CN108442535A - A kind of assembled architecture element connection device - Google Patents

A kind of assembled architecture element connection device Download PDF

Info

Publication number
CN108442535A
CN108442535A CN201810553428.7A CN201810553428A CN108442535A CN 108442535 A CN108442535 A CN 108442535A CN 201810553428 A CN201810553428 A CN 201810553428A CN 108442535 A CN108442535 A CN 108442535A
Authority
CN
China
Prior art keywords
steel pipe
assembled architecture
bolt
connection device
element connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810553428.7A
Other languages
Chinese (zh)
Inventor
江培刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810553428.7A priority Critical patent/CN108442535A/en
Publication of CN108442535A publication Critical patent/CN108442535A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/388Separate connecting elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention discloses a kind of assembled architecture element connection devices, including:First component, second component and element connection device, the element connection device includes the first steel pipe, second steel pipe, nuts and bolt, first steel pipe is separately positioned in first component, second steel pipe is separately positioned in second component and corresponding from beginning to end one by one with the first steel pipe, the tail end of first steel pipe and the second steel pipe is respectively arranged with bottom plate, the front end of first steel pipe and the second steel pipe is provided with upper head plate, it is provided with through-hole in the bottom plate, the bolt is connected across bottom plate with the nut in the upper head plate on the second steel pipe from the first steel pipe.Through the above way, assembled architecture element connection device of the present invention, improve the connection convenience of precast concrete assembled architecture and steel construction assembled architecture, it is ensured that the position that steel construction assembled architecture component should connect can effectively be connected.

Description

A kind of assembled architecture element connection device
Technical field
The present invention relates to technical field of buildings, more particularly to a kind of assembled architecture element connection device.
Background technology
There are mainly three types of international at present, domestic assembled architectures:Precast concrete assembled architecture, steel construction assembled are built It builds and timber structure assembled architecture.Wherein precast concrete assembled architecture component connects based on sleeve grouting connection type, The connection type that the connection of steel construction assembled architecture component mainly welding and steel column planing are held out against.
The sleeve grouting quality of connection of precast concrete assembled architecture component ensures more difficult.Precast concrete assembled The sleeve grouting connection of building element, because the grouting situation in sleeve can't see, and is also detected without suitable means at present The quality being in the milk in sleeve.
Steel construction assembled architecture component is attached by welding, and site workload is big, and because is not welded Work surface is connect, some positions can not weld, and the connection type that the steel column planing in steel construction assembled architecture is held out against, due to connecing Contacting surface is only held out against, and is not attached, and upper and lower steel column is not an entirety, cannot bear vertical tension and lateral force, is needed It improves.
Invention content
The invention mainly solves the technical problem of providing a kind of assembled architecture element connection devices, solve concrete The problem of native prefabricated member quality of connection and tie point detect, it is easy for construction, and facilitate detection, it solves steel construction assembled and builds During component is built in such a way that welding is attached the problem of welding work surface, it is ensured that the position that should be connected can be had The connection of effect solves that in the connection type that the planing of the steel column in steel construction assembled architecture is held out against vertical tension and side cannot be born The problem of to power.
In order to solve the above technical problems, one aspect of the present invention is:A kind of assembled architecture component is provided Attachment device, including:First component, second component and element connection device, the first component are arranged in the upper of second component Side or side, the element connection device include the first steel pipe, the second steel pipe, nuts and bolt, the first steel pipe difference It is arranged in first component, second steel pipe is separately positioned in second component and, institute corresponding from beginning to end one by one with the first steel pipe The tail end for stating the first steel pipe and the second steel pipe is respectively arranged with bottom plate, and the front end of first steel pipe and the second steel pipe is provided with Upper head plate is provided with through-hole in the bottom plate, and the first threaded hole is provided in the upper head plate, and the nut is arranged first In threaded hole, the bolt is connected across bottom plate with the nut in the upper head plate on the second steel pipe from the first steel pipe.
In a preferred embodiment of the present invention, external screw thread corresponding with the first threaded hole is provided with outside the nut.
In a preferred embodiment of the present invention, the nut top indent is provided with spanner location hole.
In a preferred embodiment of the present invention, restraining position ring block is set in the nut top outer circle, the upper head plate It is provided with limiting slot corresponding with spacing ring at the top of first threaded hole.
In a preferred embodiment of the present invention, the bolt carries out rotation installation using sleeve, and the sleeve top is same The heart is provided with sleeve extension rod.
In a preferred embodiment of the present invention, the bolt be outer-hexagonal bolt when, the sleeve bottom be provided with The corresponding hexagon limit hole of bolt head.
In a preferred embodiment of the present invention, the bolt be hexagon socket head cap screw when, the sleeve bottom be provided with Bolt head corresponding circular hole is provided with hex wrench bar in the circular hole.
In a preferred embodiment of the present invention, first steel pipe and the second steel pipe are pipe or rectangular tube.
In a preferred embodiment of the present invention, the bottom plate is respectively welded at the tail of the first steel pipe and the second steel pipe End, the upper head plate are respectively welded at the front end of the first steel pipe and the second steel pipe.
In a preferred embodiment of the present invention, it is provided with thread spacer on the bolt, is arranged in the thread spacer There is the second threaded hole corresponding with bolt.
The beneficial effects of the invention are as follows:A kind of assembled architecture element connection device that the present invention points out transports after prefabricated It is assembled to construction site, improves the connection facility of precast concrete assembled architecture and steel construction assembled architecture Property, construction is more quick, and facilitates the detection of precast concrete assembled architecture junction, it is ensured that steel construction assembled architecture structure The position that part should connect can effectively be connected, and the structural strength for bearing vertical tension and lateral force is promoted.
Description of the drawings
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing, wherein:
Fig. 1 is a kind of structural schematic diagram of one preferred embodiment of assembled architecture element connection device of the present invention;
Fig. 2 is the element connection device partial enlarged view in a kind of assembled architecture element connection device of the present invention.
Specific implementation mode
The technical scheme in the embodiments of the invention will be clearly and completely described below, it is clear that described implementation Example is only a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, this field is common All other embodiment that technical staff is obtained without making creative work belongs to the model that the present invention protects It encloses.
~ Fig. 2 is please referred to Fig.1, the embodiment of the present invention includes:
A kind of assembled architecture element connection device, including:First component 2, second component 4 and element connection device, described One component 2 is arranged in the top or side of second component 4, the element connection device include the first steel pipe 1, the second steel pipe 3, Nut 11 and bolt 5, first steel pipe 1 are separately positioned in first component 2, and second steel pipe 3 is separately positioned on second Head and the tail are corresponding one by one in component 4 and with the first steel pipe 1, and the tail end of first steel pipe, 1 and second steel pipe 3 is respectively arranged with lower end The front end of plate 9, first steel pipe, 1 and second steel pipe 3 is provided with upper head plate 8, and through-hole is provided in the bottom plate 9, convenient Bolt 5 interts.
The first threaded hole is provided in the upper head plate 8, the nut 11 is arranged in the first threaded hole, the bolt 5 It is connected with the nut 11 in the upper head plate 8 on the second steel pipe 3 across bottom plate 9 from the first steel pipe 1.
External screw thread corresponding with the first threaded hole is provided with outside the nut 11,11 top indent of the nut is provided with Spanner location hole 7, is facilitated and is rotated using spanner, is mounted in the first threaded hole.It is arranged in 11 top outer circle of the nut Restraining position ring block 10, nut 11 are integrated steel construction, sound construction, the first threaded hole top of the upper head plate 8 with spacing ring 10 Portion is provided with limiting slot corresponding with spacing ring 10, and after nut 11 screws in the first threaded hole, spacing ring 10, which enters limiting slot, to carry out The axial limiting of nut 11, lift structure stability.
The bolt 5 carries out rotation installation using sleeve, and sleeve extension rod has been arranged concentrically at the top of the sleeve, convenient hand-held It is operated.5 generally use outer-hexagonal bolt of bolt or hexagon socket head cap screw, when the bolt 5 is outer-hexagonal bolt, the set Cylinder bottom is provided with hexagon limit hole corresponding with 5 head of bolt;
When the bolt 5 is hexagon socket head cap screw, the sleeve bottom is provided with circular hole corresponding with 5 head of bolt, the circular hole Inside it is provided with hex wrench bar.Being provided with magnet or sleeve itself in sleeve simultaneously has certain magnetism, can be to spiral shell Bolt 5 is adsorbed, and bolt 5 is facilitated to be sent into the first steel pipe 1.
First steel pipe, 1 and second steel pipe 3 is pipe or rectangular tube, and selection is flexible.The bottom plate 9 is respectively welded In the tail end of the first steel pipe 1 and the second steel pipe 3, the upper head plate 8 is respectively welded at the front end of the first steel pipe 1 and the second steel pipe 3, Sound construction.It is provided with thread spacer 6 on the bolt 5, second spiral shell corresponding with bolt 5 is provided in the thread spacer 6 Pit so that thread spacer 6 is fitted together with bolt 5, easy for installation.
Embodiment 1:
When first component 2 and second component 4 are respectively precast concrete, several first steel pipes 1 is needed to be embedded in first In component 2, several second steel pipes 3 are embedded in second component 4, are first respectively welded one in the first steel pipe 1 and 3 bottom of the second steel pipe One piece of upper end with interior first threaded hole is respectively welded in the top of bottom plate 9 of the block with through-hole, the first steel pipe 1 and the second steel pipe 3 Then first steel pipe 1 and the second steel pipe 3 are cast in corresponding concrete component by plate 8, form first component 2 and the second structure The specification of part 4, first component 2 and second component 4 can be identical, can also be different, component is in place in building-site Afterwards, it is screwed into nut 11 in the upper head plate 8 of the second steel pipe 3, is screwed into bolt 5 in the first steel pipe 1 by sleeve and sleeve extension rod , at the construction field (site) can be by torque spanner come drive sleeve extension bar into the nut 11 of the second steel pipe 3, detection bolt 5 is tightened Torsion, it is ensured that torsion meets the requirements, and so that first component 2 and second component 4 link together, bolt 5 takes out after tightening Nut 11 with internal and external screw thread is screwed into the upper head plate 8 of first component 2 by sleeve and sleeve extension rod, and operation facility is kept away The problem of having exempted from sleeve grouting, quality of connection is stablized, easy to detect.
Embodiment 2:
When first component 2 and second component 4 are respectively steel construction assembled architecture component, first component 2 is substituted with the first steel pipe 1 In part steel column, with the second steel pipe 3 substitute second component 4 in part steel column, first at 3 bottom of the first steel pipe 1 and the second steel pipe Portion is respectively welded one piece of bottom plate 9 with through-hole, and the top of the first steel pipe 1 and the second steel pipe 3 is respectively welded one piece with interior first Then the upper head plate 8 of threaded hole is welded to form the identical or different first component 2 of multiple models and second component 4 in factory, It is screwed into nut 11 in the upper head plate 8 of the second steel pipe 3, bolt 5 in the first steel pipe 1 is screwed by sleeve and sleeve extension rod In the nut 11 of two steel pipes 3, to which the first steel pipe 1 and the second steel pipe 3 link together, instead of traditional welding, avoid The problem of welding work surface so that first component 2 and second component 4 link together, bolt 5 taken out after tightening sleeve and Nut 11 with internal and external screw thread is screwed into the upper head plate 8 of first component 2 by sleeve extension rod, facilitates subsequent construction, behaviour It facilitates, construction efficiency is high, while the steel column in current planing jacking mechanism being vertically connected with as an entirety, improves The vertical and lateral force performance of steel construction assembled architecture.
In conclusion a kind of assembled architecture element connection device that the present invention points out, is suitable for precast concrete and assembles Formula is built and the connection of steel construction assembled architecture, promotes the convenience and structural stability of connection, easy to detect, structural strength Height, due to being to be bolted, speed is fast, efficient, saves duration and cost of labor, has prevented weld fumes to ambient enviroment Pollution, improves the work situation of worker.
Example the above is only the implementation of the present invention is not intended to limit the scope of the invention, every to utilize this hair Equivalent structure or equivalent flow shift made by bright description is applied directly or indirectly in other relevant technology necks Domain is included within the scope of the present invention.

Claims (10)

1. a kind of assembled architecture element connection device, for precast concrete assembled architecture and steel construction assembled architecture Connection, which is characterized in that including:First component, second component and element connection device, the first component are arranged in the second structure The top or side of part, the element connection device include the first steel pipe, the second steel pipe, nuts and bolt, first steel Pipe is separately positioned in first component, and second steel pipe is separately positioned in second component and head and the tail are right one by one with the first steel pipe It answers, the tail end of first steel pipe and the second steel pipe is respectively arranged with bottom plate, the front end of first steel pipe and the second steel pipe It is provided with upper head plate, through-hole is provided in the bottom plate, the first threaded hole, the nut setting are provided in the upper head plate In the first threaded hole, the bolt from the first steel pipe across bottom plate and with the nut phase in the upper head plate on the second steel pipe Connection.
2. assembled architecture element connection device according to claim 1, which is characterized in that be provided with outside the nut External screw thread corresponding with the first threaded hole.
3. assembled architecture element connection device according to claim 1, which is characterized in that recessed in the nut top It is equipped with spanner location hole.
4. assembled architecture element connection device according to claim 1, which is characterized in that in the nut top outer circle Restraining position ring block is set, limiting slot corresponding with spacing ring is provided at the top of the first threaded hole of the upper head plate.
5. assembled architecture element connection device according to claim 1, which is characterized in that the bolt using sleeve into Row rotation installation, the sleeve top have been arranged concentrically sleeve extension rod.
6. assembled architecture element connection device according to claim 5, which is characterized in that the bolt is outer-hexagonal spiral shell When bolt, the sleeve bottom is provided with hexagon limit hole corresponding with bolt head.
7. assembled architecture element connection device according to claim 5, which is characterized in that the bolt is interior hexagonal spiral shell When bolt, the sleeve bottom is provided with circular hole corresponding with bolt head, and hex wrench bar is provided in the circular hole.
8. assembled architecture element connection device according to claim 1, which is characterized in that first steel pipe and second Steel pipe is pipe or rectangular tube.
9. assembled architecture element connection device according to claim 1, which is characterized in that the bottom plate is respectively welded In the tail end of the first steel pipe and the second steel pipe, the upper head plate is respectively welded at the front end of the first steel pipe and the second steel pipe.
10. assembled architecture element connection device according to claim 1, which is characterized in that be provided on the bolt Thread spacer is provided with the second threaded hole corresponding with bolt in the thread spacer.
CN201810553428.7A 2018-06-01 2018-06-01 A kind of assembled architecture element connection device Pending CN108442535A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810553428.7A CN108442535A (en) 2018-06-01 2018-06-01 A kind of assembled architecture element connection device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810553428.7A CN108442535A (en) 2018-06-01 2018-06-01 A kind of assembled architecture element connection device

Publications (1)

Publication Number Publication Date
CN108442535A true CN108442535A (en) 2018-08-24

Family

ID=63206329

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810553428.7A Pending CN108442535A (en) 2018-06-01 2018-06-01 A kind of assembled architecture element connection device

Country Status (1)

Country Link
CN (1) CN108442535A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387511A (en) * 2022-08-23 2022-11-25 中国矿业大学 Quickly-assembled multi-cavity concrete filled steel tube shear wall

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206815524U (en) * 2017-05-26 2017-12-29 重庆大学 A kind of assembled connecting node
CN207211428U (en) * 2017-08-30 2018-04-10 河北建筑工程学院 A kind of fabricated shear wall plate and its wallboard connecting structure
CN108005307A (en) * 2017-11-27 2018-05-08 清华大学 A kind of replaceable assembly concrete-filled steel tube component
CN208293781U (en) * 2018-06-01 2018-12-28 江培刚 A kind of assembled architecture element connection device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN206815524U (en) * 2017-05-26 2017-12-29 重庆大学 A kind of assembled connecting node
CN207211428U (en) * 2017-08-30 2018-04-10 河北建筑工程学院 A kind of fabricated shear wall plate and its wallboard connecting structure
CN108005307A (en) * 2017-11-27 2018-05-08 清华大学 A kind of replaceable assembly concrete-filled steel tube component
CN208293781U (en) * 2018-06-01 2018-12-28 江培刚 A kind of assembled architecture element connection device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115387511A (en) * 2022-08-23 2022-11-25 中国矿业大学 Quickly-assembled multi-cavity concrete filled steel tube shear wall
CN115387511B (en) * 2022-08-23 2024-07-23 中国矿业大学 A quick-assembled multi-cavity steel tube concrete shear wall

Similar Documents

Publication Publication Date Title
CA2857258C (en) Bolt tightening robot for wind turbines
CN105155781A (en) Reinforced connecting structure and method between precast reinforced concrete components
CN208293781U (en) A kind of assembled architecture element connection device
CN105275095A (en) Circular steel tube column in threaded connection and construction method
CN108442535A (en) A kind of assembled architecture element connection device
CN103911952A (en) Positioning construction method of prestressed steel corrugated pipe
CN205243009U (en) Ribbed steel bar formwork support is to drawing fastening tool
CN205100376U (en) Threaded connection's circular steel tube post
CN211194387U (en) A prefabricated cover beam grouting bellows positioning device
CN214399423U (en) An adjustable wall mount
CN204349332U (en) A fastening tool for transmission line suspension clamp with torque display function
CN209723347U (en) A kind of energy conservation steel bar truss floor structure
CN215441917U (en) Pre-tightening device used in steel pipe pile supporting
CN201794069U (en) Recyclable steel hanger structure of bored pile
CN101664960B (en) Prestressed Steel Rod Mounting Nuts
CN206581502U (en) A kind of reinforcing bar couples fastener
CN210894392U (en) Steerable wind speed sensor mounting device
CN205421317U (en) Assembled basis mounting adjustment ware
CN224030536U (en) A manual auxiliary tower crane slewing tool
CN220645328U (en) A kind of building reinforced steel structure
CN217603133U (en) Self-locking anti-seismic bolt for motorcycle
CN205765842U (en) A kind of power steel pipe rod flange bolt fastening specific purpose tool
CN206769080U (en) A kind of pin connected construction with pressure sensor device
CN210887587U (en) Connection structure with adjustable stake
CN202441049U (en) External pull connecting device of scaffold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180824