CN108502102A CN201810317370.6A CN201810317370A CN108502102A CN 108502102 A CN108502102 A CN 108502102A CN 201810317370 A CN201810317370 A CN 201810317370A CN 108502102 A CN108502102 A CN 108502102A
Authority
CN
China
Prior art keywords
lng fuel
fuel tank
hull
side enclosure
enclosure wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810317370.6A
Other languages
Chinese (zh)
Inventor
刘文华
陈刚
徐旭敏
张艳
赖明雁
徐军
徐一军
张华平
袁俊
朱蕾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Merchant Ship Design and Research Institute of CSSC No 604 Research Institute
Original Assignee
Shanghai Merchant Ship Design and Research Institute of CSSC No 604 Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Merchant Ship Design and Research Institute of CSSC No 604 Research Institute filed Critical Shanghai Merchant Ship Design and Research Institute of CSSC No 604 Research Institute
Priority to CN201810317370.6A priority Critical patent/CN108502102A/en
Publication of CN108502102A publication Critical patent/CN108502102A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B17/00Vessels parts, details, or accessories, not otherwise provided for
    • B63B17/0027Tanks for fuel or the like ; Accessories therefor, e.g. tank filler caps

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)

Abstract

The present invention is a kind of LNG fuel bulk freighter, is related to technical field of ships, to solve in existing LNG fuel bulk freighter, because LNG fuel tank arrange it is unreasonable caused by problem of high cost and inconvenient for use due to design.The LNG fuel bulk freighters include hull and the LNG fuel tank that is arranged on hull, wherein hull includes upper deck, and LNG fuel tank part is embedded into upper deck, and LNG fuel tank is at least one.LNG fuel bulk freighter center of gravity provided by the invention is relatively low, so that ship more easily controls during navigation, the navigation stability of LNG fuel bulk freighters ensure that, and, occupancy of the LNG fuel tank to nacelle space is also reduced, navigation cost is thus greatly reduced.

Description

LNG fuel bulk freighters
Technical field
The present invention relates to technical field of ships more particularly to a kind of LNG fuel bulk freighters.
Background technology
It with liquefied natural gas is combustion that LNG (Liquefied Natural Gas, liquefied natural gas) fuel bulk freighter, which is a kind of, Material, for the powered ship of replacement or partial alternative tradition marine fuel completely.Compared with the ship using diesel oil as power, Under the premise of generating identical power, since the carbon dioxide content that liquefied natural gas burning generates is relatively low, and hardly generate Any sulfide, thus the extensive concern of industry is received, meanwhile, but also the quantity of LNG fuel bulk freighters is held in recent years It is continuous to increase.
In the prior art, it is usually placed in deck for containing the LNG fuel tank of LNG fuel, alternatively, being arranged in cabin It is interior.For the LNG fuel tank that volume is larger, if being arranged on deck, it will so that the center of gravity of hull is increased significantly, not only It is unfavorable for the Weight control of ship entirety, moreover, also totally unfavorable to stability of ship during navigation;If by its cloth It sets in cabin, the volume of compartment of cargo hold can not only be greatly reduced, to improve shipping transport cost, moreover, when LNG fuel tank is located at cabin When interior, when damage is intake, buoyancy is larger suffered by flow container, the reinforcement of large area need to be carried out to only floating structure and Ship Structure, in this way One, the weight of hull will be aggravated, to increase the discharge during ship's navigation.
Invention content
The purpose of the present invention is to provide a kind of LNG fuel bulk freighters, to solve in existing LNG fuel bulk freighter, because of LNG Fuel tank arrange it is unreasonable caused by technical problem of high cost and inconvenient for use.
LNG fuel bulk freighter provided by the invention, including hull and the LNG fuel tank that is arranged on the hull, it is described Hull includes upper deck, and the LNG fuel tank part is embedded into the upper deck.
The LNG fuel tank is at least one.
Further, the LNG fuel tank is two, longitudinally asymmetric cloth of two LNG fuel tanks along the hull It sets in the both sides of chimney.
Further, the LNG fuel tank is located at the top of the cabin upper mounting plate of the hull.
Further, further include for the LNG fuel tank to be located to interior closure.
Further, the hull includes the isolation platform for the upper surface for being fixedly arranged on the cabin upper mounting plate, the LNG combustions Batch can is mounted on the isolation platform.
The closure includes being sequentially connected the first side enclosure wall to form " u "-shaped semi-surrounding structure, rear wall and second Side enclosure wall, first side enclosure wall and second side enclosure wall be opposite and interval setting, and each parallel to the longitudinal direction of the hull, The bottom of first side enclosure wall, the rear wall and second side enclosure wall is installed on the isolation platform, " u "-shaped half The open at one end for surrounding structure is connected to the superstructure front bulkhead of the hull so that first side enclosure wall, the back wall Wall, second side enclosure wall, the superstructure front bulkhead and the isolation platform are collectively formed for accommodating the LNG fuel The accommodating space of tank.
The closing shell further includes the roof for closing the accommodating space.
Further, the LNG fuel tank is mounted on by fixation kit on the isolation platform, the fixation kit packet Multiple support bases for being fixedly arranged on the isolation platform are included, along the longitudinal direction of the hull, the end of the LNG fuel tank and at least one A support base is slidably connected.
Further, first side enclosure wall and the junction of the rear wall and second side enclosure wall and the back wall The junction of wall is both provided with bevelling.
Further, multiple support ribs are connected between the cabin upper mounting plate and the isolation platform.
Further, first side enclosure wall, rear wall, second side enclosure wall, the superstructure front bulkhead Material with the roof is steel.
Further, the height for being embedded the LNG fuel tank into the upper deck accounts for the 1/4-1/2 of its total height.
The advantageous effect that LNG fuel bulk freighter of the present invention is brought is:
LNG fuel tank part by being embedded the upper deck into hull by the LNG fuel bulk freighter, so that LNG fuel A part for tank is located at the lower section of upper deck, and another part is located at the top of upper deck, the arrangement form of this half flush type, The whole height for not only reducing LNG fuel bulk freighters, to reduce its center of gravity so that ship is more easy during navigation In control, the navigation stability of LNG fuel bulk freighters ensure that.Moreover, this set form, also effectively improves previous incite somebody to action The larger drawback of buoyancy suffered by flow container when LNG fuel tank is fully disposed in caused damage in nacelle, to a certain extent The increase of the hull weight caused by needing large area to reinforce only floating structure and Ship Structure is avoided, and then reduces LNG Discharge of fuel bulk freighter during navigation, has effectively saved the energy.Also, half flush type of this LNG fuel tank is set Form is set, the occupancy to nacelle space is also reduced, thus greatly reduces navigation cost, operation grade is higher.
Rationally it is arranged by the quantity to LNG fuel tank, such as:One LNG fuel tank is set on hull, alternatively, Multiple LNG fuel tanks are set on hull, the navigation demand of LNG fuel bulk freighter under different operating modes can also be met, to big The generalization degree of the LNG fuel bulk freighters is improved greatly.
In addition, the LNG fuel bulk freighters are simple in structure, scheme is easily achieved, and the transformation period is short, for improving LNG power The running working condition of ship is of great significance to achieve the purpose that improve security of shipping.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, other drawings may also be obtained based on these drawings.
Fig. 1 is the partial structurtes side view of LNG fuel bulk freighter provided in an embodiment of the present invention;
Fig. 2 is the A-A sectional views in Fig. 1;
Fig. 3 is the structure top view of LNG fuel bulk freighters in Fig. 1;
Fig. 4 is the structural schematic diagram of floor in LNG fuel bulk freighter provided in an embodiment of the present invention.
Reference numeral:
100- hulls;200-LNG fuel tanks;300- closures;400- superstructures;500- chimneys;600- fixation groups Part;700- support ribs;800- mooring gears;
110- upper decks;120- cabin upper mounting plates;130- isolation platforms;
Wall after 310-;320- roofs;The first side enclosure walls of 330-;The second side enclosure walls of 340-;
410- superstructure front bulkheads;
The first support bases of 610-;The second support bases of 620-;
710- through-holes.
Specific implementation mode
To make the object, technical solutions and advantages of the present invention clearer, below in conjunction with attached drawing to the technology of the present invention Scheme carries out clear, complete description.Obviously, the described embodiments are merely a part of the embodiments of the present invention, rather than complete The embodiment in portion.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instructions such as term "top", "bottom", "inner", "outside", "left", "right" Orientation or positional relationship be to be based on the orientation or positional relationship shown in the drawings, it is only for convenient for description the present invention and letter Change description, do not indicate or imply the indicated device or element must have a particular orientation, with specific azimuth configuration and Operation, therefore be not considered as limiting the invention.In addition, term " first ", " second " are used for description purposes only, and cannot It is interpreted as indicating or implying relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connection " should be done It broadly understood, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be directly connected, Can also can be indirectly connected through an intermediary the connection inside two elements.For those of ordinary skill in the art For, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
As depicted in figs. 1 and 2, a kind of LNG fuel bulk freighter, including hull 100 and setting are present embodiments provided in ship LNG fuel tank 200 on body 100.Specifically, hull 100 includes upper deck 110,200 part of LNG fuel tank is embedded into upper first Plate 110.Wherein, LNG fuel tank 200 is at least one.
200 part of LNG fuel tank by being embedded the upper deck 110 into hull 100 by the LNG fuel bulk freighter, to make The part for obtaining LNG fuel tank 200 is located at the lower section of upper deck 110, and another part is located at the top of upper deck 110, this The arrangement form of half flush type not only reduces the whole height of LNG fuel bulk freighters, to reduce its center of gravity so that ship Oceangoing ship more easily controls during navigation, ensure that the navigation stability of LNG fuel bulk freighters.Moreover, this set form, It also effectively improves when LNG fuel tank 200 being fully disposed in caused damage in nacelle in the past suffered by LNG fuel tank 200 The larger drawback of buoyancy, to avoid to a certain extent because need large area reinforce only floating structure and hull 100 structure due to The increase of 100 weight of caused hull, and then reduce discharge of LNG fuel bulk freighter during navigation, effectively save The energy.Also, the setting form of 200 half flush type of this LNG fuel tank, also reduces the occupancy to nacelle space, to Navigation cost is greatly reduced, operation grade is higher.
Rationally it is arranged by the quantity to LNG fuel tank 200, such as:One LNG fuel tank is set on hull 100 200, alternatively, multiple LNG fuel tanks 200 are arranged on hull 100, LNG fuel bulk freighter under different operating modes can also be met Navigation demand, to substantially increase the generalization degree of the LNG fuel bulk freighters.
In addition, the LNG fuel bulk freighters are simple in structure, scheme is easily achieved, and the transformation period is short, for improving LNG power The running working condition of ship is of great significance to achieve the purpose that improve security of shipping.
Please continue to refer to Fig. 1 and Fig. 3, in the present embodiment, the shape of LNG fuel tank 200 can be cylindrical shape, and its both ends For hemispherical, the axis of tank body is along the longitudinally disposed of hull 100.
This set form, can effectively reduce the own wt of LNG fuel tank 200, and can improve LNG fuel bulk goods The functional reliability of ship.
In the present embodiment, the diameter of LNG fuel tank 200 can be 12m.
It should be noted that in the present embodiment, LNG fuel tank 200 can be above-mentioned columnar structure type, but not only It is limited only to this, other structures form can also be used, such as:It is spherical or prismatic etc..
It should also be noted that, in the present embodiment, LNG fuel tank 200 can be double-layer tank, or single layer tank.
Specifically, when LNG fuel tank 200 is the double-deck jar structure, internal layer tank is made of low temperature material, for containing LNG fuel is put, outer layer tank uses common material (such as:Stainless steel) it is made, wherein it is vacuum, profit between internal layer tank and outer layer tank It is realized with the vacuum layer between ectonexine tank body and the temperature of internal LNG fuel is kept.When LNG fuel tank 200 is single layer tank knot When structure, which is made of low temperature material, also, has insulation and heat preservation material in the external sheath of tank body.
In the present embodiment, LNG fuel tank 200 is located at the top of the damage balance waterline of hull 100.Such setting, makes The present embodiment LNG fuel bulk freighter is obtained in the unfavorable operating mode for damage occur, the buoyancy suffered by LNG fuel tank 200 is smaller, centainly The additional reinforcement that 100 structure of hull is avoided in degree, further reduced the weight of hull 100, and reduce hull 100 Still water bending moment has achieved the effect that carry out dual loss of weight to hull 100, dissipated to further improve the present embodiment LNG fuel The navigation reliability and stability of freighter.
Please continue to refer to Fig. 1 and Fig. 2, and Fig. 3 is combined, in the present embodiment, LNG fuel bulk freighters further include being set to hull 100 chimney 500, superstructure 400 and mooring gear 800, and the cabin inside hull 100 and at least one goods Cabin.
Please continue to refer to Fig. 2 and Fig. 3, in the present embodiment, LNG fuel tank 200 can be two.Specifically, two LNG combustions Batch can 200 is along the longitudinally asymmetric both sides for being arranged in chimney 500 of hull 100.
It should be noted that in the present embodiment, " longitudinal direction of hull 100 " refers to the length direction of hull 100, i.e.,:Fig. 1 With the left and right directions in Fig. 3.
Please continue to refer to Fig. 1 and Fig. 2, in the present embodiment, LNG fuel tank 200 is located at the cabin upper mounting plate 120 of hull 100 Top.Specifically, hull 100 further includes the isolation platform 130 for the upper surface for being fixedly arranged on cabin upper mounting plate 120, LNG fuel tank 200 are mounted on isolation platform 130.
The setting of isolation platform 130, realize it is mutually isolated between LNG fuel tank 200 and cabin, to a certain extent Avoid because LNG fuel tank 200 accidental release due to caused by cabin pollution, the generation of safety accident is reduced, to improve The security performances of the present embodiment LNG fuel bulk freighters.
Please continue to refer to Fig. 2, in the present embodiment, multiple supports are connected between cabin upper mounting plate 120 and isolation platform 130 Floor 700.Such setting plays the role of isolation platform 130 certain structural strengthening, to enhance isolation platform 130 are used to support support reliability when LNG fuel tank 200.
Please continue to refer to Fig. 2, in the present embodiment, each support rib 700 can be along the longitudinally spaced setting of hull 100.When So, each support rib 700 can also being horizontally arranged at interval along hull 100, alternatively, on the vertical and horizontal along hull 100 Multiple support ribs 700, then multiple support ribs alternatively, edge and the longitudinal direction of hull 100 are angularly staggered are set simultaneously 700, as long as by the support rib 700 of this structure type, can realize to the structural strengthening of isolation platform 130 i.e. Can, the present embodiment is not defined the specific arrangement form of support rib 700.
Specifically, as shown in figure 4, in the present embodiment, support rib 700 can be to offer the harden structure of through-hole 710.This The setting of sample considerably increases support rib 700 structural strength of itself, when being supported so as to improve support rib 700 by Power performance further improves the support reliability of isolation platform 130.
It should be noted that in the present embodiment, the structure of support rib 700 can have two rows big shown in Fig. 4 The structure type in small equal hole, but it is not limited solely to this, other setting forms can also be used, such as:Multiple rows of hole has 700 form of support rib in hole of different sizes, as long as passing through this support rib 700, Neng Goushi with pore structure Now to effective support of isolation platform 130.
In the present embodiment, spacing between cabin upper mounting plate 120 and isolation platform 130 can be 900mm, also, cabin The thickness of upper mounting plate 120 can be 10mm, and the thickness of isolation platform 130 can be 15mm.
Please continue to refer to Fig. 1, Fig. 2 and Fig. 3, in the present embodiment, which can also include for by LNG Fuel tank 200 is located at interior closure 300.
Such setting so that LNG fuel tank 200 is completely disposed in the enclosure space of hull 100, realizes LNG fuel Tank 200 is isolated with external environment, avoids the volatilization and leakage of fuel outwardly in LNG fuel tank 200 to a certain extent, The pollution caused by hull 100 and marine environment is reduced, the safety of the present embodiment LNG fuel bulk freighters is further improved Energy.
Please continue to refer to Fig. 1, Fig. 2 and Fig. 3, in the present embodiment, closure 300 may include being sequentially connected to be formed " U " The first side enclosure wall 330, rear wall 310 and the second side enclosure wall 340 of shape semi-surrounding structure, specifically, the first side enclosure wall 330 and Two side enclosure walls 340 are opposite and interval setting, and each parallel to the longitudinal direction of hull 100, also, the first side enclosure wall 330, rear wall 310 and second the bottom of side enclosure wall 340 be installed on isolation platform 130, the open at one end of " u "-shaped semi-surrounding structure is connected to Build front bulkhead in the upside of hull 100 so that before the first side enclosure wall 330, rear wall 310, the second side enclosure wall 340, superstructure The accommodating space for accommodating LNG fuel tank 200 is collectively formed in end wall 410 and isolation platform 130.Also, in accommodating space Top is additionally provided with roof 320, for closing accommodating space, to form 300 structure of closure.
This setting is utilized one side of the superstructure front bulkhead 410 as closure 300, not only reduces envelope The manufacture material dosage for closing shell 300 to reduce production cost, and also reduces the space hold of closure 300, Realize integrated and compact-sizedization of the present embodiment LNG fuel bulk freighters.
It should be noted that in the present embodiment, the first side enclosure wall 330, rear wall 310 and the second side enclosure wall 340 can be Above-mentioned bottom is connected to the setting form on isolation platform 130, but is not limited solely to this, can also use other setting shapes Formula, such as:First side enclosure wall 330, rear wall 310 and the second side enclosure wall 340 are both connected on upper deck 110.Such setting, Reduce the first side enclosure wall 330, rear wall 310 and the second side enclosure wall 340 material utilization amount, to further reduced this implementation The manufacturing cost of example LNG fuel bulk freighters.
It should also be noted that, in the present embodiment, the first side enclosure wall 330, rear wall 310, the second side enclosure wall 340, upper layer The material for building front bulkhead 410 and roof 320 is steel.Such setting so that LNG fuel tank 200 is by the closing of steel wall In shell 300 is enclosed in, safety greatly improves.Certainly, the first side enclosure wall 330, rear wall 310, the second side enclosure wall 340, on The material of layer building front bulkhead 410 and roof 320 can also be other materials form, as long as can be realized by this material Encirclement to LNG fuel tank 200.
Specifically, the first side enclosure wall 330, rear wall 310, the second side enclosure wall 340, superstructure front bulkhead 410 and roof In 320, adjacent to each other can be connected between the two by welding manner.
In the present embodiment, the first side enclosure wall 330 and the second side enclosure wall 340 at 200 closest approach of LNG fuel tank at a distance from can Think 1100mm, rear wall 310, superstructure front bulkhead 410 and roof 320 at 200 closest approach of LNG fuel tank at a distance from can Think 900mm.Also, the thickness of the first side enclosure wall 330 and the second side enclosure wall 340 can be 12mm, and the thickness of roof 320 can be with Thickness for 11mm, superstructure front bulkhead 410 can be 12mm.
Please continue to refer to Fig. 1 and Fig. 2, in the present embodiment, LNG fuel tank 200 can be mounted on by fixation kit 600 every From on platform 130, specifically, fixation kit 600 includes multiple support bases for being fixedly arranged on isolation platform 130, also, along hull 100 longitudinal direction, the end of LNG fuel tank 200 are slidably connected at least one support base.
In the present embodiment, support base is two, is respectively located at first support base on 100 front side of hull (right side in Fig. 1) 610 and the second support base 620 positioned at the rear side of hull 100 (left side in Fig. 1), between the first support base 610 and the second support base 620 Every setting, LNG fuel tank 200 is slidably connected with the first support base 610.
Such setting so that fixation kit 600 can adapt to caused by LNG fuel tank 200 expands with heat and contract with cold deformation Tank body elongates or shortens, to the situation that tank body damages caused by stress raisers of surface to a certain extent, into One step improves the functional reliability of the present embodiment LNG fuel bulk freighters.
Please continue to refer to Fig. 3, in the present embodiment, junction and second side enclosure wall of first side enclosure wall 330 with rear wall 310 340 are both provided with bevelling with the junction of rear wall 310.Such setting saves the confined space on upper deck 110, is The installation of mooring gear 800 is provided convenience with normal work.
Specifically, longitudinal angle of bevelling and hull 100 can be 30 °.
It should be noted that in the present embodiment, bevelling can be the structure type of straight flange shown in figure, but not only office It is limited to this, other setting forms can also be used, such as:Arc-shaped side, as long as by the bevelling of this structure type, Neng Goushi Now to the evacuation of mooring gear 800.
Please continue to refer to Fig. 1 and Fig. 2, in the present embodiment, the height for being embedded the LNG fuel tank 200 into upper deck 110 can be with Account for the 1/4-1/2 of its total height.Specifically, the height for being embedded the LNG fuel tank 200 into upper deck 110 can be its total height 1/3, i.e.,:As a diameter of 12m of tank body, the tank body height being embedded into upper deck 110 can be 4m.
In the present embodiment, which can be the bulk freighter for having larger molded breadth, can also be directly existing It is transformed on ship, LNG fuel tank 200 is installed additional, to form the LNG fuel bulk freighters of the present embodiment.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, it will be understood by those of ordinary skill in the art that:It still may be used To modify to the technical solution recorded in previous embodiment, either which part or all technical features are equal It replaces;And these modifications or replacements, the model for technical solution of the embodiment of the present invention that it does not separate the essence of the corresponding technical solution It encloses.

Claims (10)

1. a kind of LNG fuel bulk freighter includes the LNG fuel tank (200) of hull (100) and setting on the hull (100), It is characterized in that, the hull (100) includes upper deck (110), the LNG fuel tank (200) is partly embedded into the upper first Plate (110);
The LNG fuel tank (200) is at least one.
2. LNG fuel bulk freighter according to claim 1, which is characterized in that the LNG fuel tank (200) be two, two A LNG fuel tank (200) is along the longitudinally asymmetric both sides for being arranged in chimney (500) of the hull (100).
3. LNG fuel bulk freighter according to claim 1, which is characterized in that the LNG fuel tank (200) is located at described The top of the cabin upper mounting plate (120) of hull (100).
4. LNG fuel bulk freighter according to claim 3, which is characterized in that further include for by the LNG fuel tank (200) it is located at interior closure (300).
5. LNG fuel bulk freighter according to claim 4, which is characterized in that the hull (100) is described including being fixedly arranged on The isolation platform (130) of the upper surface of cabin upper mounting plate (120), the LNG fuel tank (200) are mounted on the isolation platform (130) on;
(300 include being sequentially connected the first side enclosure wall (330) to form " u "-shaped semi-surrounding structure, rear wall to the closure (310) and the second side enclosure wall (340), first side enclosure wall (330) and second side enclosure wall (340) is opposite and interval is set Set, and each parallel to the longitudinal direction of the hull (100), first side enclosure wall (330), it is described after wall (310) and described the The bottom of two side enclosure walls (340) is installed on the isolation platform (130), and the open at one end of " u "-shaped semi-surrounding structure abuts In the superstructure front bulkhead (410) of the hull (100) so that first side enclosure wall (330), it is described after wall (310), Second side enclosure wall (340), the superstructure front bulkhead (410) and the isolation platform (130) are collectively formed for holding Receive the accommodating spaces of the LNG fuel tank (200);
The closing shell further includes for closing the roof of the accommodating space (320).
6. LNG fuel bulk freighter according to claim 5, which is characterized in that the LNG fuel tank (200) passes through fixation Component (600) is mounted on the isolation platform (130), and the fixation kit (600) includes that multiple to be fixedly arranged on the isolation flat The support base of platform (130), the longitudinal direction along the hull (100), the end of the LNG fuel tank (200) with it is at least one described Support base is slidably connected.
7. LNG fuel bulk freighter according to claim 5, which is characterized in that first side enclosure wall (330) with it is described after The junction of wall (310) and second side enclosure wall (340) and the junction of the rear wall (310) are both provided with bevelling.
8. LNG fuel bulk freighter according to claim 5, which is characterized in that the cabin upper mounting plate (120) with it is described every From being connected with multiple support ribs (700) between platform (130).
9. LNG fuel bulk freighter according to claim 5, which is characterized in that first side enclosure wall (330), it is described after Wall (310), second side enclosure wall (340), the material of the superstructure front bulkhead (410) and the roof (320) are equal For steel.
10. according to claim 1-9 any one of them LNG fuel bulk freighters, which is characterized in that be embedded into the upper deck (110) height of the LNG fuel tank (200) accounts for the 1/4-1/2 of its total height.
CN201810317370.6A 2018-04-10 2018-04-10 LNG fuel bulk freighters Pending CN108502102A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810317370.6A CN108502102A (en) 2018-04-10 2018-04-10 LNG fuel bulk freighters

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810317370.6A CN108502102A (en) 2018-04-10 2018-04-10 LNG fuel bulk freighters

Publications (1)

Publication Number Publication Date
CN108502102A true CN108502102A (en) 2018-09-07

Family

ID=63381369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810317370.6A Pending CN108502102A (en) 2018-04-10 2018-04-10 LNG fuel bulk freighters

Country Status (1)

Country Link
CN (1) CN108502102A (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110131077A (en) * 2019-06-12 2019-08-16 温岭正峰动力有限公司 A kind of fuel filling device of engine
JP2020050135A (en) * 2018-09-27 2020-04-02 今治造船株式会社 Vessel
CN112356976A (en) * 2020-11-23 2021-02-12 上海外高桥造船有限公司 Superstructure of dual-fuel bulk cargo ship
CN113428288A (en) * 2021-07-21 2021-09-24 上海外高桥造船有限公司 Ship cabin structure and design method thereof
CN113443076A (en) * 2021-07-21 2021-09-28 上海外高桥造船有限公司 Bulk cargo ship
WO2021189986A1 (en) * 2020-03-27 2021-09-30 上海外高桥造船有限公司 Dual-fuel bulk cargo ship
CN113636016A (en) * 2021-07-21 2021-11-12 上海外高桥造船有限公司 Novel marine single track hangs portal device
WO2022121270A1 (en) * 2020-12-10 2022-06-16 沪东中华造船(集团)有限公司 Container ship and high-capacity gas fuel cabin arrangement structure thereof
FR3130739A1 (en) 2021-12-22 2023-06-23 Gaztransport Et Technigaz Ship comprising a castle and a tank for the storage of liquefied gas behind the castle
CN116654168A (en) * 2023-07-20 2023-08-29 江苏新时代造船有限公司 Liquefied gas tank arrangement structure of dual-fuel ship

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104044697A (en) * 2014-06-09 2014-09-17 山东航宇船业集团有限公司 Gas storage tank bearing device for LNG (liquefied natural gas) single-fuel ship
CN204264411U (en) * 2014-11-10 2015-04-15 中集船舶海洋工程设计研究院有限公司 LNG fuel box ship
CN205131579U (en) * 2015-10-10 2016-04-06 上海航盛船舶设计有限公司 Adopt boats and ships of double -deck high vacuum insulation type LNG storage tank of half -naked dew formula under -deck
CN105564588A (en) * 2014-11-10 2016-05-11 中集船舶海洋工程设计研究院有限公司 LNG fuel cargo ship
CN107614370A (en) * 2015-05-29 2018-01-19 株式会社大岛造船所 Ship

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104044697A (en) * 2014-06-09 2014-09-17 山东航宇船业集团有限公司 Gas storage tank bearing device for LNG (liquefied natural gas) single-fuel ship
CN204264411U (en) * 2014-11-10 2015-04-15 中集船舶海洋工程设计研究院有限公司 LNG fuel box ship
CN105564588A (en) * 2014-11-10 2016-05-11 中集船舶海洋工程设计研究院有限公司 LNG fuel cargo ship
CN107614370A (en) * 2015-05-29 2018-01-19 株式会社大岛造船所 Ship
CN205131579U (en) * 2015-10-10 2016-04-06 上海航盛船舶设计有限公司 Adopt boats and ships of double -deck high vacuum insulation type LNG storage tank of half -naked dew formula under -deck

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020050135A (en) * 2018-09-27 2020-04-02 今治造船株式会社 Vessel
CN110131077A (en) * 2019-06-12 2019-08-16 温岭正峰动力有限公司 A kind of fuel filling device of engine
WO2021189986A1 (en) * 2020-03-27 2021-09-30 上海外高桥造船有限公司 Dual-fuel bulk cargo ship
CN112356976A (en) * 2020-11-23 2021-02-12 上海外高桥造船有限公司 Superstructure of dual-fuel bulk cargo ship
WO2022121270A1 (en) * 2020-12-10 2022-06-16 沪东中华造船(集团)有限公司 Container ship and high-capacity gas fuel cabin arrangement structure thereof
CN113428288A (en) * 2021-07-21 2021-09-24 上海外高桥造船有限公司 Ship cabin structure and design method thereof
CN113443076A (en) * 2021-07-21 2021-09-28 上海外高桥造船有限公司 Bulk cargo ship
CN113636016A (en) * 2021-07-21 2021-11-12 上海外高桥造船有限公司 Novel marine single track hangs portal device
FR3130739A1 (en) 2021-12-22 2023-06-23 Gaztransport Et Technigaz Ship comprising a castle and a tank for the storage of liquefied gas behind the castle
WO2023118320A1 (en) 2021-12-22 2023-06-29 Gaztransport Et Technigaz Vessel comprising a superstructure and a tank for the storage of liquefied gas to the rear of the superstructure
CN116654168A (en) * 2023-07-20 2023-08-29 江苏新时代造船有限公司 Liquefied gas tank arrangement structure of dual-fuel ship
CN116654168B (en) * 2023-07-20 2023-10-10 江苏新时代造船有限公司 Liquefied gas tank arrangement structure of dual-fuel ship

Similar Documents

Publication Publication Date Title
CN108502102A (en) LNG fuel bulk freighters
US8235242B2 (en) Anti-sloshing structure for LNG cargo tank
JP6869353B2 (en) Gas fuel propulsion container carrier
WO2022121270A1 (en) Container ship and high-capacity gas fuel cabin arrangement structure thereof
KR20170078501A (en) Container Carrier capable of mounting LNG Fueled Propulsion System
CN103764494A (en) LNG carrier
CN101687535A (en) Liquefied natural gas carrier vessel, and marine transportation method for liquefied natural gas
CN114212188B (en) Gas fuel propelling container transport ship
US20160031531A1 (en) LNG Ship or LPG Ship
CN109863080B (en) Liquefied gas carrier
KR102028830B1 (en) Fuel Tank Structure and Ship having the same
CN111409776B (en) Rhombic isolation empty cabin structure of liquefied gas carrier
KR20200083426A (en) Floating Storage Regasification Unit Dedicated Vessel with Slow Speed and Large Full Form
CN207466901U (en) A kind of only floating structure of the LNG fuel compartments of roll-on/roll-off vessel for vehicle
CN111661238B (en) Dual-fuel ultra-large ore carrier
KR101686907B1 (en) Mineral carrier using liquefied fuel gas
US10081412B2 (en) Floating vessel with tank trough deck
CN218877509U (en) A-type fuel tank large bulk carrier with truss type isolation empty cabin
CN220809712U (en) Methanol fuel cabin protruding out of deck
KR20200031948A (en) Floating Storage Regasification Unit Dedicated Vessel with Slow Speed and Large Full Form
CN214890508U (en) LNG power ship
CN218343684U (en) Arrangement structure of methanol fuel tank of container ship
CN215826931U (en) Transport ship suitable for shallow water area
CN113264150B (en) Watertight transverse bulkhead structure of cargo compartment
CN114379704B (en) Method and device for arranging B-type cargo tank in bow area of LNG ship

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180907