地下大地漏电流计算方法,解决了无法求解该故障状态下大地漏电流大小的窘态,利用该模型计算多点接地状况下的大地漏电流大小,可为计算该故障状况下的护套环流提供求解条件。
附图说明
图1是本发明的电缆结构图;
图2是本发明的大地漏电流电路等效模型;
图3是本发明的第λ段大地回路的三种故障接地方式;
其中,图3(a)是k支路故障接地方式;
其中,图3(b)是g支路故障接地方式;
其中,图3(c)是f支路故障接地方式;
图4是本发明中公开的一种电缆金属护套多点接地下大地漏电流计算方法的流程图。
具体实施方式
为使本发明实施例的目的、技术方案和优点更加清楚,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
实施例
本实施例公开一种电缆金属护套多点接地下大地漏电流计算方法,如图1所示为当前电力单芯电缆最为常见的结构,该计算模型及计算方法适用于此类电缆。如图2所示为大地漏电流电路等效模型,本发明所有的计算参数、推导以及公式的建立均是围绕着此电路图展开,求解电力电缆金属护套多点接地情况下各段大地漏电流的数值本质上即为求解此电路。如图3(a)-图3(b)为第λ段大地回路的三种故障接地方式,是说明书中式(6)推导的理论基础,也是系数矩阵A的求解原理。
其具体包括下列步骤:
1)测量电缆金属护套两端接地电阻R1和R2。这个数值可以从设计指标中直接读取,最好通过专用仪器现场测量,因为时间变化、环境变迁,接地电阻也在不断变化。
2)计算大地漏电阻Re,参照下列计算公式,
Re=π2Lf×10-7 (1)
式中,L为护套长度;f为输电线路运行频率。
3)确认每个故障点所在相位和位置,在此基础上再计算αλ,根据以下公式计算:
式中,li为第i段大地回路长度,L为电缆线路总长度,且满足
4)测量电缆金属护套故障接地点接地电阻测量各故障接地电阻Rki、Rgj、Rft。该测量需通过专用仪器进行测量,其阻值随接触状态会有很大的浮动值。
5)计算系数矩阵A,可表达为以下公式:
其中,系数矩阵A的第λ行对应第λ段大地回路,若第λ段大地回路前三相支路金属护套分别发生i、j、t个接地故障,则矩阵中的元素数值可由以下公式确定:
I=Iki+Igj+Ift (6)
其中,Iki、Igj、Ift为三相支路金属护套第i、j、t个故障处的接地电流,0<i<s,0<j<m,0<t<n;此时,对应系数矩阵A的λ行元素aλi、aλj、aλt数值为1,其它元素为0。
6)计算各段大地漏电流向量Ie根据以下公式计算:
AI=Ie (7)
其中,I向量为三相支路护套环流,且I=(Ik1…IksIg1…IgmIf1…Ifn)T;Ie=(Ie1Ie2…Ie(s+m+n-2))T
综上所述,本发明切实可行的提出了一种电缆金属护套多相多点接地下护层感应电流的计算方法,可方便计算多相多点接地状况下各段电缆上的感应电流数值。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。

Claims (6)

1.一种电缆金属护套多点接地下大地漏电流计算方法,其特征在于,所述的大地漏电流计算方法包含以下步骤:
S1、使用仪器测量电缆两端接地电阻R1和R2,计算大地漏电阻Re
S2、三相电缆金属护套依次发生(s-1)、(m-1)、(n-1)个故障接地,将各故障接地支路依次排开,计算任意相邻接地支路间距占线路总长度比例αλ
s>1,m>1,n>1,λ=1,2,…,s+m+n-2;
S3、计算各分段大地漏电阻R
S4、使用仪器测量(s+m+n-3)个故障接地电阻Rki、Rgj、Rft
S5、根据三相支路各故障点距电缆首端距离确定系数矩阵A;
S6、计算各段大地漏电流向量Ie
2.根据权利要求1所述的一种电缆金属护套多点接地下大地漏电流计算方法,其特征在于:所述的大地漏电阻Re的计算公式为:
Re=π2Lf×10-7 (1)
式中,L为护套长度;f为输电线路运行频率。
3.根据权利要求1所述的一种电缆金属护套多点接地下大地漏电流计算方法,其特征在于,所述的长度比例αλ根据以下公式计算:
式中,lλ为第λ段大地回路长度,L为电缆线路总长度,且满足
4.根据权利要求1所述的一种电缆金属护套多点接地下大地漏电流计算方法,其特征在于,所述的各分段大地漏电阻Re根据以下公式计算:
R=Re×αλ (4)。
5.根据权利要求1所述的一种电缆金属护套多点接地下大地漏电流计算方法,其特征在于,所述的系数矩阵A可表达为以下公式:
其中,系数矩阵A的第λ行对应第λ段大地回路,若第λ段大地回路前三相支路金属护套分别发生i、j、t个接地故障,则矩阵中的元素数值可由以下公式确定:
I=Iki+Igj+Ift (6)
其中,Iki、Igj、Ift为三相支路金属护套第i、j、t个故障处的接地电流,0<i<s,0<j<m,0<t<n;此时,对应系数矩阵A的λ行元素aλi、aλj、aλt数值为1,其它元素为0。
6.根据权利要求1所述的一种电缆金属护套多点接地下大地漏电流计算方法,其特征在于,所述的各段大地漏电流向量Ie根据以下公式计算:
AI=Ie (7)
其中,I向量为三相支路护套环流,且I=(Ik1…IksIg1…IgmIf1…Ifn)T;Ie=(Ie1Ie2…Ie(s+m+n-2))T
CN201810170545.5A 2018-03-01 2018-03-01 一种电缆金属护套多点接地下大地漏电流计算方法 Active CN108519537B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810170545.5A CN108519537B (zh) 2018-03-01 2018-03-01 一种电缆金属护套多点接地下大地漏电流计算方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810170545.5A CN108519537B (zh) 2018-03-01 2018-03-01 一种电缆金属护套多点接地下大地漏电流计算方法

Publications (2)

Publication Number Publication Date
CN108519537A CN108519537A (zh) 2018-09-11
CN108519537B true CN108519537B (zh) 2019-10-18

Family

ID=63433396

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810170545.5A Active CN108519537B (zh) 2018-03-01 2018-03-01 一种电缆金属护套多点接地下大地漏电流计算方法

Country Status (1)

Country Link
CN (1) CN108519537B (zh)

Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3760298A (en) * 1972-07-05 1973-09-18 Us Navy Circuit for suppressing leakage currents flowing into an underground cable sheath
JPS60233574A (ja) * 1984-05-02 1985-11-20 Sumitomo Electric Ind Ltd 単心金属シ−スケ−ブルの事故点検出装置
CN101645548A (zh) * 2009-08-25 2010-02-10 山东电力集团公司淄博供电公司 单芯高压电缆金属护套接地方法
US8643380B1 (en) * 2010-07-15 2014-02-04 Edward Herbert Method and apparatus for reducing shock and arc-flash hazards in power distribution systems
CN103792467A (zh) * 2014-02-25 2014-05-14 国家电网公司 一种高压交联聚乙烯电缆接地电流机理与故障分析方法
CN103941161A (zh) * 2014-05-12 2014-07-23 国家电网公司 一种电缆护层电流及载流量在线监测系统
CN104007354A (zh) * 2013-02-27 2014-08-27 上海宝钢工业技术服务有限公司 10kV氧化锌避雷器与电缆的整组试验电路和方法
CN203811728U (zh) * 2013-12-30 2014-09-03 国家电网公司 基于环流测量的单芯电力电缆护套接地故障检测系统
CN204228878U (zh) * 2014-11-06 2015-03-25 沈阳市联发城乡电力设计所(有限责任公司) 一种电缆护层接地环流检测系统
CN104502807A (zh) * 2015-01-13 2015-04-08 国家电网公司 电缆线路故障定位方法及装置、系统
CN104714161A (zh) * 2015-04-02 2015-06-17 兖州煤业股份有限公司 一种电缆绝缘化数据处理方法
CN105004907A (zh) * 2015-04-20 2015-10-28 江苏省电力公司常州供电公司 电力电缆交叉互联接地系统接地电流监测评价方法
CN105021871A (zh) * 2014-04-17 2015-11-04 国家电网公司 一种不完全信息下电缆线路泄露电流确定方法
CN105445526A (zh) * 2015-11-20 2016-03-30 国家电网公司 一种运行条件下单芯电缆绝缘泄漏电流的测量结构
CN105572553A (zh) * 2016-03-02 2016-05-11 国家电网公司 单芯高压电缆外护层绝缘和交叉互联接线的在线测试方法
CN105954652A (zh) * 2016-07-14 2016-09-21 广西电网有限责任公司柳州供电局 一种护层接地故障点定位方法
CN205665317U (zh) * 2016-06-12 2016-10-26 四川网达科技有限公司 电缆对地参数测试仪
CN106226650A (zh) * 2016-07-05 2016-12-14 长沙理工大学 一种单芯电力电缆金属护套故障定位方法
CN106249087A (zh) * 2016-09-18 2016-12-21 国网山东省电力公司德州供电公司 一种电缆金属护套接地线的在线实时监测系统及方法
CN106680662A (zh) * 2016-11-16 2017-05-17 国网上海电力设计有限公司 一种双端接地交叉互联电缆的金属护套内的环流估算方法

Patent Citations (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3760298A (en) * 1972-07-05 1973-09-18 Us Navy Circuit for suppressing leakage currents flowing into an underground cable sheath
JPS60233574A (ja) * 1984-05-02 1985-11-20 Sumitomo Electric Ind Ltd 単心金属シ−スケ−ブルの事故点検出装置
CN101645548A (zh) * 2009-08-25 2010-02-10 山东电力集团公司淄博供电公司 单芯高压电缆金属护套接地方法
US8643380B1 (en) * 2010-07-15 2014-02-04 Edward Herbert Method and apparatus for reducing shock and arc-flash hazards in power distribution systems
CN104007354A (zh) * 2013-02-27 2014-08-27 上海宝钢工业技术服务有限公司 10kV氧化锌避雷器与电缆的整组试验电路和方法
CN203811728U (zh) * 2013-12-30 2014-09-03 国家电网公司 基于环流测量的单芯电力电缆护套接地故障检测系统
CN103792467A (zh) * 2014-02-25 2014-05-14 国家电网公司 一种高压交联聚乙烯电缆接地电流机理与故障分析方法
CN105021871A (zh) * 2014-04-17 2015-11-04 国家电网公司 一种不完全信息下电缆线路泄露电流确定方法
CN103941161A (zh) * 2014-05-12 2014-07-23 国家电网公司 一种电缆护层电流及载流量在线监测系统
CN204228878U (zh) * 2014-11-06 2015-03-25 沈阳市联发城乡电力设计所(有限责任公司) 一种电缆护层接地环流检测系统
CN104502807A (zh) * 2015-01-13 2015-04-08 国家电网公司 电缆线路故障定位方法及装置、系统
CN104714161A (zh) * 2015-04-02 2015-06-17 兖州煤业股份有限公司 一种电缆绝缘化数据处理方法
CN105004907A (zh) * 2015-04-20 2015-10-28 江苏省电力公司常州供电公司 电力电缆交叉互联接地系统接地电流监测评价方法
CN105445526A (zh) * 2015-11-20 2016-03-30 国家电网公司 一种运行条件下单芯电缆绝缘泄漏电流的测量结构
CN105572553A (zh) * 2016-03-02 2016-05-11 国家电网公司 单芯高压电缆外护层绝缘和交叉互联接线的在线测试方法
CN205665317U (zh) * 2016-06-12 2016-10-26 四川网达科技有限公司 电缆对地参数测试仪
CN106226650A (zh) * 2016-07-05 2016-12-14 长沙理工大学 一种单芯电力电缆金属护套故障定位方法
CN105954652A (zh) * 2016-07-14 2016-09-21 广西电网有限责任公司柳州供电局 一种护层接地故障点定位方法
CN106249087A (zh) * 2016-09-18 2016-12-21 国网山东省电力公司德州供电公司 一种电缆金属护套接地线的在线实时监测系统及方法
CN106680662A (zh) * 2016-11-16 2017-05-17 国网上海电力设计有限公司 一种双端接地交叉互联电缆的金属护套内的环流估算方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
Research on on-line insulation monitoring and fault location method of mine power supply XLPE cable;Xudong Wang;《2014 IEEE Conference and Expo Transportation Electrification Asia-Pacific (ITEC Asia-Pacific)》;20140903;全文 *
多点泄漏对电力电缆高阻故障探测影响的分析;赵文辉;《中国新技术新产品》;20130810;全文 *
超高压海底电缆护套环流的理论计算新方法;杜兆斌;《华南理工大学学报(自然科学版)》;20131231;全文 *
高压单芯电缆护套接地电流的数模与应用;孙学锋;《山东电机工程学会第四届供电专业学术交流会》;20070801;全文 *

Also Published As

Publication number Publication date
CN108519537A (zh) 2018-09-11

Similar Documents

Publication Publication Date Title
CN103698653B (zh) 基于环流测量的单芯电力电缆护套接地故障检测系统及方法
CN104330659B (zh) 一种基于电缆传热模型的准动态增容方法
CN203811728U (zh) 基于环流测量的单芯电力电缆护套接地故障检测系统
CN108445342B (zh) 一种电缆护套单点金属性故障接地感应电流计算方法
CN107066719B (zh) 光纤复合海底电缆接地故障时温度分布仿真分析方法
CN111123041B (zh) 一种基于温度特性的电缆护层故障定位方法
WO2016124014A1 (zh) 用于气体绝缘变电站的跨步电压和最大接触电压计算方法
Benato et al. Zero sequence behaviour of a double-circuit overhead line
CN105445567B (zh) 全封闭式gis系统的核相方法
CN108469562A (zh) 高压电缆金属护套环流模型及模型建立方法
CN105044643A (zh) 一种具有自校功能的特高压ct线圈设计方法
CN103852693A (zh) 一种小电流接地选线系统的判断方法
Benato et al. Different bonding types of scilla–villafranca (Sicily–Calabria) 43-km double-circuit AC 380-kV submarine–land cables
CN108519537B (zh) 一种电缆金属护套多点接地下大地漏电流计算方法
CN108761167A (zh) 一种电缆金属护套多相多点接地下护层感应电流计算方法
CN103746364B (zh) 一种直流系统单极运行时变压器中性点电流预测方法
Mangione A simple method for evaluating ground-fault current transfer at the transition station of a combined overhead-cable line
CN108761166B (zh) 一种基于矩阵分析的电缆金属护套n点接地的感应电流计算方法
US20230341473A1 (en) A method for monitoring an electrical power transmission system and an associated device
Liang et al. Study on the calculation and suppression method of metal sheath circulating current of three-phase single-core cable
TWI627598B (zh) 用於計算輸、配電線路的披覆感應電壓與循環電流的圖形化人機介面及方法
CN108445341B (zh) 一种电缆护套多点接地下各段泄露电流的计算方法
CN104833835A (zh) 一种用于气体绝缘变电站的跨步电压的计算方法
CN108469542B (zh) 一种含绝缘金布的单芯电缆分布式感应电流的计算方法
Arafat et al. Magnetic field calculation under unconventional lines with increased power delivery

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant