一种外包钢板剪力墙模型试验加载梁设计装置 Download PDFInfo
- Publication number
- CN108505646A CN108505646A CN201810359405.2A CN201810359405A CN108505646A CN 108505646 A CN108505646 A CN 108505646A CN 201810359405 A CN201810359405 A CN 201810359405A CN 108505646 A CN108505646 A CN 108505646A
- Authority
- CN
- China
- Prior art keywords
- plate
- shaped
- shear wall
- steel plate
- outsourcing steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/56—Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)
Abstract
本发明公开了一种外包钢板剪力墙模型试验加载梁设计装置,包括侧板、“回”字形底板、“凹”字形承力板和“L”形传力板,所述“回”字形底板与外包钢板剪力墙的外包钢板焊接作为底板;所述侧板与“回”字形底板的四周焊接,所述“凹”字形承力板凹口朝下沿外包钢板剪力墙纵向布置嵌入剪力墙模型上方与“回”字形底板和侧板焊接;所述“L”形传力板布置在外包钢板剪力墙的两端与所述“凹”字形承力板垂直,所述“L”形传力板分别与所述“回”字形底板、“凹”字形承力板、底部的外包钢板剪力墙和侧板焊接。本发明提供的设计装置能较好完成剪力墙结构模型试验,相较于以往混凝土加载梁设计简洁,制作方便,具有支模快捷,模型成型快等优点。
Description
技术领域
本发明涉及构构件水平加载试验技术领域,特别涉及一种外包钢板剪力墙模型试验加载梁设计装置。
背景技术
剪力墙模型试验研究是众多研究剪力墙性能的科研人员经常选用的研究方法之一,特别是在研究剪力墙的抗震性能,进行低周往复试验,一批设计合理、制作简单的剪力墙构件对试验的成功、试验进度的加快就显得格外重要。在剪力墙的水平加载试验中,通常为了避免剪力墙墙体局部应力集中,影响试验效果及准确性,在模型设计时经常在墙体的上下两端设置加载梁和地梁,地梁的设置能很好地模拟实际中墙体与基础的固结,加载梁的设置能有效解决墙体加载时的应力集中,使荷载均匀传递至墙体。
在实际模型制作中,加载梁的设置通常采用现浇式钢筋混凝土梁,现浇式钢筋混凝土梁因其取材方便、价格低廉的特点,得到较为普遍的应用。但是,在剪力墙的模型制作中,由于加载梁的尺寸较大,且位置悬空,现浇式钢筋混凝土梁施工复杂,模板支撑难度大,严重影响加载梁的成型,造成作动器水平力的传递偏差,给模型试验的准确性带来隐患。
发明内容
有鉴于此,本发明的目的在于提供一种外包钢板剪力墙模型试验加载梁设计装置,目的在于解决制作剪力墙模型过程中,模板支撑难度大严重影响加载梁的成型,造成作动器水平力的传递偏差的问题。
为了达到上述目的,本发明采用的技术方案是:一种外包钢板剪力墙模型试验加载梁设计装置,包括侧板,“回”字形底板,“凹”字形承力板和“L”形传力板;所述“回”字形底板与外包钢板剪力墙的外包钢板焊接作为底板;所述侧板与“回”字形底板的四周焊接,所述“凹”字形承力板凹口朝下沿外包钢板剪力墙纵向布置嵌入剪力墙模型上方与“回”字形底板焊接,两侧边与侧板焊接;所述“L”形传力板布置在剪力墙的两端与所述“凹”字形承力板垂直,所述“L”形传力板分别与所述“回”字形底板、“凹”字形承力板、底部的外包钢板剪力墙和侧板焊接。
进一步,所述“凹”字形承力板的厚度比所述侧板、“L”形传力板和“回”字形底板的厚度更厚。
进一步,所述“凹”字形承力板、“L”形传力板均可根据试验要求加密布置。
进一步,所述侧板,“回”字形底板,“凹”字形承力板和“L”形传力板以及外包钢板剪力墙之间焊接的焊缝均为双面角焊缝,焊脚尺寸依设计而定。
与现有技术相比,本发明的有益效果是:
1.本发明免去了以往钢筋混凝土加载梁支模板、绑扎钢筋的复杂步骤,试件制作进度相应提前,能较好保证试验的成功;
2.本装置无需脱模,所述侧板、“回”字形底板、“凹”字形承力板和“L”形传力板在加载梁模型制作完成后可直接作为加载梁的外包钢板。
3采用此发明制作的加载梁传力路径明确、施工便捷。
附图说明
图1为本发明的整体结构示意图;
图2为本发明外包钢板剪力墙模型示意图;
图3为本发明的剖面图;
图4为本发明各特殊板的示意图;
其中,1-侧板、2-“回”字形底板、3-“凹”字形承力板、4-“L”形传力板、5-外包钢板剪力墙、6-加载梁。
具体实施方式
下面结合附图和具体实施例对本发明作进一步的详细描述。
如图1-4所示,本发明为一种外包钢板剪力墙模型试验加载梁设计装置,包括侧板1、“回”字形底板2、“凹”字形承力板3和“L”形传力板4;所述“回”字形底板2与外包钢板剪力墙5的外包钢板焊接作为底板;所述侧板1与“回”字形底板2的四周焊接,所述“凹”字形承力板3凹口朝下沿外包钢板剪力墙5纵向布置嵌入剪力墙模型上方与“回”字形底板2焊接,两侧边与侧板1焊接;所述“L”形传力板4布置在外包钢板剪力墙5的两端与所述“凹”字形承力板3垂直,所述“L”形传力板4分别与所述“回”字形底板2、“凹”字形承力板3、底部的外包钢板剪力墙5和侧板1焊接。所述“凹”字形承力板3的厚度比所述侧板1、“L”形传力板4和“回”字形底板2的厚度更厚。所述“凹”字形承力板3、“L”形传力板4均可根据试验要求加密布置。
本发明的具体实施方式,具体如下:
1.根据目标外包钢板剪力墙模型设计加载梁6的尺寸,准备相应数量、相关尺寸的加载梁6所用型材钢板,包括:侧板1,“回”字形底板2,“凹”字形承力板3,“L”形传力板4;
2.将“回”字形底板2在指定位置与目标外包钢板剪力墙模型按照钢结构施工验收规范进行焊接;
3.依次将“凹”字形承力板2、“L”形传力板4与已焊接完成的“回”字形底板2和目标外包钢板剪力墙模型进行焊接,焊缝为双面角焊缝,焊缝质量符合相关规定;
4.进行加载梁6混凝土浇筑作业,完成模型制作。
以上对本发明的具体实施例进行了详细描述,但其只是作为其中的一种实施例,本发明并不限制于以上描述的具体实施例。对于本领域技术人员而言,任何对本发明进行的等同修改和替代也都在本发明的范畴之中。因此,在不脱离本发明的精神和范围下所作的均等变换和修改,都应涵盖在本发明的范围内。
Claims (4)
1.一种外包钢板剪力墙模型试验加载梁设计装置,其特征在于:包括侧板(1)、“回”字形底板(2)、“凹”字形承力板(3)和“L”形传力板(4);所述“回”字形底板(2)与外包钢板剪力墙(5)的外包钢板焊接作为底板;所述侧板(1)与“回”字形底板(2)的四周焊接,所述“凹”字形承力板(3)凹口朝下沿外包钢板剪力墙(5)纵向布置嵌入剪力墙模型上方与“回”字形底板(2)焊接,两侧边与侧板(1)焊接;所述“L”形传力板(4)布置在外包钢板剪力墙(5)的两端与所述“凹”字形承力板(3)垂直,所述“L”形传力板(4)分别与所述“回”字形底板(2)、“凹”字形承力板(3)、底部的外包钢板剪力墙(5)和侧板(1)焊接。
2.根据权利要求1所述的一种外包钢板剪力墙模型试验加载梁设计装置,其特征在于:所述“凹”字形承力板(3)的厚度比所述侧板(1)、“L”形传力板(4)和“回”字形底板(2)的厚度更厚。
3.根据权利要求1所述的一种外包钢板剪力墙模型试验加载梁设计装置,其特征在于:所述“凹”字形承力板(3)、“L”形传力板(4)均可根据试验要求加密布置。
4.根据权利要求1所述的一种外包钢板剪力墙模型试验加载梁设计装置,其特征在于:所述侧板(1)、“回”字形底板(2)、“凹”字形承力板(3)和“L”形传力板(4)以及外包钢板剪力墙(5)之间焊接的焊缝均为双面角焊缝,焊脚尺寸依设计而定。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810359405.2A CN108505646B (zh) | 2018-04-20 | 2018-04-20 | 一种外包钢板剪力墙模型试验加载梁设计装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810359405.2A CN108505646B (zh) | 2018-04-20 | 2018-04-20 | 一种外包钢板剪力墙模型试验加载梁设计装置 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN108505646A true CN108505646A (zh) | 2018-09-07 |
| CN108505646B CN108505646B (zh) | 2019-07-09 |
Family
ID=63383090
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810359405.2A Expired - Fee Related CN108505646B (zh) | 2018-04-20 | 2018-04-20 | 一种外包钢板剪力墙模型试验加载梁设计装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108505646B (zh) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11324174A (ja) * | 1998-05-14 | 1999-11-26 | Taisei Corp | 耐震壁の構造 |
| CN1341188A (zh) * | 1999-01-26 | 2002-03-20 | 3-D复合建材有限公司 | 建筑系统 |
| CN102704594A (zh) * | 2012-05-25 | 2012-10-03 | 北京工业大学 | 型钢叠合边框柱内藏“多钢板-支撑”组合剪力墙及作法 |
| CN102995789A (zh) * | 2012-05-25 | 2013-03-27 | 北京工业大学 | 内藏型钢柱-格构钢梁-网状钢撑混凝土墙体及作法 |
| CN207088134U (zh) * | 2017-08-01 | 2018-03-13 | 陕西建工第十一建设集团有限公司 | 配电箱上部混凝土过梁预制模具 |
-
2018
- 2018-04-20 CN CN201810359405.2A patent/CN108505646B/zh not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH11324174A (ja) * | 1998-05-14 | 1999-11-26 | Taisei Corp | 耐震壁の構造 |
| CN1341188A (zh) * | 1999-01-26 | 2002-03-20 | 3-D复合建材有限公司 | 建筑系统 |
| CN102704594A (zh) * | 2012-05-25 | 2012-10-03 | 北京工业大学 | 型钢叠合边框柱内藏“多钢板-支撑”组合剪力墙及作法 |
| CN102995789A (zh) * | 2012-05-25 | 2013-03-27 | 北京工业大学 | 内藏型钢柱-格构钢梁-网状钢撑混凝土墙体及作法 |
| CN207088134U (zh) * | 2017-08-01 | 2018-03-13 | 陕西建工第十一建设集团有限公司 | 配电箱上部混凝土过梁预制模具 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN108505646B (zh) | 2019-07-09 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103711201B (zh) | 一种大跨度预应力混凝土梁板框架结构体系 | |
| CN204252345U (zh) | 一种预制混凝土板与钢梁的连接构造 | |
| CN107060140A (zh) | 一种预制装配式双钢管混凝土剪力墙及其装配方法 | |
| CN104032864B (zh) | 屈曲约束钢板墙与混凝土框架连接的腹板开孔h型钢连接节点 | |
| CN205314538U (zh) | 一种适用于逐层夯筑夯土墙模型试验的建筑模板 | |
| CN105442712B (zh) | 环梁钢筋连接结构及钢管柱环梁节点施工方法 | |
| CN108487453A (zh) | 一种钢管混凝土柱与钢筋混凝土梁连接结构及其连接方法 | |
| CN115816639A (zh) | 一种适用于铁路预制梁的钢筋骨架及横向串联建造方法 | |
| CN208137178U (zh) | 一种预制墙板锚固连接结构 | |
| CN108505646A (zh) | 一种外包钢板剪力墙模型试验加载梁设计装置 | |
| CN102182276A (zh) | 一种双亚字形巨型柱及其制作方法 | |
| CN103015627A (zh) | 一种内嵌式带栓钉外包钢高强混凝土组合梁 | |
| CN205259618U (zh) | 一种混凝土现浇楼板厚度控制装置 | |
| CN203066352U (zh) | 自承式异形外包钢-混凝土组合梁 | |
| CN103061444A (zh) | 自承式异形外包钢-混凝土组合梁 | |
| Li et al. | Punching shear strength of CFT bridge column to reinforced concrete four-pile cap connections | |
| CN100443671C (zh) | 配置斜向钢筋的钢筋混凝土承台及其制作方法 | |
| CN108316317A (zh) | 一种钢管混凝土拱架灌注模拟装置 | |
| Wang et al. | Hysteretic and rotational performance study of outwardly extending shape-steelprefabricated beam-column joints | |
| CN207901402U (zh) | 制梁、存梁及试验共用台座装置 | |
| CN212294729U (zh) | 一种钢结构外包柱脚结构 | |
| CN211285991U (zh) | 一种山丹丹花造型的大体量复杂曲率钢结构 | |
| Sheng et al. | Analysis of dumbbell-shaped CFST members subjected to combined compression and torsion loadings | |
| CN205224079U (zh) | 接触网杯型基础施工用内芯模 | |
| CN220598804U (zh) | 多腔外包钢板混凝土剪力墙 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190709 Termination date: 20200420 |