CN108460211A - Engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower - Google Patents

Engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower Download PDF

Info

Publication number
CN108460211A
CN108460211A CN201810171820.5A CN201810171820A CN108460211A CN 108460211 A CN108460211 A CN 108460211A CN 201810171820 A CN201810171820 A CN 201810171820A CN 108460211 A CN108460211 A CN 108460211A
Authority
CN
China
Prior art keywords
quantities
communication iron
iron tower
measuring
built
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810171820.5A
Other languages
Chinese (zh)
Inventor
徐起源
郑军
廖琪
梁晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Jay Communications Planning And Design Institute Co Ltd
GCI Science and Technology Co Ltd
Original Assignee
Guangzhou Jay Communications Planning And Design Institute Co Ltd
GCI Science and Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Jay Communications Planning And Design Institute Co Ltd, GCI Science and Technology Co Ltd filed Critical Guangzhou Jay Communications Planning And Design Institute Co Ltd
Priority to CN201810171820.5A priority Critical patent/CN108460211A/en
Publication of CN108460211A publication Critical patent/CN108460211A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]

Abstract

The present invention relates to engineering method for measuring and calculating, device, computer equipment and the storage mediums of a kind of communication iron tower, including:The tower and ground for obtaining communication iron tower yet to be built survey parameter, and at least two sets of underlying parameter schemes that parameter determines communication iron tower yet to be built are surveyed according to the tower and ground;For each underlying parameter scheme, the corresponding first quantities measuring and calculating value of multiple quantities modules that communication iron tower yet to be built includes is calculated;According to the corresponding first quantities measuring and calculating value of multiple quantities modules, second quantities measuring and calculating value of the communication iron tower yet to be built under corresponding underlying parameter scheme is calculated;Compare the second quantities measuring and calculating value under each underlying parameter scheme, optimal basic parametric scheme is determined from least two sets of underlying parameter schemes, obtains the corresponding second quantities measuring and calculating value of optimal basic parametric scheme, the quantities measuring and calculating value as communication iron tower yet to be built.Above-mentioned technical proposal realizes the quantities that communication iron tower is built in efficiently measuring and calculating.

Description

Engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower
Technical field
The present invention relates to field of computer technology, more particularly to a kind of engineering method for measuring and calculating of communication iron tower, device, Computer equipment and storage medium.
Background technology
Communication iron tower needs to calculate the quantities etc. of the communication iron tower of construction before construction.Currently, related logical Letter steel tower design quantities rely primarily on designer to calculate, but with communication iron tower designer trends to standardization, standard Change, the direction of procedure is developed, the fining of design require it is also higher and higher, so if the management unit of communication iron tower design And relevant design unit still continues to use traditional management mode and design pattern, the manual accounting energy by designer simply Power is calculated to complete highly complex quantities, it is easy to generate error, it is difficult to which effectively the quantities of communication iron tower is built in measuring and calculating.
Invention content
Based on this, it is necessary to which the problem of being difficult to effectively calculate the quantities for building communication iron tower for the prior art provides A kind of engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower.
A kind of engineering method for measuring and calculating of communication iron tower, including:
The tower and ground for obtaining communication iron tower yet to be built survey parameter, and surveying parameter according to the tower and ground determines yet to be built lead to Believe at least two sets of underlying parameter schemes of steel tower;
For each underlying parameter scheme, multiple quantities modules corresponding first that communication iron tower yet to be built includes are calculated Quantities measuring and calculating value;
The sum of corresponding first quantities of multiple quantities modules is calculated, obtains communication iron tower yet to be built on corresponding basis The second quantities measuring and calculating value under parametric scheme;
Compare the second quantities measuring and calculating value under each underlying parameter scheme, is determined most from least two sets of underlying parameter schemes Excellent underlying parameter scheme obtains the corresponding second quantities measuring and calculating value of optimal basic parametric scheme, as communication iron tower yet to be built Quantities measuring and calculating value.
After determining optimal basic parametric scheme in one of the embodiments, further include:According to the optimal basis Parametric scheme generates the corresponding design drawing of communication iron tower yet to be built.
In one of the embodiments, according to the optimal basic parametric scheme, it is corresponding to generate communication iron tower yet to be built Before design drawing, further include:Parameter in optimal basic parametric scheme is corrected.
The tower of communication iron tower yet to be built includes in one of the embodiments,:Single-pipe tower and three towers;Parameter packet is surveyed on ground It includes:Great soil group type, soil thickness, cohesive strength, internal friction angle, native unit weight, foundation bearing capacity, end resistance, pile side resistance, resistance to plucking system Number and level of ground water.
If the tower of communication iron tower yet to be built is single-pipe tower, the work that communication iron tower yet to be built includes in one of the embodiments, Journey amount module includes:Isolated footing, single-pile foundation, four Pile-supported stand foundations, anchor rod foundation;
Described in one of the embodiments, to be directed to each underlying parameter scheme, calculate that communication iron tower yet to be built includes is multiple The step of quantities module corresponding first quantities measuring and calculating value includes:According to each underlying parameter scheme, acquisition waits for Communication iron tower is built to need to carry out multiple quantities modules of quantities measuring and calculating;The corresponding multiple engineerings of each quantities module are obtained, The quantities of each engineering is calculated according to design specification, and obtains the whole project corresponding to each quantities module;According to described Whole project obtains the quantities measuring and calculating value of each quantities module.
A kind of quantities measuring and calculating device of communication iron tower, including:
Program prediction module, tower and ground for obtaining communication iron tower yet to be built survey parameter, according to the tower and At least two sets of underlying parameter schemes that parameter determines communication iron tower yet to be built are surveyed on ground;
First quantities calculates module, and for being directed to each underlying parameter scheme, calculate that communication iron tower yet to be built includes is multiple The corresponding first quantities measuring and calculating value of quantities module;
Second quantities calculates module, calculates the sum of corresponding first quantities of multiple quantities modules, is waited for Build second quantities measuring and calculating value of the communication iron tower under corresponding underlying parameter scheme;
Optimal case determining module, for the second quantities measuring and calculating value under more each underlying parameter scheme, from least two Set underlying parameter scheme determines optimal basic parametric scheme, obtains the corresponding second quantities measuring and calculating of optimal basic parametric scheme Value, the quantities measuring and calculating value as communication iron tower yet to be built.
In one embodiment, further include design drawing generation module, for according to the optimal basic parametric scheme, generating The corresponding design drawing of communication iron tower yet to be built.
The engineering method for measuring and calculating and device of above-mentioned communication iron tower, obtain communication iron tower yet to be built turriform and survey ginseng After number, it is first determined the underlying parameter scheme of the steel tower calculates every then further according to the engineering corresponding to each underlying parameter scheme The quantities of a underlying parameter scheme finally compares the quantities of each underlying parameter scheme, and is obtaining optimal base case Quantities after, using the quantities of the optimal base case as the quantities of communication iron tower yet to be built, be difficult to solve The problem of quantities of communication iron tower is built in effect measuring and calculating.
A kind of computer equipment, including memory, processor and be stored on the memory and can be in the processing The computer program run on device, the processor realize the quantities such as above-mentioned communication iron tower when executing the computer program Measuring method.
Above computer equipment is realized efficiently measuring and calculating and built and led to by the computer program run on the processor Believe the quantities of steel tower.
A kind of computer storage media, is stored thereon with computer program, is realized when which is executed by processor as above State the engineering method for measuring and calculating of communication iron tower.
Above computer storage medium realizes efficiently measuring and calculating and builds communication iron tower by the computer program of its storage Quantities.
Description of the drawings
Fig. 1 is the applied environment figure of the engineering method for measuring and calculating of an embodiment communication iron tower;
Fig. 2 is the flow chart of the engineering method for measuring and calculating of an embodiment communication iron tower;
Fig. 3 is the flow chart of the engineering method for measuring and calculating of another embodiment communication iron tower;
Fig. 4 is that the quantities of an embodiment communication iron tower calculates the structural schematic diagram of device;
Fig. 5 is that the quantities of another embodiment communication iron tower calculates the structural schematic diagram of device.
Specific implementation mode
It is below in conjunction with the accompanying drawings and preferably real further to illustrate the effect of the technological means and acquirement of the invention taken Example is applied, to the technical solution of the embodiment of the present invention, carries out clear and complete description.
Fig. 1 is the applied environment figure of the engineering method for measuring and calculating of an embodiment communication iron tower, which is a meter Calculation machine system 100.The computer system 100 is an example for being suitable for the invention computer environment, is not construed as Propose any restrictions of the use scope to the present invention.Computer system 100 can not be construed to need to rely on or have The combination of one or more of the illustrative computer system 100 of diagram component.
Computer system 100 shown in Fig. 1 for example have big well known desktop computer, notebook, personal digital assistant, The classes such as smart phone, tablet computer, portable media player, set-top box, but it is not limited to equipment enumerated above.
As shown in Figure 1, computer system 100 includes processor 110, memory 120 and system bus 150.Including storage Various system components including device 120 and processor 110 are connected on system bus 150.Processor 110 is one and is used for passing through Basic arithmetic sum logical operation executes the hardware of computer program instructions in computer system.Memory 120 is a use In temporarily or permanently storage calculation procedure or the physical equipment of data (for example, program state information).System bus 150 can be with For any one in the bus structures of following several types, including memory bus or storage control, peripheral bus drawn game Portion's bus.Processor 110 and memory 120 can be by system bus 150 into row data communication.Wherein memory 120 includes Read-only memory (ROM) or flash memory (being all not shown in figure) and random access memory (RAM), RAM typically refer to be loaded with The main memory of operating system and application program.
Computer system 100 further include display interface 130 (for example, graphics processing unit) and display equipment 140 (for example, Liquid crystal display).Computer system 100 generally comprises a storage device 160.Storage device 160 can be from a variety of computers It being selected in readable medium, computer-readable medium refers to any available medium that can be accessed by computer system 100, Including mobile and fixed two media.For example, computer-readable medium includes but not limited to, flash memory (miniature SD Card), CD-ROM, digital versatile disc (DVD) or other optical disc storages, cassette, tape, disk storage or other magnetic storages are set Any other medium that is standby, or can be used for storing information needed and being accessed by computer system 1000.
Computer system 100 further includes input unit 170 and input interface 180 (for example, I/O controller).User can lead to Input unit 170 is crossed, such as keyboard, mouse, is inputted in instruction and information to computer system 100.Input unit 180 is typically logical It crosses input interface 170 to be connected on system bus 150, but can also be connected by other interfaces or bus structures, it is such as logical With universal serial bus (USB).
As detailed above, the engineering measurement of communication iron tower can be executed by being suitable for the invention computer system 100 The specified operation of calculation method.Computer system 100 runs software instruction in computer-readable medium by processor 110 Form executes these operations.These software instructions can be read into from storage device 160 in memory 120.It is stored in storage Software instruction in device 120 makes processor 110 execute the engineering method for measuring and calculating of above-mentioned communication iron tower.In addition, by hard Part circuit or hardware circuit combination software instruction also can equally realize the present invention.Therefore, realize that the present invention is not limited to any The combination of specific hardware circuit and software.
As shown in Fig. 2, Fig. 2 is the flow chart of the engineering method for measuring and calculating of an embodiment communication iron tower, include the following steps:
Step S21, the tower and ground for obtaining communication iron tower yet to be built survey parameter, and it is true to survey parameter according to the tower and ground At least two sets of underlying parameter schemes of fixed communication iron tower yet to be built.
It should be noted that the engineering built required for the communication iron tower of different turriforms is different, therefore carrying out communication iron Before the quantities measuring and calculating of tower, not only it needs to be determined that communication iron tower will the ground of build area survey parameter, be also predefined yet to be built The turriform of communication iron tower can obtain the basis of communication iron tower yet to be built to survey parameter and the turriform of communication iron tower in combination Parametric scheme.
It is respectively right to calculate multiple quantities modules that communication iron tower yet to be built includes for each underlying parameter scheme by step S22 The the first quantities measuring and calculating value answered.
In above-mentioned steps, the first quantities measuring and calculating value is the whole project corresponding to each quantities module.According to engineering Design needs, and communication iron tower yet to be built may include the underlying parameter scheme more covered.Often set underlying parameter scheme has corresponding more A quantities module, and each quantities module is corresponding with multiple engineerings again.The quantities of each engineering is calculated and converged Always, the first engineering measuring and calculating value of quantities module is just obtained.
Step S23 calculates the sum of corresponding first quantities of multiple quantities modules, obtains communication iron tower yet to be built and exist The second quantities measuring and calculating value under corresponding underlying parameter scheme.
In above-mentioned steps, the first engineering measuring and calculating value is the total quantities of each quantities module.Due to each quantities mould Block has corresponding multiple engineerings, and each engineering also has corresponding quantities, then is calculated each in quantities module After the quantities of engineering, the total quantities of the quantities module is obtained.
Step S24, the second quantities measuring and calculating value under more each underlying parameter scheme, from least two sets of underlying parameters Scheme determines optimal basic parametric scheme, obtains the corresponding second quantities measuring and calculating value of optimal basic parametric scheme, as waiting for Build the quantities measuring and calculating value of communication iron tower.
In above-mentioned steps, the second quantities measuring and calculating value is often to cover the corresponding total quantities of underlying parameter scheme.It will often cover After second quantities measuring and calculating value of underlying parameter scheme is compared, obtain corresponding to the second wherein minimum quantities measuring and calculating value Underlying parameter scheme, then the underlying parameter scheme is determined as optimal basic parametric scheme, by the of the underlying parameter scheme Two quantities measuring and calculating values are determined as the quantities measuring and calculating value of communication iron tower yet to be built.
The engineering method for measuring and calculating of above-mentioned communication iron tower, obtain communication iron tower yet to be built turriform and survey parameter after, Determine that the underlying parameter scheme of the steel tower calculates each base then further according to the engineering corresponding to each underlying parameter scheme first The quantities of plinth parametric scheme finally compares the quantities of each underlying parameter scheme, and is obtaining optimal base case After quantities, using the quantities of the optimal base case as the quantities of communication iron tower yet to be built, it is difficult to effectively to solve The problem of quantities of communication iron tower, is built in measuring and calculating.
Step S22 includes in one of the embodiments,:According to each underlying parameter scheme, communication iron yet to be built is obtained Multiple quantities modules that tower includes;The corresponding multiple engineerings of each quantities module are obtained, are advised according to the corresponding design of each engineering Model calculates the quantities of each engineering, is accumulated by the whole project corresponding to each quantities module, as each quantities module The first quantities measuring and calculating value.Wherein, design specification herein is industry design specification, including building foundation design rule It is one or more in model, high-rise structural design specifications, Code for design of concrete structures and communication iron tower standard collective drawings V1.3.Often A underlying parameter scheme is corresponding with multiple and different quantities modules, and each quantities module is corresponding with multiple engineerings.Reference is set Specification and underlying parameter scheme are counted, is calculated in quantities module after the quantities of each engineering, by all works in quantities module The quantities of journey is summarized, to obtain the quantities measuring and calculating value of quantities module.
As shown in figure 3, Fig. 3 is the flow chart of the engineering method for measuring and calculating of another embodiment communication iron tower, including walk as follows Suddenly:
Step S31, the tower and ground for obtaining communication iron tower yet to be built survey parameter, and it is true to survey parameter according to the tower and ground At least two sets of underlying parameter schemes of fixed communication iron tower yet to be built.
It should be noted that the engineering built required for the communication iron tower of different turriforms is different, therefore carrying out communication iron Before the quantities measuring and calculating of tower, not only it needs to be determined that communication iron tower will the ground of build area survey parameter, be also predefined yet to be built The turriform of communication iron tower can obtain the basis of communication iron tower yet to be built to survey parameter and the turriform of communication iron tower in combination Parametric scheme.
It is respectively right to calculate multiple quantities modules that communication iron tower yet to be built includes for each underlying parameter scheme by step S32 The the first quantities measuring and calculating value answered.
In above-mentioned steps, the first quantities measuring and calculating value is the whole project corresponding to each quantities module.According to engineering Design needs, and communication iron tower yet to be built may include the underlying parameter scheme more covered.Often set underlying parameter scheme has corresponding more A quantities module, and each quantities module is corresponding with multiple engineerings again.The quantities of each engineering is calculated and converged Always, the first engineering measuring and calculating value of quantities module is just obtained.
Step S33 calculates communication iron tower yet to be built according to the corresponding first quantities measuring and calculating value of multiple quantities modules The second quantities measuring and calculating value under corresponding underlying parameter scheme.
In above-mentioned steps, the first engineering measuring and calculating value is the total quantities of each quantities module.Due to each quantities mould Block has corresponding multiple engineerings, and each engineering also has corresponding quantities, then is calculated each in quantities module After the quantities of engineering, the total quantities of the quantities module is obtained.
Step S34, the second quantities measuring and calculating value under more each underlying parameter scheme, from least two sets of underlying parameters Scheme determines optimal basic parametric scheme, according to the optimal basic parametric scheme, generates that communication iron tower yet to be built is corresponding to be set Meter figure.
In above-mentioned steps, the second quantities measuring and calculating value is often to cover the corresponding total quantities of underlying parameter scheme.It will often cover After second quantities measuring and calculating value of underlying parameter scheme is compared, obtain corresponding to the second wherein minimum quantities measuring and calculating value Underlying parameter scheme, then the underlying parameter scheme is determined as optimal basic parametric scheme, and according to optimal underlying parameter side Case generates the CAD design figure of communication iron tower.
The engineering method for measuring and calculating of above-mentioned communication iron tower, obtain communication iron tower yet to be built turriform and survey parameter after, Determine that the underlying parameter scheme of the steel tower calculates each base then further according to the engineering corresponding to each underlying parameter scheme first The quantities of plinth parametric scheme finally compares the quantities of each underlying parameter scheme, and is obtaining optimal base case After quantities, the corresponding design drawing of communication iron tower yet to be built is generated according to optimal base case, so as to open-and-shut sight Survey the quantities of communication iron tower yet to be built.
In one of the embodiments, according to the optimal basic parametric scheme, it is corresponding to generate communication iron tower yet to be built Before design drawing, further include:Parameter in optimal basic parametric scheme is corrected.Due to the optimal underlying parameter side of acquisition Parameter in case may not all meet the design specification of steel tower, therefore before generating design drawing, need according to industry design Specification detect underlying parameter scheme in parameter whether specification.After detecting that parameter does not meet specification, then parameter is corrected Afterwards, the design drawing of communication iron tower yet to be built is generated further according to the parameter after correction.
The tower of communication iron tower yet to be built includes in one of the embodiments,:Single-pipe tower and three towers;Parameter packet is surveyed on ground It includes:Great soil group type, soil thickness, cohesive strength, internal friction angle, native unit weight, foundation bearing capacity, end resistance, pile side resistance, resistance to plucking system At least one of number and level of ground water.Wherein, it is that engineers and technicians build area progress ground to communication iron tower that parameter is surveyed on ground The measurement data that matter is reconnoitred.
The tower of communication iron tower yet to be built is single-pipe tower, the engineering that communication iron tower yet to be built includes in one of the embodiments, Measuring module includes:Isolated footing, single-pile foundation, four Pile-supported stand foundations and anchor rod foundation;If the tower of communication iron tower yet to be built is three Tower, the quantities module that communication iron tower yet to be built includes include:Raft foundation, pile foundation and anchor rod foundation.Wherein, each engineering It includes multiple engineerings to measure module again, if single-pipe tower isolated footing includes engineering:It is vertical that plate is wide, plate thickness, column indulge muscle, column tie-bar and plate Muscle;Single-pipe tower single-pile foundation includes engineering:Stake is long and muscle is indulged in stake;Four Pile-supported stand foundation of single-pipe tower includes:Cushion cap width, cushion cap are high The vertical muscle of degree, column, column tie-bar, cushion cap arrangement of reinforcement, stake is long and muscle is indulged in stake;Single-pipe tower anchor rod foundation includes:Bolt diameter and quantity and base Plinth size, column indulge muscle, column tie-bar, plate and indulge muscle and anchor pole.Three tower raft foundation include engineering:Plate is wide, plate thickness, column indulge muscle, column Stirrup and plate indulge muscle;Three tower pile foundations include:Stake is long and muscle is indulged in stake;Single-pipe tower anchor rod foundation includes engineering:Bolt diameter with Quantity and key dimension, column indulge muscle, column tie-bar, plate and indulge muscle and anchor pole.
As shown in figure 4, Fig. 4, which is the quantities of an embodiment communication iron tower, calculates the structural schematic diagram of device, including:
Program prediction module 410, tower and ground for obtaining communication iron tower yet to be built survey parameter, according to the tower with And at least two sets of underlying parameter schemes that parameter determines communication iron tower yet to be built are surveyed on ground.
It should be noted that the engineering built required for the communication iron tower of different turriforms is different, therefore carrying out communication iron Before the quantities measuring and calculating of tower, not only it needs to be determined that communication iron tower will the ground of build area survey parameter, be also predefined yet to be built The turriform of communication iron tower can obtain the basis of communication iron tower yet to be built to survey parameter and the turriform of communication iron tower in combination Parametric scheme.
First quantities calculates module 420, and for being directed to each underlying parameter scheme, calculate that communication iron tower yet to be built includes is more A corresponding first quantities measuring and calculating value of quantities module.
Wherein, the first quantities measuring and calculating value is the whole project corresponding to each quantities module.According to engineering design need It wants, communication iron tower yet to be built may include the underlying parameter scheme more covered.Often set underlying parameter scheme has corresponding multiple engineerings Module is measured, and each quantities module is corresponding with multiple engineerings again.The quantities of each engineering is calculated and summarized, it must To the first engineering measuring and calculating value of quantities module.
Second quantities calculates module 430, for calculating the sum of corresponding first quantities of multiple quantities modules, Obtain second quantities measuring and calculating value of the communication iron tower yet to be built under corresponding underlying parameter scheme.
Wherein, the first engineering measuring and calculating value is the total quantities of each quantities module.Since each quantities module has Corresponding multiple engineerings, and each engineering also has corresponding quantities, then each engineering in quantities module is calculated After quantities, the total quantities of the quantities module is obtained.
Optimal case determining module 440, for the second quantities measuring and calculating value under more each underlying parameter scheme, from described At least two sets of underlying parameter schemes determine optimal basic parametric scheme, obtain corresponding second engineering of optimal basic parametric scheme Measure calculation value, the quantities measuring and calculating value as communication iron tower yet to be built.
Wherein, the second quantities measuring and calculating value is often to cover the corresponding total quantities of underlying parameter scheme.Basic ginseng will often be covered After second quantities measuring and calculating value of number scheme is compared, the basis corresponding to the second wherein minimum quantities measuring and calculating value is obtained The underlying parameter scheme is then determined as optimal basic parametric scheme, by the second engineering of the underlying parameter scheme by parametric scheme Measure the quantities measuring and calculating value that calculation value is determined as communication iron tower yet to be built.
The quantities of above-mentioned communication iron tower calculates device, obtains communication iron yet to be built by program prediction module 410 first The turriform of tower and ground survey parameter after, determine the underlying parameter scheme of the steel tower, then by the first quantities measuring and calculating module 420, The quantities for calculating each underlying parameter scheme obtains multiple quantities modules corresponding that communication iron tower yet to be built includes One quantities measuring and calculating value;Calculate module 430 and optimal case determining module 440 finally by the second quantities, it is each comparing After the quantities of underlying parameter scheme obtains the quantities of optimal base case, made according to the quantities of the optimal base case For the quantities of communication iron tower yet to be built, to solve the problems, such as to be difficult to effectively calculate the quantities for building communication iron tower.
The first quantities measuring and calculating module 420 includes in one of the embodiments,:According to each underlying parameter scheme, Obtain multiple quantities modules that communication iron tower yet to be built includes;The corresponding multiple engineerings of each quantities module are obtained, according to each work The corresponding design specification of journey calculates the quantities of each engineering, is accumulated by the whole project corresponding to each quantities module, makees For the first quantities measuring and calculating value of each quantities module.Wherein, design specification herein is industry design specification, including building ground In base foundation design code, high-rise structural design specifications, Code for design of concrete structures and communication iron tower standard collective drawings V1.3 It is one or more.Each underlying parameter scheme is corresponding with multiple and different quantities modules, and each quantities module is corresponding with more A engineering.With reference to design specification and underlying parameter scheme, calculate in quantities module after the quantities of each engineering, by quantities The quantities of all engineerings is summarized in module, to obtain the quantities measuring and calculating value of quantities module.
As shown in figure 5, Fig. 5, which is the quantities of another embodiment communication iron tower, calculates the structural schematic diagram of device, including:
Underlying parameter program prediction module 510, tower and ground for obtaining communication iron tower yet to be built survey parameter, according to institute It states tower and at least two sets of underlying parameter schemes that parameter determines communication iron tower yet to be built is surveyed on ground.
It should be noted that the engineering built required for the communication iron tower of different turriforms is different, therefore carrying out communication iron Before the quantities measuring and calculating of tower, not only it needs to be determined that communication iron tower will the ground of build area survey parameter, be also predefined yet to be built The turriform of communication iron tower can obtain the basis of communication iron tower yet to be built to survey parameter and the turriform of communication iron tower in combination Parametric scheme.
Quantities measuring and calculating module 520 calculates multiple quantities that communication iron tower yet to be built includes for each underlying parameter scheme The corresponding first quantities measuring and calculating value of module.
Wherein, the first quantities measuring and calculating value is the whole project corresponding to each quantities module.According to engineering design need It wants, communication iron tower yet to be built may include the underlying parameter scheme more covered.Often set underlying parameter scheme has corresponding multiple engineerings Module is measured, and each quantities module is corresponding with multiple engineerings again.The quantities of each engineering is calculated and summarized, it must To the first engineering measuring and calculating value of quantities module.
Quantities summarizing module 530, according to the corresponding first quantities measuring and calculating value of multiple quantities modules, calculating waits for Build second quantities measuring and calculating value of the communication iron tower under corresponding underlying parameter scheme.
Wherein, the first engineering measuring and calculating value is the total quantities of each quantities module.Since each quantities module has Corresponding multiple engineerings, and each engineering also has corresponding quantities, then each engineering in quantities module is calculated After quantities, the total quantities of the quantities module is obtained.
Design drawing generates 540, the second quantities measuring and calculating value under more each underlying parameter scheme, from least two sets of bases Plinth parametric scheme determines optimal basic parametric scheme, according to the optimal basic parametric scheme, generates communication iron tower pair yet to be built The design drawing answered.
Wherein, the second quantities measuring and calculating value is often to cover the corresponding total quantities of underlying parameter scheme.Basic ginseng will often be covered After second quantities measuring and calculating value of number scheme is compared, the basis corresponding to the second wherein minimum quantities measuring and calculating value is obtained The underlying parameter scheme is then determined as optimal basic parametric scheme, and is generated according to optimal basic parametric scheme by parametric scheme The CAD design figure of communication iron tower.
The quantities of above-mentioned communication iron tower calculates device, is obtained first by underlying parameter program prediction module 510 yet to be built Communication iron tower turriform and survey parameter after, determine the underlying parameter scheme of the steel tower, module then calculated by quantities 520, the quantities of each underlying parameter scheme is calculated, multiple quantities modules that communication iron tower yet to be built includes is obtained and respectively corresponds to The first quantities measuring and calculating value;Finally by quantities summarizing module 530 and design drawing generation module 540, each base is being compared After the quantities of plinth parametric scheme obtains the quantities of optimal base case, communication yet to be built is generated according to optimal base case The corresponding CAD design figure of steel tower.
In one of the embodiments, design drawing generation module 540 be used for the parameter in optimal basic parametric scheme into Row correction.Since the parameter in the optimal basic parametric scheme of acquisition may not all meet the design specification of steel tower, Before generating design drawing, need according to industry design specification detect underlying parameter scheme in parameter whether specification.Join when detecting After number does not meet specification, then after being corrected to parameter, the design of communication iron tower yet to be built is generated further according to the parameter after correction Figure.
The tower of communication iron tower yet to be built includes in one of the embodiments,:Single-pipe tower and three towers;Parameter packet is surveyed on ground It includes:Great soil group type, soil thickness, cohesive strength, internal friction angle, native unit weight, foundation bearing capacity, end resistance, pile side resistance, resistance to plucking system At least one of number and level of ground water.Wherein, it is that engineers and technicians build area progress ground to communication iron tower that parameter is surveyed on ground The measurement data that matter is reconnoitred.
The tower of communication iron tower yet to be built is single-pipe tower, the engineering that communication iron tower yet to be built includes in one of the embodiments, Measuring module includes:Isolated footing, single-pile foundation, four Pile-supported stand foundations and anchor rod foundation;If the tower of communication iron tower yet to be built is three Tower, the quantities module that communication iron tower yet to be built includes include:Raft foundation, pile foundation and anchor rod foundation.Wherein, each engineering It includes multiple engineerings to measure module again, if single-pipe tower isolated footing includes engineering:It is vertical that plate is wide, plate thickness, column indulge muscle, column tie-bar and plate Muscle;Single-pipe tower single-pile foundation includes engineering:Stake is long and muscle is indulged in stake;Four Pile-supported stand foundation of single-pipe tower includes:Cushion cap width, cushion cap are high The vertical muscle of degree, column, column tie-bar, cushion cap arrangement of reinforcement, stake is long and muscle is indulged in stake;Single-pipe tower anchor rod foundation includes:Bolt diameter and quantity and base Plinth size, column indulge muscle, column tie-bar, plate and indulge muscle and anchor pole.Three tower raft foundation include engineering:Plate is wide, plate thickness, column indulge muscle, column Stirrup and plate indulge muscle;Three tower pile foundations include:Stake is long and muscle is indulged in stake;Single-pipe tower anchor rod foundation includes engineering:Bolt diameter with Quantity and key dimension, column indulge muscle, column tie-bar, plate and indulge muscle and anchor pole.
Based on example as described above, a kind of computer equipment is also provided in one embodiment, the computer equipment packet The computer program that includes memory, processor and storage on a memory and can run on a processor, wherein processor executes The method that the quantities measuring and calculating such as any one communication iron tower in the various embodiments described above is realized when described program.
Above computer equipment is realized efficiently measuring and calculating and built and led to by the computer program run on the processor Believe the quantities of steel tower.
One of ordinary skill in the art will appreciate that realizing all or part of flow in above-described embodiment method, being can be with Relevant hardware is instructed to complete by computer program, it is non-volatile computer-readable that the program can be stored in one It takes in storage medium, in the embodiment of the present invention, which can be stored in the storage medium of computer system, and by the calculating At least one of machine system processor executes, and includes the flow such as the embodiment of above-mentioned each sleep householder method with realization.Its In, the storage medium can be magnetic disc, CD, read-only memory (Read-Only Memory, ROM) or random storage Memory body (RandomAccess Memory, RAM) etc..
Accordingly, a kind of storage medium is also provided in one embodiment, is stored thereon with computer program, wherein the journey The method that the quantities measuring and calculating such as any one communication iron tower in the various embodiments described above is realized when sequence is executed by processor.
Above computer storage medium realizes efficiently measuring and calculating and builds communication iron tower by the computer program of its storage Quantities.
Each technical characteristic of embodiment described above can be combined arbitrarily, to keep description succinct, not to above-mentioned reality It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited In contradiction, it is all considered to be the range of this specification record.
Several embodiments of the invention above described embodiment only expresses, the description thereof is more specific and detailed, but simultaneously It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to the protection of the present invention Range.Therefore, the protection domain of patent of the present invention should be determined by the appended claims.

Claims (10)

1. a kind of engineering method for measuring and calculating of communication iron tower, which is characterized in that including:
The tower and ground for obtaining communication iron tower yet to be built survey parameter, and surveying parameter according to the tower and ground determines communication iron yet to be built At least two sets of underlying parameter schemes of tower;
For each underlying parameter scheme, corresponding first engineering of multiple quantities modules that communication iron tower yet to be built includes is calculated Measure calculation value;
According to the corresponding first quantities measuring and calculating value of multiple quantities modules, communication iron tower yet to be built is calculated in corresponding basis ginseng The second quantities measuring and calculating value under number scheme;
Compare the second quantities measuring and calculating value under each underlying parameter scheme, is determined most from least two sets of underlying parameter schemes Excellent underlying parameter scheme obtains the corresponding second quantities measuring and calculating value of optimal basic parametric scheme, as communication iron tower yet to be built Quantities measuring and calculating value.
2. the engineering method for measuring and calculating of communication iron tower according to claim 1, which is characterized in that including:It determines optimal After underlying parameter scheme, further include:
According to the optimal basic parametric scheme, the corresponding design drawing of communication iron tower yet to be built is generated.
3. the engineering method for measuring and calculating of communication iron tower according to claim 2, which is characterized in that according to the optimal base Plinth parametric scheme further includes before generating the corresponding design drawing of communication iron tower yet to be built:
Parameter in optimal basic parametric scheme is corrected.
4. the engineering method for measuring and calculating of communication iron tower according to claim 2, which is characterized in that
The tower of communication iron tower yet to be built includes:Single-pipe tower and three towers;
Parameter is surveyed on ground:Great soil group type, soil thickness, cohesive strength, internal friction angle, native unit weight, foundation bearing capacity, end resistance, At least one of pile side resistance, anti-pulls coefficient, level of ground water.
5. the engineering method for measuring and calculating of communication iron tower according to claim 4, which is characterized in that if communication iron tower yet to be built Tower is single-pipe tower, and the quantities module that communication iron tower yet to be built includes includes:Isolated footing, single-pile foundation, four Pile-supported stand foundations And anchor rod foundation;
If the tower of communication iron tower yet to be built is three towers, the quantities module that communication iron tower yet to be built includes includes:Raft foundation, stake Basis and anchor rod foundation.
6. the engineering method for measuring and calculating of communication iron tower according to any one of claims 1 to 4, which is characterized in that described to be directed to Each underlying parameter scheme calculates the corresponding first quantities measuring and calculating value of multiple quantities modules that communication iron tower yet to be built includes The step of include:
According to each underlying parameter scheme, multiple quantities modules that communication iron tower yet to be built includes are obtained;
The corresponding multiple engineerings of each quantities module are obtained, the engineering of each engineering is calculated according to the corresponding design specification of each engineering Amount, is accumulated by the whole project corresponding to each quantities module, the first quantities measuring and calculating value as each quantities module.
7. a kind of quantities of communication iron tower calculates device, which is characterized in that including:
Program prediction module, tower and ground for obtaining communication iron tower yet to be built are surveyed parameter, are surveyed according to the tower and ground Parameter determines at least two sets of underlying parameter schemes of communication iron tower yet to be built;
First quantities calculates module, for being directed to each underlying parameter scheme, calculates multiple engineerings that communication iron tower yet to be built includes Measure the corresponding first quantities measuring and calculating value of module;
Second quantities measuring and calculating module is waited for for calculating the sum of corresponding first quantities of multiple quantities modules Build second quantities measuring and calculating value of the communication iron tower under corresponding underlying parameter scheme;
Optimal case determining module, for the second quantities measuring and calculating value under more each underlying parameter scheme, from described at least two Set underlying parameter scheme determines optimal basic parametric scheme, obtains the corresponding second quantities measuring and calculating of optimal basic parametric scheme Value, the quantities measuring and calculating value as communication iron tower yet to be built.
8. the engineering method for measuring and calculating of communication iron tower according to claim 7, which is characterized in that further include that design drawing generates Module, for according to the optimal basic parametric scheme, generating the corresponding design drawing of communication iron tower yet to be built.
9. a kind of computer readable storage medium, is stored thereon with computer program, which is characterized in that the program is held by processor The step of engineering method for measuring and calculating of any communication iron tower of claim 1 to 6 is realized when row.
10. a kind of computer equipment, including memory, processor and storage are on a memory and the meter that can run on a processor Calculation machine program, which is characterized in that the processor realizes claim 1 to 6 any communication iron when executing described program The step of engineering method for measuring and calculating of tower.
CN201810171820.5A 2018-03-01 2018-03-01 Engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower Pending CN108460211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810171820.5A CN108460211A (en) 2018-03-01 2018-03-01 Engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810171820.5A CN108460211A (en) 2018-03-01 2018-03-01 Engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower

Publications (1)

Publication Number Publication Date
CN108460211A true CN108460211A (en) 2018-08-28

Family

ID=63219694

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810171820.5A Pending CN108460211A (en) 2018-03-01 2018-03-01 Engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower

Country Status (1)

Country Link
CN (1) CN108460211A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109543296A (en) * 2018-11-21 2019-03-29 广东南方电信规划咨询设计院有限公司 It is a kind of for communicating the software systems and calculation method of civil Engineering Design

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617243A (en) * 2013-11-28 2014-03-05 国家电网公司 System and method for automatically generating project amount and drawing CAD chart
CN104008241A (en) * 2014-05-27 2014-08-27 江苏省电力设计院 System and method for multi-window linked line selection and tower arrangement positioning of power transmission lines
CN106202831A (en) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 A kind of pipeline layout optimization method based on BIM
CN107194522A (en) * 2017-06-28 2017-09-22 中国电力工程顾问集团西南电力设计院有限公司 A kind of serial planning method of 1100kV extra high voltage direct current transmission lines shaft tower

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617243A (en) * 2013-11-28 2014-03-05 国家电网公司 System and method for automatically generating project amount and drawing CAD chart
CN104008241A (en) * 2014-05-27 2014-08-27 江苏省电力设计院 System and method for multi-window linked line selection and tower arrangement positioning of power transmission lines
CN106202831A (en) * 2016-08-10 2016-12-07 中国建筑第八工程局有限公司 A kind of pipeline layout optimization method based on BIM
CN107194522A (en) * 2017-06-28 2017-09-22 中国电力工程顾问集团西南电力设计院有限公司 A kind of serial planning method of 1100kV extra high voltage direct current transmission lines shaft tower

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吕建春等: "新建通信铁塔最优设计造价的快速分析工具", 《科技资讯》 *
胡龙等: "珠三角地区泥沼地形条件下送电线路铁塔方案综合经济性比较", 《中华建设》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109543296A (en) * 2018-11-21 2019-03-29 广东南方电信规划咨询设计院有限公司 It is a kind of for communicating the software systems and calculation method of civil Engineering Design

Similar Documents

Publication Publication Date Title
Dar et al. Evaluation of ASCE 43-05 seismic design criteria for rocking objects in nuclear facilities
WO2019232667A1 (en) Sensor arrangement method for reducing uncertainty in structural mode identification
Prowell et al. Shake table testing and numerical simulation of a utility‐scale wind turbine including operational effects
CN101915733B (en) Frequency change-based structural damage degree assessment method
CN102959489A (en) Memory power estimation by means of calibrated weights and activity counters
CN106033510A (en) Method and system for identifying user equipment
CN102759573A (en) Frequency change-based structure damage positioning and damage degree evaluating method
CN106556877B (en) A kind of earth magnetism Tonghua method and device
CN106323575B (en) The reinforced concrete frame structure performance test methods of bottom steel core concrete column
CN106327023A (en) Method and device for measuring transmission project man hour quota
CN111336985B (en) Monitoring method and device for goaf iron tower, storage medium and electronic equipment
CN108460211A (en) Engineering method for measuring and calculating, device, computer equipment and the storage medium of communication iron tower
CN108827145A (en) A kind of rural holding house site area measurement method and system
CN115688607A (en) Band-shaped cross-sea quasi-geoid refinement method based on multi-channel spectrum combination
CN108877969B (en) Nuclear power theoretical model establishing and verifying method, system and terminal equipment
Zhang et al. Bayesian updating model for structural vibration–induced hydrodynamic added mass of rectangular pile cap submerged in water
CN109800508A (en) The calculation method and terminal device of the empty top plate thickness at rock-socketed piles end
CN106895832B (en) A kind of angular velocity signal analogy method of Gyro
CN114841077A (en) Wind power prediction method, device and medium
CN114812733A (en) Water conservancy industry reservoir capacity monitoring system and implementation method
CN109284538A (en) A kind of bridge slope pile foundation length reduction method
CN109460627A (en) The method and apparatus of full tower crane revolving platform static(al) simulation analysis
CN108062436A (en) The pull out force detection method and system of rock-bolt
CN115075309B (en) Pile shaft axial force and side friction resistance testing system and method
CN107230005A (en) A kind of data processing method and equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180828

RJ01 Rejection of invention patent application after publication