CN108387442A - It is hidden to split test bracket and system - Google Patents

It is hidden to split test bracket and system Download PDF

Info

Publication number
CN108387442A
CN108387442A CN201810181922.5A CN201810181922A CN108387442A CN 108387442 A CN108387442 A CN 108387442A CN 201810181922 A CN201810181922 A CN 201810181922A CN 108387442 A CN108387442 A CN 108387442A
Authority
CN
China
Prior art keywords
column
bottom girder
short
hidden
length
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810181922.5A
Other languages
Chinese (zh)
Inventor
徐志宏
侯国华
石建春
张志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cce Oasis Technology Corp
Original Assignee
Cce Oasis Technology Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cce Oasis Technology Corp filed Critical Cce Oasis Technology Corp
Priority to CN201810181922.5A priority Critical patent/CN108387442A/en
Publication of CN108387442A publication Critical patent/CN108387442A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N3/00Investigating strength properties of solid materials by application of mechanical stress
    • G01N3/02Details
    • G01N3/04Chucks

Landscapes

  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Analytical Chemistry (AREA)
  • Biochemistry (AREA)
  • General Health & Medical Sciences (AREA)
  • General Physics & Mathematics (AREA)
  • Immunology (AREA)
  • Pathology (AREA)
  • Photovoltaic Devices (AREA)

Abstract

Test bracket and system are split the present invention provides hidden, is related to photovoltaic technology field, including:Two root longs are connected with two short support bottom girders to stress bottom girder and constitute rectangular seat, column there are two being vertically arranged on stress bottom girder per root long, identical distance interval is arranged with the short of corresponding side support bottom girder in each column, the inside between stress bottom girder is provided with diagonal brace in column and length, along it is long to two columns between be equipped with it is long to top supporting beam, short top bearing beam is installed between two columns along short, it is welded with otic placode on the bearing beam of short top, drag-line is installed between two short top bearing beams by otic placode;Further include photovoltaic module and adapter, when by cable tension to default Suo Lishi, photovoltaic module is fixedly connected on drag-line by adapter.The present invention can detect the hidden of photovoltaic module on flexible support and split situation, and then evaluate and test the performance of flexible support.

Description

It is hidden to split test bracket and system
Technical field
The present invention relates to photovoltaic technology field, split test bracket and system more particularly, to hidden.
Background technology
Hidden split is failure mode relatively conventional in photovoltaic module, and the performance of solar cell can be caused to deteriorate, limited The electricity conversion and service life of cell piece, so needing to be detected in early period.It is currently possible to adapt to the soft of large span Property photovoltaic bracket applied, it is characterized in that using Cable Structure as support construction, since this kind of holder is New-support, for light It lies prostrate hidden split problem of the component on the class formation and there is no suitable detection means.
Invention content
In view of this, test bracket and system are split the purpose of the present invention is to provide hidden, to detect photovoltaic on flexible support The hidden of component splits situation, and then evaluates and tests the performance of flexible support.
In a first aspect, hidden splitting test bracket an embodiment of the present invention provides a kind of, wherein including:It grows to stress bottom girder, stand Column, diagonal brace, short support bottom girder, are long to top supporting beam and short top bearing beam;
Two length are bolted to stress bottom girder and two short support bottom girders and constitute rectangle bottom Seat, the every length are vertically arranged on stress bottom girder there are two the column, each column with corresponding side Identical distance interval is arranged in the short support bottom girder, is arranged to the inside between stress bottom girder in the column and the length Have the diagonal brace, along it is long to two columns between the length is installed to top supporting beam, along two of short Short top bearing beam is installed, and the position of short top bearing beam is upward higher than the length between the column Portion's supporting beam is welded with otic placode on the bearing beam of the short top, by the otic placode in two short top stress Drag-line is installed between beam.
With reference to first aspect, an embodiment of the present invention provides the first possible embodiments of first aspect, wherein The predetermined position of the drag-line is equipped with pulling force sensor.
With reference to first aspect, an embodiment of the present invention provides second of possible embodiments of first aspect, wherein institute The end face for stating short support bottom girder is welded with first end plate, in the length to stress bottom girder position corresponding with the first end plate The place of setting offers matched bolt hole, and then supports bottom girder to connect to stress bottom girder and the short length by bolt It connects.
With reference to first aspect, an embodiment of the present invention provides the third possible embodiments of first aspect, wherein institute The lower face for stating column is welded with the second end plate, and is welded with and adds between the edge of a wing position of the column and second end plate Strength rib, in the length to offering matched bolt hole, Jin Ertong at stress bottom girder position corresponding with second end plate Bolt is crossed to be attached the length to stress bottom girder and the column.
With reference to first aspect, an embodiment of the present invention provides the 4th kind of possible embodiments of first aspect, wherein institute Two end faces for stating diagonal brace are welded with third end plate, in the third end plate respectively with the column and the length to stress bottom girder Offer matched bolt hole at corresponding position, so by bolt by the diagonal brace be installed on the column with it is described Length is between stress bottom girder.
With reference to first aspect, an embodiment of the present invention provides the 5th kind of possible embodiments of first aspect, wherein institute It states and is welded with connecting plate on two edges of a wing of column side, in the length to top supporting beam position corresponding with the connecting plate The place of setting offers matched bolt hole, and then is attached the length to top supporting beam and the column by bolt.
With reference to first aspect, an embodiment of the present invention provides the 6th kind of possible embodiments of first aspect, wherein The column and the short top bearing beam connection offer matched bolt hole, and then by bolt by the column It is attached with short top bearing beam, and short top bearing beam is installed on the outside of the column.
With reference to first aspect, an embodiment of the present invention provides the 7th kind of possible embodiments of first aspect, wherein institute It is no less than two to state drag-line.
Second aspect, the embodiment of the present invention, which also provides, a kind of hidden splits pilot system, wherein including photovoltaic module, adapter With any one of them as above is hidden splits test bracket;
When by the hidden cable tension split in test bracket to default Suo Lishi, by the adapter by the photovoltaic Component is fixedly connected on the drag-line.
In conjunction with second aspect, an embodiment of the present invention provides the first possible embodiments of second aspect, wherein also Including wind pressure simulator and operation console.
The embodiment of the present invention brings following advantageous effect:
It is provided by the invention it is hidden split test bracket and system, including:Two root longs support bottom to stress bottom girder and two shorts Beam is bolted and constitutes rectangular seat, is vertically arranged on stress bottom girder per root long there are two column, Mei Geli Identical distance interval is arranged with the short of corresponding side support bottom girder in column, in column and grows to the inside between stress bottom girder Be provided with diagonal brace, along it is long to two columns between be equipped with it is long to top supporting beam, between two columns along short Short top bearing beam is installed, and the position of short top bearing beam is higher than length to top supporting beam, in short top stress It is welded with otic placode on beam, drag-line is equipped between two short top bearing beams by otic placode;Further include photovoltaic module and turn Fitting, when by cable tension to default Suo Lishi, photovoltaic module is fixedly connected on drag-line by adapter.The present invention can be with The hidden of photovoltaic module splits situation on detection flexible support, and then evaluates and tests the performance of flexible support.
Other features and advantages of the present invention will illustrate in the following description, also, partly become from specification It obtains it is clear that understand through the implementation of the invention.The purpose of the present invention and other advantages are in specification, claims And specifically noted structure is realized and is obtained in attached drawing.
To enable the above objects, features and advantages of the present invention to be clearer and more comprehensible, preferred embodiment cited below particularly, and coordinate Appended attached drawing, is described in detail below.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, other drawings may also be obtained based on these drawings.
Fig. 1 be the embodiment of the present invention one provide hidden split test bracket stereoscopic schematic diagram;
Fig. 2 be the embodiment of the present invention one provide hidden split test bracket left view;
Fig. 3 is the base plane figure that the embodiment of the present invention one provides;
Fig. 4 is the length that provides of the embodiment of the present invention one to stress bottom girder schematic diagram;
Fig. 5 is that the short that the embodiment of the present invention one provides supports bottom girder schematic diagram;
Fig. 6 is the column schematic diagram that the embodiment of the present invention one provides;
Fig. 7 is the diagonal brace schematic diagram that the embodiment of the present invention one provides;
Fig. 8 is the length that provides of the embodiment of the present invention one to top supporting beam schematic diagram;
Fig. 9 is the short top bearing beam schematic diagram that the embodiment of the present invention one provides;
Figure 10 is provided by Embodiment 2 of the present invention hidden to split pilot system vertical view;
Figure 11 is provided by Embodiment 2 of the present invention hidden to split pilot system front view.
Icon:
01- long is to stress bottom girder;02- shorts support bottom girder;03- columns;04- diagonal braces;05- long is to top supporting beam;06- Short top bearing beam;07- drag-lines;08- pulling force sensors;09- photovoltaic modulies.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with attached drawing to the present invention Technical solution be clearly and completely described, it is clear that described embodiments are some of the embodiments of the present invention, rather than Whole embodiments.Based on the embodiments of the present invention, those of ordinary skill in the art are not making creative work premise Lower obtained every other embodiment, shall fall within the protection scope of the present invention.
Hidden split is failure mode relatively conventional in photovoltaic module, and the performance of solar cell can be caused to deteriorate, limited The electricity conversion and service life of cell piece, so needing to be detected in early period.It is currently possible to adapt to the soft of large span Property photovoltaic bracket applied, it is characterized in that using Cable Structure as support construction, since this kind of holder is New-support, for light It lies prostrate hidden split problem of the component on the class formation and there is no suitable detection means.
Based on this, it is provided in an embodiment of the present invention it is hidden split test bracket and system, photovoltaic group on flexible support can be detected The hidden of part splits situation, and then evaluates and tests the performance of flexible support.
For ease of understanding the present embodiment, the hidden test bracket that splits disclosed in the embodiment of the present invention is carried out in detail first It is thin to introduce.
Embodiment one:
Fig. 1 be the embodiment of the present invention one provide hidden split test bracket stereoscopic schematic diagram.
Referring to Fig.1, the hidden test bracket that splits includes:Two root longs are to 03, four stress bottom girder 01, four columns diagonal brace 04, two Root short supports bottom girder 02, two root longs to top supporting beam 05 and two short top bearing beams 06.
As shown in Fig. 2-Fig. 9, two root longs are to stress bottom girder 01 and two short support bottom girders 02 are bolted and structure Rectangularity pedestal;It is vertically arranged on stress bottom girder 01 per root long there are two column 03, each column 03 is with corresponding one Identical distance interval is arranged in the short support bottom girder 02 of side, that is to say, that the square center and length that four columns 03 are linked to be Plinth center is overlapped;The inside between stress bottom girder 01 is provided with diagonal brace 04 in column 03 and length;Along it is long to two Length is installed to top supporting beam 05 between a column 03, two root longs are mounted on the inside of column 03 to top supporting beam 05; Short top bearing beam 06 is installed between two columns 03 along short, two short top bearing beams 06 are mounted on vertical The outside of column 03, and the position of short top bearing beam 06 is higher than length to top supporting beam 05;In two short top bearing beams It is welded with matched otic placode on 06, drag-line 07 is equipped between two short top bearing beams 06 by otic placode.
Drag-line 07 is no less than two, and is equipped with pulling force sensor 08 in the predetermined position of drag-line 07.
The specific connection type of rectangular seat is:The end face of short support bottom girder 02 is welded with first end plate, it is long to Stress bottom girder 01 offers matched bolt hole at position corresponding with first end plate, the two bolt hole to after just, leading to Bolt is crossed to be attached long to stress bottom girder 01 and short support bottom girder 02.
It is long to be to stress bottom girder 01 and the specific connection type of column 03:The lower face of column 03 is welded with the second end plate, And between the edge of a wing position and the second end plate of column 03 (inside and outside) it is welded with ribbed stiffener, long to stress bottom girder 01 and the Two end plates offer matched bolt hole at corresponding position, the two bolt hole to after just, by bolt will it is long to by Power bottom girder 01 is attached with column 03.
The specific connection type of column 03 and diagonal brace 04 is:Two end faces of diagonal brace 04 are welded with third end plate, Three end plates respectively with column 03 and long to matched bolt hole is offered at the corresponding position of stress bottom girder 01, at third end Plate and long bolt hole to stress bottom girder 01, third end plate and column 03 bolt hole respectively to after just, by bolt by diagonal brace 04 is installed on column 03 and length between stress bottom girder 01.
Column 03 and length are to the specific connection type of top supporting beam 05:On two edges of a wing inwardly of 03 side of column It is welded with connecting plate, long to matched bolt hole is offered at the position corresponding with connecting plate of top supporting beam 05, two The bolt hole of person by bolt to top supporting beam 05 and column 03 to after just, long will be attached.
The specific connection type of column 03 and top bearing beam is:In column 03 and 06 connection of short top bearing beam Offer matched bolt hole, the two bolt hole to after just, by bolt by column 03 and short top bearing beam 06 into Row connection, and short top bearing beam 06 is installed on the outside of column 03.
Embodiment two:
Figure 10 is provided by Embodiment 2 of the present invention hidden to split pilot system vertical view.
0 and Figure 11 referring to Fig.1, it is hidden split pilot system include photovoltaic module 09, adapter and it is above-mentioned it is hidden split test bracket, Further include wind pressure simulator and operation console.In practical applications, the hidden test bracket that splits can be divided into 5 meters and 3.7 meters of two kinds of sizes Specification.
When it is hidden split test bracket integral installation after the completion of, to drag-line 07 carry out tensioning, so that the Suo Li of drag-line 07 is reached default Suo Li such as makes Suo Li reach 10kN.Drag-line 07 is stretched to default Suo Lihou, carries out photovoltaic module 09 and installs, will by adapter Photovoltaic module 09 is fixedly connected on drag-line 07, forms an entirety.
Wind pressure simulator is mainly made of sucker, jack etc..The setting of wind pressure pressure value, wind may be implemented in operation console Pressure being arranged of reciprocal time, the setting etc. of test number (TN) per minute;By the setting in operation console, to reach the mesh of experiment 's.
Unless specifically stated otherwise, the opposite step of the component and step that otherwise illustrate in these embodiments, digital table It is not limit the scope of the invention up to formula and numerical value.
It should be noted that:Similar label and letter indicate similar terms in following attached drawing, therefore, once a certain Xiang Yi It is defined, then it further need not be defined and explained in subsequent attached drawing in a attached drawing.
The embodiment of the present invention brings following advantageous effect:
It is provided by the invention it is hidden split test bracket and system, including:Two root longs support bottom to stress bottom girder and two shorts Beam is bolted and constitutes rectangular seat, is vertically arranged on stress bottom girder per root long there are two column, Mei Geli Identical distance interval is arranged with the short of corresponding side support bottom girder in column, in column and grows to the inside between stress bottom girder Be provided with diagonal brace, along it is long to two columns between be equipped with it is long to top supporting beam, between two columns along short Short top bearing beam is installed, and the position of short top bearing beam is higher than length to top supporting beam, in short top stress It is welded with otic placode on beam, drag-line is equipped between two short top bearing beams by otic placode;Further include photovoltaic module and turn Fitting, when by cable tension to default Suo Lishi, photovoltaic module is fixedly connected on drag-line by adapter.The present invention can be with The hidden of photovoltaic module splits situation on detection flexible support, and then evaluates and tests the performance of flexible support.
In the description of the embodiment of the present invention unless specifically defined or limited otherwise, term " installation ", " connects " connected " Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine Tool connects, and can also be electrical connection;It can be directly connected, can also can be indirectly connected through an intermediary two members Connection inside part.For the ordinary skill in the art, it can understand above-mentioned term in the present invention with concrete condition Concrete meaning.
In the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for the description present invention and simplify description, do not indicate or imply the indicated device or element must have a particular orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for description purposes only, and is not understood to indicate or imply relative importance.
In several embodiments provided herein, it should be understood that disclosed systems, devices and methods, it can be with It realizes by another way.The apparatus embodiments described above are merely exemplary, for example, the division of the unit, Only a kind of division of logic function, formula that in actual implementation, there may be another division manner, in another example, multiple units or component can To combine or be desirably integrated into another system, or some features can be ignored or not executed.Another point, it is shown or beg for The mutual coupling, direct-coupling or communication connection of opinion can be by some communication interfaces, device or unit it is indirect Coupling or communication connection can be electrical, machinery or other forms.
Finally it should be noted that:Embodiment described above, only specific implementation mode of the invention, to illustrate the present invention Technical solution, rather than its limitations, scope of protection of the present invention is not limited thereto, although with reference to the foregoing embodiments to this hair It is bright to be described in detail, it will be understood by those of ordinary skill in the art that:Any one skilled in the art In the technical scope disclosed by the present invention, it can still modify to the technical solution recorded in previous embodiment or can be light It is readily conceivable that variation or equivalent replacement of some of the technical features;And these modifications, variation or replacement, do not make The essence of corresponding technical solution is detached from the spirit and scope of technical solution of the embodiment of the present invention, should all cover the protection in the present invention Within the scope of.Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (10)

1. one kind is hidden to split test bracket, which is characterized in that including:It is long to support bottom girder, length to stress bottom girder, column, diagonal brace, short To top supporting beam and short top bearing beam;
Two length are bolted and constitute rectangular seat to stress bottom girder and two short support bottom girders, often Long described in root to be vertically arranged on stress bottom girder there are two the column, each column is described short with corresponding side Identical distance interval is set to support bottom girder, is provided with to the inside between stress bottom girder in the column and the length described Diagonal brace, along it is long to two columns between the length is installed to top supporting beam, described vertical along two of short Short top bearing beam is installed, and the position of short top bearing beam is higher than the length to upper support between column Beam is welded with otic placode on the bearing beam of the short top, by the otic placode between two short top bearing beams Drag-line is installed.
2. hidden test bracket is split according to claim 1, which is characterized in that is equipped in the predetermined position of the drag-line Pulling force sensor.
3. hidden test bracket is split according to claim 1, which is characterized in that the end face of the short support bottom girder is welded with First end plate, in the length to offering matched bolt hole at stress bottom girder position corresponding with the first end plate, into And bottom girder is supported to be attached to stress bottom girder and the short length by bolt.
4. hidden test bracket is split according to claim 1, which is characterized in that the lower face of the column is welded with second end Plate, and ribbed stiffener is welded between the edge of a wing position of the column and second end plate, the length to stress bottom girder with Offer matched bolt hole at the corresponding position of second end plate, so by bolt by the length to stress bottom girder with The column is attached.
5. hidden test bracket is split according to claim 1, which is characterized in that two end faces of the diagonal brace are welded with third End plate, in the third end plate respectively with the column and the length to offering matching at the corresponding position of stress bottom girder Bolt hole, and then the diagonal brace is installed on between stress bottom girder by the column and the length by bolt.
6. hidden test bracket is split according to claim 1, which is characterized in that is welded on two edges of a wing of the column side There is connecting plate, in the length to offering matched bolt hole at top supporting beam position corresponding with the connecting plate, into And the length is attached to top supporting beam and the column by bolt.
7. hidden test bracket is split according to claim 1, which is characterized in that in the column and short top stress Beam connection offers matched bolt hole, and then is connected the column and short top bearing beam by bolt It connects, and short top bearing beam is installed on the outside of the column.
8. hidden test bracket is split according to claim 1, which is characterized in that the drag-line is no less than two.
9. one kind is hidden to split pilot system, which is characterized in that including photovoltaic module, adapter and such as any one of claim 1~8 institute That states hidden splits test bracket;
When by the hidden cable tension split in test bracket to default Suo Lishi, by the adapter by the photovoltaic module It is fixedly connected on the drag-line.
10. hidden pilot system is split according to claim 9, which is characterized in that further includes wind pressure simulator and operation console.
CN201810181922.5A 2018-03-06 2018-03-06 It is hidden to split test bracket and system Pending CN108387442A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810181922.5A CN108387442A (en) 2018-03-06 2018-03-06 It is hidden to split test bracket and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810181922.5A CN108387442A (en) 2018-03-06 2018-03-06 It is hidden to split test bracket and system

Publications (1)

Publication Number Publication Date
CN108387442A true CN108387442A (en) 2018-08-10

Family

ID=63068737

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810181922.5A Pending CN108387442A (en) 2018-03-06 2018-03-06 It is hidden to split test bracket and system

Country Status (1)

Country Link
CN (1) CN108387442A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116192051A (en) * 2023-04-11 2023-05-30 常州华阳检验检测技术有限公司 Photovoltaic module anti-hidden crack performance detection equipment

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202066752U (en) * 2011-03-03 2011-12-07 常州天合光能有限公司 Pneumatic-type mechanical load test machine
CN104242800A (en) * 2014-09-22 2014-12-24 浙江国利英核能源有限公司 Flexible photovoltaic support
CN204967704U (en) * 2015-10-13 2016-01-13 晶科能源有限公司 Photovoltaic module and bracing piece thereof
CN206192638U (en) * 2016-10-13 2017-05-24 阿特斯阳光电力集团有限公司 Photovoltaic module is with dynamic load testing device
CN207069965U (en) * 2017-06-28 2018-03-02 延安新电能源开发有限责任公司 A kind of special steel reinforced concrete support of flexible photovoltaic

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202066752U (en) * 2011-03-03 2011-12-07 常州天合光能有限公司 Pneumatic-type mechanical load test machine
CN104242800A (en) * 2014-09-22 2014-12-24 浙江国利英核能源有限公司 Flexible photovoltaic support
CN204967704U (en) * 2015-10-13 2016-01-13 晶科能源有限公司 Photovoltaic module and bracing piece thereof
CN206192638U (en) * 2016-10-13 2017-05-24 阿特斯阳光电力集团有限公司 Photovoltaic module is with dynamic load testing device
CN207069965U (en) * 2017-06-28 2018-03-02 延安新电能源开发有限责任公司 A kind of special steel reinforced concrete support of flexible photovoltaic

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116192051A (en) * 2023-04-11 2023-05-30 常州华阳检验检测技术有限公司 Photovoltaic module anti-hidden crack performance detection equipment

Similar Documents

Publication Publication Date Title
EP2787151A1 (en) Mount support structure for solar cell module
CN108387442A (en) It is hidden to split test bracket and system
JP2013213350A (en) Supporting member attachment structure, construction method for support structure, and photovoltaic power generation system using supporting member attachment structure
CN204495334U (en) A kind of portable construction and installation horizontal measuring instrument
CN108444824A (en) The hidden detection method and device split of photovoltaic module of flexible support support
CN207946291U (en) It is hidden to split test bracket and system
CN102967954A (en) Device and method for testing liquid crystal panel
CN105986679A (en) Bus shelter with electronic billboard powered through solar energy and wind energy
CN202651150U (en) Hanging rope fixing device of photovoltaic module
CN205608110U (en) Automatic change product quality control and survey equipment
CN207947753U (en) Photovoltaic module is hidden to split test bracket and system
CN218211864U (en) Testing device for wind resistance field evaluation of metal roof system
JP2013214564A (en) Installation structure of solar cell panel, and solar cell panel installation frame
CN215871325U (en) Photovoltaic equipment fault on-line detection and on-site rechecking device
CN210349259U (en) Oiling machine liquid crystal screen signal detection instrument
CN201417296Y (en) Indicator integrated circuit test device
CN105301814B (en) Power supply circuit and display panel with detecting function
IL297909A (en) Supporting structure for fotovoltaic panels and photovoltaic instalation comprising the supporting structure
CN113089925A (en) Dust-free room ceiling mounting structure of lithium battery production plug-in components
CN110918823A (en) Lead bending tool for welding photovoltaic module junction box
CN108111126A (en) Photovoltaic module is hidden to split test bracket and system
CN206863074U (en) Fixture and experimental rig
CN2549508Y (en) Synchronous balance monitor of lifting scaffold
CN213068960U (en) Jig for testing fingerprint module
JP2016067153A (en) Installation structure for solar cell module, installation method for solar cell module, and photovoltaic power generation system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180810

RJ01 Rejection of invention patent application after publication