- CN108492079A CN108492079A CN201810183260.5A CN201810183260A CN108492079A CN 108492079 A CN108492079 A CN 108492079A CN 201810183260 A CN201810183260 A CN 201810183260A CN 108492079 A CN108492079 A CN 108492079A
- Authority
- CN
- China
- Prior art keywords
- mapping
- worker
- project
- surveying
- terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/101—Collaborative creation, e.g. joint development of products or services
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of mapping work compound method, belong to technical field of mapping, including received server-side project information and generates project;Server end is split using grid lines to entirely surveying and drawing region, and counts the number of grid that each mapping region includes;The project open command that received server-side manager sends;It surveys and draws terminal and obtains project information, and mapping mission bit stream is associated with working space;Surveying and mapping data in working space is uploaded to server end by mapping terminal;Mapping mission bit stream is updated after received server-side to surveying and mapping data;The number of grid of mapping is completed in each mapping worker of server end real-time statistics, and is ranked up to each mapping worker.The present invention realizes the Real-Time Sharing that more members cooperate with mapping and each group surveying and mapping data, effectively avoid the occurrence of test leakage, resurvey and it is wrong survey, realize project process and survey and draw the fully controllable of operation, a kind of mapping work compound method of mapping efficiency is greatly improved.
Description
Technical field
The present invention relates to a kind of mapping work compound methods, belong to technical field of mapping.
Background technology
Traditional single mode of surveying refers to that each program member individually completes the region mapping task for being assigned to oneself,
When all members complete mapping, all measurement data are merged together by staff in the industry, are finally obtained most at figure
Terminate fruit.However, unavoidably occurring test leakage in such a mode, in mapping, resurveying and wrong the case where surveying.
With the development of constantly bringing forth new ideas of mapping equipment, network savvy module is already present in most of mapping equipment, newly
Mapping work pattern demand be also thus born.Have a small number of mapping enterprises at present and start with this module, and proposes new
Mapping work pattern.The patent of invention of Chinese patent application publication No. CN104717256A discloses a kind of measurement data cloud and deposits
Measurement data can be sent to cloud server by storage system and its workflow, and staff is by accessing the measurement in the industry
Data, and handling data realize data processing in the industry in real time, then further according to real-time meeting of the data handled in the industry outside
Industry operation realizes that the work of interior industry and field operation is interactive.But currently with network savvy module, utilization is most wide still to survey and draw
The high in the clouds of data stores, such as:Chinese patent Authorization Notice No. is a kind of more ground disclosed in the patent of invention of CN104052819B
High in the clouds data integrity verification method and the Chinese patent Authorization Notice No. for managing position storage are the invention of CN104765876B
A kind of magnanimity GNSS small documents cloud storage method of patent disclosure.These are all that simple high in the clouds stores data, are made to mapping
Industry pattern does not have a great impact.
If the data that each member is surveyed in traditional single mode of surveying are realized that Real-Time Sharing, i.e., each member exist
The data that can implement the data and oneself of seeing that other members are surveyed in operation process realize more member's work compounds, then
It is just avoided that test leakage, resurveys and the occurrence of test leakage, working efficiency is greatly improved.
Invention content
The object of the present invention is to provide a kind of mapping work compound method, the surveying and mapping data of the more members of Real-Time Sharing is realized
Collaboration mapping, is greatly improved working efficiency.
The present invention above-mentioned technical purpose technical scheme is that:A kind of mapping work compound side
Method includes the following steps:
S1, received server-side manager for the project information set by project and generate project, and the project information includes
Mission bit stream and mapping worker information are surveyed and drawn, and the mapping mission bit stream and mapping worker information are one-to-one relationship;
S2, server end are split using grid lines to entirely surveying and drawing region, and it is right to count each mapping mission bit stream institute
The number of grid that region includes should be surveyed and drawn;
The project open command that S3, received server-side manager send discloses the project information in project to mapping terminal;
S4, mapping terminal obtain project information from server end according to the project retrieval instruction received, and are stepped on according to itself
Corresponding mapping mission bit stream is associated by the mapping worker information in land with the working space of itself;
S5, mapping terminal are stored in generated surveying and mapping data is surveyed and drawn in the working space of itself, and will be in working space
Surveying and mapping data is uploaded to server end;
It is updated according to the surveying and mapping data to surveying and drawing mission bit stream accordingly after S6, received server-side to surveying and mapping data;
The number of grid of mapping is completed in S7, each mapping worker of server end real-time statistics, and according to the grid that mapping is completed
Quantity is ranked up each mapping worker by up to few sequence, while the sequencing information being disclosed to each mapping terminal in real time.
By using above-mentioned technical proposal, manager can assign project open command online using networking module, and will
Project information is communicated to each mapping terminal through server end;It is each to survey and draw acquired in terminal meanwhile in practical mapping process
Surveying and mapping data can be uploaded to server end in real time;The surveying and mapping data of all mapping terminals is carried out in server end whole in real time
It closes, and after forming mapping, server end can in real time disclose the mapping to each mapping terminal, facilitate all mappings
Personnel understand current survey progress, avoid test leakage occurs, resurvey and wrong situations such as surveying.In addition, before project open command is assigned,
Server end is split using grid lines to entirely surveying and drawing region, can by counting the quantity of grid in each mapping region
Ensure that the size in each mapping region is almost the same, each mapping worker is contributed to synchronously complete whole mapping tasks;Meanwhile it servicing
Device end is after real-time update surveys and draws mission bit stream, moreover it is possible to count each using the number of grid that mapping region is included is completed
The mapping progress of mapping worker, and the sequence of each mapping worker mapping progress is public to each mapping terminal by networking module
It opens, the mapping worker that progress can not only be reminded slightly slow accelerates mapping progress, moreover it is possible to play drum to the faster mapping worker of progress
The effect encouraged can effectively transfer the job enthusiasm of whole mapping workers in this way, and then greatly speed up mapping progress,
Improve mapping efficiency.
The present invention is further arranged to:Further include after step s 7:
S8, when received server-side to mapping terminal transmitted by project acquisition instruction, then current project information is sent to
Corresponding mapping terminal so that the mapping terminal can show the mapping mission bit stream of other mapping terminals.
By using above-mentioned technical proposal, in surveying and drawing operation process, when mapping worker sends out project by surveying and drawing terminal
When acquisition instruction, corresponding mapping terminal can obtain current project information online, can not only understand the mapping progress of oneself, also
It can check the mapping progress of other mapping workers.
The present invention is further arranged to:Further include after step s8:
S9, when in project all mapping task complete, server end by each mapping mission bit stream according to preset format into
Then row combination generates project result and provides download.
By using above-mentioned technical proposal, after the completion of whole mapping tasks, server end can be to project information and complete
Portion's surveying and mapping data is integrated, and is then combined according to preset format, and generates project result;Any work with permission
Making personnel can download in server end and check final project as a result, saving the flows such as intermediate treatment, waiting, further increase
Working efficiency.
The present invention is further arranged to:When a certain mapping worker completes the mapping task of itself, according to the mapping worker
The additional mapping task that the additional mapping task requests instruction or manager that corresponding mapping terminal is sent out are sent out dispatches instruction, takes
Be engaged in device end from real-time ranking be located at last position mapping worker or adjacent mapping worker corresponding to mapping region middle finger foregone conclusion portion
Divide mapping area, and is assigned to the mapping worker that original mapping task is completed as new mapping task.
By using above-mentioned technical proposal, it is contemplated that the mapping speed of each mapping worker is different, when a certain mapping
After personnel complete its original mapping task, which can submit additional mapping task requests instruction by surveying and drawing terminal,
Or assign additional mapping task to corresponding mapping terminal from server end from manager and dispatch instruction, server end can be from reality
When rank behind or the mapping region of adjacent mapping worker in specified one piece of part point mapping area, as the mapping worker
Additional mapping task helps speed up the mapping progress in each mapping region, realizes that more members cooperate with mapping, survey is greatly improved
Paint efficiency.
The present invention is further arranged to:The mapping mission bit stream forms a complete mapping by multiple mapping regions
Map is presented.
By using above-mentioned technical proposal, using mapping real-time exhibition current survey mission bit stream, it is more intuitive and
Clearly, manager and each mapping worker is facilitated to understand current survey progress.
The present invention is further arranged to:In the mapping that mapping terminal is presented, the survey corresponding to each mapping worker
Region is painted to distinguish in different colors.
By using above-mentioned technical proposal, different colors is specified for different mapping workers, is being surveyed by corresponding color
It paints and identifies its correspondence mapping region in map, it is more eye-catching, not only facilitate each mapping worker to understand and grasps the mapping task of oneself,
Manager can also be facilitated to understand the real-time progress for grasping each mapping region.
The present invention is further arranged to:After the part point mapping area is designated, this locally divides mapping area on mapping ground
The color that will be changed to by the color corresponding to former mapping worker corresponding to new mapping worker in figure.
By using above-mentioned technical proposal, after locally a point mapping area is designated, the color identified is subject to table more, energy
Enough task performances that each mapping worker is more intuitively embodied in mapping, provide for the internal control of manager
With reference to.
In conclusion the invention has the advantages that:
1, in the case where work pattern is surveyed and drawn in collaboration, by server end, networking module and mapping terminal, each mapping worker can be real-time
The surveying and mapping data of oneself, and the mapping task of the mapping real time contrast oneself provided by server end are provided, contributed to
It avoids the occurrence of test leakage, wrong survey and resurveys;
2, after the surveying and mapping data that each mapping worker uploads oneself in real time, server end can be according to the mapping in each mapping region
Progress sorts in real time to each mapping worker, grasps current whole mapping progress convenient for mapping worker and manager, helps
In forming the atmosphere of benign competition inside each mapping worker, and accomplish project process and mapping worker mapping operation it is complete
Controllably;
3, the mapping mission bit stream integrated out using server end, can realize be completed the mapping worker of mapping worker with not yet
The work compound between the mapping worker of mapping task is completed, while improving mapping worker enthusiasm, is contributed to further
Accelerate mapping progress, working efficiency is greatly improved.
Description of the drawings
Fig. 1 is the flow chart of the mapping work compound method of the present invention;
Fig. 2 is the concrete scene schematic diagram of the mapping work compound of the present invention.
Specific implementation mode
Below in conjunction with attached drawing, invention is further described in detail.
Referring to attached drawing 1, a kind of mapping work compound method is applied to server end and mapping terminal, it includes following step
Suddenly:
S1, received server-side manager for the project information set by project and generate project, and the project information includes
Mission bit stream and mapping worker information are surveyed and drawn, and the mapping mission bit stream and mapping worker information are one-to-one relationship.
In step sl, project administrator is by mapping equipment, intelligent terminal or PC Connection Service device end, and
Project information in project is configured, server end is after receiving the project information set by raw corresponding item
Mesh.Above-mentioned mapping mission bit stream is preferably presented using mapping, and the mapping is by the survey corresponding to each mapping worker
Region is painted to be composed;Meanwhile each mapping region is distinguished for ease of manager and mapping worker, in the mapping, respectively
It is preferably labelled using different colors in a mapping region.
S2, server end are split using grid lines to entirely surveying and drawing region, and count each mapping mission bit stream
The number of grid that corresponding mapping region includes.
Before project unlatching, server end is by grid lines to just respectively mapping region is split;In practical operation, it should use up
Amount ensures that the mapping area size for distributing to each mapping worker is almost the same.To realize this point, ensureing that single grid is big
It is small it is identical under the premise of, by control it is each mapping region in grid quantity, can to it is each mapping region size realize
More it is accurately controlled.
S3, received server-side manager send project open command, by the project information in project to mapping terminal
It is open.
S4, mapping terminal obtain project information according to the project retrieval instruction received from server end, and according to itself
Corresponding mapping mission bit stream is associated by the mapping worker information logged in the working space of itself.
After project open command is assigned, after mapping terminal to server end sends out project retrieval instruction, terminal is surveyed and drawn
The project information set by manager can be obtained from server end;Meanwhile the mapping people used in mapping terminal is logged according to it
Member's information obtains corresponding mapping mission bit stream from server end.In this way, the online reception and registration of mapping task is realized,
Intermediate flow is saved, working efficiency is improved.After mapping mission bit stream is associated with working space, stored in the working space
Data are the surveying and mapping data first closed with the mapping mission bit stream.
S5, mapping terminal are stored in generated surveying and mapping data is surveyed and drawn in the working space of itself, and by working space
In surveying and mapping data be uploaded to server end.
It is carried out more according to the surveying and mapping data to surveying and drawing mission bit stream accordingly after S6, received server-side to surveying and mapping data
Newly.
When mapping worker is surveyed and drawn using mapping terminal, which can be stored in working space by surveying and mapping data
In, and the surveying and mapping data is uploaded to server end in real time by networking module,;Due in working space surveying and mapping data with it is right
It is associated when the mapping mission bit stream answered, thus server end also can by the surveying and mapping data received and corresponding mapping mission bit stream into
Row association.Meanwhile after the completion of received server-side to surveying and mapping data and association, server end can survey and draw mission bit stream to corresponding
Carry out real-time update.
S7, each mapping worker of server end real-time statistics are completed the number of grid of mapping, and according to mapping is completed
Number of grid is ranked up each mapping worker by up to few sequence, while by the sequencing information in real time to each mapping terminal public affairs
It opens.
Mapping mission bit stream obtained by server end real-time update, server end can accurately count each mapping area
The number of grid of mapping is completed in domain, which is to represent the mapping progress in current each mapping region, while going back generation
The table mapping efficiency of each mapping worker.According to the statistical data, server end can arrange each mapping worker in real time
Sequence, each mapping worker can obtain current sequencing information in real time by surveying and drawing terminal, contribute between each mapping worker
Benign competition is formed, and the mapping worker for reminding progress to fall behind accelerates mapping progress.
In practical mapping process, it is contemplated that the mapping efficiency of each mapping worker there will necessarily be certain difference, when a certain
When mapping worker completes its original mapping task, which can select to send out additionally by surveying and drawing terminal to server end
Task requests instruction is surveyed and drawn, or additional mapping is sent out from manager from server end to the corresponding mapping terminal of the mapping worker
Task dispatches instruction.At this point, server end will be automatically from the adjacent mapping region for not yet completing mapping task or ranking end position
The corresponding mapping region middle finger of mapping worker make part point mapping area, and be assigned to this as additional mapping task
The mapping worker of original mapping task is completed, realizes that more members cooperate with mapping, and accelerate mapping progress.It is clear for convenience of manager
Chu understands the task amount that each mapping worker is actually completed, and after being designated, the color of mark will in above-mentioned part point mapping area
It is changed to that the color in the corresponding mapping region of mapping worker of former mapping task is completed;At this point, manager and mapping worker are logical
Cross the practical distribution condition for checking that the color identified on mapping can have a clear understanding of each mapping region.
S8, the project acquisition instruction transmitted by the received server-side to mapping terminal, then send out current project information
It send to corresponding and surveys and draws terminal so that the mapping terminal can show the mapping mission bit stream of other mapping terminals.
In practical mapping process, each mapping worker can be referred to by surveying and drawing terminal to server end and sending out project and obtain
It enables, to obtain current mapping mission bit stream;Each mapping worker can not only understand the surveying and mapping data of oneself, moreover it is possible to real time inspection
Other people surveying and mapping data is avoided there is a situation where test leakage, is resurveyed and mistake, then realizes that more members cooperate with mapping, improve mapping
Efficiency.
S9, when in project all mapping task complete, server end is by each mapping mission bit stream according to preset lattice
Formula is combined, and is then generated project result and is provided download.
After the completion of whole mapping tasks, server end can integrate project information and whole surveying and mapping datas, so
It is combined afterwards according to preset format, and generates project result;Any staff with permission can be in server end
Final project is downloaded and checked as a result, saving the flows such as intermediate treatment, waiting, further increases working efficiency.
The above method is described further with reference to concrete scene:
Administrator creates project in server end first, and distributes several each mapping workers in the project, while being each mapping
Personnel specify corresponding mapping task.The mapping task will be shown by mapping, and administrator will be according to mapping worker
Quantity and mapping difficulty different mapping regions is marked off in mapping, each region of surveying and drawing corresponds to a mapping people respectively
Member.It is identical in mapping difficulty to guarantee fairness, it should ensure that each mapping area size is almost the same as possible.
For example, as shown in Fig. 2, including the tetra- mapping regions A, B, C, D in a mapping, each region of surveying and drawing is divided
Mapping is not responsible for by a mapping worker;Mapping worker is acquired every time when carrying out field surveys using mapping terminal
Surveying and mapping data can all carry respective coordinates information;Therefore, each mapped point will be uploaded to server there are one coordinate information
End, server end can be updated according to received surveying and mapping data and coordinate information in corresponding mapping region, until
Corresponding mapping worker completes its responsible whole mapping region.
When a-quadrant, corresponding mapping task is completed, if the corresponding mapping worker in a-quadrant is by surveying and drawing terminal to server
End sends out additional mapping task requests instruction or manager sends out additional mapping task by server end to the mapping worker
Instruction is dispatched, server end can make part point mapping area E from the remaining region middle finger to be surveyed and drawn of B, C or D, and be made
It is assigned to the corresponding mapping worker in a-quadrant for the additionally task of surveying and drawing;Meanwhile this locally preferably to survey and draw progress most slow by a point mapping area E
Mapping region specified.
By the above-mentioned means, by server end, networking module and mapping terminal, each mapping worker can Real-Time Sharing from
Oneself surveying and mapping data, and the mapping task of the mapping real time contrast oneself provided by server end, help avoid leaking
It surveys, wrong the occurrence of surveying and resurveying;Meanwhile after the surveying and mapping data that each mapping worker uploads oneself in real time, server end energy
Enough mapping progresses according to each mapping region sort in real time to each mapping worker, are slapped convenient for mapping worker and manager
Hold current whole mapping progress, contribute to inside each mapping worker to form the atmosphere of benign competition, and accomplish project process with
Mapping worker surveys and draws the fully controllable of operation;In addition, the mapping mission bit stream integrated out using server end, can realize
The work compound between the mapping worker of mapping worker and the mapping worker for not yet completing mapping task is completed, people is surveyed and drawn improving
While member's enthusiasm, helps to further speed up mapping progress, working efficiency is greatly improved.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, people in the art
Member can as needed make the present embodiment the modification of not creative contribution after reading this specification, but as long as at this
It is all protected by Patent Law in the right of invention.
Claims (7)
1. a kind of mapping work compound method, which is characterized in that include the following steps:
S1, received server-side manager for the project information set by project and generate project, and the project information includes
Mission bit stream and mapping worker information are surveyed and drawn, and the mapping mission bit stream and mapping worker information are one-to-one relationship;
S2, server end are split using grid lines to entirely surveying and drawing region, and it is right to count each mapping mission bit stream institute
The number of grid that region includes should be surveyed and drawn;
The project open command that S3, received server-side manager send discloses the project information in project to mapping terminal;
S4, mapping terminal obtain project information from server end according to the project retrieval instruction received, and are stepped on according to itself
Corresponding mapping mission bit stream is associated by the mapping worker information in land with the working space of itself;
S5, mapping terminal are stored in generated surveying and mapping data is surveyed and drawn in the working space of itself, and will be in working space
Surveying and mapping data is uploaded to server end;
It is updated according to the surveying and mapping data to surveying and drawing mission bit stream accordingly after S6, received server-side to surveying and mapping data;
The number of grid of mapping is completed in S7, each mapping worker of server end real-time statistics, and according to the grid that mapping is completed
Quantity is ranked up each mapping worker by up to few sequence, while the sequencing information being disclosed to each mapping terminal in real time.
2. a kind of mapping work compound method according to claim 1, which is characterized in that further include after step s 7:
S8, when received server-side to mapping terminal transmitted by project acquisition instruction, then current project information is sent to
Corresponding mapping terminal so that the mapping terminal can show the mapping mission bit stream of other mapping terminals.
3. a kind of mapping work compound method according to claim 2, which is characterized in that further include after step s8:
S9, when in project all mapping task complete, server end by each mapping mission bit stream according to preset format into
Then row combination generates project result and provides download.
4. a kind of mapping work compound method according to claim 1 or 3, which is characterized in that when a certain mapping worker is complete
When at itself mapping task, the instruction of additional mapping task requests or manage that mapping terminal is sent out are corresponded to according to the mapping worker
The additional mapping task that reason person sends out dispatches instruction, and server end is located at the mapping worker of last position or adjacent survey from real-time ranking
The mapping region middle finger foregone conclusion part mapping area corresponding to personnel is painted, and is assigned to as new mapping task and original is completed
The mapping worker of beginning mapping task.
5. a kind of mapping work compound method according to claim 4, which is characterized in that the mapping mission bit stream be by
Multiple mapping regions form a complete mapping and are presented.
6. a kind of mapping work compound method according to claim 5, which is characterized in that in the survey that mapping terminal is presented
It paints in map, the mapping region corresponding to each mapping worker distinguishes in different colors.
7. a kind of mapping work compound method according to claim 6, which is characterized in that when the part point mapping area's quilt
After specified, the part point mapping area will be changed to new mapping worker in mapping by the color corresponding to former mapping worker
Corresponding color.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810183260.5A CN108492079A (en) | 2018-03-06 | 2018-03-06 | A kind of mapping work compound method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810183260.5A CN108492079A (en) | 2018-03-06 | 2018-03-06 | A kind of mapping work compound method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108492079A true CN108492079A (en) | 2018-09-04 |
Family
ID=63341384
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810183260.5A Pending CN108492079A (en) | 2018-03-06 | 2018-03-06 | A kind of mapping work compound method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108492079A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112857309A (en) * | 2021-01-21 | 2021-05-28 | 江西地信数云科技有限公司 | Surveying and mapping service platform |
CN114707948A (en) * | 2022-03-04 | 2022-07-05 | 广东省国土资源测绘院 | Management method, device and storage medium for large surveying and mapping production project |
CN114882190A (en) * | 2022-05-30 | 2022-08-09 | 广州市城市规划勘测设计研究院 | Topographic map collaborative surveying and mapping method and system |
CN115034696A (en) * | 2022-08-12 | 2022-09-09 | 北京迈平测绘技术开发有限公司 | Geological mapping cooperative operation method and system |
CN118013062A (en) * | 2024-01-29 | 2024-05-10 | 深圳市优领通软件技术有限公司 | Data management method and system of handheld mapping terminal |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105701644A (en) * | 2016-01-01 | 2016-06-22 | 广州市中海达测绘仪器有限公司 | Surveying and mapping cooperative working method and system |
CN106779417A (en) * | 2016-12-20 | 2017-05-31 | 黄河勘测规划设计有限公司 | The collection of engineering investigation information digitalization, management and integrated application method |
-
2018
- 2018-03-06 CN CN201810183260.5A patent/CN108492079A/en active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105701644A (en) * | 2016-01-01 | 2016-06-22 | 广州市中海达测绘仪器有限公司 | Surveying and mapping cooperative working method and system |
CN106779417A (en) * | 2016-12-20 | 2017-05-31 | 黄河勘测规划设计有限公司 | The collection of engineering investigation information digitalization, management and integrated application method |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112857309A (en) * | 2021-01-21 | 2021-05-28 | 江西地信数云科技有限公司 | Surveying and mapping service platform |
CN114707948A (en) * | 2022-03-04 | 2022-07-05 | 广东省国土资源测绘院 | Management method, device and storage medium for large surveying and mapping production project |
CN114882190A (en) * | 2022-05-30 | 2022-08-09 | 广州市城市规划勘测设计研究院 | Topographic map collaborative surveying and mapping method and system |
CN115034696A (en) * | 2022-08-12 | 2022-09-09 | 北京迈平测绘技术开发有限公司 | Geological mapping cooperative operation method and system |
CN115034696B (en) * | 2022-08-12 | 2022-11-01 | 北京迈平测绘技术开发有限公司 | Geological mapping cooperative operation method and system |
CN118013062A (en) * | 2024-01-29 | 2024-05-10 | 深圳市优领通软件技术有限公司 | Data management method and system of handheld mapping terminal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108492079A (en) | A kind of mapping work compound method | |
CN104580284B (en) | Traffic assignments device and method for distributing business | |
CN104850596B (en) | A kind of distribution data processing method based on mobile GIS and RTK positioning | |
CN106897418A (en) | A kind of three real data integrated approaches based on oblique photograph three-dimensional map | |
Noyman et al. | Finding places: HCI platform for public participation in refugees’ accommodation process | |
CN107609721A (en) | Project task distribution method, device, computer equipment and project management system | |
CN105930920A (en) | Logistics distribution management method and logistics distribution management apparatus | |
CN109472483A (en) | A kind of building-site modeling method and system based on BIM model and technology of taking photo by plane | |
CN107368967A (en) | Engineering safety quality inspection intelligent management based on internet | |
CN106462999A (en) | Processing and/or transmitting 3d data | |
CN106202245A (en) | Industry map system project special topic methods of exhibiting based on data linkage and system | |
CN105701644A (en) | Surveying and mapping cooperative working method and system | |
CN109857137A (en) | Plant protection drone, operation control terminal, information processing centre and cooperative control method, system | |
CN108229768A (en) | Aircraft overhauls task Workforce Management | |
CN105429718A (en) | Multiple concurrent wireless frequency spectrum monitoring method | |
CN106251081A (en) | A kind of airline air duty task assignment method and system | |
CN110110950A (en) | Generate the method, apparatus and computer readable storage medium in dispatching road area | |
CN104298761B (en) | The implementation method that master data is matched between a kind of heterogeneous software system | |
CN114756942B (en) | BIM and cloud service-based fabricated building management method and system | |
CN115828433A (en) | Flight simulation method for helicopter formation based on FlightGear | |
CN105049462B (en) | A kind of Surveillance center's collaborative work subsystem and its method of work based on GIS | |
CN109416788A (en) | The management method and equipment of plant protection task | |
CN104616073A (en) | Precise management system based on digitized two-dimensional animation production | |
CN108694082A (en) | A kind of cross-domain operation stream scheduling method and system | |
CN101996235A (en) | Report submitting method and device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180904 |