CN108442318A - A kind of construction method of ecological revetment for riparian protection - Google Patents

A kind of construction method of ecological revetment for riparian protection Download PDF

Info

Publication number
CN108442318A
CN108442318A CN201810102388.4A CN201810102388A CN108442318A CN 108442318 A CN108442318 A CN 108442318A CN 201810102388 A CN201810102388 A CN 201810102388A CN 108442318 A CN108442318 A CN 108442318A
Authority
CN
China
Prior art keywords
ecological
block
ecological block
overlap joint
revetment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810102388.4A
Other languages
Chinese (zh)
Other versions
CN108442318B (en
Inventor
刘学应
裘慧萍
刘敏
袁婷
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Fengmao Sheng Construction Co.,Ltd.
Original Assignee
Zhejiang University of Water Resources and Electric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University of Water Resources and Electric Power filed Critical Zhejiang University of Water Resources and Electric Power
Priority to CN201810102388.4A priority Critical patent/CN108442318B/en
Publication of CN108442318A publication Critical patent/CN108442318A/en
Application granted granted Critical
Publication of CN108442318B publication Critical patent/CN108442318B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/121Devices for applying linings on banks or the water bottom
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/12Revetment of banks, dams, watercourses, or the like, e.g. the sea-floor
    • E02B3/14Preformed blocks or slabs for forming essentially continuous surfaces; Arrangements thereof
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/30Flood prevention; Flood or storm water management, e.g. using flood barriers

Abstract

The invention discloses a kind of construction methods of the ecological revetment for riparian protection, include the following steps:A, it is laid with gravel sarking;B, geotextiles are laid with;C, the soil horizon of 20 30cm is backfilled in geotextiles, and is compacted;D, ecological revetment is built;E, soil, then planting plants are placed in the ecologic planting hole of ecological block.Ecological block after present invention construction is not in obscission, improve the globality of entire ecological revetment, enhance the flood control effect of ecological revetment, ecological effect, landscape effect and the effect of self-purification, the ponding of construction site can be flowed into the chamfered portion of ecological block by overlapping the filter plate of building block simultaneously, the water of the chamfered portion of ecological block is discharged to by rhone in soil, prevent the earthwork for not being laid with the construction area of ecological block from sedimentation phenomenon a little occur, ensure the planarization of earth excavation, convenient for being quickly laid with ecological block, and energy quick-replaceable ecological block, be conducive to increase the service life of ecological revetment.

Description

A kind of construction method of ecological revetment for riparian protection
Technical field
The invention belongs to river training works technical fields, and in particular to a kind of ecological revetment for riparian protection is applied Work method.
Background technology
Restoration of the ecosystem refers to stopping human interference to the ecosystem, with the pressure that lightens the load, by the ecosystem self Regulating power makes it develop to orderly direction with self organization ability, or utilizes this self-recovery energy of the ecosystem Power is aided with artificial measures, so that the ecosystem destroyed is gradually restored or the ecosystem is made to develop to benign cycle direction;It is main Refer to and is dedicated to those under natural mutation and the effect of human activity by the recovery for the natural ecosystems destroyed and reconstruction work Make, the looks of restored ecosystem script.
Ecological riverway reparation is one of restoration of the ecosystem field, is repaiied at present to ecological riverway using ecological revetment It is multiple.Ecological revetment refers to being combined with civil engineering using plant or plant, a kind of river protected river slope surface Road slope protection form;It can be except preventing riverbank from collapsing, and being also equipped with makes river water be interpenetrated with soil, enhances river from net energy Power has the river course slope protection form of certain natural landscape effect.Ecological revetment collection flood control effect, ecological effect, landscape effect and from Net effect is not only a much progress of bank-protection works construction in one, also will be as the mainstream of bank-protection works construction from now on.It is existing Technology is built by laying bricks or stones in ecological revetment work progress, using ecological block in slope surface, laterally adjacent two pieces of ecological blocks Concrete is all made of with vertically-adjacent two pieces of ecological blocks to be fixedly connected, which has certain construction period so that It is not laid with the easy ponding of construction area of ecological block, the earthwork appearance for not being laid with the construction area of ecological block is caused to settle a little Phenomenon, and after the completion of construction, for ecological block in the case where river water washes away, easily there is ecological block obscission, shadow in ecological revetment The globality for ringing entire ecological revetment, weakens flood control effect, ecological effect, landscape effect and the effect of self-purification of ecological revetment.
Invention content
Above-mentioned technical problem present in present invention aims to solve the prior art provides a kind of for riparian protection The construction method of ecological revetment first carries out reinforcement processing before building ecological revetment to the basis of excavation, and it is softly to adapt to the earthwork It is the case where base, stringent to control the earthwork gradient, when building ecological revetment, it is first laid with the ecological block of the bottom, controls most bottom Spacing between adjacent two pieces of ecological blocks of layer, then on the basis of the ecological block of the bottom, carry out each row ecological block Laying, adjacent two pieces of ecological blocks of same row are fixedly connected using overlap joint building block, and the ecological block of same row is fixed to each other Connection mainly uses connecting rod, the rope made of hemp and the concrete that pours to be fixedly connected the ecological block of same a line, ecology Building block is not in obscission, improves the globality of entire ecological revetment, enhances flood control effect, the Ecological Effect of ecological revetment It answers, landscape effect and the effect of self-purification, while the ponding of construction site can be flowed into ecological block by overlapping the filter plate of building block Chamfered portion, the water of the chamfered portion of ecological block is discharged in soil by rhone, prevents from not being laid with applying for ecological block There is sedimentation phenomenon a little in the earthwork in work area domain, ensures the planarization of earth excavation, convenient for being quickly laid with ecological block, Er Qieneng Quick-replaceable ecological block is conducive to the service life for increasing ecological revetment.
In order to solve the above-mentioned technical problem, the present invention adopts the following technical scheme that:
The construction method of a kind of ecological revetment for riparian protection, it is characterised in that include the following steps:
A, it is laid with gravel sarking
1) scene is reconnoitred, removes the barrier on ground, then measure setting-out, lays location control stake, standard level Stake, excavation foundation sideline and excavation foundation depth then use the excavator excavation section by section earthwork from top to bottom, then modify side slope The gradient and the compacting earthwork;
2) it is laid with one layer of gravel sarking on the basis of excavation and tamps, the thickness of gravel sarking is generally 10cm;
B, geotextiles are laid with
1) geotextiles are unfolded to and are deposited in the place of smooth not ponding, the height that heap is set is no more than volume four, then with impermeable The geotextiles that bright material covering heap is set;
2) geotextiles are laid on the gravel sarking of compacting from the bottom up along earth excavation, then geotextiles is carried out Overlap joint, lap width 20cm;
C, the soil horizon of 20-30cm is backfilled in geotextiles, and is compacted;
D, ecological revetment is built
1) in the bottommost of ecological revetment construction area, slope surface is inserted into support board, then the table in support board downward vertically Face nailing enters wooden unit, and wooden unit is laterally arranged, the distance between center of adjacent two pieces of wooden units and preset adjacent two pieces of ecology The distance between center of building block is identical;
2) ecological block is integrally rinsed using giant, then at the construction field (site) by the tiling of ecological block block-by-block, The rhone of every piece of ecological block is rinsed using giant;
3) ecological block of the bottom is laid with, the connection end of ecological block is inserted into the wooden unit of support board On, the distance between laterally adjacent two pieces of ecological blocks are controlled in 30-40cm, then in the through-hole of the ecological block of the bottom Laterally it is passed through connecting rod;
4) it uses giant to be integrally rinsed overlap joint building block, then is packed into filtering in the water seepage hole of overlap joint building block Plate;
5) the setting overlap joint building block on the ecological block of the bottom, the inclined-plane on the inclined-plane and ecological block of overlap joint building block bottom Fitting, the elastic button block of overlap joint building block bottom snap onto in the connection end of ecological block, then suitable in the other end of overlap joint building block It the gradient and slides into second piece of ecological block from top to bottom, the connection end of second piece of ecological block is another with overlap joint building block bottom Elastic button block clamping, then second piece of overlap joint building block is set on second piece of ecological block, the another of building block is then overlapped at second piece One end slides into third block ecological block along the gradient from top to bottom, is circularly set overlap joint building block and ecological block, until top Ecological block when reaching design position, stop setting overlap joint building block and ecological block;
6) connecting rod is laterally passed through in the through-hole of the ecological block in same a line, then in the adjacent of same row Soil is inserted between two pieces of ecological blocks, the height for inserting soil is overlap joint the distance between building block bottom and slope surface;
7) end of all connecting rods is adjusted on same plane, then with the rope made of hemp that all connecting rods is mutual Bundled fixed, then formwork in the space between adjacent two pieces of ecological blocks in same a line, side mould are added using the wooden diagonal brace Timber is fixed, and centre supports mutual drawknot to fix using steel fastener, then the casting concrete at formwork, the top surface of concrete layer It is flushed with the top surface of ecological block;
8) formwork at the ecological block of top, then the casting concrete at formwork, concrete cover top ecology The rhone of building block, and the top surface of concrete layer is flushed with the top surface of top ecological block;
E, soil, then planting plants are placed in the ecologic planting hole of ecological block.
Further, the of step b is 2) in part, after the completion of overlapping geotextiles, in top layer and undermost geotechnique Stone is suppressed at the horizontal edge of cloth, prevents geotextiles from winding.
Further, the of step d is 3) in part, after being passed through connecting rod, along earthwork line of slope on connecting rod Reference line is set from the bottom up, and the ecological block of every piece of bottom corresponds to two reference lines, and reference line is close to the side of ecological block Face, identical as the earthwork gradient with reference to the gradient of line, 5) the of step d is partly operated according to the reference line of setting. The setting of two reference lines can keep the ecological block of same row on the same line, to improve ecological block laying quality.
Further, the of step d punishes three sections of casting concretes in formwork, is poured successively from lower to upper 7) in part It builds, every section needs the length of the concrete poured to be gradually reduced from top to bottom.Due to concrete when pouring with certain stream Dynamic property, using being segmented the method poured successively from lower to upper so that the concrete foundation that lower section pours completion is used as top Supporting surface when casting concrete basis reduces the difficulty of construction of concreting, and every section needs the concrete poured Length is gradually reduced from top to bottom so that the concrete rapid curing poured accelerates concrete pouring construction progress.
Further, in step e, before planting plants, water pipe, Mei Yilie are placed at the top surface of top ecological block Ecological block corresponds to a water pipe, and water pipe carries out spray function to ecological block, and water is discharged at the ecological block of the bottom When time reaches 15min, water pipe spray function is closed, after 0.5-1h, plants and plants in the ecologic planting hole of ecological block Object.Spray function is carried out to ecological block by water pipe, soil in ecologic planting hole is sufficiently humidified so as to, plant stock is conducive to.
The present invention is by adopting the above-described technical solution, have the advantages that:
The present invention is first laid with sandy gravel bed course, then in gravel sarking before building ecological revetment in the earthwork of excavation Upper laying geotextiles, then the backfill earth layer in geotextiles, reinforcement processing is carried out to the basis of excavation, and it is softly to adapt to the earthwork It is the case where base, stringent to control the earthwork gradient.
The present invention is first integrally rinsed ecological block when building ecological revetment, removes the mud on ecological block surface Soil, then at the construction field (site) by the tiling of ecological block block-by-block, the rhone of every piece of ecological block is rinsed using giant, The sundries in rhone is removed, ensures water smooth outflow on ecological block.The ecological block for re-laying the bottom, by the bottom The connection end of ecological block is inserted on the wooden unit of support board, between the adjacent two pieces of ecological blocks for controlling the bottom Spacing, then it is laterally passed through connecting rod in the through-hole of the ecological block of the bottom, prevent the ecological block of the bottom from sliding.So Afterwards on the basis of the ecological block of the bottom, the laying of each row ecological block, adjacent two pieces of ecological blocks of same row are carried out It is fixedly connected using overlap joint building block, in the connection end that the elastic button block for overlapping building block bottom is snapped onto to ecological block so that The ecological block of same row is mutually permanently connected, and the mutual connection speed of ecological block of same row is fast, without coagulation Soil.For connection function between the ecological block of same a line, the lateral company of being passed through in the through-hole of the ecological block in same a line Extension bar part, then soil is inserted between adjacent two pieces of ecological blocks in same row, then with the rope made of hemp by all connecting rods The mutual bundled fixed of part, then the casting concrete at formwork, the top surface of concrete layer flush with the top surface of ecological block, pour Concrete limits connecting rod in slope surface, and connecting rod acts power to the ecological block in same a line, prevents same The ecological block of a line misplaces, and is consolidated in this way using connecting rod, the rope made of hemp and the concrete that pours with the ecological block of a line Fixed connection is improved with the bonding strength between the ecological block of a line, will not shadow when the connecting rod at one is broken Ring the loosening of ecological block.Then the formwork at the ecological block of top, then the casting concrete at formwork, entire ecology shield The supported underneath of bank is limited in support board, the top of ecological revetment by concrete, and entire ecological revetment stabilization is being protected On slope.After the completion of ecological revetment construction, ecological block is not in obscission, improves the globality of entire ecological revetment, is increased Flood control effect, ecological effect, landscape effect and the effect of self-purification of strong ecological revetment;The ponding of construction site can pass through overlap joint simultaneously The filter plate of building block is flowed into the chamfered portion of ecological block, and the water of the chamfered portion of ecological block is discharged to soil by rhone In, it prevents the earthwork for not being laid with the construction area of ecological block from sedimentation phenomenon a little occur, ensures the planarization of earth excavation, just In quickly laying ecological block.
It, only need to be upward by the overlap joint building block being connect with damaged ecological block when ecological block in the present invention occurs damaged It removes, elastic button block elastic shrinkage is disconnected end, you can the ecological block more renewed, then overlap joint building block is pressed downward to, Fast and easy replaces ecological block, is conducive to the service life for increasing ecological revetment.
Description of the drawings
The invention will be further described below in conjunction with the accompanying drawings:
Fig. 1 is the structural schematic diagram that ecological revetment of the present invention construction is completed;
Fig. 2 is the structural schematic diagram when present invention builds ecological revetment;
Fig. 3 is the structural schematic diagram of ecological block in the present invention;
Fig. 4 is the structural schematic diagram that building block is overlapped in the present invention;
Structural schematic diagram when Fig. 5 is overlap joint building block loading filter plate in the present invention;
Fig. 6 is the structural schematic diagram that ecological block is connect with overlap joint building block in the present invention.
Specific implementation mode
As shown in Figures 1 to 6, it is a kind of construction method of ecological revetment for riparian protection of the invention, including as follows Step:
A, it is laid with gravel sarking 1
1) scene is reconnoitred, removes the barrier on ground, then measure setting-out, lays location control stake, standard level Stake, excavation foundation sideline and excavation foundation depth.Then the excavator excavation section by section earthwork from top to bottom is used, side slope is then modified The gradient and the compacting earthwork.
2) it is laid with one layer of gravel sarking 1 on the basis of excavation and tamps, the thickness of gravel sarking 1 is generally 10cm。
B, geotextiles 2 are laid with
1) geotextiles 2 are unfolded to and are deposited in the place of smooth not ponding, the height that heap is set is no more than volume four, then with impermeable The geotextiles 2 that bright material covering heap is set.
2) geotextiles 2 are laid on the gravel sarking 1 of compacting from the bottom up along earth excavation, then by geotextiles 2 It is overlapped, lap width 20cm.
After the completion of overlapping geotextiles 2, stone is suppressed at the horizontal edge of top layer and undermost geotextiles 2, is prevented Geotextiles 2 are wound.
C, the soil horizon 3 of 20-30cm is backfilled in geotextiles 2, and is compacted.
D, ecological revetment is built
1) in the bottommost of ecological revetment construction area, slope surface is inserted into support board, then the table in support board downward vertically Face nailing enters wooden unit, and wooden unit is laterally arranged, the distance between center of adjacent two pieces of wooden units and preset adjacent two pieces of ecology The distance between center of building block is identical.
2) it uses giant is whole to ecological block 4 to be rinsed, then 4 block-by-block of ecological block is laid in construction now , the rhone 7 of every piece of ecological block 4 is rinsed using giant.
3) ecological block of the bottom 4 is laid with, the connection end 8 of ecological block 4 is inserted into support board On wooden unit, the distance between laterally adjacent two pieces of ecological blocks 4 are controlled in 30-40cm, then in the ecological block of the bottom 4 Connecting rod 6 is laterally passed through in through-hole 9.
After being passed through connecting rod 6, reference line is set from the bottom up along earthwork line of slope on connecting rod 6, every piece The ecological block 4 of the bottom corresponds to two reference lines, and reference line is close to the side of ecological block 4, with reference to the gradient of line Identical as the earthwork gradient, the setting of two reference lines can keep the ecological block 4 of same row on the same line, to improve ecology 4 laying quality of building block.
4) it uses giant is whole to overlap joint building block 5 to be rinsed, then was packed into the water seepage hole 13 of overlap joint building block 5 Filter plate 12.
5) it is operated according to the reference line of setting, the building block 5 of setting overlap joint, overlap joint are built on the ecological block 4 of the bottom The inclined-plane of 5 bottom of block is bonded with the inclined-plane of ecological block 4, and the elastic button block 11 of 5 bottom of overlap joint building block snaps onto ecological block 4 In connection end 8.Again second piece of ecological block 4, second piece of life are slid into from top to bottom along the gradient in the other end of overlap joint building block 5 The connection end 8 of state building block 4 and another elastic button block 11 of 5 bottom of overlap joint building block are clamped.It is set on second piece of ecological block 4 again Second piece of overlap joint building block 5 is set, the other end that building block 5 is then overlapped at second piece slides into third block ecology along the gradient from top to bottom Building block 4.It is circularly set overlap joint building block 5 and ecological block 4, until when the ecological block 4 of top reaches design position, stops setting Set overlap joint building block 5 and ecological block 4.
6) it is laterally passed through connecting rod 6 in the through-hole 9 of the ecological block 4 in same a line, then in same row Soil is inserted between adjacent two pieces of ecological blocks 4, the height for inserting soil is overlap joint the distance between 5 bottom of building block and slope surface.
7) end of all connecting rods 6 is adjusted on same plane, then with the rope made of hemp by all 6 phases of connecting rod Mutual bundled fixed.Then formwork in the space between adjacent two pieces of ecological blocks 4 in same a line, side mould is using the wooden diagonal brace Timber is added to fix, centre supports mutual drawknot to fix using steel fastener, then the casting concrete at formwork, the top of concrete layer Face is flushed with the top surface of ecological block 4.
Three sections of casting concretes are punished in formwork, are poured successively from lower to upper, every section needs the concrete poured Length is gradually reduced from top to bottom.Due to concrete when pouring with certain mobility, using being segmented from lower to upper successively The method poured so that lower section pours supporting surface of the concrete foundation of completion as top casting concrete basis when, The difficulty of construction of concreting is reduced, and every section needs the length of the concrete poured to be gradually reduced from top to bottom so that The concrete rapid curing poured accelerates concrete pouring construction progress.
8) formwork at the ecological block of top 4, then the casting concrete at formwork, concrete cover top ecology The rhone 7 of building block 4, and the top surface of concrete layer is flushed with the top surface of top ecological block 4.
E, soil, then planting plants are placed in the ecologic planting hole 10 of ecological block 4.
Before planting plants, water pipe is placed at the top surface of top ecological block 4, each row ecological block 4 corresponds to A piece water pipe, water pipe carry out spray function to ecological block 4.The time that water is discharged at the ecological block 4 of the bottom reaches When 15min, water pipe spray function, after 0.5-1h, the planting plants in the ecologic planting hole 10 of ecological block 4 are closed.It is logical It crosses water pipe and spray function is carried out to ecological block 4, soil in ecologic planting hole 10 is sufficiently humidified so as to, plant stock is conducive to.
The present invention is first laid with sandy gravel bed course 1, then in gravel sarking before building ecological revetment in the earthwork of excavation It is laid with geotextiles 2 on 1, then the backfill earth layer in geotextiles 2, reinforcement processing is carried out to the basis of excavation, adapting to the earthwork is It is the case where subgrade, stringent to control the earthwork gradient.
The present invention is first whole to ecological block 4 to be rinsed when building ecological revetment, removes 4 surface of ecological block Soil, then at the construction field (site) by the tiling of 4 block-by-block of ecological block, the rhone 7 of every piece of ecological block 4 is carried out using giant It rinses, removes the sundries in rhone 7, ensure water smooth outflow on ecological block 4.The ecological block 4 of the bottom is re-layed, The connection end 8 of bottom ecological block 4 is inserted on the wooden unit of support board, adjacent two pieces of ecology of the bottom is controlled Spacing between building block 4, then it is laterally passed through connecting rod 6 in the through-hole 9 of the ecological block 4 of the bottom, prevent the bottom Ecological block 4 slides.Then on the basis of the ecological block of the bottom 4, the laying of each row ecological block 4, same row are carried out Adjacent two pieces of ecological blocks 4 be fixedly connected using overlap joint building block 5, the elastic button block 11 for overlapping building block 5 bottom is snapped onto into life In the connection end 8 of state building block 4 so that the ecological block 4 of same row is mutually permanently connected, and the ecological block 4 of same row is mutual Between connection speed it is fast, without concrete.For connection function between the ecological block 4 of same a line, in same a line Ecological block 4 through-hole 9 in be laterally passed through connecting rod 6, then filled out between adjacent two pieces of ecological blocks 4 in same row Enter soil, then with the rope made of hemp by all 6 mutual bundled fixeds of connecting rod, then the casting concrete at formwork, concrete layer Top surface flushed with the top surface of ecological block 4, the concrete poured by connecting rod 6 limit in slope surface, connecting rod 6 to place Power is acted in the ecological block 4 of same a line, prevents the ecological block 4 of same a line from misplacing, in this way with the ecological block of a line 4 It is fixedly connected, is improved with the connection between the ecological block 4 of a line using connecting rod 6, the rope made of hemp and the concrete that pours Intensity will not influence the loosening of ecological block 4 when the connecting rod 6 at one is broken.Then in the ecology of top Formwork at building block 4, then the casting concrete at formwork, the supported underneath of entire ecological revetment in support board, ecological revetment Top is limited by concrete, and entire ecological revetment is stablized on bank protection.After the completion of ecological revetment construction, ecological block 4 Be not in obscission, improve the globality of entire ecological revetment, enhances flood control effect, ecological effect, the scape of ecological revetment See effect and the effect of self-purification;The ponding of construction site can be flowed into ecological block 4 by overlapping the filter plate 12 of building block 5 simultaneously The water of chamfered portion, the chamfered portion of ecological block 4 is discharged to by rhone 7 in soil, prevents from not being laid with applying for ecological block 4 There is sedimentation phenomenon a little in the earthwork in work area domain, ensures the planarization of earth excavation, convenient for being quickly laid with ecological block 4.
When there is breakage in ecological block 4 in the present invention, the overlap joint building block 5 that need to will be connect with damaged ecological block 4 It moves upward out, 11 elastic shrinkage of elastic button block is disconnected end 8, you can the ecological block 4 more renewed, then building block 5 will be overlapped It presses downward to, fast and easy replaces ecological block 4, is conducive to the service life for increasing ecological revetment.
It these are only specific embodiments of the present invention, but the technical characteristic of the present invention is not limited thereto.It is any with this hair Based on bright, to solve essentially identical technical problem, essentially identical technique effect is realized, made simple change, etc. With replacement or modification etc., all it is covered by among protection scope of the present invention.

Claims (5)

1. a kind of construction method of ecological revetment for riparian protection, it is characterised in that include the following steps:
A, it is laid with gravel sarking
1) scene is reconnoitred, removes the barrier on ground, then measure setting-out, location control stake is laid, standard level stake, opens Basic sideline and excavation foundation depth are dug, the excavator excavation section by section earthwork from top to bottom is then used, then modifies grade of side slope With the compacting earthwork;
2) it is laid with one layer of gravel sarking on the basis of excavation and tamps, the thickness of gravel sarking is generally 10cm;
B, geotextiles are laid with
1) geotextiles are unfolded to and are deposited in the place of smooth not ponding, the height that heap is set is no more than volume four, then with opaque material The geotextiles that material covering heap is set;
2) geotextiles are laid on the gravel sarking of compacting from the bottom up along earth excavation, then geotextiles is taken It connects, lap width 20cm;
C, the soil horizon of 20-30cm is backfilled in geotextiles, and is compacted;
D, ecological revetment is built
1) in the bottommost of ecological revetment construction area, slope surface is inserted into support board downward vertically, then is followed closely on the surface of support board Enter wooden unit, wooden unit is laterally arranged, the distance between center of adjacent two pieces of wooden units and preset adjacent two pieces of ecological blocks The distance between center it is identical;
2) ecological block is integrally rinsed using giant, then at the construction field (site) by the tiling of ecological block block-by-block, used Giant is rinsed the rhone of every piece of ecological block;
3) ecological block of the bottom is laid with, the connection end of ecological block is inserted on the wooden unit of support board, The distance between laterally adjacent two pieces of ecological blocks are controlled in 30-40cm, then horizontal in the through-hole of the ecological block of the bottom To being passed through connecting rod;
4) it uses giant to be integrally rinsed overlap joint building block, then filter plate is packed into the water seepage hole of overlap joint building block;
5) the setting overlap joint building block on the ecological block of the bottom, the inclined-plane of overlap joint building block bottom and the inclined-plane of ecological block paste It closes, the elastic button block of overlap joint building block bottom snaps onto in the connection end of ecological block, then
Second piece of ecological block, the connection of second piece of ecological block are slid into from top to bottom along the gradient in the other end of overlap joint building block Another elastic button block of end and overlap joint building block bottom is clamped, then second piece of overlap joint building block is arranged on second piece of ecological block, Then the other end that building block is overlapped at second piece slides into third block ecological block along the gradient from top to bottom, is circularly set overlap joint and builds Block and ecological block stop setting overlap joint building block and ecological block until when the ecological block of top reaches design position;
6) connecting rod is laterally passed through in the through-hole of the ecological block in same a line, then in adjacent two pieces in same row Soil is inserted between ecological block, the height for inserting soil is overlap joint the distance between building block bottom and slope surface;
7) end of all connecting rods is adjusted on same plane, then is mutually bundled all connecting rods with the rope made of hemp Fixed, then formwork in the space between adjacent two pieces of ecological blocks in same a line, side mould add timber using the wooden diagonal brace Fixed, centre supports mutual drawknot to fix using steel fastener, then the casting concrete at formwork, the top surface of concrete layer and life The top surface of state building block flushes;
8) formwork at the ecological block of top, then the casting concrete at formwork, concrete cover top ecological block Rhone, and the top surface of concrete layer is flushed with the top surface of top ecological block;
E, soil, then planting plants are placed in the ecologic planting hole of ecological block.
2. a kind of construction method of ecological revetment for riparian protection according to claim 1, it is characterised in that:Step 2) the of b in part, after the completion of overlapping geotextiles, suppresses stone at the horizontal edge of top layer and undermost geotextiles.
3. a kind of construction method of ecological revetment for riparian protection according to claim 1, it is characterised in that:Step 3) in part, after being passed through connecting rod, reference line is arranged along earthwork line of slope on connecting rod in the of d from the bottom up, The ecological block of every piece of bottom corresponds to two reference lines, and reference line is close to the side of ecological block, with reference to the inclination of line Degree is identical as the earthwork gradient, 5) the of step d is partly operated according to the reference line of setting.
4. a kind of construction method of ecological revetment for riparian protection according to claim 1, it is characterised in that:Step 7) the of d in part, punishes three sections of casting concretes in formwork, is poured successively from lower to upper, every section need to pour it is mixed The length for coagulating soil is gradually reduced from top to bottom.
5. a kind of construction method of ecological revetment for riparian protection according to claim 1, it is characterised in that:Step In e, before planting plants, water pipe is placed at the top surface of top ecological block, each row ecological block corresponds to a water Pipe, water pipe carry out spray function to ecological block, when the time of discharge water reaches 15min at the ecological block of the bottom, close Water pipe spray function is closed, after 0.5-1h, the planting plants in the ecologic planting hole of ecological block.
CN201810102388.4A 2018-02-01 2018-02-01 construction method of ecological revetment for river bank protection Active CN108442318B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810102388.4A CN108442318B (en) 2018-02-01 2018-02-01 construction method of ecological revetment for river bank protection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810102388.4A CN108442318B (en) 2018-02-01 2018-02-01 construction method of ecological revetment for river bank protection

Publications (2)

Publication Number Publication Date
CN108442318A true CN108442318A (en) 2018-08-24
CN108442318B CN108442318B (en) 2019-12-17

Family

ID=63191649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810102388.4A Active CN108442318B (en) 2018-02-01 2018-02-01 construction method of ecological revetment for river bank protection

Country Status (1)

Country Link
CN (1) CN108442318B (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056652A (en) * 2018-09-12 2018-12-21 浙江建设职业技术学院 A kind of channel revetment structure and its construction method
CN109281296A (en) * 2018-10-22 2019-01-29 浙江水利水电学院 A kind of construction method of irrigation water delivery channel
CN110424327A (en) * 2019-06-20 2019-11-08 金华市广和古建筑技术研发有限公司 A kind of precast concrete ecological slope protection construction method
CN110747839A (en) * 2019-09-19 2020-02-04 国网浙江省电力有限公司建设分公司 Construction method for backfilling on soft mud flat foundation
CN111455932A (en) * 2020-04-14 2020-07-28 济南大学 Laying method of separated building blocks applied to reservoir protection slope
CN112144474A (en) * 2020-09-24 2020-12-29 深圳市建工建设集团有限公司 Wetland shoreside trees ecological revetment reinforced structure
CN112523166A (en) * 2020-11-06 2021-03-19 河海大学 Method for constructing ecological bank protection
CN112921896A (en) * 2021-01-30 2021-06-08 倪成 Water conservancy dyke slope protection structure of quick construction
CN113914261A (en) * 2021-10-25 2022-01-11 中电建路桥集团有限公司 Reservoir engineering concrete precast block ecological slope protection construction method
CN114277737A (en) * 2021-12-31 2022-04-05 广东中都建筑集团有限公司 Construction method of bank protection cavity precast block

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2177043Y (en) * 1993-10-09 1994-09-14 林剑都 Connected revetting block
KR101387728B1 (en) * 2013-10-31 2014-04-21 (주)전엔지니어링 Vegetation block for reinforcing slope
CN103774617A (en) * 2013-12-06 2014-05-07 浙江水利水电学院 Mutually-embedded type slope protection building block and construction method thereof
CN105569194A (en) * 2016-02-25 2016-05-11 金胜昔 Module splicing structure
CN206438473U (en) * 2016-12-26 2017-08-25 嘉兴市黄山新型建材有限公司 A kind of earth-retaining brick

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2177043Y (en) * 1993-10-09 1994-09-14 林剑都 Connected revetting block
KR101387728B1 (en) * 2013-10-31 2014-04-21 (주)전엔지니어링 Vegetation block for reinforcing slope
CN103774617A (en) * 2013-12-06 2014-05-07 浙江水利水电学院 Mutually-embedded type slope protection building block and construction method thereof
CN105569194A (en) * 2016-02-25 2016-05-11 金胜昔 Module splicing structure
CN206438473U (en) * 2016-12-26 2017-08-25 嘉兴市黄山新型建材有限公司 A kind of earth-retaining brick

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109056652A (en) * 2018-09-12 2018-12-21 浙江建设职业技术学院 A kind of channel revetment structure and its construction method
CN109056652B (en) * 2018-09-12 2021-08-24 浙江建设职业技术学院 River bank protection structure and construction method thereof
CN109281296A (en) * 2018-10-22 2019-01-29 浙江水利水电学院 A kind of construction method of irrigation water delivery channel
CN110424327A (en) * 2019-06-20 2019-11-08 金华市广和古建筑技术研发有限公司 A kind of precast concrete ecological slope protection construction method
CN110747839A (en) * 2019-09-19 2020-02-04 国网浙江省电力有限公司建设分公司 Construction method for backfilling on soft mud flat foundation
CN111455932A (en) * 2020-04-14 2020-07-28 济南大学 Laying method of separated building blocks applied to reservoir protection slope
CN112144474A (en) * 2020-09-24 2020-12-29 深圳市建工建设集团有限公司 Wetland shoreside trees ecological revetment reinforced structure
CN112523166A (en) * 2020-11-06 2021-03-19 河海大学 Method for constructing ecological bank protection
CN112921896A (en) * 2021-01-30 2021-06-08 倪成 Water conservancy dyke slope protection structure of quick construction
CN112921896B (en) * 2021-01-30 2022-04-15 倪成 Water conservancy dyke slope protection structure of quick construction
CN113914261A (en) * 2021-10-25 2022-01-11 中电建路桥集团有限公司 Reservoir engineering concrete precast block ecological slope protection construction method
CN114277737A (en) * 2021-12-31 2022-04-05 广东中都建筑集团有限公司 Construction method of bank protection cavity precast block

Also Published As

Publication number Publication date
CN108442318B (en) 2019-12-17

Similar Documents

Publication Publication Date Title
CN108442318A (en) A kind of construction method of ecological revetment for riparian protection
CN101591904B (en) Method for strengthening composite pile foundation by prepressing drainage and following grouting for drainage body
CN106930231B (en) A kind of construction method applied to engineering flood bank reinforcing of passing the flood period
CN106320120B (en) A kind of peg board formula is without dirt road base construction of the highway technique
CN212404676U (en) Soft soil foundation anti-settlement structure
CN110306565B (en) Road ecological slope protection system and construction method
CN103669291A (en) Method for constructing slope through connected slope bricks
CN106836244A (en) A kind of method of friction pile dative guest barricade joint protection steep slope subgrade high
CN104514216A (en) Fill channel anti-frost heaving and anti-seepage structure and construction method
CN108396771A (en) Raw earth-retaining wall construction method is planted from embedded reinforcement
CN209760147U (en) A ecological bank protection for hydraulic engineering
CN219218876U (en) Seepage-proofing structure of clay core wall dam foundation
CN108316237B (en) Revetment retaining wall
CN1080010A (en) The construction method of the composite geo-membrane heart (tiltedly) wall earth dam
CN208594531U (en) A kind of large scale prefabricated armored concrete ecological slope protection or shore protection component
CN108914959B (en) Foundation structure suitable for mountain house building and construction method thereof
CN207176627U (en) Large-scale earthing concrete block
CN216474804U (en) Novel sheet pile type revetment structure
CN212052857U (en) Concrete buttress formula retaining wall structure permeates water
CN208949835U (en) A kind of channel revetment structure
CN205062597U (en) Road bed embankment structure of blowing sand is filled out to lake region height
CN104947630B (en) For the mistake adfluxion slag weir of Hydraulic and Hydro-Power Engineering and its construction method
CN209555876U (en) A kind of hydraulic engineering concrete revetment
CN208379542U (en) A kind of low water level building blocks for bank protection construction structure
CN206090199U (en) Device for preventing road bed that rockfills is crossed depositing in water and is fallen

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220328

Address after: 315000 Shi Qi Jie Dao Feng Jia Cun, Haishu District, Ningbo City, Zhejiang Province

Patentee after: Zhejiang Fengmao Sheng Construction Co.,Ltd.

Address before: 310018 508 Xuefu street, Xiasha Higher Education East District, Hangzhou, Zhejiang

Patentee before: ZHEJIANG University OF WATER RESOURCES AND ELECTRIC POWER