CN108365978A - A kind of preprocessor, system and method for underground pipe gallery monitoring - Google Patents
A kind of preprocessor, system and method for underground pipe gallery monitoring Download PDFInfo
- Publication number
- CN108365978A CN108365978A CN201810102482.XA CN201810102482A CN108365978A CN 108365978 A CN108365978 A CN 108365978A CN 201810102482 A CN201810102482 A CN 201810102482A CN 108365978 A CN108365978 A CN 108365978A
- Authority
- CN
- China
- Prior art keywords
- data
- equipment
- linkage
- alarm
- offline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000002224 dissection Methods 0.000 claims abstract description 10
- 238000004364 calculation method Methods 0.000 claims abstract description 8
- 238000004891 communication Methods 0.000 claims description 42
- 230000000875 corresponding Effects 0.000 claims description 7
- 210000001519 tissues Anatomy 0.000 claims description 6
- 230000005540 biological transmission Effects 0.000 claims description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,PD94bWwgdmVyc2lvbj0nMS4wJyBlbmNvZGluZz0naXNvLTg4NTktMSc/Pgo8c3ZnIHZlcnNpb249JzEuMScgYmFzZVByb2ZpbGU9J2Z1bGwnCiAgICAgICAgICAgICAgeG1sbnM9J2h0dHA6Ly93d3cudzMub3JnLzIwMDAvc3ZnJwogICAgICAgICAgICAgICAgICAgICAgeG1sbnM6cmRraXQ9J2h0dHA6Ly93d3cucmRraXQub3JnL3htbCcKICAgICAgICAgICAgICAgICAgICAgIHhtbG5zOnhsaW5rPSdodHRwOi8vd3d3LnczLm9yZy8xOTk5L3hsaW5rJwogICAgICAgICAgICAgICAgICB4bWw6c3BhY2U9J3ByZXNlcnZlJwp3aWR0aD0nMzAwcHgnIGhlaWdodD0nMzAwcHgnIHZpZXdCb3g9JzAgMCAzMDAgMzAwJz4KPCEtLSBFTkQgT0YgSEVBREVSIC0tPgo8cmVjdCBzdHlsZT0nb3BhY2l0eToxLjA7ZmlsbDojRkZGRkZGO3N0cm9rZTpub25lJyB3aWR0aD0nMzAwLjAnIGhlaWdodD0nMzAwLjAnIHg9JzAuMCcgeT0nMC4wJz4gPC9yZWN0Pgo8dGV4dCB4PScxMDAuNScgeT0nMTcwLjAnIGNsYXNzPSdhdG9tLTAnIHN0eWxlPSdmb250LXNpemU6NDBweDtmb250LXN0eWxlOm5vcm1hbDtmb250LXdlaWdodDpub3JtYWw7ZmlsbC1vcGFjaXR5OjE7c3Ryb2tlOm5vbmU7Zm9udC1mYW1pbHk6c2Fucy1zZXJpZjt0ZXh0LWFuY2hvcjpzdGFydDtmaWxsOiNFODQyMzUnID5IPC90ZXh0Pgo8dGV4dCB4PScxMjYuMScgeT0nMTg2LjAnIGNsYXNzPSdhdG9tLTAnIHN0eWxlPSdmb250LXNpemU6MjZweDtmb250LXN0eWxlOm5vcm1hbDtmb250LXdlaWdodDpub3JtYWw7ZmlsbC1vcGFjaXR5OjE7c3Ryb2tlOm5vbmU7Zm9udC1mYW1pbHk6c2Fucy1zZXJpZjt0ZXh0LWFuY2hvcjpzdGFydDtmaWxsOiNFODQyMzUnID4yPC90ZXh0Pgo8dGV4dCB4PScxMzguMCcgeT0nMTcwLjAnIGNsYXNzPSdhdG9tLTAnIHN0eWxlPSdmb250LXNpemU6NDBweDtmb250LXN0eWxlOm5vcm1hbDtmb250LXdlaWdodDpub3JtYWw7ZmlsbC1vcGFjaXR5OjE7c3Ryb2tlOm5vbmU7Zm9udC1mYW1pbHk6c2Fucy1zZXJpZjt0ZXh0LWFuY2hvcjpzdGFydDtmaWxsOiNFODQyMzUnID5PPC90ZXh0Pgo8L3N2Zz4K data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 2
- 238000006243 chemical reaction Methods 0.000 description 4
- 239000000969 carrier Substances 0.000 description 3
- 235000010384 tocopherol Nutrition 0.000 description 3
- 235000019731 tricalcium phosphate Nutrition 0.000 description 3
- 239000007788 liquid Substances 0.000 description 2
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,PD94bWwgdmVyc2lvbj0nMS4wJyBlbmNvZGluZz0naXNvLTg4NTktMSc/Pgo8c3ZnIHZlcnNpb249JzEuMScgYmFzZVByb2ZpbGU9J2Z1bGwnCiAgICAgICAgICAgICAgeG1sbnM9J2h0dHA6Ly93d3cudzMub3JnLzIwMDAvc3ZnJwogICAgICAgICAgICAgICAgICAgICAgeG1sbnM6cmRraXQ9J2h0dHA6Ly93d3cucmRraXQub3JnL3htbCcKICAgICAgICAgICAgICAgICAgICAgIHhtbG5zOnhsaW5rPSdodHRwOi8vd3d3LnczLm9yZy8xOTk5L3hsaW5rJwogICAgICAgICAgICAgICAgICB4bWw6c3BhY2U9J3ByZXNlcnZlJwp3aWR0aD0nODVweCcgaGVpZ2h0PSc4NXB4JyB2aWV3Qm94PScwIDAgODUgODUnPgo8IS0tIEVORCBPRiBIRUFERVIgLS0+CjxyZWN0IHN0eWxlPSdvcGFjaXR5OjEuMDtmaWxsOiNGRkZGRkY7c3Ryb2tlOm5vbmUnIHdpZHRoPSc4NS4wJyBoZWlnaHQ9Jzg1LjAnIHg9JzAuMCcgeT0nMC4wJz4gPC9yZWN0Pgo8dGV4dCB4PSczNS4wJyB5PSc1My42JyBjbGFzcz0nYXRvbS0wJyBzdHlsZT0nZm9udC1zaXplOjIzcHg7Zm9udC1zdHlsZTpub3JtYWw7Zm9udC13ZWlnaHQ6bm9ybWFsO2ZpbGwtb3BhY2l0eToxO3N0cm9rZTpub25lO2ZvbnQtZmFtaWx5OnNhbnMtc2VyaWY7dGV4dC1hbmNob3I6c3RhcnQ7ZmlsbDojM0I0MTQzJyA+QzwvdGV4dD4KPHRleHQgeD0nNTEuMCcgeT0nNTMuNicgY2xhc3M9J2F0b20tMCcgc3R5bGU9J2ZvbnQtc2l6ZToyM3B4O2ZvbnQtc3R5bGU6bm9ybWFsO2ZvbnQtd2VpZ2h0Om5vcm1hbDtmaWxsLW9wYWNpdHk6MTtzdHJva2U6bm9uZTtmb250LWZhbWlseTpzYW5zLXNlcmlmO3RleHQtYW5jaG9yOnN0YXJ0O2ZpbGw6IzNCNDE0MycgPkg8L3RleHQ+Cjx0ZXh0IHg9JzY3LjAnIHk9JzYyLjknIGNsYXNzPSdhdG9tLTAnIHN0eWxlPSdmb250LXNpemU6MTVweDtmb250LXN0eWxlOm5vcm1hbDtmb250LXdlaWdodDpub3JtYWw7ZmlsbC1vcGFjaXR5OjE7c3Ryb2tlOm5vbmU7Zm9udC1mYW1pbHk6c2Fucy1zZXJpZjt0ZXh0LWFuY2hvcjpzdGFydDtmaWxsOiMzQjQxNDMnID40PC90ZXh0Pgo8L3N2Zz4K C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 2
- 241001269238 Data Species 0.000 description 1
- 229920001940 conductive polymer Polymers 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing Effects 0.000 description 1
- 239000007789 gas Substances 0.000 description 1
- 230000002401 inhibitory effect Effects 0.000 description 1
- 201000002161 intrahepatic cholestasis of pregnancy Diseases 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- MYMOFIZGZYHOMD-UHFFFAOYSA-N oxygen Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O=O MYMOFIZGZYHOMD-UHFFFAOYSA-N 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 238000010200 validation analysis Methods 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance or administration or management of packet switching networks
- H04L41/06—Arrangements for maintenance or administration or management of packet switching networks involving management of faults or events or alarms
- H04L41/0681—Arrangements for maintenance or administration or management of packet switching networks involving management of faults or events or alarms involving configuration of triggering conditions
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L1/00—Arrangements for detecting or preventing errors in the information received
- H04L1/004—Arrangements for detecting or preventing errors in the information received by using forward error control
- H04L1/0056—Systems characterized by the type of code used
- H04L1/0061—Error detection codes
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance or administration or management of packet switching networks
- H04L41/06—Arrangements for maintenance or administration or management of packet switching networks involving management of faults or events or alarms
- H04L41/069—Arrangements for maintenance or administration or management of packet switching networks involving management of faults or events or alarms involving storage or log of alarms or notifications or post-processing thereof
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network-specific arrangements or communication protocols supporting networked applications
- H04L67/02—Network-specific arrangements or communication protocols supporting networked applications involving the use of web-based technology, e.g. hyper text transfer protocol [HTTP]
- H04L67/025—Network-specific arrangements or communication protocols supporting networked applications involving the use of web-based technology, e.g. hyper text transfer protocol [HTTP] for remote control or remote monitoring of the application
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network-specific arrangements or communication protocols supporting networked applications
- H04L67/12—Network-specific arrangements or communication protocols supporting networked applications adapted for proprietary or special purpose networking environments, e.g. medical networks, sensor networks, networks in a car or remote metering networks
-
- H04L67/54—
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L63/00—Network architectures or network communication protocols for network security
- H04L63/08—Network architectures or network communication protocols for network security for supporting authentication of entities communicating through a packet data network
- H04L63/0876—Network architectures or network communication protocols for network security for supporting authentication of entities communicating through a packet data network based on the identity of the terminal or configuration, e.g. MAC address, hardware or software configuration or device fingerprint
Abstract
Preprocessor, the system and method that the invention discloses a kind of for underground pipe gallery monitoring, the monitoring system, including:Preprocessor, the preprocessor obtains device data from several zone controllers, after dissection process, device data alarming processing and equipment linkage calculation processing being carried out to device data, final handling result is uploaded to monitor supervision platform, monitor supervision platform directly shows handling result, can solve the problems, such as that underground pipe gallery monitoring system data throughout is limited, data-handling capacity is insufficient and propagation energy force difference.
Description
Technical field
The present invention relates to underground pipe gallery monitoring fields, before a kind of monitoring for underground pipe gallery
Set processor, system and method.
Background technology
Underground pipe gallery monitoring system is mainly directly communicated using monitor supervision platform with zone controller at present
Pattern.The data that monitor supervision platform is actively or passively receiving area controller uploads, then upload number according to zone controller
According to agreement carry out data parsings, processing, the operations such as alarm calculates, linkage calculates.This monitors system for small-sized pipe gallery
System is feasible, but with the development of underground pipe gallery, piping lane scale is increasing, single underground pipe gallery monitoring system
Zone controller number included in system is more and more, and this pattern has seriously affected the number of underground pipe gallery monitoring system
According to the extended capability of handling capacity, data-handling capacity and whole system.
Invention content
In order to solve the deficiencies in the prior art, the present invention provides a kind of preposition processing for underground pipe gallery monitoring
Machine, system and method, can solve that underground pipe gallery monitoring system data throughout is limited, data-handling capacity is insufficient and
The problem of propagation energy force difference;
The present invention provides the first technical solution:
A kind of preprocessor for underground pipe gallery monitoring, including:
Downlink communication module receives the equipment initial data of one or more zone controller upload;
Data resolution module, the data uploaded to zone controller parse, and the data of parsing are uploaded to alarm meter
Calculate module and linkage computing module;
Computing module is alerted, according to the data of parsing, generates alarm data;
Link computing module, according to the data of parsing, the mode of operation of corresponding interlocking equipment is arranged, generates equipment linkage control
System instruction and equipment linkage daily record;
Equipment initial data, alarm data or linkage daily record are uploaded to monitor supervision platform by uplink communication module, and from monitoring
Equipment Foundations information is downloaded on platform and is transferred to data resolution module, is downloaded alarm threshold and is transferred to alarm computing module, downloads
Linkage regular transmission is transferred to downlink communication module to linkage computing module and download equipment remote control commands.
Further, data information classify and deposit by the downlink communication module according to the IP address of zone controller
Storage uploads data to the zone controller received and carries out CRC check, equipment linkage control instruction is issued to zone controller.
Further, it before the equipment initial data step for receiving the upload of one or more zone controller, needs
Establish with the connection of one or more zone controller, in particular to:Downlink communication module builds TCP server-sides, per taiwan area domain
Controller pre-sets preprocessor address, and zone controller is connected automatically to by preconfigured preprocessor address
Downlink communication module.
Further, the data resolution module, the equipment for being uploaded zone controller according to the instruction set of equipment are original
Data conversion forming apparatus real physical data.
Further, the alarm data, which refers to equipment numerical value, transfinites alarm, and device data alarm of transfiniting is basis
The alarm status of the alarm threshold computing device that transfinites of all types of equipment;The offline alarm is divided into equipment off-line alarm and region
Controller alerts offline;
Equipment off-line decision condition is:The offline period that equipment continues to exceed setting does not upload valid data or equipment institute
It is offline in zone controller, then judge that equipment state is offline;
The offline decision condition of zone controller is:The offline period for continuing to exceed setting does not upload data, then judges area
Domain controller state is offline.
Further, the mode of operation of the interlocking equipment, including:Automatic linkage, self-test linkage and remote control;
Automatic linkage is calculated according to device data and linkage rule, if device data is more than or equal to the linkage upper limit,
Then start the associated control device of current device, if device data is less than linkage lower limit, resets the associated control of current device
Equipment;
Self-test linkage is to lead to equipment fault to prevent piping lane internal control equipment from not running for a long time, to wind turbine or
Pump equipment starts it once every fixed duration, after the startup time reaches preset starting duration, is resetted automatically to it
Operation;
Remote control is the equipment to needing remote opening or closing, remote control notification instruction is generated, by remote control
Request instruction is sent to monitor supervision platform, after the remote control commands for receiving monitor supervision platform, according to remote control commands to corresponding
Equipment carries out remote control.
Further, the equipment essential information, including:Zone controller information, sensing equipment information, control device letter
Breath;The sensing equipment, including:Temperature sensor, humidity sensor, gas detection sensor, liquid level sensor;The control
Equipment, including:Wind turbine, water pump, intelligent well cover, fire resistant doorsets, gate inhibition, lighting apparatus;The alarm threshold data, including:Temperature
Threshold value, humidity threshold, oxygen concentration threshold value, methane concentration threshold value, liquid level threshold value;The linkage rule, including:Linkage source
Equipment, linkage target device, linkage start threshold value, linkage reset threshold.
The zone controller, including:Central processor CPU, the central processor CPU respectively with numeral input mould
Block, digital output module, memory module, RS485 buses, network communication module are connected with Web server.
Further, the Web server, for providing web administration service function, provide a user administration interface and
Various configuration interfaces receive remote configuration information.
Further, the memory module, for store web administration application program, central processor CPU configuration information,
The intermediate data of central processor CPU operational process.
Further, the network communication module, including:RJ45 communication modules, 4G wireless communication modules and/or RS458
Communication module.
Further, the RJ45 communication modules run ICP/IP protocol, and the RJ45 communication modules pass through cable network
It is communicated with preprocessor.
Further, the 4G wireless communication modules are communicated with preprocessor using wireless network.
Further, the RS485 communication modules realize underground pipe gallery zone controller and other underground integrated pipes
It is connected between corridor zone controller.The RS485 buses use MODBUS communication protocols.
Further, the RS485 buses are connect with sensor, and the sensor includes:Temperature sensor, humidity sensor
Device, CH4 sensors, O2 sensors or H2S sensors.
Further, the underground pipe gallery zone controller, is laid in underground pipe gallery region.
The present invention provides second of technical solution:
A kind of underground pipe gallery monitoring system, including:
An at least preprocessor, the preprocessor obtain device data from several zone controllers, pair set
After standby data carry out dissection process, device data alarming processing and equipment linkage calculation processing, final handling result is uploaded
To monitor supervision platform, monitor supervision platform directly shows handling result.
The present invention provides the third technical solution:
A kind of underground pipe gallery monitoring method, including:
Preprocessor obtains device data from several zone controllers,
The preprocessor carries out at dissection process, device data alarming processing and equipment linkage calculating device data
Reason;
Final handling result is uploaded to monitor supervision platform by the preprocessor.
Further, the preprocessor also wraps before obtaining device data step in several zone controllers
It includes:Preprocessor establishes communication connection with several zone controllers.
Further, the preprocessor establishes communication connection with several zone controllers, and steps are as follows:
Preprocessor establishes TCP Server;
The access of preprocessor waiting area controller carries out authentication, only area to the zone controller of access
Pre-stored IP address successful match just allows the access of zone controller in the IP address and preprocessor of domain controller.
Further, the preprocessor obtains device data from several zone controllers, and steps are as follows:
Preprocessor obtains equipment initial data from several zone controllers, and CRC is carried out to equipment initial data
Verification, verifies the equipment initial data passed through and enters dissection process step.
Further, the preprocessor is to the step of device data progress dissection process:
Receiving device initial data;
The armamentarium information under each zone controller is traversed, it is original from what is received according to the address code of each equipment
The initial data that corresponding equipment is taken out in data, according to the data conversion rule of equipment to the initial data of current device into line number
According to conversion, the actual physical amount data of forming apparatus are converted;
Further, the device data alarming processing, including:It transfinites and alerts or alert offline;
It is described transfinite alarm the step of be:
S301:The alarm threshold of current device is searched in equipment alarm threshold value caching, and if it exists, enter S302;Otherwise
Into S304;
S302:Judge whether device data exceeds alarm threshold, if beyond S303 is entered, otherwise enters S304;
S303:The state of equipment is set to alarm, generates the warning information of equipment, by the device data and announcement of alarm status
Alert information output;
S304:The state of equipment is set to normally, the device data of normal condition is exported.
The step of offline alarm is:
S311:The acquisition time of computing device latest data and present system time are poor, if more than the offline period of setting,
Then judge that equipment state is offline, the state of equipment is set to offline warning information that is offline and generating equipment, by off-line state
Device data and warning information output;
S312:The newest upload data time of zoning controller and present system time are poor, if offline more than setting
Period, then determinating area controller state is offline, and the state of armamentarium under zone controller, which is set to offline and generation, to be set
Standby offline warning information exports the device data of off-line state and warning information.
Further, the equipment linkage calculation processing, including:Automatic linkage, self-test linkage and remote control;
The step of automatic linkage is:
S401:Receive the equipment initial data that data parse;
S402:In equipment linkage rule cache search current device linkage rule, and if it exists, while enter S403 and
Otherwise S405 returns to S401;
S403:Judge whether equipment initial data meets the linkage entry condition of linkage rule, if satisfied, into S404,
Otherwise S401 is returned;
S404:The state for judging linkage target device, if starting state, into S401;If reset state, then it is arranged
The enabled instruction of linkage target device, enabled instruction is exported to zone controller;Combined operation daily record is generated simultaneously, will be linked
Operation log is exported to monitor supervision platform;
S405:Judge whether device data meets the linkage reset condition of linkage rule, if satisfied, into S406, otherwise
Return to S401;
S406:The state for judging linkage target device, if reset state, into S401;If starting state, then it is arranged
The reset instruction of linkage target device, reset instruction is exported to zone controller;Tissue generates combined operation daily record, will link
Operation log is exported to monitor supervision platform.
The step of self-test linkage is:
S411:Control device information is traversed, is judged whether to automatic according to self-test linkage period and last linkage time
It links the time, equipment enabled instruction is generated if meeting and is exported to zone controller, generate linkage daily record and export to monitor supervision platform;
S412:The facility information for traversing the linkage of self-test judges whether to meet linkage duration, it is multiple that equipment is generated if meeting
Bit instruction is exported to zone controller, is generated linkage daily record and is exported to monitor supervision platform;
The step of remote control is:
S421:Remote control information is traversed, control instruction and linkage daily record are generated to control device;
S422:Control instruction is issued to equipment region controller, linkage daily record is exported to monitor supervision platform;
Further, the step of final handling result is uploaded to monitor supervision platform by the preprocessor be:
S501:The HTTP connections for establishing preprocessor and monitor supervision platform, from monitor supervision platform download zone controller information,
Equipment Foundations information, equipment alarm threshold value, equipment linkage rule, equipment far control information, and data are cached;
S502:Foundation is connect with the message queue MQ of monitor supervision platform;
S503:Receive the device data, warning information and linkage daily record of input;
S504:It is connected by message queue MQ, the data of S503 is uploaded to message queue MQ connections.
Compared with prior art, the beneficial effects of the invention are as follows:
Preprocessor in underground pipe gallery monitoring system be communicated between zone controller and monitor supervision platform,
The intermediate equipment or system of data processing, it can improve the data throughout of underground pipe gallery monitoring system, data processing
Ability and extended capability.
Preprocessor, as the intermediate equipment or system of zone controller and monitor supervision platform, realization and zone controller
It is flat to be uploaded to monitoring by communication, device data parsing, equipment alarm calculating, equipment linkage computing function for final handling result
Platform, what monitor supervision platform received is equipment final data, can be used to directly show, significantly reduces the data processing of monitor supervision platform
Pressure;Preprocessor support is extending transversely, in extensive piping lane monitoring system, can laterally dispose more preposition processing
Machine, every preprocessor are responsible for the zone controller of certain amount, and which greatly enhances the extended capabilities of entire monitoring system.
Therefore limited underground pipe gallery monitoring system data throughout, data-handling capacity deficiency and propagation energy force difference can be solved
Present situation.
Description of the drawings
The accompanying drawings which form a part of this application are used for providing further understanding of the present application, and the application's shows
Meaning property embodiment and its explanation do not constitute the improper restriction to the application for explaining the application.
Fig. 1 is a kind of underground pipe gallery monitoring system provided by the invention;
Fig. 2 is the functional block diagram of the preprocessor in a kind of underground pipe gallery monitoring system provided by the invention;
Fig. 3 is the downlink communication module of the preprocessor in a kind of underground pipe gallery monitoring system provided by the invention
Flow chart;
Fig. 4 is the data resolution module of the preprocessor in a kind of underground pipe gallery monitoring system provided by the invention
Flow chart;
Fig. 5 is the alarm computing module of the preprocessor in a kind of underground pipe gallery monitoring system provided by the invention
Flow chart;
Fig. 6 is the linkage computing module of the preprocessor in a kind of underground pipe gallery monitoring system provided by the invention
(automatic linkage) flow chart;
Fig. 7 (a) and Fig. 7 (b) is the preprocessor in a kind of underground pipe gallery monitoring system provided by the invention
Link computing module (self-test linkage, remote control) flow chart;
Fig. 8 is the uplink communication module of the preprocessor in a kind of underground pipe gallery monitoring system provided by the invention
Flow chart.
Specific implementation mode
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another
It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field
The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific implementation mode, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative
It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet
Include " when, indicate existing characteristics, step, operation, device, component and/or combination thereof.
The first embodiment provided by the invention, as shown in Figure 1, a kind of underground pipe gallery monitoring system, including:
Preprocessor, the preprocessor from several zone controllers obtain device data, to device data into
After row dissection process, device data alarming processing and equipment linkage calculation processing, it is flat that final handling result is uploaded to monitoring
Platform, monitor supervision platform directly show handling result.
The preprocessor, including one or more;The preprocessor is supported extending transversely.
As shown in Fig. 2, the preprocessor, including:
Downlink communication module, establish and keep with the connection of one or more zone controller, on the controller of receiving area
The equipment initial data of biography;
Data resolution module, according to configuration information, the data uploaded to zone controller parse, by the data of parsing
It is assigned to the sensor and controller equiment of zone controller mounting, and is uploaded to alarm computing module and linkage computing module;
Computing module is alerted, for calculating alarm status, generates warning information, alarm status, which is divided into equipment numerical value, to transfinite announcement
Alert and offline alarm;
Link computing module, corresponds to the mode of operation of interlocking equipment for calculating it according to the linkage rule of equipment, generates
Equipment linkage control instruction and equipment linkage daily record;
Uplink communication module, for according to preconfigured monitor supervision platform address, establishing and communicating with corresponding monitor supervision platform
Device data, alarm data or linkage daily record are uploaded to monitor supervision platform, and download Equipment Foundations letter from monitor supervision platform by connection
Breath, alarm threshold, linkage rule and equipment remote control commands.
Second of embodiment provided by the invention, a kind of underground pipe gallery monitoring method, including:
S10:Preprocessor establishes communication connection with several zone controllers;The preposition processing is from several areas
Device data is obtained in domain controller;
S20:The preposition processing carries out dissection process to device data;
S30:The preposition processing carries out device data alarming processing to parsing data;
S40:The preposition processing carries out equipment linkage calculation processing to parsing data;
S50:Final handling result is uploaded to monitor supervision platform by the preposition processing.
As shown in figure 3, S10:Preprocessor establishes the implementation steps of communication connection with several zone controllers:
S101:Establish TCP Server;
S102:The access of waiting area controller, when zone controller accesses validation region controller IP address whether
In system zone controller set, the zone controller only in system zone controller set just allows to access;
S103:The initial data that receiving area controller uploads carries out CRC check, verifies the data passed through and export to number
According to parsing module, initial data must be the data based on standard MODBUS agreements, contain and connected under the zone controller
The data of armamentarium;
S104:The equipment control instruction of input is received, the zone controller where interlocking equipment is inquired, to zone controller
Issue control instruction;
As shown in figure 4, S20:The preposition processing carries out device data the implementation steps of dissection process:
S201:Receive the equipment initial data of downlink communication module input;
S202:The armamentarium letter under this group of initial data corresponding region controller is searched in Equipment Foundations information cache
Breath;
S203:Facility information is traversed, which is taken out from initial data corresponding position according to the address code of each equipment
No-load voltage ratio, according to the change of equipment compare the equipment initial data carry out data conversion, convert the actual physical amount data of forming apparatus;
S204:The device data that parsing obtains is exported to alarm computing module, linkage computing module.
As shown in figure 5, S30:The preposition processing carries out device data alarming processing to parsing data:
It transfinites alarm
S301:Receive the device data of data resolution module input;
S302:The alarm threshold of the equipment is searched in equipment alarm threshold value caching, and if it exists, enter S303;Otherwise into
Enter S305;
S303:Judge whether device data meets alarm threshold, enters S304 if meeting, otherwise enter S305;
S304:The state of equipment is set to alarm and organizes the warning information of generation equipment, by the device data of carrier state
And warning information is exported to uplink communication module;
S305:The state of equipment is set to normally, the device data of carrier state is exported to uplink communication module;
Offline alarm
S311:The acquisition time of computing device latest data and present system time are poor, if more than the offline period of setting,
Then judge that equipment state is offline, the state of equipment is set to offline warning information that is offline and organizing generation equipment, it will be band-like
The device data and warning information of state are exported to uplink communication module;
S312:The newest upload data time of zoning controller and present system time are poor, if offline more than setting
Period, then determinating area controller state is offline, is set to offline by the state of armamentarium under the zone controller and organizes
The offline warning information for generating equipment, the device data of carrier state and warning information are exported to uplink communication module;
As shown in fig. 6, S40:The preposition processing carries out parsing data the implementation steps of equipment linkage calculation processing:
Automatic linkage
S401:Receive the device data of data resolution module input;
S402:The linkage rule of the equipment is searched in equipment linkage rule cache, and if it exists, enter S403, S405, it is no
Then enter S401;
S403:Judge whether device data meets the linkage entry condition of linkage rule, if satisfied, into S404, otherwise
Into S401;
S404:The state for judging linkage target device, if starting state, into S401;If reset state, tissue connection
The enabled instruction of moving-target equipment exports enabled instruction to downlink communication module;Tissue generates combined operation daily record, will link
Operation log is exported to uplink communication module;
S405:Judge whether device data meets the linkage reset condition of linkage rule, if satisfied, into S406, otherwise
Into S401;
S406:The state for judging linkage target device, if reset state, into S401;If starting state, tissue connection
The reset instruction of moving-target equipment exports reset instruction to downlink communication module;Tissue generates combined operation daily record, will link
Operation log is exported to uplink communication module;
As shown in Fig. 7 (a) and Fig. 7 (b), self-test linkage
S411:Control device information is traversed, is judged whether to automatic according to self-test linkage period and last linkage time
It links the time, equipment enabled instruction is generated if meeting and is exported to downlink communication module, generate linkage daily record and export to uplink and lead to
Believe module;
S412:The facility information for traversing the linkage of self-test judges whether to meet linkage duration, it is multiple that equipment is generated if meeting
Bit instruction is exported to downlink communication module, is generated linkage daily record and is exported to uplink communication module;
Remote control
S421:Remote control information is traversed, control instruction and linkage daily record are generated to control device;
S422:Control instruction is issued to equipment region controller, linkage daily record is exported to uplink communication module;
As shown in figure 8, S50:Final handling result is uploaded to the implementation steps of monitor supervision platform by the preposition processing:
S501:The connection with monitor supervision platform HTTP is established, zone controller information, Equipment Foundations letter are downloaded from monitor supervision platform
Breath, equipment alarm threshold value, equipment linkage rule, equipment far control the basic datas such as information, and these data are cached, under
Row communication module, data resolution module, alarm computing module, linkage computing module use;
S502:Establish the connection with monitor supervision platform MQ (message queue);
S503:Receive device data, the warning information of alarm computing module input, the linkage day of linkage computing module input
Will;
S504:It is connected by MQ, the data of S503 is uploaded to MQ;
The foregoing is merely the preferred embodiments of the application, are not intended to limit this application, for the skill of this field
For art personnel, the application can have various modifications and variations.Within the spirit and principles of this application, any made by repair
Change, equivalent replacement, improvement etc., should be included within the protection domain of the application.
Claims (10)
1. a kind of preprocessor for underground pipe gallery monitoring, characterized in that including:
Downlink communication module receives the equipment initial data of one or more zone controller upload;
Data resolution module, the data uploaded to zone controller parse, and the data of parsing, which are uploaded to alarm, calculates mould
Block and linkage computing module;
Computing module is alerted, according to the data of parsing, generates alarm data;
Link computing module, and according to the data of parsing, the mode of operation of corresponding interlocking equipment is arranged, and generates equipment linkage control and refers to
Order and equipment linkage daily record;
Equipment initial data, alarm data or linkage daily record are uploaded to monitor supervision platform by uplink communication module, and from monitor supervision platform
Upper download Equipment Foundations information is transferred to data resolution module, downloads alarm threshold and is transferred to alarm computing module, downloads linkage
Regular transmission is transferred to downlink communication module to linkage computing module and download equipment remote control commands.
2. a kind of preprocessor for underground pipe gallery monitoring as described in claim 1, characterized in that
The alarm data, which refers to equipment numerical value, to transfinite alarm, and device data alarm of transfiniting is according to the super of all types of equipment
Limit the alarm status of alarm threshold computing device;The offline alarm is divided into equipment off-line alarm and zone controller is accused offline
It is alert;
Equipment off-line decision condition is:The offline period that equipment continues to exceed setting does not upload valid data or equipment location
Domain controller is offline, then judges that equipment state is offline;
The offline decision condition of zone controller is:The offline period for continuing to exceed setting does not upload data, then determinating area control
Device state processed is offline.
3. a kind of preprocessor for underground pipe gallery monitoring as described in claim 1, characterized in that
The mode of operation of the interlocking equipment, including:Automatic linkage, self-test linkage and remote control;
Automatic linkage is calculated according to device data and linkage rule, if device data is more than or equal to the linkage upper limit, is opened
The associated control device of dynamic current device resets the associated control device of current device if device data is less than linkage lower limit;
Self-test linkage is to lead to equipment fault to prevent piping lane internal control equipment from not running for a long time, to wind turbine or water pump
Equipment starts it once every fixed duration, after the startup time reaches preset starting duration, carries out reset behaviour to it automatically
Make;
Remote control is the equipment to needing remote opening or closing, remote control notification instruction is generated, by remote control notification
Instruction is sent to monitor supervision platform, after the remote control commands for receiving monitor supervision platform, according to remote control commands to relevant device
Carry out remote control.
4. a kind of underground pipe gallery monitoring system, characterized in that including:
An at least preprocessor, the preprocessor obtains device data from several zone controllers, to number of devices
After carrying out dissection process, device data alarming processing and equipment linkage calculation processing, final handling result is uploaded to prison
Platform is controlled, monitor supervision platform directly shows handling result.
5. a kind of underground pipe gallery monitoring method, characterized in that including:
Preprocessor obtains device data from several zone controllers,
The preprocessor carries out dissection process, device data alarming processing and equipment linkage calculation processing to device data;
Final handling result is uploaded to monitor supervision platform by the preprocessor.
6. a kind of underground pipe gallery monitoring method as claimed in claim 5, characterized in that at the device data alarm
Reason, including:It transfinites and alerts or alert offline;
It is described transfinite alarm the step of be:
S301:The alarm threshold of current device is searched in equipment alarm threshold value caching, and if it exists, enter S302;Otherwise enter
S304;
S302:Judge whether device data exceeds alarm threshold, if beyond S303 is entered, otherwise enters S304;
S303:The state of equipment is set to alarm, generates the warning information of equipment, the device data of alarm status and alarm are believed
Breath output;
S304:The state of equipment is set to normally, the device data of normal condition is exported.
7. a kind of underground pipe gallery monitoring method as claimed in claim 6, characterized in that the step of the offline alarm
For:
S311:The acquisition time of computing device latest data and present system time are poor, if more than the offline period of setting, sentence
Locking equipment state is offline, the state of equipment is set to offline warning information that is offline and generating equipment, by setting for off-line state
Standby data and warning information export;
S312:The newest upload data time of zoning controller and present system time are poor, if more than the offline period of setting,
Then determinating area controller state is offline, by the state of armamentarium under zone controller be set to it is offline and generate equipment from
Line warning information exports the device data of off-line state and warning information.
8. a kind of underground pipe gallery monitoring method as claimed in claim 5, characterized in that at the equipment linkage calculating
Reason, including:Automatic linkage, self-test linkage and remote control;
The step of automatic linkage is:
S401:Receive the equipment initial data that data parse;
S402:In equipment linkage rule cache search current device linkage rule, and if it exists, while enter S403 and
Otherwise S405 returns to S401;
S403:Judge whether equipment initial data meets the linkage entry condition of linkage rule, if satisfied, into S404, otherwise
Return to S401;
S404:The state for judging linkage target device, if starting state, into S401;If reset state, then linkage is set
The enabled instruction of target device exports enabled instruction to zone controller;Combined operation daily record is generated simultaneously, by combined operation
Daily record is exported to monitor supervision platform;
S405:Judge whether device data meets the regular linkage reset condition of linkage and otherwise returned if satisfied, into S406
S401;
S406:The state for judging linkage target device, if reset state, into S401;If starting state, then linkage is set
The reset instruction of target device exports reset instruction to zone controller;Tissue generates combined operation daily record, by combined operation
Daily record is exported to monitor supervision platform.
9. a kind of underground pipe gallery monitoring method as claimed in claim 8, characterized in that the step of self-test links
For:
S411:Control device information is traversed, is judged whether to automatic linkage according to self-test linkage period and last linkage time
Time generates equipment enabled instruction if meeting and exports to zone controller, generates linkage daily record and exports to monitor supervision platform;
S412:The facility information for traversing the linkage of self-test judges whether to meet the duration that links, generating device reset if meeting refers to
It enables output to zone controller, generates linkage daily record and export to monitor supervision platform;
The step of remote control is:
S421:Remote control information is traversed, control instruction and linkage daily record are generated to control device;
S422:Control instruction is issued to equipment region controller, linkage daily record is exported to monitor supervision platform.
10. a kind of underground pipe gallery monitoring method as claimed in claim 5, characterized in that the preprocessor will most
The step of whole handling result is uploaded to monitor supervision platform be:
S501:The HTTP connections for establishing preprocessor and monitor supervision platform download zone controller information, equipment from monitor supervision platform
Basic information, equipment alarm threshold value, equipment linkage rule, equipment far control information, and data are cached;
S502:Foundation is connect with the message queue MQ of monitor supervision platform;
S503:Receive the device data, warning information and linkage daily record of input;
S504:It is connected by message queue MQ, the data of S503 is uploaded to message queue MQ connections.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810102482.XA CN108365978A (en) | 2018-02-01 | 2018-02-01 | A kind of preprocessor, system and method for underground pipe gallery monitoring |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810102482.XA CN108365978A (en) | 2018-02-01 | 2018-02-01 | A kind of preprocessor, system and method for underground pipe gallery monitoring |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108365978A true CN108365978A (en) | 2018-08-03 |
Family
ID=63004236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810102482.XA Pending CN108365978A (en) | 2018-02-01 | 2018-02-01 | A kind of preprocessor, system and method for underground pipe gallery monitoring |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108365978A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109951574A (en) * | 2019-04-23 | 2019-06-28 | 广州市技安电子科技有限公司 | Internet of things equipment interlock method and system based on edge calculations |
CN110007650A (en) * | 2019-03-13 | 2019-07-12 | 深圳博沃智慧科技有限公司 | A kind of pollutant discharge of enterprise management-control method and system |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101231777A (en) * | 2007-12-14 | 2008-07-30 | 北京世纪之星应用技术研究中心 | Three-dimensional sound sensitivity early warning and alarming check system |
CN105334769A (en) * | 2015-10-26 | 2016-02-17 | 辽宁达能电气股份有限公司 | Urban comprehensive pipe gallery comprehensive acquisition equipment and comprehensive acquisition system comprising same |
CN105787115A (en) * | 2016-03-23 | 2016-07-20 | 广州市高科通信技术股份有限公司 | Method and device for analyzing urban signal traffic control system |
CN106094690A (en) * | 2016-07-27 | 2016-11-09 | 浙江警安科技有限公司 | City piping lane comprehensive monitoring system and monitoring method thereof |
CN205880632U (en) * | 2016-06-17 | 2017-01-11 | 史晓祎 | Cabin section controller |
CN107632581A (en) * | 2017-09-13 | 2018-01-26 | 四川君逸数码科技股份有限公司 | A kind of monitoring management system of underground pipe gallery |
-
2018
- 2018-02-01 CN CN201810102482.XA patent/CN108365978A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101231777A (en) * | 2007-12-14 | 2008-07-30 | 北京世纪之星应用技术研究中心 | Three-dimensional sound sensitivity early warning and alarming check system |
CN105334769A (en) * | 2015-10-26 | 2016-02-17 | 辽宁达能电气股份有限公司 | Urban comprehensive pipe gallery comprehensive acquisition equipment and comprehensive acquisition system comprising same |
CN105787115A (en) * | 2016-03-23 | 2016-07-20 | 广州市高科通信技术股份有限公司 | Method and device for analyzing urban signal traffic control system |
CN205880632U (en) * | 2016-06-17 | 2017-01-11 | 史晓祎 | Cabin section controller |
CN106094690A (en) * | 2016-07-27 | 2016-11-09 | 浙江警安科技有限公司 | City piping lane comprehensive monitoring system and monitoring method thereof |
CN107632581A (en) * | 2017-09-13 | 2018-01-26 | 四川君逸数码科技股份有限公司 | A kind of monitoring management system of underground pipe gallery |
Non-Patent Citations (4)
Title |
---|
李小岭: "综合管廊环境与设备监控系统分析", 《中国仪器仪表》 * |
王积荣,孙左一: "《中国电网调度自动化的现状与展望》", 31 May 1989 * |
田飞: "实例分析城市地下综合管廊弱电系统的组成及设计", 《工程技术研究》 * |
邵国强: "城市综合管廊监控系统的设计", 《"决策论坛——基于公共管理学视角的决策研讨会"论文集(下)》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110007650A (en) * | 2019-03-13 | 2019-07-12 | 深圳博沃智慧科技有限公司 | A kind of pollutant discharge of enterprise management-control method and system |
CN109951574A (en) * | 2019-04-23 | 2019-06-28 | 广州市技安电子科技有限公司 | Internet of things equipment interlock method and system based on edge calculations |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108365978A (en) | A kind of preprocessor, system and method for underground pipe gallery monitoring | |
CN108815784A (en) | A kind of fire fighting monitoring terminal and fire-fighting safety system | |
CN104199405A (en) | Liquefied natural gas station monitoring system | |
CN110161952A (en) | A kind of method for managing and monitoring and device carrying out inspection for fire-fighting equipment | |
CN107942969A (en) | A kind of water plant automation monitoring system | |
CN111721907A (en) | Sewage treatment in-situ monitoring system | |
CN104486101B (en) | A kind of online power remote IEC104 transmission abnormality detection methods | |
CN110430225A (en) | A kind of industrial equipment monitoring and managing method, device, equipment and readable storage medium storing program for executing | |
CN104898522B (en) | A kind of digital source of welding current remote monitoring system | |
CN108549294A (en) | A kind of electric apparatus monitoring method and system | |
CN111932816B (en) | Fire alarm management method and device for offshore wind farm and island microgrid | |
CN107146385A (en) | Intelligent building gas leakage monitoring system based on ZigBee technology | |
CN107942963A (en) | A kind of electric power operational system based on coordinated signals and cloud platform | |
CN112769913A (en) | Microenvironment on-site monitoring system and microenvironment monitoring system of electric cabinet | |
CN103556674A (en) | Remote monitoring method and embedded mainboard of constant-pressure variable-frequency water supply device | |
CN106384297A (en) | Method and system for operating and maintaining photovoltaic power generation | |
CN106208385A (en) | A kind of power utility check system based on platform of internet of things | |
CN209417580U (en) | A kind of remote supervisory and control(ling) equipment device based on Internet of Things | |
CN207339915U (en) | A kind of vulnerability scanning managing device | |
CN110880812A (en) | Transformer substation equipment monitoring method and device and transformer substation equipment monitor | |
CN205211107U (en) | Entrance guard alarm system based on solar energy | |
CN214427809U (en) | Utility tunnel control system | |
CN214901317U (en) | Industrial Internet edge computing intelligent terminal for water treatment | |
CN106934905A (en) | A kind of access controller and management system based on LoRa technologies | |
CN109990946A (en) | Pressure transmitter and its fault self-detection method with fault self-checking function |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180803 |
|
RJ01 | Rejection of invention patent application after publication |