CN108331226A - Laminated floor slab with prefabricated reinforced concrete convex bearing - Google Patents
Laminated floor slab with prefabricated reinforced concrete convex bearing Download PDFInfo
- Publication number
- CN108331226A CN108331226A CN201711481834.9A CN201711481834A CN108331226A CN 108331226 A CN108331226 A CN 108331226A CN 201711481834 A CN201711481834 A CN 201711481834A CN 108331226 A CN108331226 A CN 108331226A
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- prefabricated
- prefabricated reinforced
- girder
- bearing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B5/00—Floors; Floor construction with regard to insulation; Connections specially adapted therefor
- E04B5/16—Load-carrying floor structures wholly or partly cast or similarly formed in situ
- E04B5/17—Floor structures partly formed in situ
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Rod-Shaped Construction Members (AREA)
Abstract
The present invention provides the laminated floor slab with prefabricated reinforced concrete convex bearing, including engaging shallow seam between prefabricated reinforced concrete convex bearing, prefabricated convex girder, cavity floor component, cavity floor component;The shape it is characterized in that the prefabricated reinforced concrete convex bearing assumes diamond in shape;Prefabricated reinforced concrete convex bearing diamond shaped periphery bottom surface has L shape concrete raised;The water chestnut of the diamond shaped sets girder assembly side;Be square post holes among the prefabricated reinforced concrete bearing;The cavity floor component is hexagon;Cavity floor component concrete containing longitudinal bar girt strip, cross reinforcement concrete girt strip, cavity body, steel mesh concrete lower flange thin plate;The cavity floor component is superimposed on the side of the upper bit protrusion part of prefabricated reinforced concrete convex bearing and prefabricated convex girder;Longitudinal rib slot and shallow joint close are formed between the cavity floor component.
Description
Technical field
The present invention relates to a kind of assembled architecture systems technologies, and in particular to the overlapping building with prefabricated reinforced concrete convex bearing
Plate.
Background technology
In order to adjust construction industry structure, construction quality is improved, Accelerating The Construction speed realizes energy conservation and environmental protection, reduces engineering
Cost, country's proposition widely popularize assembled architecture, specify specific implementation plan;And it requires in reinforced concrete frame knot
Extensive use in structure, reinforced concrete frame shear wall structure, steel construction and steel-concrete combined structure system specifies that China fills
With formula architectural structure system and application field;But large-span steel-reinforced concrete frame structure assembled architecture ground zero, and
Using common laminated floor slab and T plate superstructure technology, cause cost high, earth-free gas constrains assembled architecture industry
Development.
Such as a kind of ZL200410082381.9 " hollow floor slab with small dense ribs " of inventor, hollow filling body is embedded in cast-in-situ floor
Middle formation " T fonts " stress cross-section hollow layer, solves the problems, such as large span, large space, big load, is assembled architecture floor
It lays a good foundation.
Again in order to promote China's housing industrialization to develop, the ZL201620408935.8 of inventor's application " build by passive type
Energy saving integrated system " expands to cast-in-place concrete hollow building roof assembled architecture field by creating transition, solves
Assembled arthitecutral structure globality poor, large span without bright beam, component super large, component industrialization, construction quality controllability, work efficiency and
The problems such as environmental protection;These inventions, although laying the foundation for China's Process of Housing Industrialization, it is pre- that there is also long strip types
Crackle, the bidirectional stress in gap when the one-way of assembled cavity plate member stress processed, two pieces of prefabricated assembled cavity plate splits
The problems such as connection space of cavity floor transverse direction reinforcing bar is restricted.
In order to capture the low difficulty of steel reinforced concrete assembling building structure assembly rate, inventor applies
Assembly rate, within 40% has been increased to 70% or more, has passed through state by 201710951186.2 " a kind of assembled arthitecutral structures "
Family's grade experiment is checked and accepted, and safety of structure is strong and good economy performance, carries out assembled architecture for government and has played positive effect;But
Beam, column, floor node are all taken at cast-in-place state, although structure safety, need a large amount of temporary support supporting beam, column, building
Board member and there are many splices in Liang Yuliang, beam and column infall, bar connecting is loaded down with trivial details and cost is high.
At present, the assembled architecture of reinforced concrete frame structure also has many Ji arts Wen Ti No to have solution, causes to build
Cost is high, and popularization is obstructed;Therefore, inventor is again on the basis of existing background technology self, by verification experimental verification, by beam, column,
The cast-in-place concrete node region of floor, it is creative to be modified in that prefabricated reinforced concrete bearing body, enhancing shearing and resistance to flush shear force
Ability, by the column of rear pouring concrete and beam stress reinforcing bar node, be dispersed in column centre and prefabricated reinforced concrete bearing body except diamond shape
In the girder assembly side being arranged on the water chestnut of shape or triangle;Column steel bar stress passes through square column among prefabricated reinforced concrete bearing
Crisscross beam stress reinforcing bar up extends in hole, realizes in beam, Column border node position no-reinforcing-bar connector, greatly reduces support
Rod piece and assembling speed is further speeded up, assembled quality is improved, reduces project cost;Realize that strong column and weak beam pours on floor afterwards again
The assembled architecture overall structure new technology of edge of a wing overlapping layers;It is reinforced concrete frame structure assembled architecture new technology system
Important breakthrough, have become assembled architecture technical field innovation urgent need.
Invention content
It is an object of the invention to thoroughly solve the shearing of assembling frame Structure Beam-column node and resistance to flush shear force, reaches and carry
High building quality accelerates built speed, realizes that energy conservation and environmental protection, increase assembly rate, reduction cost and structure are safe and reliable;Play wound
The advantage of new assembled Building technology, the shortcomings that overcoming the prior art;Prefabricated reinforced concrete bearing body, the column of factorial praluction
The prefabricated components such as frame, girder, cavity board member, stair, wallboard, after assembled in situ, then outside prefabricated reinforced concrete bearing body
In node, column frame, the connection spaces rear pouring concrete such as the top flange of building floor, realize that strong column and weak beam pours floor top flange overlapping afterwards again
The assembled architecture overall structure new technology of layer;Reduce a large amount of supporting bar and easy construction process;By available frame knot
Structure, frame core wall structure, steel construction assembled laminated floor slab and T plate superstructure technology, transition and upgrade are a kind of band pre-manufactured steel
The assembled architecture technology of muscle concrete bearing body;Reach the existing assembled arthitecutral structure technical system of optimization, overcomes existing structure
A series of defects existing for technology.
Technical scheme is as follows, the laminated floor slab with prefabricated reinforced concrete convex bearing, including prefabricated reinforced concrete is convex
Shallow seam is engaged between shape bearing, prefabricated convex girder, cavity floor component, cavity floor component;It is characterized in that the pre-manufactured steel
Muscle concrete convex bearing assumes diamond in shape shape;Prefabricated reinforced concrete convex bearing diamond shaped periphery bottom surface has L shape concrete raised;
The water chestnut of the diamond shaped sets girder assembly side;Be square post holes among the prefabricated reinforced concrete bearing;The cavity floor structure
Part is hexagon;Cavity floor component concrete containing longitudinal bar girt strip, cross reinforcement concrete girt strip, cavity body, steel mesh concrete bottom wing
Edge thin plate;The cavity floor component is superimposed on the upper bit protrusion part of prefabricated reinforced concrete convex bearing and prefabricated convex girder
Side;Longitudinal rib slot and shallow joint close are formed between the cavity floor component.
Another preferred embodiment of the present invention is to indulge girder reinforcing bar and cross among the prefabricated reinforced concrete bearing in rectangular post holes
Girder reinforcing bar intersects and no-reinforcing-bar node;The girder assembly side development length >=100mm;The girder assembly side is reserved with master
Beam stress bar connecting end.
Another preferred embodiment of the present invention is the prefabricated post frame smooth outer surface, and inner surface is formed recessed by steel mesh concrete
The rough surface of convex injustice;The prefabricated post frame is assemblied in the upper surface on the outside of prefabricated reinforced concrete bearing hollow part;It is described prefabricated
Column reinforcing bar is connected in column frame.
Another preferred embodiment of the present invention is that the girder assembly side is reserved with vertical or cross bolts hole;The girder dress
It is reserved with baltimore groove with end bottom surface.
Another preferred embodiment of the present invention is that the precast main beam both ends are in inclined-plane or inclined-plane of vertically slotting;The girder two
Reserve vertical bolt hole in end;Girder both ends bottom surface is reserved with baltimore groove;Steel plate connector is assembled in the baltimore groove;
Precast main beam both ends reserved steel bar is using mechanical connection or slip casting connection.
Another preferred embodiment of the present invention is the water chestnut side bottom protrusion of the prefabricated reinforced concrete bearing;Under the precast main beam
Bottom protrusion;When the contiguous prefabricated reinforced concrete bearing assembling, the square tube component of the fixed specification of girder assembly end side surface faces
Shi Dingwei.
The present invention another preferred embodiment be the cavity floor component be hexagon by two right-angle sides and two isosceles
Hypotenuse is formed;Cavity body in the cavity floor component is engraved using steel mesh with ribbing, and the steel mesh with ribbing is engraved to expand
Steel mesh with ribbing is engraved or fish scale steel mesh with ribbing is engraved.
Another preferred embodiment of the present invention, which is the cavity floor component two ends bottom surface, L shape concrete recess.
Another preferred embodiment of the present invention, which is the bottom surface of the cavity floor component longitudinal bar concrete girt strip, L shape coagulation
Native protrusion.
The present invention another preferred embodiment be the cavity floor component cavity between be mutually communicated, formed dark air duct or
It is formed in dark air duct and adds the inorganic board composition dark smokejack of fire-fighting.
The laminated floor slab with prefabricated reinforced concrete convex bearing of the present invention, is needle on the basis of Architectural Structure Design drawing
To the girder and superstructure of horizontal structure, the column of vertical structure and the geometric dimension of wallboard decompose Architectural Structure Design drawing, to dress
Quantization Secondary Design is carried out with form or BIM processing, drawing resolve into N number of column and beam and assembled cavity board member and wall body structure
Part etc., factory are produced into the prefabricated member of the specifications and models by the paper organization of decomposition, and component is transported to engineering site
Assembly is poured with after as assembled monolithic architecture.
The laminated floor slab with prefabricated reinforced concrete convex bearing of specific implementation, the first process, prefabricated diamond shaped are precast reinforced
Concrete bearing body, prefabricated post frame, precast main beam, stair, cavity floor component and Self-insulation wall plate component or wallboard;Prefabricated post frame,
Centrifugal force manufacture craft may be used, four interior angle concretes of rectangular prefabricated post frame thicken irregular at this time, are answered at four interior angles built-in
The right angle of falling water chestnut internal model control in the Fang Mo of centrifugal force rotation, is placed in steel wire, forms strip when being made of centrifugal force
The prefabricated post thin-wall frame of silk screen concrete;When rectangular prefabricated post thin-wall frame using three faces smooth, coarse prefabricated post thin-walled on one side
Coarse to face exterior wall when frame, the assembling of preformed self thermal insulation wall plate member is outer to be hung on rough surface.Prefabricated component is transported into engineering site
The sequence assembling of column, bearing, beam, floor, wallboard is pressed afterwards;First column, by rectangular post holes among diamond shaped prefabricated reinforced concrete bearing
It is directed at the column reinforcing bar extended, column reinforcing bar avoids girder reinforcing bar crisscross in prefabricated reinforced concrete bearing hole, and passes through post holes;In advance
Reinforced concrete bearing processed is assemblied on the capital concrete for acting on lower rear pouring concrete by prefabricated post frame, and every layer is controlled using prefabricated post frame length
The story height in building;While every column Top assembles bearing, girder is inserted into the tightening latch of the square tube of fixed specifications and models size
In the bolt hole that assembly side pre-sets, reinforced concrete bearing body mutually restrains connection temporarily with the square tube of fixed specifications and models size,
After measuring correction prefabricated post frame verticality and prefabricated reinforced concrete bearing body positioning accuracy, and reconnects extending column reinforcing bar and bind column
Prefabricated post frame is sleeved on outside the column reinforcing bar bound by reinforcing bar, and the pour concrete in prefabricated post frame had both secured capital bearing,
Control has been extended continuously again can also form open tubular column per layer height when placing cavity in column steel reinforcement cage.
Second process for reinforcement structure intensity and mitigates dead weight, and precast main beam can be used convex hollow beam, can also be used
The porous hollow beam of small-bore;The two ends both ends of precast main beam are in inclined-plane or inclined-plane of vertically slotting;Reserve vertical bolt in both ends
Hole;Both ends bottom surface is reserved with baltimore groove, and convenient for assembling, permanent steel plate connector is not exposed to cause following table protrusion and steel plate to connect
Fitting gets rusty;Again by main cable and girder two capital bearings girder assembly side, in the prefabricated baltimore groove in girder assembly side bottom
Junction steel plate is installed, by the connection of bolt hold-down support and girder of vertical bolt hole, then by the reinforcing bar of assembly side extension
With girder reserved steel bar main beam stress reinforcing bar is connected into such a way that mechanical connection or slip casting connect;Connection can not also be used
The process of steel plate is directly connected the reinforcing bar that assembly side extends with girder reserved steel bar by mechanical connection or slip casting;Assembly side
The reinforcing bar and girder reserved steel bar of extension are propped up by four water chestnuts of bearing before mechanical connection with vertical supporting temporarily.
Third process install prefabricated hollow board member, prefabricated hollow board member by longitudinal bar concrete girt strip, cross reinforcement concrete girt strip,
Cavity body, lower flange board group at;Vertical and horizontal side girt strip in cavity board member is wide between 50mm~100mm, Zong Xianghe
For cross rib deck-siding between 150mm~200mm, the bottom surface of cavity board member longitudinal bar concrete girt strip has L shape concrete protrusion split,
Longitudinal rib beam notch is poured after forming split, longitudinal rib reinforcement is added in notch, freely-supported cavity board member is become into continuous floor girt strip
Key is notch space, while thoroughly solving the problems, such as that combinated seam cracks when two pieces of cavity plate sections again;Actually L shape
The height of concrete protrusion is the depth of shallow combinated seam, and shallow seam depth is generally 30mm;In addition the split notch is that regeneration gate beam carries
Connection space has been supplied, the cross rib reinforcing bar of adjacent two pieces of cavity board members has been connected using welding or mechanical connection or grouting method,
Regeneration gate beam is formed, it is double that cavity board member single load bearing plate is become the laminated floor slab floor with prefabricated reinforced concrete convex bearing
To stressed plate;In order to reduce regeneration gate beam connection, also can in cavity board member girt strip preset elongated deformed bar or
Prestress steel twist cord hole deferent;Deformed bar is sealed in the deferent of hole, post stretching is taken to apply prestressing force;Making Liang Hekong
When cavity plate component, when assembled in situ, Reinforcement can also be changed into prestress steel twisted rope;The cavity of cavity board member it
Between be mutually communicated to form dark air duct;For the dark air duct of fire control smoke exhausting, in order to reduce fire control smoke exhausting resistance, steel mesh with ribbing engrave in set again
Jiong shape thin-walled air duct or thin plate air duct, steel mesh with ribbing engrave the end trepanning along Jiong shape thin-walled air duct, form the dark air duct in part, subtract
Resistance caused by participating in smoke evacuation due to entire cavity body when discharging fume less, improves smoke discharging effect again;Cavity in cavity board member
Body is engraved by steel mesh with ribbing or fish scale steel mesh with ribbing is engraved;Again in place by cavity floor lifting component, cavity floor component is hexagon
It is formed by the bevel edge of two right-angle sides and two isosceles right triangles;Two isosceles right triangle bevel edges are pre- against diamond shaped
The water chestnut side of reinforced concrete bearing body processed;When using there is bright girder construction, cavity floor component is assemblied in diamond shaped prefabricated reinforced concrete branch
The upper surface of seat and girder bottom surface L shape concrete protrusion, diamond shaped prefabricated reinforced concrete bearing and girder bottom surface L shape concrete protrusion regard
For the bright beam portion position of girder;When using without bright girder construction, when making cavity floor component, by design convex girder lower shape
The concave cavity floor component of assembled cavity floor member bottom section, convex girder and re-entrant cavity floor member are combined into nothing
Bright girder construction.
4th process, in diamond shaped prefabricated reinforced concrete bearing, precast main beam or prefabricated post frame, cavity floor component upper limb
Rear pour concrete, maintenance rear pouring concrete form removal obtain required folding with prefabricated reinforced concrete convex bearing again for edge and above-mentioned each space
Close floor object.Prefabricated Self-insulation wall plate is assembled on the rod rest of frame column and is decorated by the 5th process.When implementation framework core
When barrel structure, the connection type of girder and scheme noted earlier are essentially identical, only girder one end and triangular pedestals corner master
Beam connecting pin connects, and the girder junction port of the girder other end and Core Walls Structure connects;Girder Core Walls Structure junction port
Preferably from Core Walls Structure stack shell outwardly convex 500mm or more;Diamond shape bearing is as the function of triangular pedestals, and only shape is different;
The girder extension reinforcing bar of Core Walls Structure can misplace on the steel plate with precast main beam reinforcing bar to be connect.
Description of the drawings
Fig. 1 is frame structure plane embodiment figure of the present invention.
Fig. 2 is diamond shaped prefabricated reinforced concrete bearing plan view of the present invention.
Fig. 3 is prefabricated post block diagram of the present invention.
Fig. 4 is the prefabricated convex beam of the present invention without bright beam floor cross section.
Fig. 5 is cavity plate member planar figure of the present invention.
Fig. 6 is that steel mesh with ribbing engraves structure chart in cavity board member of the present invention.
Specific implementation mode
The present invention is further described below in conjunction with the accompanying drawings.
Fig. 1 is frame structure plane embodiment figure of the present invention, when the present invention is implemented,
First step:Column frame 3, the diamond shaped prefabricated reinforced concrete of the Prefabricated Concrete of specifications and models needed for frame structure 1 are made in factory
Bearing body 2 or triangle prefabricated reinforced concrete support body 21, precast main beam 4, precast stair, cavity floor 5 and column reinforcing bar 31;Diamond shaped
Prefabricated reinforced concrete bearing body 2 includes between girder assembly side 24, the rectangular post holes 22 in bearing centre, water chestnut side 23, water chestnut 25, Liang Yuliang
Reinforced concrete 26, bolt hole 27, girder junction steel plate 28, the girder cross wise reinforcement 29 among bearing in rectangular post holes 22;It again will be
Factory makes required specifications and models prefabricated concrete element transported batchwise to frame structure building engineering site;
Second step:Column reinforcing bar 31 is bound on ground structure foundation columns position;It binds column reinforcing bar length and is more than story height;It will
Prefabricated post frame 3 is sleeved on outside the column reinforcing bar 31 of binding, and correction prefabricated post frame 3 is set with to pour into a mould in prefabricated post frame after location coordinate and mix
Solidifying soil concrete 33, builds up reinforced concrete combined column;
Third step:By the 2 horizontal handling of prefabricated reinforced concrete bearing body, be square post holes among diamond shape prefabricated reinforced concrete bearing body 2
22 alignment reinforced concrete combined columns, and across the exposed column reinforcing bar 31 of combined column, it is placed in the upper end concrete of combined column prefabricated post frame 3
On, four water chestnuts 25 of diamond shape prefabricated reinforced concrete bearing body 2 are propped up with vertical supporting bar, and girder assembly side 24 is aligned adjacent compound
The water chestnut of the prefabricated reinforced concrete bearing body 2 of column upper end;Diamond shape or three angle prefabricated reinforced concrete branch are disposed in adjacent combined column upper end
Pedestal 21;Girder assembly side between girder assembly side 24 and girder connecting pin 211 is overlapped temporarily with positioning square steel tube, is carried out
It corrects and positions support;Girder 4 is aligned to the girder assembly side of prefabricated reinforced concrete bearing body, connects contiguous prefabricated reinforced concrete bearing
The steel plate 28 of the girder assembly side girder bottom longitudinal notch of body, steel plate is solid by the screw rod in bolt hole 27, while passing through steel
Muscle connector 212, which is linked and packed, constitutes girder;
Four steps:Precast stair is installed;Cavity is disposed in the reinforced concrete frame that prefabricated reinforced concrete bearing body and girder are constituted
Floor member 5 connects cross rib beam steel 51 and adds longitudinal michinaga rib joist steel 52 in split slot between plate, is laid on floor thereafter
Flange plate reinforcing bar 53 and holder top reinforcing bar;It repeats binding and prolongs the column reinforcing bar 31 risen, length is equal to story height, by prefabricated post
Frame 3 is sleeved on outside the column reinforcing bar 31 of binding, and after correction prefabricated post frame suit location coordinate, concrete is poured into a mould in prefabricated post frame
33, build up reinforced concrete combined column;Simultaneously by split slot 54, floor top flange slab between rectangular post holes 22, girder assembly side 24, plate
Muscle 52 and holder top reinforcing bar pour concrete;It repeats the above steps, simple and direct assembly is combined into a kind of reinforced concrete frame structure.Also may be used
First to assemble the reinforced concrete for reassembling cavity floor component 5 after N layers of frame and pouring into a mould afterwards.
Fig. 2 is diamond shaped prefabricated reinforced concrete bearing plan view of the present invention, and diamond shaped prefabricated reinforced concrete bearing body 2 includes girder
Reinforced concrete 26, bolt hole 27, girder connect between rectangular post holes 22, water chestnut side 23, water chestnut 25, Liang Yuliang among assembly side 24, bearing
Connect steel plate 28, the girder cross wise reinforcement 29 among bearing in rectangular post holes 22;Diamond shape flat-die is put on a vibration table, is pacified in mold
Oneself either binds 29 skeleton of girder reinforcing bar by banded good girder framework of steel reinforcement in diamond shape flat-die, in vertical girder and horizontal girder
Between pour concrete 26 after setting shearing resistance reinforcing bar, constitute diamond shaped prefabricated reinforced concrete bearing 2;When as dark air duct or mitigation dead weight
When, it is bound in diamond shape flat-die in 29 skeleton of girder reinforcing bar and hollow mold is set, hollow mold can be extracted out after pour concrete, also can be permanent
Indwelling.23 bottom of the water chestnut side protrusion of diamond shaped prefabricated reinforced concrete bearing 2,23 bottom projection portion of water chestnut side are in assembly and empty
Chamber floor member bumps are coupled, and constitute 2 or bright beam support 2 of concealed beam bearing.
Fig. 3 is prefabricated post block diagram of the present invention, and prefabricated post frame 3 can be used centrifugal force mold system and produce the prefabricated of four marginal rays cunning
Column frame 3, at this time the four of centrifugal force mold system interior angle position must dispose local internal model;Also band sealing can be put on a vibration table
Three face external molds and four sides internal model, the smooth prefabricated post frame 3 in three faces of production, external mold and internal model Jian Clip steel wires, inject concrete 35
And vibrating casting is at prefabricated post frame 3;The three face external molds and steel mesh with ribbing replacement four sides internal model that band sealing can also be used, outside three faces
Concrete vibration is injected between mould and steel mesh with ribbing can obtain prefabricated post frame 3, and outer three faces of prefabricated post frame 3 at this time are smooth, prefabricated post frame 3
Interior four four sides is coarse, is conducive to compound with cast column concrete afterwards.
Fig. 4 is the prefabricated convex beam of the present invention without bright beam floor cross section, and the bottom width of prefabricated convex girder 4 exists
Within 600mm, the height of prefabricated convex girder 4 is within 800mm;In order to mitigate weight, hollow 412 can be formed;Again with big mouth
Diameter supporting rod 403 supports 4 bottom 401 of prefabricated convex beam, and when prefabricated convex beam without bright beam, cavity plate component end lower end is in recessed
Shape, 4 bottom protrusion height h of prefabricated convex girder is usually most preferably 60mm within 100mm, at this time longitudinal rib beam bottom reinforcement bars end
Head upwarps;4 bottom protrusion width of prefabricated convex girder is usually most preferably 150mm within 200mm, under cavity plate component end
Concave size is held to be matched with beam, bumps combine, and realize without bright beam floor.
Fig. 5 is hexagonal cavities board member plan view of the present invention, and cavity board member 53 is by longitudinal girt strip 501, longitudinal edge rib
Beam 502, the L shape concrete protrusion 503 of longitudinal edge rib, lateral girt strip 504, regeneration cross rib beam steel 505, end cross rib
Beam 506 engraves 507, dark air hose 508 composition with diamond shaped prefabricated reinforced concrete bearing water chestnut side with edge fit 510, steel mesh with ribbing;Vertical
Steel mesh with ribbing is placed in the girt strip grid of traversed by mistake and engraves 507, in order to reduce fire control smoke exhausting resistance, is increased in steel mesh with ribbing engraves 507
If the small dark air duct of plate system is penetrated through with dark air hose hole 508;Surface is equipped with hanging ring 509 and rib reinforcement reserves exposed, girt strip and lower flange
Concrete or mortar are prefabricated in plate;With diamond shaped prefabricated reinforced concrete bearing water chestnut side isosceles right triangle is generally with edge fit 510
Bevel edge.
Fig. 6 is that steel mesh with ribbing engraves structure chart in cavity board member of the present invention, cavity board member at cavity steel mesh with ribbing
It engraves 507 and body 515, built-in bar-mat reinforcement supporter net 516, in order to reduce fire control smoke exhausting resistance, band rib steel is engraved by steel mesh body with ribbing
Net is engraved sets Jiong shape thin-walled air duct 517 or thin plate air duct again in 307;Steel mesh with ribbing is engraved 507 and is opened along the end of Jiong shape thin-walled wind 517
Hole 518 is used as fire-fighting smoke controlling air duct or solar energy air supply duct, realizes cavity floor multifunctional application.
Finally it should be noted that:The above embodiments are merely illustrative of the technical scheme of the present invention and are not intended to be limiting thereof, to the greatest extent
Invention is explained in detail with reference to above-described embodiment for pipe, it should be understood by a person of ordinary skill in the art that still
The specific implementation mode of the present invention can be modified or replaced equivalently, and end is detached from any of spirit and scope of the invention
Modification or equivalent replacement, are intended to be within the scope of the claims of the invention.
Claims (10)
1. the laminated floor slab with prefabricated reinforced concrete convex bearing, including prefabricated reinforced concrete convex bearing, prefabricated convex girder, cavity
Shallow seam is engaged between floor member, cavity floor component;The shape it is characterized in that the prefabricated reinforced concrete convex bearing assumes diamond in shape;It is described
Prefabricated reinforced concrete convex bearing diamond shaped periphery bottom surface has L shape concrete raised;The water chestnut of the diamond shaped sets girder dress
With end;Be square post holes among the prefabricated reinforced concrete bearing;The cavity floor component is hexagon;The cavity floor structure
Part concrete containing longitudinal bar girt strip, cross reinforcement concrete girt strip, cavity body, steel mesh concrete lower flange thin plate;The cavity floor component is folded
Close the side that part is protruded in the upper bit of prefabricated reinforced concrete convex bearing and prefabricated convex girder;The cavity floor component it
Between form longitudinal rib slot and shallow joint close.
2. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, spy are the prefabricated reinforced concrete
Girder reinforcing bar is indulged among bearing in rectangular post holes and horizontal girder reinforcing bar intersects and no-reinforcing-bar node;The girder assembly side extends length
Degree >=100mm;The girder assembly side is reserved with main beam stress bar connecting end.
3. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, it is characterised in that the prefabricated post frame
Smooth outer surface, inner surface form rough rough surface by steel mesh concrete;The prefabricated post frame is assemblied in precast reinforced
Upper surface on the outside of concrete bearing hollow part;It is connected with column reinforcing bar in the prefabricated post frame.
4. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, it is characterised in that the girder assembly
End is reserved with vertical or cross bolts hole;The girder assembly side bottom surface is reserved with baltimore groove.
5. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, it is characterised in that the precast main beam
Both ends are in inclined-plane or inclined-plane of vertically slotting;Reserve vertical bolt hole in the girder both ends;Girder both ends bottom surface is reserved with
Baltimore groove;Steel plate connector is assembled in the baltimore groove;Precast main beam both ends reserved steel bar is using mechanical connection or note
Slurry connection.
6. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, it is characterised in that described precast reinforced
The water chestnut side bottom protrusion of concrete bearing;Precast main beam bottom protrusion;When the contiguous prefabricated reinforced concrete bearing assembling, girder dress
It is positioned temporarily with the square tube component of fixed specification with end side surface.
7. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, it is characterised in that the cavity floor
Component is that hexagon is formed by the bevel edge of two right-angle sides and two isosceles triangles;Cavity body in the cavity floor component
It is engraved using steel mesh with ribbing, the steel mesh with ribbing is engraved to be engraved or fish scale steel mesh with ribbing is engraved for spreading belt rib steel net.
8. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, it is characterised in that the cavity floor
Component two ends bottom surface has L shape concrete recess.
9. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, it is characterised in that the cavity floor
The bottom surface of component longitudinal bar concrete girt strip has L shape concrete raised.
10. the laminated floor slab as described in claim 1 with prefabricated reinforced concrete convex bearing, it is characterised in that the cavity floor
It is mutually communicated between the cavity of component, forms dark air duct or formed in dark air duct and add the inorganic board composition dark smokejack of fire-fighting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711481834.9A CN108331226A (en) | 2017-12-29 | 2017-12-29 | Laminated floor slab with prefabricated reinforced concrete convex bearing |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711481834.9A CN108331226A (en) | 2017-12-29 | 2017-12-29 | Laminated floor slab with prefabricated reinforced concrete convex bearing |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108331226A true CN108331226A (en) | 2018-07-27 |
Family
ID=62923828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711481834.9A Pending CN108331226A (en) | 2017-12-29 | 2017-12-29 | Laminated floor slab with prefabricated reinforced concrete convex bearing |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108331226A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116717081A (en) * | 2023-07-20 | 2023-09-08 | 新疆兵团城建集团有限公司 | BDF ribbed steel mesh hollow member hollow floor construction device |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3918222A (en) * | 1974-06-03 | 1975-11-11 | Bahram Bahramian | Prefabricated modular flooring and roofing system |
US4333285A (en) * | 1977-01-20 | 1982-06-08 | Kajima Kensetsu Kabushiki Kaisha | Building structure |
JPH03250130A (en) * | 1990-02-27 | 1991-11-07 | Shimizu Corp | Building frame construction method |
CN106013567A (en) * | 2016-06-08 | 2016-10-12 | 湖南标迪夫节能科技有限公司 | Fabricated stressed island reinforced concrete cavity floor system |
CN106351375A (en) * | 2016-10-21 | 2017-01-25 | 王本淼 | Stress island assembled type hollow floor |
CN106381952A (en) * | 2016-10-21 | 2017-02-08 | 王海崴 | Assembling type overlapped cavity floor cover |
-
2017
- 2017-12-29 CN CN201711481834.9A patent/CN108331226A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3918222A (en) * | 1974-06-03 | 1975-11-11 | Bahram Bahramian | Prefabricated modular flooring and roofing system |
US4333285A (en) * | 1977-01-20 | 1982-06-08 | Kajima Kensetsu Kabushiki Kaisha | Building structure |
JPH03250130A (en) * | 1990-02-27 | 1991-11-07 | Shimizu Corp | Building frame construction method |
CN106013567A (en) * | 2016-06-08 | 2016-10-12 | 湖南标迪夫节能科技有限公司 | Fabricated stressed island reinforced concrete cavity floor system |
CN106351375A (en) * | 2016-10-21 | 2017-01-25 | 王本淼 | Stress island assembled type hollow floor |
CN106381952A (en) * | 2016-10-21 | 2017-02-08 | 王海崴 | Assembling type overlapped cavity floor cover |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116717081A (en) * | 2023-07-20 | 2023-09-08 | 新疆兵团城建集团有限公司 | BDF ribbed steel mesh hollow member hollow floor construction device |
CN116717081B (en) * | 2023-07-20 | 2024-04-30 | 新疆兵团城建集团有限公司 | BDF ribbed steel mesh hollow member hollow floor construction device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108252407A (en) | A kind of building with prefabricated reinforced concrete bearing | |
CN101892743A (en) | Construction method of permanent housing | |
CN108360672A (en) | Assembled architecture with prefabricated reinforced concrete convex bearing | |
CN108252408A (en) | A kind of assembly method of reinforced concrete frame structure system | |
CN108149827A (en) | The compound girt strip floor of assembled with prefabricated reinforced concrete bearing | |
CN207812664U (en) | A kind of prefabricated post frame for assembled architecture | |
CN108331226A (en) | Laminated floor slab with prefabricated reinforced concrete convex bearing | |
CN207469430U (en) | A kind of assembled arthitecutral structure | |
CN108360676A (en) | A kind of assembled architecture with girder bearing | |
CN108149826A (en) | A kind of assembled floor with prefabricated reinforced concrete bearing | |
CN108301509A (en) | A kind of assembly method of reinforced concrete frame structure | |
CN108086474A (en) | A kind of assembled architecture prefabricated reinforced concrete convex bearing body | |
CN108360673A (en) | The assembled architecture of beam infall no-reinforcing-bar connector | |
CN208309951U (en) | Cavity board member for stress island superstructure | |
CN108149787A (en) | A kind of assembled architecture with prefabricated reinforced concrete bearing | |
CN108301508A (en) | A kind of assembly method of reinforced concrete frame | |
CN107620415A (en) | A kind of assembling type steel structure cavity board member | |
CN108331221A (en) | Assembled with prefabricated reinforced concrete bearing regenerates girt strip floor | |
CN108086475A (en) | A kind of assembled architecture prefabricated reinforced concrete bearing body | |
CN207812658U (en) | A kind of assembled steel reinforced concrete composite frame structure with bolumn cap | |
CN207812665U (en) | A kind of cavity board member for beam column combination angle | |
CN208965715U (en) | Frame structure prefabricated reinforced concrete girder | |
CN107700729A (en) | A kind of assembled cavity floor on stress island | |
CN108149789A (en) | A kind of assembled architecture triangular pedestals body | |
CN108149785A (en) | A kind of prefabricated post frame for assembled architecture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180727 |
|
RJ01 | Rejection of invention patent application after publication |