CN108316930A - 一种斜井冻结法施工巷道掌子面快速加固方法 - Google Patents
一种斜井冻结法施工巷道掌子面快速加固方法 Download PDFInfo
- Publication number
- CN108316930A CN108316930A CN201810132183.0A CN201810132183A CN108316930A CN 108316930 A CN108316930 A CN 108316930A CN 201810132183 A CN201810132183 A CN 201810132183A CN 108316930 A CN108316930 A CN 108316930A
- Authority
- CN
- China
- Prior art keywords
- freezing pipe
- face
- freezing
- pipe
- tunnel face
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
Abstract
一种斜井冻结法施工巷道掌子面快速加固方法,包含以下步骤予以实现将位于掌子面中间冻结管分割为顶冻结管(1)和底冻结管(2)两部分,同时在顶冻结管(1)和底冻结管(2)接口处安装三通(3)。本发明在掌子面周边布设冻结管,并通过顶冻结管(1)和底冻结管(2)形成循环管路,为巷道掌子面持续提供冷量,使巷道掌子面温度迅速降低,快速提高掌子面顶板、帮和底部冻结壁强度,可提高巷道掌子面局部强度,对巷道掌子面进行快速加固,能有效防止溃砂、涌水、塌方和淹井等灾害发生,尤其是对淤泥、富水砂层等复杂地质条件下的斜井开挖过程中灾害防止效果显著。
Description
技术领域
本发明涉及的是斜井冻结法施工技术领域,具体涉及一种种斜井冻结法施工巷道掌子面快速加固方法。
背景技术
在富水砂层、淤泥、裂隙发育的含水层以及松散不稳定的冲积层等复杂地质条件下开凿隧道或巷道时,往往会发生溃砂、涌水和塌方等灾害,对施工人员的人身安全造成了极大的危害。针对上述现象目前最常见的解决办法是采用冻结法施工,即预先在地面巷道位置范围内打冻结孔,然后在冻结孔内插入冻结管,冻结开始后由冻结管向周围土体传递冷量,但由于土体的导温性能较差,无法快速提高冻结巷道掌子面顶、帮和底板的土体强度。
发明内容
为了克服上述现有技术的不足,本发明的目的是提供一种斜井冻结法施工巷道掌子面快速加固方法,可沿掌子面周边布设环形冻结管路,为掌子面周边岩土体提供冷量,可快速提高掌子面周围岩土体强度,保证掌子面的安全稳定。
为了实现上述目的,本发明采用的技术方案是:
一种斜井冻结法施工巷道掌子面快速加固方法,包含以下步骤予以实现:
1)冻结管外部为无缝钢管(盐水回路),内部为橡胶管(盐水去路),两者之间形成一个去回路循环,在巷道开挖时,将冻结管从掌子面冻结土体中挖出,使得掌子面中间冻结管外露;
2)将位于掌子面中间冻结管分割为顶冻结管1和底冻结管2两部分,同时在顶冻结管1和底冻结管2接口处安装三通3;
3)然后在掌子面周边布设环形冻结管4,环形冻结管4由φ30-60mm的无缝钢管组成,环形冻结管4的两端通过橡胶管5分别与顶冻结管1和底冻结管2处的三通3一端相连组成盐水去路;顶冻结管1和底冻结管2处的三通3另一端通过橡胶管5相连形成盐水回路;
4)在掌子面加固过程中,为了减少冷量损失,在冻结开始后应及时在掌子面及其四周边喷射300mm厚混凝土。
由于采用了以上技术方案,本发明具有以下有益效果:
可沿掌子面周边布设环形冻结管路,为掌子面周边岩土体提供冷量,可快速提高掌子面周围岩土体强度,保证掌子面的安全稳定,能有效防止涌水、溃砂、塌方等灾害的发生,尤其对富水砂层、淤泥、裂隙发育的含水层以及松散不稳定的冲积层等复杂地质条件下的灾害防止效果显著。
附图说明
为了更清楚地说明本发明,下面将结合附图对实施例作简单的介绍。
图1是本发明的立面示意图;
图2是本发明的剖面示意图;
图3是本发明平面示意图。
具体实施方式
为了使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述。
参看图1-3,本具体实施方式是采用以下步骤予以实现:
(1)冻结管外部为无缝钢管(盐水回路),内部为橡胶管(盐水去路),两者之间形成一个去回路循环,在巷道开挖时,将冻结管从掌子面冻结土体中挖出,使得掌子面中间冻结管外露;
(2)将位于掌子面中间冻结管分割为顶冻结管1和底冻结管2两部分,同时在顶冻结管1和底冻结管2接口处安装三通3;
(3)然后在掌子面周边布设环形冻结管4,环形冻结管4由φ30-60mm的无缝钢管组成,环形冻结管4的两端通过橡胶管5分别与顶冻结管1和底冻结管2处的三通3一端相连组成盐水去路;顶冻结管1和底冻结管2处的三通3另一端通过橡胶管5相连形成盐水回路;
(4)在掌子面加固过程中,为了减少冷量损失,在冻结开始后应及时在掌子面及其四周边喷射300mm厚混凝土。
由于采用了以上技术方案,本发明具有以下有益效果:能够在工作面底板附近以及两帮制作环形冻结管路,提供冷量,以加强工作面顶、底、帮冻结壁的强度,快速增加隧道或巷道局部围岩强度,有效防止塌方、溃砂、涌水等灾害,特别是对富水砂层、淤泥等复杂地质条件下,灾害防止效果显著。
最后应说明的是:以上实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解,其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的精神和范围。
Claims (1)
1.一种斜井冻结法施工巷道掌子面快速加固方法,其特征在于,包含以下步骤:
1)冻结管外部为无缝钢管(盐水回路),内部为橡胶管(盐水去路),两者之间形成一个去回路循环,在巷道开挖时,将冻结管从掌子面冻结土体中挖出,使得掌子面中间冻结管外露;
2)将位于掌子面中间冻结管分割为顶冻结管(1)和底冻结管(2)两部分,同时在顶冻结管(1)和底冻结管(2)接口处安装三通(3);
3)然后在掌子面周边布设环形冻结管(4),环形冻结管(4)由φ30-60mm的无缝钢管组成,环形冻结管(4)的两端通过橡胶管(5)分别与顶冻结管(1)和底冻结管(2)处的三通(3)一端相连组成盐水去路;顶冻结管(1)和底冻结管(2)处的三通(3)另一端通过橡胶管(5)相连形成盐水回路;
4)在掌子面加固过程中,为了减少冷量损失,在冻结开始后应及时在掌子面及其四周边喷射300mm厚混凝土。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810132183.0A CN108316930A (zh) | 2018-02-09 | 2018-02-09 | 一种斜井冻结法施工巷道掌子面快速加固方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810132183.0A CN108316930A (zh) | 2018-02-09 | 2018-02-09 | 一种斜井冻结法施工巷道掌子面快速加固方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108316930A true CN108316930A (zh) | 2018-07-24 |
Family
ID=62903280
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810132183.0A Pending CN108316930A (zh) | 2018-02-09 | 2018-02-09 | 一种斜井冻结法施工巷道掌子面快速加固方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108316930A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107497A (zh) * | 2021-04-14 | 2021-07-13 | 中铁工程服务有限公司 | 一种硬岩隧道掘进施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104632225A (zh) * | 2014-12-24 | 2015-05-20 | 陕西煤业化工建设(集团)有限公司 | 一种环形冻结管路 |
CN105257297A (zh) * | 2015-11-04 | 2016-01-20 | 中铁十八局集团有限公司 | 一种管间精准控制冻土帷幕的施工方法 |
CN105927234A (zh) * | 2016-06-27 | 2016-09-07 | 中国矿业大学 | 一种水平隧道多竖井冻结法加固开挖的施工方法 |
CN206419017U (zh) * | 2017-01-23 | 2017-08-18 | 中铁十一局集团城市轨道工程有限公司 | 大断面浅埋隧道冻结暗挖施工结构 |
-
2018
- 2018-02-09 CN CN201810132183.0A patent/CN108316930A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104632225A (zh) * | 2014-12-24 | 2015-05-20 | 陕西煤业化工建设(集团)有限公司 | 一种环形冻结管路 |
CN105257297A (zh) * | 2015-11-04 | 2016-01-20 | 中铁十八局集团有限公司 | 一种管间精准控制冻土帷幕的施工方法 |
CN105927234A (zh) * | 2016-06-27 | 2016-09-07 | 中国矿业大学 | 一种水平隧道多竖井冻结法加固开挖的施工方法 |
CN206419017U (zh) * | 2017-01-23 | 2017-08-18 | 中铁十一局集团城市轨道工程有限公司 | 大断面浅埋隧道冻结暗挖施工结构 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113107497A (zh) * | 2021-04-14 | 2021-07-13 | 中铁工程服务有限公司 | 一种硬岩隧道掘进施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104963334B (zh) | 用注浆冻结管加固冻结联络通道抑制冻胀融沉的施工方法 | |
CN109208637A (zh) | 在既有隧道基础上新增明挖车站的施工方法 | |
CN103899323B (zh) | 一种盾构穿越铁路站场的施工方法 | |
CN104213932B (zh) | 一种突出煤层水力相变致裂石门揭煤方法 | |
CN201412163Y (zh) | 一种敞开式隧道掘进机施工的圆形隧道衬砌结构 | |
CN105863646A (zh) | 大断面暗挖隧道钢管幕内冻结施工方法 | |
CN107091101A (zh) | 海域中部矿山盾构交接隧道叠合型接头结构及施工方法 | |
CN107034874B (zh) | 双螺旋式注浆型冻结装置及施工方法 | |
CN107587881A (zh) | 一种用于多年冻土隧道的复合式衬砌结构及施工工艺 | |
CN203924137U (zh) | 一种地下连续墙严重渗漏封堵结构 | |
CN108843328A (zh) | 一种地铁联络通道开挖施工支护结构施工方法 | |
CN110878697A (zh) | 高富水砂卵石地层中紧邻城市主干道的盾构水下接收方法 | |
CN208793021U (zh) | 一种盾构隧道抗浮控制结构 | |
CN109296371A (zh) | Mjs法与水平冻结法联合加固承压富水砂性地层交叠车站下穿段的体系及其施工方法 | |
CN103924980B (zh) | 清障施工方法 | |
CN101748742B (zh) | 降压井混凝土与法兰盘双重封堵施工方法 | |
CN108825247B (zh) | 一种用于8导洞pba工法的外倾侧壁水平造底盆形冻结止水工法 | |
CN108316930A (zh) | 一种斜井冻结法施工巷道掌子面快速加固方法 | |
CN207033463U (zh) | 海域中部矿山盾构交接隧道叠合型接头结构 | |
CN206157860U (zh) | 一种排水管道 | |
CN103527205A (zh) | 盾构水下斜交进洞施工方法 | |
CN207212364U (zh) | 衬砌背后虚渣处理后的复合衬砌结构 | |
JP6624441B2 (ja) | 褄壁の施工方法 | |
JP2817085B2 (ja) | 凍結工法 | |
CN104632225A (zh) | 一种环形冻结管路 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180724 |