CN108487528A - A kind of big face stone material or artificial board curtain wall construction and method - Google Patents
A kind of big face stone material or artificial board curtain wall construction and method Download PDFInfo
- Publication number
- CN108487528A CN108487528A CN201810581331.7A CN201810581331A CN108487528A CN 108487528 A CN108487528 A CN 108487528A CN 201810581331 A CN201810581331 A CN 201810581331A CN 108487528 A CN108487528 A CN 108487528A
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- artificial board
- stone material
- column
- pendant
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000004575 stone Substances 0.000 title claims abstract description 69
- 238000000034 method Methods 0.000 title claims abstract description 10
- 238000010276 construction Methods 0.000 title claims description 27
- 239000000463 material Substances 0.000 title claims description 21
- 239000000565 sealant Substances 0.000 claims description 11
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 239000006260 foam Substances 0.000 claims description 7
- 239000012530 fluid Substances 0.000 claims 3
- 238000007789 sealing Methods 0.000 claims 2
- 238000003466 welding Methods 0.000 abstract description 11
- 238000005520 cutting process Methods 0.000 abstract description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 abstract 1
- 229910052782 aluminium Inorganic materials 0.000 description 4
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 4
- 230000007812 deficiency Effects 0.000 description 4
- 238000009434 installation Methods 0.000 description 4
- 239000000945 filler Substances 0.000 description 3
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 229910000838 Al alloy Inorganic materials 0.000 description 1
- 229910001335 Galvanized steel Inorganic materials 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 239000008397 galvanized steel Substances 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229910001256 stainless steel alloy Inorganic materials 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B2/00—Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
- E04B2/88—Curtain walls
- E04B2/96—Curtain walls comprising panels attached to the structure through mullions or transoms
- E04B2/965—Connections of mullions and transoms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
本发明公开了一种大面石材或人造板材幕墙结构及方法,它解决了现有技术中需要现场切割、现场焊接组装幕墙结构的问题,具有实现工厂化生产,可在工厂预制或现场装配,减少对技术工人依赖,保证组装质量的有益效果,其方案如下:一种大面石材或人造板材幕墙结构,包括至少一组幕墙单元,幕墙单元包括至少两根立柱,相邻两根立柱之间通过螺栓连接有多根横梁,横梁相互平行设置,横梁设有连接件,螺栓穿过连接件与石材或人造板材的背侧连接,立柱顶部内侧设有用于将幕墙单元挂接到建筑墙体预埋件的结构挂件。
The invention discloses a large stone or man-made board curtain wall structure and method, which solves the problem of on-site cutting, on-site welding and assembly of the curtain wall structure in the prior art, and has the advantages of realizing factory production and can be prefabricated in the factory or assembled on site. The beneficial effect of reducing dependence on skilled workers and ensuring the quality of assembly is as follows: a large stone or man-made panel curtain wall structure includes at least one set of curtain wall units, the curtain wall unit includes at least two columns, and the gap between two adjacent columns A plurality of beams are connected by bolts. The beams are arranged parallel to each other. The beams are provided with connectors. The bolts pass through the connectors to connect with the back side of the stone or artificial board. Structural pendants for embeds.
Description
技术领域technical field
本发明涉及建筑幕墙的石材幕墙(或人造板材)设计领域,特别是涉及一种大面石材或人造板材幕墙结构及方法。The invention relates to the design field of stone curtain walls (or man-made panels) of building curtain walls, in particular to a structure and method for a large-faced stone or man-made panel curtain wall.
背景技术Background technique
现有传统石材幕墙(人造板材幕墙)一般为焊接设计施工,依赖施工人员的技能水平,可是传统的工法需要多工种配合,质量不能控制,施工进度无法提高。具体存在以下问题:The existing traditional stone curtain wall (man-made panel curtain wall) is generally designed and constructed by welding, which depends on the skill level of the construction personnel. However, the traditional construction method requires the cooperation of multiple types of work, the quality cannot be controlled, and the construction progress cannot be improved. Specifically, the following problems exist:
1)材料与龙骨之间通常为焊接方式连接,人工焊接因人而异,导致焊接质量因人而异,而且幕墙内部结构件较多,部分处存在不易焊接的问题,导致施工时间较长;1) The material and the keel are usually connected by welding. Manual welding varies from person to person, resulting in different welding quality. Moreover, there are many structural parts inside the curtain wall, and some parts are not easy to weld, resulting in longer construction time;
2)现场切割加工龙骨,导致尺寸精度不高;2) The keel is cut and processed on site, resulting in low dimensional accuracy;
3)现场焊接需要搭设脚手架,或者安装吊篮,高空作业量大,施工效率低,受环境影响大,施工成本较高且安全性较低;3) On-site welding requires scaffolding or hanging baskets, which requires a lot of work at heights, low construction efficiency, great environmental impact, high construction costs and low safety;
4)钻孔焊接部位需要补漆;4) The drilling and welding parts need to be repainted;
5)整体需要检查督办保证焊接到位,主要依靠工人安装的熟练程度,若工人组装能力不足,则无法保证装配效果。5) The overall inspection and supervision is required to ensure that the welding is in place, which mainly depends on the proficiency of the workers in the installation. If the workers' assembly ability is insufficient, the assembly effect cannot be guaranteed.
因此,需要对一种大面石材或人造板材幕墙结构进行研究。Therefore, it is necessary to study a large stone or man-made panel curtain wall structure.
发明内容Contents of the invention
为了克服现有技术的不足,本发明提供了一种大面石材或人造板材幕墙结构,通过螺栓连接的方式,无需焊接连接,不仅可以有效保证施工质量,而且能提高施工速度,降低对熟练工的依赖程度。In order to overcome the deficiencies of the prior art, the present invention provides a large stone or man-made panel curtain wall structure, which is connected by bolts without welding, which can not only effectively ensure the construction quality, but also increase the construction speed and reduce the burden on skilled workers. degree of dependence.
一种大面石材或人造板材幕墙结构的具体方案如下:A specific scheme of a large stone or man-made panel curtain wall structure is as follows:
一种大面石材或人造板材幕墙结构,包括至少一组幕墙单元,幕墙单元包括至少两根立柱,相邻两根立柱之间通过螺栓连接有多根横梁,横梁相互平行设置,横梁设有连接件,连接件与石材或人造板材背侧的背栓连接,立柱顶部内侧设有用于将幕墙单元挂接到建筑墙体预埋件的结构挂件。A large stone or man-made panel curtain wall structure, including at least one set of curtain wall units, the curtain wall unit includes at least two columns, a plurality of beams are connected between two adjacent columns by bolts, the beams are arranged parallel to each other, and the beams are provided with connections The connecting piece is connected to the back bolt on the back side of the stone or man-made board, and the inner side of the top of the column is provided with a structural pendant for hanging the curtain wall unit to the embedded part of the building wall.
两根立柱间隔设定距离相互平行设置,石材或人造板材通过螺栓与横梁连接,从而通过两根立柱、横梁和石材或人造板材形成一组幕墙单元,通过结构挂件方便整体幕墙单元挂设于建筑墙体,整体无需现场切割、焊接,减少对技术工人的依赖,不受天气影响进行组装,施工安全快捷。Two vertical columns are arranged parallel to each other at a set distance, and the stone or man-made panels are connected to the beam through bolts, so that a group of curtain wall units is formed through two columns, beams and stone or artificial panels, and the overall curtain wall unit is conveniently hung on the building through the structural pendant The wall does not need to be cut and welded on site as a whole, reducing the dependence on skilled workers, and the assembly is not affected by the weather, and the construction is safe and fast.
进一步地,幕墙单元通常设有多组,所述立柱的侧部设有水平连接件,通过螺栓与相邻幕墙单元立柱相连,水平连接件为金属块,方便对准相邻幕墙单元的连接位置,金属块设于立柱的侧部,相邻的立柱通过螺栓穿过水平连接件实现连接,或者另一方案中,水平连接件为相互配合的凸块和凹槽,相互配合,方便连接,而且相邻两组幕墙单元再通过螺栓进行连接。Furthermore, curtain wall units are usually provided with multiple groups, and the sides of the columns are provided with horizontal connectors, which are connected to the columns of adjacent curtain wall units through bolts. The horizontal connectors are metal blocks, which are convenient for aligning the connection positions of adjacent curtain wall units. , the metal block is set on the side of the column, and the adjacent columns are connected by bolts passing through the horizontal connector, or in another solution, the horizontal connector is a protrusion and a groove that cooperate with each other to facilitate connection, and The adjacent two groups of curtain wall units are then connected by bolts.
进一步地,所述幕墙单元内侧交叉设置竖向斜撑,竖向斜撑的两端分别与立柱通过螺栓进行连接;Further, the inner side of the curtain wall unit is provided with vertical diagonal braces, and the two ends of the vertical diagonal braces are respectively connected to the columns through bolts;
或者,竖向斜撑设于幕墙单元的上半段,竖向斜撑和横梁均选用铝材或表面做防锈处理的钢材。Alternatively, the vertical braces are set on the upper half of the curtain wall unit, and the vertical braces and beams are made of aluminum or steel with antirust treatment on the surface.
进一步地,所述石材或人造板材的背侧设置开孔,开孔内设有背栓。Further, an opening is provided on the back side of the stone or man-made board, and a back bolt is provided in the opening.
进一步地,所述连接件包括开孔挂件和开槽挂件,开孔挂件一侧通过对穿螺栓与所述的横梁连接,另一侧通过开孔与石材或人造板材通过背栓连接,开槽挂件一侧通过对穿螺栓与所述的横梁连接,另一侧通过卡槽与石材或人造板材的背栓连接,这样在设置石材或人造板材时,首先通过背栓挂接于横梁的开槽挂件,再通过螺栓穿过开孔挂件连接石材或人造板材,可方便对石材或人造板材的固定,而且保证连接的可靠稳定性。Further, the connecting piece includes a hole hanging piece and a slotted piece. One side of the hole hanging piece is connected to the beam through a through bolt, and the other side is connected to the stone or man-made board through a hole through a back bolt, and the slotting is carried out. One side of the pendant is connected to the beam through the cross bolt, and the other side is connected to the back bolt of the stone or man-made board through the slot, so that when setting the stone or man-made board, firstly, it is hooked to the slot of the beam through the back bolt The pendant is connected to the stone or man-made board through the bolt through the hole pendant, which can facilitate the fixing of the stone or man-made board and ensure the reliability and stability of the connection.
石材或人造板材下部背栓通过卡槽与开槽挂件固定,上部与开孔挂件固定,背栓卡入卡槽后有设定活动空间,保证幕墙能够承受一定的不均匀外力荷载或温度荷载作用下的变形,增加幕墙的柔性和抗变形能力,具备更好的荷载适应能力The lower part of the stone or man-made panel is fixed by the card slot and the slotted pendant, and the upper part is fixed by the hole pendant. After the back bolt is inserted into the card slot, there is a set activity space to ensure that the curtain wall can withstand certain uneven external force load or temperature load. Under the deformation, increase the flexibility and deformation resistance of the curtain wall, with better load adaptability
进一步地,所述开孔挂件和开槽挂件错层设置,一块石材或人造板材通过至少两个开孔挂件、至少两个开槽挂件与横梁连接,即当石材或人造板材设有多块时,两根立柱之间就设有多组开孔挂件和开槽挂件的组合,用于支撑固定每一块的石材或人造板材。Further, the hole hangers and slotted hangers are arranged in staggered layers, and a stone or man-made panel is connected to the beam through at least two hole hangers and at least two slotted hangers, that is, when there are multiple stone or man-made panels , Between the two columns, there are a combination of multiple sets of hole pendants and slotted pendants, which are used to support and fix each piece of stone or artificial board.
进一步地,所述立柱顶部通过螺栓设置插接套芯以实现上下相邻两立柱的连接。Further, the top of the column is provided with a socket core through bolts to realize the connection between the upper and lower adjacent columns.
进一步地,所述立柱为U型立柱,所述横梁设于立柱的内凹处,这样插接套芯也设于立柱的内凹面。Further, the column is a U-shaped column, and the crossbeam is arranged at the inner concave of the column, so that the socket core is also arranged at the inner concave surface of the column.
进一步地,相邻所述石材或人造板材的缝隙填充有填充件,且缝隙处通过密封胶进行密封。Further, gaps adjacent to the stone or man-made boards are filled with fillers, and the gaps are sealed with a sealant.
为了克服现有技术的不足,本发明还提供了一种大面石材或人造板材幕墙结构的装配方法,具体步骤如下:In order to overcome the deficiencies in the prior art, the present invention also provides a method for assembling a large stone or man-made panel curtain wall structure, the specific steps are as follows:
1)分别加工立柱、横梁、竖向斜撑、石材或人造板材;1) Separately process columns, beams, vertical braces, stone or man-made panels;
2)横梁的两端分别通过角钢与立柱连接,在两根立柱之间设置多根横梁;2) The two ends of the beam are respectively connected to the column through angle steel, and multiple beams are set between the two columns;
3)在相邻两根立柱之间空间的内侧交叉设置竖向斜撑;3) Vertical diagonal braces are arranged on the inner side of the space between two adjacent columns;
4)在横梁表面安装开孔挂件、开槽挂件,并在立柱顶部设置插接套芯,在立柱顶部内侧设置结构挂件;4) Install hole pendants and slotted pendants on the surface of the beam, set a socket core on the top of the column, and set a structural pendant on the inner side of the top of the column;
5)连接相邻两组幕墙单元的立柱,并将连接后的立柱直立,将石材或人造板材安装于立柱表面;5) Connect the columns of two adjacent curtain wall units, erect the connected columns, and install stone or man-made panels on the surface of the columns;
6)将泡沫棒填充在石材或人造板材缝隙内,用密封胶将缝隙密封;6) Fill the foam sticks in the gaps of stone or man-made panels, and seal the gaps with sealant;
7)通过结构挂件将组装完成的幕墙安装于龙骨框架的预埋件,通过插接套芯安装上一层的幕墙结构,相邻幕墙之间的缝隙内设置泡沫棒,并用密封胶密封缝隙。7) Install the assembled curtain wall on the embedded part of the keel frame through the structural pendant, install the curtain wall structure of the upper layer through the socket core, set foam rods in the gaps between adjacent curtain walls, and seal the gaps with sealant.
其中结构挂件为幕墙三维调节挂件,整个装饰柱结构通过幕墙三维调节件与建筑主体结构中的预埋件连接,实现幕墙单元在水平方向、竖直方向和纵深方向的精确定位,所述三维调节构件为幕墙工程中的常用节点结构。The structural pendant is a three-dimensional adjustment pendant for the curtain wall. The whole decorative column structure is connected with the embedded parts in the main structure of the building through the three-dimensional adjustment part of the curtain wall to realize the precise positioning of the curtain wall unit in the horizontal direction, vertical direction and depth direction. The three-dimensional adjustment The component is a common node structure in curtain wall engineering.
与现有技术相比,本发明的有益效果是:Compared with prior art, the beneficial effect of the present invention is:
1)本发明通过整体结构的设置,可方便各个部件的快速连接,实现工厂预制,无需现场再进行切割、焊接、补漆等工作,整个结构无需焊接,无需切割,保证尺寸要求,组装精度高,组装速度快,质量好,对熟练工人依赖程度低。1) Through the setting of the overall structure, the present invention can facilitate the quick connection of various parts, realize factory prefabrication, and do not need to perform cutting, welding, paint repairing and other work on site. The whole structure does not need to be welded or cut, and the size requirements are guaranteed, and the assembly accuracy is high. , fast assembly speed, good quality and low dependence on skilled workers.
2)本发明通过结构挂件的设置,不仅方便将组装的幕墙挂接于龙骨框架,保证了运输的安全性,而且也方便将整个构件挂接于幕墙结构埋件。2) The present invention not only facilitates the hooking of the assembled curtain wall to the keel frame through the setting of the structural pendant, which ensures the safety of transportation, but also facilitates the hooking of the entire component to the embedded part of the curtain wall structure.
3)本发明通过横梁开孔挂件和开槽挂件的设置,方便石材或人造板材的安装,并保证连接的稳定性和可靠性。3) The present invention facilitates the installation of stone or man-made boards and ensures the stability and reliability of the connection through the arrangement of the beam opening hanger and the slotted hanger.
4)本发明整体结构也可以在施工现场安装,无需搭建脚手架,不受天气影响组装,施工安全快捷,搭建质量优于传统工法,维修更换便捷,方法更加节能、环保、安全和便利。4) The overall structure of the present invention can also be installed at the construction site without scaffolding, assembly without being affected by the weather, safe and fast construction, better construction quality than traditional construction methods, convenient maintenance and replacement, and more energy-saving, environmentally friendly, safe and convenient methods.
5)本发明通过将立柱设为U型结构件,方便对横梁的安装,而且便于保证横梁设置的稳定性。5) The present invention facilitates the installation of the crossbeam by setting the column as a U-shaped structural member, and is convenient for ensuring the stability of the crossbeam arrangement.
附图说明Description of drawings
构成本申请的一部分的说明书附图用来提供对本申请的进一步理解,本申请的示意性实施例及其说明用于解释本申请,并不构成对本申请的不当限定。The accompanying drawings constituting a part of the present application are used to provide further understanding of the present application, and the schematic embodiments and descriptions of the present application are used to explain the present application, and do not constitute improper limitations to the present application.
图1为本发明整体结构示意图;Fig. 1 is a schematic diagram of the overall structure of the present invention;
图2为本发明部分结构示意图;Fig. 2 is a schematic diagram of part of the structure of the present invention;
图3为本发明石材或人造板材结构示意图;Fig. 3 is the structural representation of stone or man-made panel of the present invention;
图中:1.石材或人造板材,2.立柱,3.竖向斜撑,4.横梁,5.横梁支托,6.对穿螺栓,7.背栓,8.开孔挂件,9.开槽挂件,10.密封胶,11.水平连接件,12.插接套芯,13.结构挂件。In the figure: 1. Stone or artificial board, 2. Upright column, 3. Vertical diagonal brace, 4. Beam, 5. Beam support, 6. Cross bolt, 7. Back bolt, 8. Hole pendant, 9. Slotted pendants, 10. Sealants, 11. Horizontal connectors, 12. Plug-in sleeves, 13. Structural pendants.
具体实施方式Detailed ways
应该指出,以下详细说明都是例示性的,旨在对本申请提供进一步的说明。除非另有指明,本文使用的所有技术和科学术语具有与本申请所属技术领域的普通技术人员通常理解的相同含义。It should be pointed out that the following detailed description is exemplary and intended to provide further explanation to the present application. Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this application belongs.
需要注意的是,这里所使用的术语仅是为了描述具体实施方式,而非意图限制根据本申请的示例性实施方式。如在这里所使用的,除非上下文另外明确指出,否则单数形式也意图包括复数形式,此外,还应当理解的是,当在本说明书中使用术语“包含”和/或“包括”时,其指明存在特征、步骤、操作、器件、组件和/或它们的组合。It should be noted that the terminology used here is only for describing specific implementations, and is not intended to limit the exemplary implementations according to the present application. As used herein, unless the context clearly dictates otherwise, the singular is intended to include the plural, and it should also be understood that when the terms "comprising" and/or "comprising" are used in this specification, they mean There are features, steps, operations, means, components and/or combinations thereof.
正如背景技术所介绍的,现有技术中存在的不足,为了解决如上的技术问题,本申请提出了一种大面石材或人造板材幕墙结构。As introduced in the background technology, there are deficiencies in the prior art. In order to solve the above technical problems, the present application proposes a large stone or man-made panel curtain wall structure.
本申请的一种典型的实施方式中,如图1所示,一种大面石材或人造板材幕墙结构,包括至少一组幕墙单元,幕墙单元包括至少两根立柱2,立柱2选用铝材或做防锈处理的钢材,两根立柱2之间通过螺栓连接有多根横梁4,横梁4相互平行设置,横梁4设有连接件,螺栓穿过连接件与石材或人造板材1的背侧连接,立柱2顶部内侧通过螺栓连接有用于将幕墙单元挂接到建筑墙体预埋件的结构挂件13,结构挂件13下表面设置卡钩,用于挂接到龙骨框架的预埋件,结构挂件13与立柱相互垂直设置,且结构挂件13能够实现三维调节。其中,横梁4通过L型的横梁支托5与立柱2连接,横梁支托5选用铝材或做防锈处理的钢材,且通过组装龙骨用对穿螺栓6进行组装,如图2所示。In a typical implementation of the present application, as shown in Figure 1, a large stone or man-made panel curtain wall structure includes at least one set of curtain wall units, the curtain wall unit includes at least two columns 2, and the columns 2 are made of aluminum or Anti-rust steel, two columns 2 are connected by bolts with multiple crossbeams 4, the crossbeams 4 are arranged parallel to each other, and the crossbeams 4 are provided with connectors, and the bolts pass through the connectors to connect with the back side of the stone or artificial board 1 , the inner side of the top of the column 2 is connected by bolts to a structural pendant 13 for hooking the curtain wall unit to the embedded part of the building wall, and the lower surface of the structural pendant 13 is provided with a hook for hooking to the embedded part of the keel frame, the structural pendant 13 and the column are arranged perpendicular to each other, and the structural pendant 13 can realize three-dimensional adjustment. Among them, the beam 4 is connected to the column 2 through an L-shaped beam support 5, the beam support 5 is made of aluminum or anti-rust steel, and is assembled with the through bolt 6 by assembling the keel, as shown in Fig. 2 .
两根立柱2间隔设定距离相互平行设置,石材或人造板材1通过螺栓与横梁4连接,从而通过两根立柱2、横梁4和石材或人造板材1形成一组幕墙单元,通过结构挂件13方便整体幕墙单元挂设于建筑墙体,整体无需现场切割、焊接,减少对技术工人的依赖,不受天气影响进行组装,施工安全快捷。Two columns 2 are arranged parallel to each other at a predetermined distance, and the stone or man-made panel 1 is connected to the beam 4 through bolts, so that a group of curtain wall units is formed by the two columns 2, the beam 4 and the stone or man-made panel 1, and it is convenient to use the structural pendant 13 The overall curtain wall unit is hung on the building wall, without on-site cutting and welding as a whole, reducing the dependence on skilled workers, and the assembly is not affected by the weather, and the construction is safe and fast.
幕墙单元通常设有多组,立柱2的侧部设有用于与相邻幕墙单元立柱2连接的水平连接件11,相邻水平连接件通过螺栓相互连接。There are usually multiple sets of curtain wall units, and the sides of the columns 2 are provided with horizontal connectors 11 for connecting the columns 2 of adjacent curtain wall units, and the adjacent horizontal connectors are connected to each other by bolts.
幕墙单元内侧交叉设置竖向斜撑3,竖向斜撑3的两端分别与立柱2通过螺栓进行连接;竖向斜撑3设于幕墙单元的上半段,竖向斜撑3和横梁4均选用铝材或表面做防锈处理的钢材。石材或人造板材1的背侧设置开孔7,开孔7内设有背栓,如图3所示。Vertical braces 3 are arranged crosswise on the inside of the curtain wall unit, and the two ends of the vertical braces 3 are respectively connected with the columns 2 through bolts; They are all made of aluminum or steel with anti-rust treatment on the surface. A hole 7 is arranged on the back side of the stone or man-made panel 1, and a back bolt is arranged in the hole 7, as shown in FIG. 3 .
连接件包括开孔挂件8和开槽挂件9,这两个挂件均为L型结构的角钢挂件,且为镀锌钢、不锈钢或铝合金材料,开孔挂件8一侧通过对穿螺栓与横梁4连接,另一侧通过开孔与石材或人造板材1通过螺栓连接,开槽挂件9一侧通过对穿螺栓与所述的横梁4连接,另一侧通过卡槽与石材或人造板材1的背栓连接,这样在设置石材或人造板材1时,首先通过背栓挂接于横梁4的开槽挂件9,再通过螺栓穿过开孔挂件连接石材或人造板材1,可方便对石材或人造板材的固定,而且保证连接的可靠稳定性。The connecting parts include a hole pendant 8 and a slotted pendant 9. These two pendants are angle steel pendants with an L-shaped structure, and are made of galvanized steel, stainless steel or aluminum alloy. One side of the hole pendant 8 passes through the bolt and the beam 4 connection, the other side is connected with the stone or man-made board 1 by bolts through the opening, one side of the slotted pendant 9 is connected with the beam 4 through the cross bolt, and the other side is connected with the stone or man-made board 1 through the slot. Back bolt connection, so when setting stone or man-made board 1, first hang on the slotted pendant 9 of beam 4 through the back bolt, and then connect the stone or man-made board 1 through the hole pendant through the bolt, which can facilitate the installation of stone or man-made board. The plate is fixed, and the reliable stability of the connection is guaranteed.
开孔挂件8和开槽挂件9错层设置,一块石材或人造板材1通过至少两个开孔挂件、两个开槽挂件与横梁4连接,即当石材或人造板材1设有多块时,两根立柱2之间就设有多组开孔挂件和开槽挂件的组合,用于支撑固定每一块的石材或人造板材。Hole hangers 8 and slotted hangers 9 are arranged in staggered layers, and a stone or man-made panel 1 is connected to the beam 4 through at least two hole hangers and two slotted hangers. Between the two uprights 2, there are multiple sets of perforated hangers and slotted hangers, which are used to support and fix each piece of stone or man-made board.
立柱2顶部通过螺栓设置插接套芯12以实现上下相邻两立柱2的连接,插接套芯12通过螺栓与立柱2进行连接。其中,立柱2为U型立柱,横梁4设于立柱的内凹处,这样插接套芯12也设于立柱的内凹面,插接套芯12选用钢制件。The top of the column 2 is provided with a socket core 12 through a bolt to realize the connection of two adjacent columns 2 up and down, and the socket core 12 is connected with the column 2 through a bolt. Wherein, column 2 is a U-shaped column, and crossbeam 4 is located at the inner recess of column, and plug sleeve core 12 is also located at the inner concave surface of column like this, and plug sleeve core 12 selects steel parts for use.
此外,相邻所述石材或人造板材的缝隙填充有填充件,填充件选用PE泡沫棒,且缝隙处通过密封胶如密封胶10进行密封。In addition, the gaps adjacent to the stone or man-made panels are filled with fillers, the fillers are made of PE foam rods, and the gaps are sealed with a sealant such as the sealant 10 .
为了克服现有技术的不足,本发明还提供了一种大面石材或人造板材幕墙结构的装配方法,具体步骤如下:In order to overcome the deficiencies in the prior art, the present invention also provides a method for assembling a large stone or man-made panel curtain wall structure, the specific steps are as follows:
1)按照设计图纸尺寸分别加工立柱、横梁、竖向斜撑、石材或人造板材;1) Process columns, beams, vertical braces, stone or man-made panels according to the dimensions of the design drawings;
2)横梁的两端分别通过角钢与立柱连接,在两根立柱之间设置多根横梁,每相邻两根横梁之间的距离相同,且横梁相互平行设置;2) The two ends of the beam are respectively connected to the column through angle steel, and multiple beams are set between the two columns, and the distance between every two adjacent beams is the same, and the beams are arranged parallel to each other;
3)在相邻两根立柱之间空间的内侧交叉设置竖向斜撑;3) Vertical diagonal braces are arranged on the inner side of the space between two adjacent columns;
4)在横梁表面安装开孔挂件、开槽挂件,并在立柱顶部设置插接套芯,在立柱顶部内侧设置结构挂件;4) Install hole pendants and slotted pendants on the surface of the beam, set a socket core on the top of the column, and set a structural pendant on the inner side of the top of the column;
5)连接相邻两组幕墙单元的立柱,并将连接后的立柱直立,将石材或人造板材安装于立柱表面;5) Connect the columns of two adjacent curtain wall units, erect the connected columns, and install stone or man-made panels on the surface of the columns;
6)将泡沫棒填充在石材或人造板材缝隙内,用密封胶将缝隙密封;6) Fill the foam sticks in the gaps of stone or man-made panels, and seal the gaps with sealant;
7)通过结构挂件将组装完成的幕墙安装于龙骨框架的预埋件,通过插接套芯安装上一层的幕墙结构,相邻幕墙之间的缝隙内设置泡沫棒,并用密封胶密封缝隙。7) Install the assembled curtain wall on the embedded part of the keel frame through the structural pendant, install the curtain wall structure of the upper layer through the socket core, set foam rods in the gaps between adjacent curtain walls, and seal the gaps with sealant.
以上所述仅为本申请的优选实施例而已,并不用于限制本申请,对于本领域的技术人员来说,本申请可以有各种更改和变化。凡在本申请的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本申请的保护范围之内。The above descriptions are only preferred embodiments of the present application, and are not intended to limit the present application. For those skilled in the art, there may be various modifications and changes in the present application. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of this application shall be included within the protection scope of this application.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810581331.7A CN108487528A (en) | 2018-06-07 | 2018-06-07 | A kind of big face stone material or artificial board curtain wall construction and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810581331.7A CN108487528A (en) | 2018-06-07 | 2018-06-07 | A kind of big face stone material or artificial board curtain wall construction and method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108487528A true CN108487528A (en) | 2018-09-04 |
Family
ID=63342154
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810581331.7A Pending CN108487528A (en) | 2018-06-07 | 2018-06-07 | A kind of big face stone material or artificial board curtain wall construction and method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108487528A (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111395617A (en) * | 2020-04-20 | 2020-07-10 | 深圳广田方特科建集团有限公司 | Stone system structure capable of being installed indoors |
| CN111705983A (en) * | 2020-05-27 | 2020-09-25 | 中博建设工程集团有限公司 | A kind of building curtain wall installation structure |
| CN114165060A (en) * | 2021-10-30 | 2022-03-11 | 北京首钢建设集团有限公司 | Method for mounting ultra-large-breadth curved surface porous steel plate curtain wall |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060070342A1 (en) * | 2003-03-17 | 2006-04-06 | Alprogetti Srl | Method to assemble curtain walls and curtain wall adopting the method |
| CN205171782U (en) * | 2015-11-18 | 2016-04-20 | 成都江河幕墙系统工程有限公司 | Frame curtain system between stone material edge list |
| CN205259413U (en) * | 2015-12-21 | 2016-05-25 | 浙江亚厦幕墙有限公司 | Connection structure of stone material curtain stand |
| CN105839821A (en) * | 2016-06-07 | 2016-08-10 | 中国航空规划设计研究总院有限公司 | Slotted stone curtain wall sealing system, curtain wall system and construction method for same |
| CN208267190U (en) * | 2018-06-07 | 2018-12-21 | 济南历下控股集团有限公司 | A kind of big face stone material or artificial board curtain wall construction |
-
2018
- 2018-06-07 CN CN201810581331.7A patent/CN108487528A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20060070342A1 (en) * | 2003-03-17 | 2006-04-06 | Alprogetti Srl | Method to assemble curtain walls and curtain wall adopting the method |
| CN205171782U (en) * | 2015-11-18 | 2016-04-20 | 成都江河幕墙系统工程有限公司 | Frame curtain system between stone material edge list |
| CN205259413U (en) * | 2015-12-21 | 2016-05-25 | 浙江亚厦幕墙有限公司 | Connection structure of stone material curtain stand |
| CN105839821A (en) * | 2016-06-07 | 2016-08-10 | 中国航空规划设计研究总院有限公司 | Slotted stone curtain wall sealing system, curtain wall system and construction method for same |
| CN208267190U (en) * | 2018-06-07 | 2018-12-21 | 济南历下控股集团有限公司 | A kind of big face stone material or artificial board curtain wall construction |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN111395617A (en) * | 2020-04-20 | 2020-07-10 | 深圳广田方特科建集团有限公司 | Stone system structure capable of being installed indoors |
| CN111705983A (en) * | 2020-05-27 | 2020-09-25 | 中博建设工程集团有限公司 | A kind of building curtain wall installation structure |
| CN114165060A (en) * | 2021-10-30 | 2022-03-11 | 北京首钢建设集团有限公司 | Method for mounting ultra-large-breadth curved surface porous steel plate curtain wall |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102900022B (en) | Cable stayed bridge leaning tower hydraulic climbing mould construction method | |
| CN204126230U (en) | Assembly scaffold unit | |
| CN104120811B (en) | A kind of metal decking unit curtain wall system | |
| CN104878867A (en) | Integrated structure of suspended ceiling keel and double-layer construction platform and its manufacturing method | |
| CN108487528A (en) | A kind of big face stone material or artificial board curtain wall construction and method | |
| CN111042399A (en) | Half-unit overhanging stone modeling and glass curtain wall system with large decorative strips | |
| CN204728554U (en) | Integral structure of ceiling keel and double-layer construction platform | |
| CN104179362A (en) | Quick-release protective railings for construction sites | |
| CN208267265U (en) | A kind of assembled curtain wall decoration rod structure | |
| CN107142950A (en) | The method and component in purlin behind gap are enclosed at a kind of quick pad steel-support | |
| CN208122259U (en) | Job platform system for assembled architecture construction | |
| CN215106409U (en) | Mounting support for unit body plate | |
| CN102767644A (en) | Assembly type heavy pipeline hanger | |
| CN212002171U (en) | Wall-hanging safe operation platform of outer facade construction of building engineering structure | |
| CN204139631U (en) | Quick-release protective railings for construction sites | |
| CN211257756U (en) | Progressive overhanging structure aiming at complex outer vertical surface modeling | |
| CN108487569A (en) | A kind of assembled curtain wall decoration rod structure and method | |
| CN209874185U (en) | Assembled angle steel lattice keel support structure for stone curtain wall | |
| CN114892867B (en) | Ceramic brick curtain wall system | |
| CN102777703A (en) | Assembly type light pipeline hanger | |
| CN106320698A (en) | Rotary wall attaching device for high-rise building hydraulic climbing formwork construction | |
| CN105298145A (en) | Vertical external sun-shading welding-free construction method of hidden-frame curtain wall | |
| CN204282788U (en) | Assembled fixed scaffold | |
| CN211899408U (en) | Building outer wall dry-hanging stone structure | |
| CN203834756U (en) | Keel support system unit used for stone curtain wall |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180904 |