CN108330841A CN201810182477.4A CN201810182477A CN108330841A CN 108330841 A CN108330841 A CN 108330841A CN 201810182477 A CN201810182477 A CN 201810182477A CN 108330841 A CN108330841 A CN 108330841A
Authority
CN
China
Prior art keywords
guide pipe
cable guide
plate body
scale
positioning panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810182477.4A
Other languages
Chinese (zh)
Other versions
CN108330841B (en
Inventor
岑峰
毛龙
李佳伟
姚小伟
刘硕
尚修东
罗兴益
范海茜
杜喜祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Original Assignee
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Engineering Co Ltd of CTCE Group filed Critical Second Engineering Co Ltd of CTCE Group
Priority to CN201810182477.4A priority Critical patent/CN108330841B/en
Publication of CN108330841A publication Critical patent/CN108330841A/en
Application granted granted Critical
Publication of CN108330841B publication Critical patent/CN108330841B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/16Suspension cables; Cable clamps for suspension cables ; Pre- or post-stressed cables

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Supports For Pipes And Cables (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The invention discloses a kind of concrete pylon cable guide pipe accurate-location device and its localization methods, cable guide pipe nozzle has anchor plate, positioning device includes positioning panel, positioning panel includes vertically disposed first plate body and the second plate body, conical socket is equipped at the crossing point of axes of two boards body, its cone tip part is equipped with location hole, using location hole as origin, along the first scale of length direction label of two plate bodys, positioning panel be equipped with for the fixed fixing device of anchor plate;Localization method includes that positioning panel is placed on anchor plate, by opposite sliding clamp and reading reading L after anchor plate clamping1、L2, adjustment sliding clamp reading be

Description

Concrete pylon cable guide pipe accurate-location device and its localization method
Technical field
The present invention relates to concrete pylon cable guide pipe accurate-location device and its localization methods.
Background technology
It is well known that cable guide pipe is widely used in the installation anchorage point of cable-stayed bridge prestressed cable, for suspension cable space The linear protection for accurately controlling, anchoring position has extremely important effect.Can concrete pylon cable guide pipe accurately be installed It is mainly dependent on whether that precise positioning goes out the central point of cable guide pipe nozzle, common method is to weld one piece in cable guide pipe nozzle at present Angle iron component is found out the nozzle center of circle with crossing method and is marked on angle iron component, and the mark point Coordinate setting-out is utilized And after being adjusted in place cable guide pipe, the diagonal steel member of need is cut off, solder joint polishes smooth and makees antirust treatment, this positioning side Method process is various complicated, time-consuming and laborious, and the error that manual operation generates is larger, causes precision too low, can also be made in work progress At the wasting of resources.
Invention content
The technical problem to be solved by the present invention is to provide concrete pylon cable guide pipe accurate-location device and its localization methods.
The technical scheme is that:A kind of concrete pylon cable guide pipe accurate-location device, the cable guide pipe nozzle Oral area periphery has the anchor plate being centrosymmetrically arranged about nozzle, and the positioning device includes positioning panel, the positioning surface Plate includes the first plate body and vertically disposed second plate body of first plate body, and first plate body, which has, to be extended along a length thereof First axle, second plate body has the second axis that extends along a length thereof, the friendship of the first axle and second axis Conical socket is equipped at point, the cone tip part of the conical socket is equipped with the location hole for positioning cable guide pipe nozzle center, The positioning panel be equipped with the first scale, first scale using the location hole as origin, along first plate body with The length direction of second plate body extends outwardly label, is additionally provided in the positioning panel for mutually fixed solid with the anchor plate Determine device.
Further, heretofore described positioning panel is T-shaped plate.
Further, heretofore described fixing device includes corresponding to each of first plate body and second plate body certainly By the sliding clamp that can be slidably reciprocated along the length direction of the first plate body or the second plate body of end setting, the sliding clamp tool It is useful for the block inconsistent with anchor plate outer rim.
Further, heretofore described sliding clamp is equipped with limit knob and is fixed on by the limit knob and determined To realize being relatively fixed between positioning panel and anchor plate on plane plate.
Further, heretofore described sliding clamp is equipped with the second scale for sliding along bearing mark.
Further, the least unit of heretofore described first scale is 1mm, and per 10mm, work has length mark.
Further, the overall length of heretofore described second scale is 19mm, least unit 0.95mm, is made per 1.9mm There is length mark.
Further, heretofore described second plate body is equipped with for adjusting the cable guide pipe and anchor plate level angle Levelling tube.
It is a further object of the present invention to provide a kind of concrete pylon cable guide pipe precise positioning methods, including:It 1) will positioning Panel is placed on anchor plate, has scale to place up;2) the sliding clamp for choosing opposite both sides is outer with anchor plate respectively Edge clamping reads the reading of two sliding clamps, is denoted as L respectively1、L2;3) utilize the first scale and the second scale corresponding thick respectively Reconcile position of the fine tuning sliding clamp in positioning panel so that the readings residing for all sliding clamps arePositioning Hole position is cable guide pipe nozzle center;4) it tightens limit knob and is fixed on clamp is slided in positioning panel, into And realize being relatively fixed between positioning panel and anchor plate by the block on sliding clamp;5) it is led by levelling tube adjustment rope Pipe and the level angle of anchor plate to design angle, the bubble in levelling tube should be at centered horizontal state;6) by total powerstation rib The bar point of mirror bar is vertically disposed in the position of location hole, and cable guide pipe and anchor plate are adjusted to designing position by total station survey setting-out It sets.
Further, in the present invention, the mark of sliding clamp fine tuning in place is a certain on the sliding clamp in step 3) Scale is overlapped with a certain scale in positioning panel just.
Compared with the prior art, the present invention has the following advantages:
1) present invention in, sliding clamp can slidably reciprocate in positioning panel, and by with the use of limit knob it is same Shi Shixian slides being relatively fixed between fixation and positioning panel and anchor plate between clamp and positioning panel, levelling tube The level angle of cable guide pipe and anchor plate can then be adjusted to design angle, the positioning device can Reusability, it is easy to operate and It is convenient for disassembly and assembly, it avoids resulting in waste of resources in work progress and environmental pollution, greatly reduces construction cost while improving construction Speed.
2) in the present invention, the first scale and the second scale are respectively used to coarse adjustment and fine tuning sliding clamp in positioning panel Position, in actual mechanical process, the size scale designed in positioning panel and the sliding clamp being matched therewith leads rope The positioning accuracy at pipe nozzle center greatly improves construction quality up to 0.05mm to realize efficient precise positioning.
3) present invention in, when being positioned using the positioning device, according to the design parameter of cable guide pipe and anchor plate it is found that The distance at each edge of anchor plate to cable guide pipe nozzle center is equal, after positioning panel is placed on anchor plate, adjustment sliding Position of the clamp in positioning panel, when a certain scale on sliding clamp is overlapped with a certain scale in positioning panel just When, then it represents that sliding clamp is adjusted in place, and when the position adjustment of all sliding clamps finishes, location hole is in cable guide pipe nozzle Heart position, the localization method is efficiently accurate, ensure that the accurate installation of cable guide pipe.
Description of the drawings
The invention will be further described with reference to the accompanying drawings and embodiments:
Fig. 1 is the dimensional structure diagram of positioning device in the present invention (wherein the first scale is not drawn into);
Fig. 2 is the vertical view of positioning device in the present invention;
Fig. 3 is the use state diagram of positioning device in the present invention;
Fig. 4 is that use state vertical view of the positioning device on cable guide pipe and anchor plate (wherein limits knob in the present invention It is not drawn into);
Fig. 5 is the normal condition schematic diagram of levelling tube when positioning device is horizontal in the present invention.
Wherein:1, positioning panel;2, conical socket;3, clamp is slided;31, block;4, knob is limited;5, levelling tube;6、 Cable guide pipe;7, anchor plate;8, prism bar.
Specific implementation mode
Embodiment:
The tool of a kind of concrete pylon cable guide pipe accurate-location device of the present invention and its localization method is shown in conjunction with attached drawing Body embodiment, the oral area periphery of 6 nozzle of the cable guide pipe have the anchor plate 7 being centrosymmetrically arranged about nozzle, the anchor The periphery of 7 cross section of backing plate is square, and therefore, the distance at each edge to the 6 nozzle center of cable guide pipe of anchor plate 7 is equal.
First, as shown in Figure 1, Figure 2, the positioning device includes positioning panel 1, the positioning panel 1 is T-shaped plate, The T-shaped plate includes the first plate body and vertically disposed second plate body of first plate body, and first plate body has along its length The first axle extended is spent, second plate body has the second axis extended along a length thereof, the first axle and the second axis The point of intersection of line is equipped with conical socket 2, and the cone tip part of the conical socket 2 is equipped with for positioning 6 nozzle center of the cable guide pipe Location hole.
As shown in Fig. 2, the positioning panel 1 be equipped with the first scale, first scale using the location hole as origin, Extending outwardly label along the length direction of first plate body and the second plate body, the least unit of first scale is 1mm, Per 10mm, work has length mark.
Be additionally provided in the positioning panel 1 for 7 mutually fixed fixing device of the anchor plate, the fixing device packet Include corresponding to each free end of first plate body and the second plate body be arranged can be along the length of the first plate body or the second plate body Three sliding clamps 3 that degree direction slidably reciprocates, the sliding clamp 3 have for the block inconsistent with 7 outer rim of anchor plate 31, as shown in Figure 1, being each equipped with limit knob 4 on sliding clamp 3 and being fixed on positioning panel 1 by the limit knob 4 On to realize being relatively fixed between positioning panel 1 and anchor plate 7.
The sliding clamp 3 is equipped with the second scale for sliding along bearing mark, and the overall length of second scale is 19mm, least unit 0.95mm, per 1.9mm, work has length mark.
In addition, being additionally provided with the levelling tube for adjusting the cable guide pipe 6 and 7 level angle of anchor plate on second plate body 5。
The sliding clamp 3 of the pointing device design can slidably reciprocate in positioning panel 1, by with the use of limit revolve Button 4 can be achieved at the same time opposite between fixation and positioning panel 1 and anchor plate 7 between sliding clamp 3 and positioning panel 1 It is fixed, it is easy to operate and convenient for disassembly and assembly, avoid resulting in waste of resources in work progress and environmental pollution, and can Reusability, It greatly reduces construction cost while improving speed of application.
In actual mechanical process, by taking the second plate body as an example, it was demonstrated that positioning panel 1 and the sliding clamp being matched therewith The size scale designed on 3, up to 0.05mm, proves that principle is as follows to the positioning accuracy at 6 nozzle center of cable guide pipe:
By positioning panel 1 with the design parameter for sliding clamp 3 it is found that the origin of the first scale is location hole, least unit For 1mm, per 10mm, work has length mark, and the overall length of the second scale is 19mm, least unit 0.95mm, per 1.9mm, work has length Scale designation.
Assuming that the distance at each edge of anchor plate 7 to 6 nozzle center of cable guide pipe is abc.de mm, and for convenience of proving, rule Determine the positive integer that a, b, c, d, e are 0~9, so:
Abc.de=100 × a+10 × b+c+0.1 × d+0.01 × e (1)
Note N is taken as the integer of 0.de/0.05=(2 × d+0.2 × e) to round up, then 0.05 × N of 0.de ≈, due to D, e is 0~9 positive integer, so N ∈ [0,20];
Remember error delta=0.de-0.05 × N, due to N be 0~20 integer, so δ is accurate to 2 significant digits, then 0.de=0.05 × N+ δ, and since N takes the mode to round up, the part cast out and supplied is respectively less than 0.025mm, because This, δ ∈ (- 0.025,0.025);
Coarse adjustment is slided position of the clamp 3 on the second plate body and is between ab.c and ab. (c+1) cm scales, then When fine tuning sliding clamp 3 makes it slowly close to from the location of outside 0.demm distances of ab.c cm scales, slide on clamp 3 Nth bar scale to the second plate body on the distance between ab.c cm scales Dn should be 0.demm+0.95 × n mm, then:
Dn=0.de+0.95 × n
≈0.05×N+0.95×n
≈0.05×n+0.95×n+0.05×(N-n)
≈n+0.05×(N-n)
Wherein, [0,19/0.95] n ∈, i.e. n ∈ [0,20], therefore, when n, [0,20] N ∈, 0.05 × (N-n) ∈ [- 1,1], when N=n, Dn ≈ N, at this point, sliding ab.c cm scales on the nth bar scale to the second plate body on clamp 3 The distance between about N mm;
Since the first scale least unit on the second plate body is 1mm, on the second plate body, there are a certain scales and sliding to block Nth bar scale on son 3 overlaps, so, the mark that judgement sliding clamp 3 is adjusted in place is the nth bar above the sliding clamp 3 Scale is overlapped with a certain scale on the second plate body just.
First scale and the second scale are respectively used to the position of coarse adjustment and fine tuning sliding clamp 3 in positioning panel 1, sliding The mark that clamp 3 is adjusted in place is that the nth bar scale on the sliding clamp 3 is overlapped with a certain scale on the second plate body just, Location hole is that 6 nozzle center of cable guide pipe greatly improves construction quality to realize efficient precise positioning.
Secondly, in conjunction with shown in Fig. 3 to Fig. 5, the localization method includes the following steps:
Step 1):Positioning panel 1 is placed on anchor plate 7, has scale to place up;
Step 2):According to the design parameter of cable guide pipe 6 and anchor plate 7 it is found that each edge of anchor plate 7 to cable guide pipe 6 is managed The distance at mouth center is equal, chooses the sliding clamp 3 on opposite both sides respectively with the outer rim clamping of anchor plate 7, reads two respectively The reading for sliding clamp 3, is denoted as L1、L2
Step 3) corresponds to coarse adjustment and each sliding clamp 3 of fine tuning in positioning panel respectively using the first scale and the second scale Position on 1, the sliding fine tuning of clamp 3 mark in place be nth bar scale on the sliding clamp 3 just in positioning panel 1 A certain scale overlap so that the reading residing for three sliding clamps 3 isLocation hole position is cable guide pipe 6 nozzle centers;
Step 4):It tightens three limit knobs 4 successively three sliding clamps 3 are fixed in positioning panel 1, and then by Block 31 on sliding clamp 3 realizes being relatively fixed between positioning panel 1 and anchor plate 7;
Step 5):By the level angle of the adjustment cable guide pipe 6 of levelling tube 5 and anchor plate 7 to design angle, as shown in figure 5, The bubble in levelling tube 5 should be at centered horizontal state at this time;
Step 6):As shown in figure 3, the bar point of total station prism bar 8 to be vertically disposed in the position of location hole, pass through whole station Instrument surveying and locating adjusts cable guide pipe 6 with anchor plate 7 to design position, ensures cable guide pipe 6 by efficiently accurately positioning Accurate installation.
Certainly the above embodiments merely illustrate the technical concept and features of the present invention, and its object is to allow be familiar with technique People can understand the content of the present invention and implement it accordingly, it is not intended to limit the scope of the present invention.It is all according to this hair The modification that the Spirit Essence of bright main technical schemes is done, should be covered by the protection scope of the present invention.

Claims (10)

1. the oral area periphery of a kind of concrete pylon cable guide pipe accurate-location device, cable guide pipe (6) nozzle has about pipe The anchor plate (7) that mouth is centrosymmetrically arranged, the positioning device includes positioning panel (1), it is characterised in that:The positioning panel (1) include the first plate body and vertically disposed second plate body of first plate body, first plate body, which has, to be extended along a length thereof First axle, second plate body has the second axis that extends along a length thereof, the friendship of the first axle and second axis Conical socket (2) is equipped at point, the cone tip part of the conical socket (2) is equipped with for positioning the cable guide pipe (6) nozzle center Location hole, the positioning panel (1) be equipped with the first scale, first scale using the location hole as origin, along institute The length direction for stating the first plate body and the second plate body extends outwardly label, be additionally provided on the positioning panel (1) for it is described Anchor plate (7) mutually fixed fixing device.
2. concrete pylon cable guide pipe accurate-location device according to claim 1, it is characterised in that:The positioning panel (1) it is T-shaped plate.
3. concrete pylon cable guide pipe accurate-location device according to claim 1, it is characterised in that:The fixing device Include corresponding to each free end of first plate body and the second plate body be arranged can be along the first plate body or the second plate body The sliding clamp (3) that length direction slidably reciprocates, the sliding clamp (3) have for inconsistent with anchor plate (7) outer rim Block (31).
4. concrete pylon cable guide pipe accurate-location device according to claim 3, it is characterised in that:The sliding clamp (3) it is equipped with limit knob (4) and is fixed in positioning panel (1) by the limit knob (4) to realize positioning panel (1) Being relatively fixed between anchor plate (7).
5. concrete pylon cable guide pipe accurate-location device according to claim 3, it is characterised in that:The sliding clamp (3) it is equipped with the second scale for sliding along bearing mark.
6. concrete pylon cable guide pipe accurate-location device according to claim 1, it is characterised in that:First scale Least unit be 1mm, per 10mm work have length mark.
7. concrete pylon cable guide pipe accurate-location device according to claim 6, it is characterised in that:Second scale Overall length be 19mm, least unit 0.95mm, per 1.9mm work have length mark.
8. concrete pylon cable guide pipe accurate-location device according to claim 1, it is characterised in that:Second plate body It is equipped with the levelling tube (5) for adjusting the cable guide pipe (6) and anchor plate (7) level angle.
9. a kind of concrete pylon cable guide pipe precise positioning method, which is characterized in that including:
1) positioning panel (1) is placed on anchor plate (7), there is scale to place up;
2) sliding clamp (3) the outer rim clamping with anchor plate (7) respectively for choosing opposite both sides, reads two sliding clamps respectively (3) reading, is denoted as L1、L2
3) the first scale and the second scale is utilized to correspond to the position of coarse adjustment and fine tuning sliding clamp (3) in positioning panel (1) respectively It sets so that the readings residing for all slidings clamps (3) areLocation hole position is in cable guide pipe (6) nozzle Heart position;
4) it tightens limit knob (4) sliding clamp (3) is fixed in positioning panel (1), and then by sliding clamp (3) Block (31) realizes being relatively fixed between positioning panel (1) and anchor plate (7);
5) by levelling tube (5) adjustment cable guide pipe (6) and the level angle of anchor plate (7) to design angle, in levelling tube (5) Bubble should be at centered horizontal state;
6) the bar point of total station prism bar (8) is vertically disposed in the position of location hole, rope is adjusted by total station survey setting-out Conduit (6) and anchor plate (7) to design position.
10. concrete pylon cable guide pipe precise positioning method according to claim 9, it is characterised in that:It is sliding in step 3) The mark of dynamic clamp (3) fine tuning in place be a certain scale on the sliding clamp (3) just with certain a moment in positioning panel (1) Degree overlaps.
CN201810182477.4A 2018-03-06 2018-03-06 Accurate positioning device and positioning method for cable guide pipe of concrete cable tower Active CN108330841B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810182477.4A CN108330841B (en) 2018-03-06 2018-03-06 Accurate positioning device and positioning method for cable guide pipe of concrete cable tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810182477.4A CN108330841B (en) 2018-03-06 2018-03-06 Accurate positioning device and positioning method for cable guide pipe of concrete cable tower

Publications (2)

Publication Number Publication Date
CN108330841A true CN108330841A (en) 2018-07-27
CN108330841B CN108330841B (en) 2024-05-07

Family

ID=62930542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810182477.4A Active CN108330841B (en) 2018-03-06 2018-03-06 Accurate positioning device and positioning method for cable guide pipe of concrete cable tower

Country Status (1)

Country Link
CN (1) CN108330841B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208477A (en) * 2018-10-17 2019-01-15 中铁大桥局集团第五工程有限公司 Adjustable positioning device and application method for cable guide pipe nozzle centralized positioning
CN111060034A (en) * 2019-12-31 2020-04-24 中国水利水电第八工程局有限公司 Cable guide central axis positioning device and cable guide central axis deviation measuring method
CN111663526A (en) * 2020-06-19 2020-09-15 北京崇建工程有限公司 Protective cylinder positioning device and method
CN114875799A (en) * 2022-06-10 2022-08-09 中铁八局集团第三工程有限公司 High-precision cable guide pipe rapid positioning and mounting device and method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU949035A1 (en) * 1980-09-24 1982-08-07 За витель 949035 (И) Device for anchoring rope
JPH0485403A (en) * 1990-07-30 1992-03-18 Kajima Corp Method for applying anti-corrosive coating of suspended structure supporting diagonal cable
JP2004309376A (en) * 2003-04-09 2004-11-04 Geotop Corp Pile position gauge
CN203022032U (en) * 2012-12-10 2013-06-26 西安建筑科技大学 Auxiliary tool for retest of pile position
CN203364717U (en) * 2013-05-30 2013-12-25 中国二十冶集团有限公司 Ruler for measuring pile diameter and central point of pile position
CN203498757U (en) * 2013-08-29 2014-03-26 中交第二航务工程局有限公司 Central point positioning device of cable duct nozzle
CN104526499A (en) * 2015-01-04 2015-04-22 中国科学院光电技术研究所 Workpiece clamp in ion beam polishing equipment
CN205981004U (en) * 2016-08-30 2017-02-22 大连船舶重工集团有限公司 Segmentation inspects that line and board mouth are with face degree deviation dipperstick
CN106638318A (en) * 2016-11-25 2017-05-10 中铁大桥局集团第五工程有限公司 Method for positioning anchor point of beam end of cable stayed bridge and installation method of cable guide pipe
CN107014359A (en) * 2017-03-20 2017-08-04 中铁大桥局集团有限公司 Stayed bridge pylon cable cableway pipe positioning measuring device and its measuring method
CN107090775A (en) * 2017-05-24 2017-08-25 中交第二航务工程局有限公司 A kind of full framing space beam-ends cable guide pipe construction localization method
CN207919379U (en) * 2018-03-06 2018-09-28 中铁四局集团第二工程有限公司 A kind of cable guide pipe precise positioning fixture on concrete pylon

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU949035A1 (en) * 1980-09-24 1982-08-07 За витель 949035 (И) Device for anchoring rope
JPH0485403A (en) * 1990-07-30 1992-03-18 Kajima Corp Method for applying anti-corrosive coating of suspended structure supporting diagonal cable
JP2004309376A (en) * 2003-04-09 2004-11-04 Geotop Corp Pile position gauge
CN203022032U (en) * 2012-12-10 2013-06-26 西安建筑科技大学 Auxiliary tool for retest of pile position
CN203364717U (en) * 2013-05-30 2013-12-25 中国二十冶集团有限公司 Ruler for measuring pile diameter and central point of pile position
CN203498757U (en) * 2013-08-29 2014-03-26 中交第二航务工程局有限公司 Central point positioning device of cable duct nozzle
CN104526499A (en) * 2015-01-04 2015-04-22 中国科学院光电技术研究所 Workpiece clamp in ion beam polishing equipment
CN205981004U (en) * 2016-08-30 2017-02-22 大连船舶重工集团有限公司 Segmentation inspects that line and board mouth are with face degree deviation dipperstick
CN106638318A (en) * 2016-11-25 2017-05-10 中铁大桥局集团第五工程有限公司 Method for positioning anchor point of beam end of cable stayed bridge and installation method of cable guide pipe
CN107014359A (en) * 2017-03-20 2017-08-04 中铁大桥局集团有限公司 Stayed bridge pylon cable cableway pipe positioning measuring device and its measuring method
CN107090775A (en) * 2017-05-24 2017-08-25 中交第二航务工程局有限公司 A kind of full framing space beam-ends cable guide pipe construction localization method
CN207919379U (en) * 2018-03-06 2018-09-28 中铁四局集团第二工程有限公司 A kind of cable guide pipe precise positioning fixture on concrete pylon

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208477A (en) * 2018-10-17 2019-01-15 中铁大桥局集团第五工程有限公司 Adjustable positioning device and application method for cable guide pipe nozzle centralized positioning
CN109208477B (en) * 2018-10-17 2023-11-28 中铁大桥局集团第五工程有限公司 Adjustable positioning device for positioning center of orifice of cable duct and use method
CN111060034A (en) * 2019-12-31 2020-04-24 中国水利水电第八工程局有限公司 Cable guide central axis positioning device and cable guide central axis deviation measuring method
CN111060034B (en) * 2019-12-31 2021-12-24 中国水利水电第八工程局有限公司 Cable guide central axis positioning device and cable guide central axis deviation measuring method
CN111663526A (en) * 2020-06-19 2020-09-15 北京崇建工程有限公司 Protective cylinder positioning device and method
CN114875799A (en) * 2022-06-10 2022-08-09 中铁八局集团第三工程有限公司 High-precision cable guide pipe rapid positioning and mounting device and method

Also Published As

Publication number Publication date
CN108330841B (en) 2024-05-07

Similar Documents

Publication Publication Date Title
CN108330841A (en) Concrete pylon cable guide pipe accurate-location device and its localization method
CN207919379U (en) A kind of cable guide pipe precise positioning fixture on concrete pylon
CN110487258B (en) Prism support device and using method thereof
CN104390632A (en) Total station collimation line method horizontal displacement observation platform and application method thereof
CN107421520B (en) Decoration paying-off device and method based on BIM technology
CN106638318B (en) The localization method and cable guide pipe installation method of cable-stayed bridge beam-ends anchor point
CN107939056B (en) Arc-shaped pay-off tool
CN101239006A (en) Intervertebral disk puncture locator
CN112589763B (en) Steel pipe pile alignment welding tool and alignment welding method
US4285139A (en) Trig pole for masonry construction
CN208844920U (en) Multilayer reserves casing and guarantees device with one heart
CN108425321B (en) Installation method of novel variable-cross-section bridge linear control device
CN105841592B (en) A kind of measuring device and its application method of jacking axis deviant
CN110130390A (en) Bolt pre-embedded structure and installation method of raft foundation
CN207798098U (en) Engineering survey actinobacillus device
CN201666794U (en) Special line laying tool for lateral central lines on working layer of molten iron mixer body
CN211229590U (en) Lofting positioning device for building main structure construction
CN215864924U (en) Portable three-arch roadway peripheral hole arranging device
CN212030537U (en) A measuring device for all-weather sea level of striding
CN115341772A (en) Pointing tool for rapidly measuring thickness of masonry mortar joint and using method thereof
CN216663728U (en) Use hanging wire device of infrared ray quick adjustment elevation
CN206815191U (en) A kind of full framing space beam-ends cable guide pipe positioner
CN210396046U (en) Tile leveling device
CN206347933U (en) A kind of survey gyp tool and system for rotary module center
CN209053440U (en) Adjustable floor leveling device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20240306

Address after: No.96, Wangjiang East Road, Baohe District, Hefei City, Anhui Province, 230041

Applicant after: CHINA TIESIJU CIVIL ENGINEERING GROUP Co.,Ltd.

Country or region after: China

Applicant after: THE SECOND CONSTRUCTION CO., LTD. OF CTCE Group

Address before: No.9, litanghe Road, Xiangcheng District, Suzhou City, Jiangsu Province

Applicant before: THE SECOND CONSTRUCTION CO., LTD. OF CTCE Group

Country or region before: China

GR01 Patent grant
GR01 Patent grant