CN108316525A CN201810397276.6A CN201810397276A CN108316525A CN 108316525 A CN108316525 A CN 108316525A CN 201810397276 A CN201810397276 A CN 201810397276A CN 108316525 A CN108316525 A CN 108316525A
Authority
CN
China
Prior art keywords
thermal insulation
wall
ontology
filling
monoblock type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810397276.6A
Other languages
Chinese (zh)
Other versions
CN108316525B (en
Inventor
魏金桥
高扬
田培园
王晨楠
郭壮雨
李旭光
冯淑品
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cct Technology Henan Co Ltd
Original Assignee
Cct Technology Henan Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cct Technology Henan Co Ltd filed Critical Cct Technology Henan Co Ltd
Priority to CN201810397276.6A priority Critical patent/CN108316525B/en
Publication of CN108316525A publication Critical patent/CN108316525A/en
Application granted granted Critical
Publication of CN108316525B publication Critical patent/CN108316525B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/76Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to heat only
    • E04B1/762Exterior insulation of exterior walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/84Walls made by casting, pouring, or tamping in situ
    • E04B2/86Walls made by casting, pouring, or tamping in situ made in permanent forms
    • E04B2002/8682Mixed technique using permanent and reusable forms
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/90Passive houses; Double facade technology

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Acoustics & Sound (AREA)
  • Building Environments (AREA)

Abstract

本发明提供了一种整体式组合保温外墙体及其施工方法,该整体式组合保温外墙体包括现浇筑的承重结构和外保温结构,现浇筑的承重结构包括剪力墙和梁,外保温结构具体包括使用拉结件组合在一起的保温板和混凝土保护层以及采用两层等厚的混凝土层夹心保温板组成的整体式组合填充墙构件。本发明中的外保温结构既起到建筑保温的作用,又作为外墙体的外立面模板使用。本发明的施工方法是将外保温结构与内立面模板组合,现场浇筑形成保温外墙体,免除了外立面模板的拆除和转运,使施工工艺简单,提高了工作效率。

The present invention provides an integral composite thermal insulation exterior wall and a construction method thereof. The integral composite thermal insulation exterior wall includes a cast-in-place load-bearing structure and an external thermal insulation structure. The cast-in-place load-bearing structure includes shear walls and beams, and the exterior The thermal insulation structure specifically includes the thermal insulation board and the concrete protective layer combined by the tie parts, and the integral combined filling wall component composed of two concrete layer sandwich insulation boards of equal thickness. The external thermal insulation structure in the present invention not only plays the role of building thermal insulation, but also is used as an external facade formwork of the external wall. The construction method of the present invention is to combine the external thermal insulation structure with the internal facade formwork, and form the thermal insulation external wall body by pouring on site, which avoids the removal and transfer of the external facade formwork, makes the construction process simple, and improves the work efficiency.

Description

一种整体式组合保温外墙体及其施工方法An integral composite thermal insulation exterior wall and its construction method

技术领域technical field

本发明涉及一种装配式建筑,特别是一种整体式组合保温外墙体及其可以作为外墙外立面模板的整体式组合保温结构及施工方法。The invention relates to a prefabricated building, in particular to an integral combined thermal insulation outer wall body and its integral combined thermal insulation structure and construction method which can be used as a formwork for the outer facade of the outer wall.

背景技术Background technique

随着对环保节能的重视,建筑对保温隔热的要求越来越高。现浇结构中,保温层是二次施工时进行的,具体是,外墙的外侧用胶和固定钉将墙体与保温层粘结成一体再在外保温层的外侧粘结瓷瓦和其它装饰,这种结构存在隐患,一是保温层的密度小,剪切强度很小,用胶粘结的强度随着温度变化和时间的变化而下降,很容易使得在保温层与墙体或保温层的外侧装饰脱落,做不到与结构同寿命,需要在建筑生命周期内进行维修更换,费工费时;二是施工现场不易保持整洁环保,完成质量往往也无法保证,存在安全隐患。With the emphasis on environmental protection and energy saving, buildings have higher and higher requirements for thermal insulation. In the cast-in-place structure, the insulation layer is carried out during the second construction. Specifically, glue and fixing nails are used on the outside of the outer wall to bond the wall and the insulation layer into one, and then ceramic tiles and other decorations are bonded on the outside of the outer insulation layer. , there are hidden dangers in this structure. First, the density of the insulation layer is small, and the shear strength is very small. The strength of the adhesive bond decreases with the change of temperature and time, and it is easy to make the insulation layer and the wall or insulation layer The outer decoration of the building falls off, and it cannot last the same life as the structure. It needs to be repaired and replaced within the life cycle of the building, which is labor-intensive and time-consuming. Second, it is not easy to keep the construction site clean and environmentally friendly, and the quality of the completion is often not guaranteed, posing safety hazards.

上述外墙体进行施工时,需要在内立面模板和外立面模板之间浇筑形成外墙体,外立面模板因为没有操作平台,存在不易安装、拆卸和转运的问题。同时,外墙体中的填充墙采用传统加气块式填充墙,加气块式填充墙不仅施工复杂,影响工期,而且多数存在开裂问题,可能导致外墙渗水等问题。During the construction of the above-mentioned exterior wall, it is necessary to pour between the interior formwork and the exterior formwork to form the exterior wall. Since the exterior formwork has no operating platform, it is difficult to install, disassemble and transfer. At the same time, the infill wall in the external wall adopts the traditional aerated block type infill wall. The construction of the aerated block type infill wall is not only complicated and affects the construction period, but most of them have cracking problems, which may lead to water seepage and other problems in the outer wall.

发明内容Contents of the invention

为解决上述技术问题,本发明提供一种整体式组合保温外墙体及其施工方法。本发明的整体式组合保温外墙体包括现浇筑的承重结构和外保温结构,现浇筑的承重结构包括剪力墙和梁,外保温结构具体包括使用拉结件组合在一起的保温板和混凝土保护层以及采用两层等厚的混凝土层夹心保温板组成的整体式组合填充墙构件,使用拉结件组合在一起的保温板和混凝土保护层锚固在承重结构外侧面。本发明中的外保温结构既起到建筑保温的作用,又作为外墙体的外立面模板使用;同时,该整体式组合保温外墙体的填充墙部分采用两层等厚的混凝土层夹心保温板组成整体式组合填充墙构件。In order to solve the above technical problems, the present invention provides an integral combined thermal insulation exterior wall and its construction method. The integral combined thermal insulation exterior wall of the present invention includes a cast-in-place load-bearing structure and an external thermal insulation structure, the cast-in-place load-bearing structure includes shear walls and beams, and the external thermal insulation structure specifically includes thermal insulation boards and concrete combined with tie-down members The protective layer and the integral composite infill wall member composed of two layers of concrete sandwich insulation boards of equal thickness are anchored to the outer surface of the load-bearing structure by using the insulation board and the concrete protection layer combined by ties. The external thermal insulation structure in the present invention not only plays the role of building thermal insulation, but also is used as the facade formwork of the external wall; at the same time, the filling wall part of the integral combined thermal insulation external wall is sandwiched by two layers of concrete layers of equal thickness The insulation panels make up the integral composite infill wall element.

本发明的整体式组合保温外墙体在施工时将外保温结构作为外立面模板,与内里面模板结合进行现场浇筑形成外墙体,可以避免外墙体外立面模板的安装、拆除和转运;同时,该整体式组合保温外墙体采用混凝土层夹心保温板组成的组合填充墙构件,施工简单,同时,混凝土层夹心保温板相比加气块式填充墙,不存在开裂问题,及导致的外墙渗水等问题。The integral combined thermal insulation external wall of the present invention uses the external thermal insulation structure as an external facade formwork during construction, and combines with the inner inner formwork to form an external wall body by on-site pouring, which can avoid the installation, removal and maintenance of the external facade formwork of the external wall. At the same time, the integral composite thermal insulation external wall adopts the composite filling wall component composed of concrete layer sandwich insulation board, which is simple in construction. At the same time, the concrete layer sandwich insulation board has no cracking problem compared with the aerated block type filling wall, and Water seepage and other problems caused by external walls.

为实现上述目的,本发明采用的技术方案为:To achieve the above object, the technical solution adopted in the present invention is:

一种整体式组合保温外墙体,包括现浇筑的承重结构和外保温结构,所述现浇筑的承重结构包括第一剪力墙本体、第二剪力墙本体、梁本体,梁本体设置在第一剪力墙本体和第二剪力墙本体的上端,梁本体的下方设置窗口,第一剪力墙本体和第二剪力墙本体之间设置有填充墙;An integral composite thermal insulation external wall, including a cast-in-place load-bearing structure and an external thermal insulation structure, the cast-in-place load-bearing structure includes a first shear wall body, a second shear wall body, and a beam body, and the beam body is arranged on A window is arranged at the upper end of the first shear wall body and the second shear wall body, and below the beam body, and a filling wall is arranged between the first shear wall body and the second shear wall body;

在现浇筑的第一剪力墙本体、第二剪力墙本体、梁本体的外表面锚固有通过拉结件连接在一起的一层保温板和一层混凝土保护层;A layer of thermal insulation board and a layer of concrete protection layer connected together by anchors are anchored on the outer surfaces of the cast-in-place first shear wall body, the second shear wall body and the beam body;

所述第一剪力墙本体、第二剪力墙本体、梁本体的外表面锚固的通过拉结件连接在一起的一层保温板和一层混凝土保护层以及填充墙构成所述外保温结构。The outer surface of the first shear wall body, the second shear wall body, and the outer surface of the beam body are anchored together by a layer of thermal insulation board, a layer of concrete protection layer and a filling wall that are connected together by tie pieces to form the external thermal insulation structure .

作为本发明优选的,所述填充墙为两层等厚的混凝土层夹心保温板组成的整体式组合填充墙构件。As preferred in the present invention, the filling wall is an integral combined filling wall component composed of two layers of equal-thickness concrete layer sandwich insulation boards.

作为本发明优选的,所述第一剪力墙本体、第二剪力墙本体、梁本体外侧的保温板以及填充墙内的保温板为EPS板、XPS板或聚氨酯保温板。As preferred in the present invention, the first shear wall body, the second shear wall body, the thermal insulation board outside the beam body and the thermal insulation board inside the filling wall are EPS boards, XPS boards or polyurethane insulation boards.

作为本发明优选的,所述窗口下方填充墙的上表面设置有防水台。As preferred in the present invention, a waterproof platform is provided on the upper surface of the filling wall below the window.

作为本发明优选的,所述窗口上方梁本体外侧的混凝土保护层底部设置有滴水槽。As preferred in the present invention, drip grooves are provided at the bottom of the concrete protective layer outside the beam body above the window.

作为本发明优选的,在所述填充墙的混凝土保护层上预留有锚固钢筋。As preferred in the present invention, anchoring steel bars are reserved on the concrete protection layer of the filling wall.

作为本发明优选的,所述窗口下方的填充墙连接有预制空调板。As preferred in the present invention, the filling wall below the window is connected with a prefabricated air-conditioning panel.

一种上述整体式组合保温外墙体的施工方法,施工时,首先,在楼板标高设置伸出外墙和挑梁作为构件安装放置的支撑,并采用背楞连接成整体加固;A construction method for the above-mentioned integral combined thermal insulation exterior wall. During construction, firstly, at the floor level, protruding from the exterior wall and cantilever beams are set as supports for component installation and placement, and are connected by back corrugated to form an overall reinforcement;

所述外保温结构通过螺杆和外墙体内侧的模板拉结固定成模板体系;The external thermal insulation structure is fixed into a formwork system by screw rods and the formwork tie on the inner side of the outer wall;

通过所述填充墙上部和左右两端预留的锚固钢筋将填充墙连接在结构钢筋上临时固定;The filling wall is temporarily fixed by connecting the filling wall to the structural reinforcement through the anchor reinforcement bars reserved on the top and left and right ends of the filling wall;

进行现场浇筑,构件间的接缝在结构浇筑完成后注胶密封,将内侧的模板拆除形成外保温墙体。On-site pouring is carried out, and the joints between components are sealed with glue after the structural pouring is completed, and the inner formwork is removed to form an external thermal insulation wall.

与现有技术相比,本发明的有益效果为:Compared with prior art, the beneficial effect of the present invention is:

1、本发明采用外保温结构作为外立墙模板使用,省去了外立面模板的使用,使施工过程简单。1. The present invention adopts the external thermal insulation structure as the formwork for the exterior wall, which saves the use of the formwork for the exterior facade and makes the construction process simple.

2、本发明的整体式组合填充墙构件采用两层等厚的混凝土层夹心保温板组成,与加气块式填充墙相比,不存在开裂问题,及导致的外墙渗水等问题,进而延长外墙体的寿命。2. The integral combined filling wall component of the present invention is composed of two layers of concrete layer sandwich insulation boards of equal thickness. Compared with the aerated block type filling wall, there is no problem of cracking, and the resulting water seepage of the outer wall and other problems, thereby extending life of the exterior wall.

3、本发明的施工方法是将外保温结构与内立面模板组合,现场浇筑形成保温外墙体,免除了外立面模板的拆除和转运,使施工工艺简单,提高了工作效率。3. The construction method of the present invention is to combine the external thermal insulation structure with the internal facade formwork, and cast on-site to form the thermal insulation external wall, which avoids the removal and transfer of the external facade formwork, makes the construction process simple, and improves work efficiency.

附图说明Description of drawings

图1为本发明整体式组合保温外墙体的平面图;Fig. 1 is the plan view of integral type combined thermal insulation outer wall body of the present invention;

图2为图1中A-A方向的剖面图;Fig. 2 is the sectional view of A-A direction in Fig. 1;

图3为图1中B-B方向的剖面图;Fig. 3 is the sectional view of B-B direction in Fig. 1;

图4为图1中C处的截面图;Fig. 4 is a cross-sectional view at C in Fig. 1;

图5为图1中D处的截面图;Fig. 5 is a cross-sectional view at D in Fig. 1;

图6为图1中E处的截面图;Fig. 6 is a sectional view at E place in Fig. 1;

图7为图1中F处的截面图;Fig. 7 is a cross-sectional view at F in Fig. 1;

图8为预制空调板连接示意图;Figure 8 is a schematic diagram of the connection of prefabricated air-conditioning panels;

图9为悬挑板连接示意图;Figure 9 is a schematic diagram of the connection of the cantilever plate;

图中,1、第一剪力墙本体,2、第二剪力墙本体,3、梁本体,4、窗口,5、填充墙,6、滴水槽,7、防水台,8、保温板,9、预制空调板,10、锚固钢筋,11、PE棒。In the figure, 1. The body of the first shear wall, 2. The body of the second shear wall, 3. The body of the beam, 4. The window, 5. The filling wall, 6. The drip tank, 7. The waterproof platform, 8. The insulation board, 9. Prefabricated air-conditioning panels, 10. Anchor steel bars, 11. PE rods.

具体实施方式Detailed ways

下面结合实施例及附图对本发明作进一步的详细说明。The present invention will be further described in detail below in conjunction with the embodiments and accompanying drawings.

实施例1Example 1

图1示出了本实施例的整体式组合保温外墙体的平面图。如图1所示,该整体式组合保温外墙体包括现浇筑的承重结构和外保温结构,现浇筑的承重结构包括第一剪力墙本体1、第二剪力墙本体2、梁本体3,梁本体3设置在第一剪力墙本体1和第二剪力墙本体2的上端,梁本体3的下方设置窗口4,第一剪力墙本体1和第二剪力墙本体2之间设置有填充墙5,根据建筑物具体设计,填充墙5可以为窗下填充墙,即窗口4和填充墙5将第一剪力墙本体1和第二剪力墙本体2之间分为上下两部分;还可以为窗下填充墙和无窗口填充墙的组合,具体结构如图1所示。Fig. 1 shows a plan view of the integral combined thermal insulation exterior wall of this embodiment. As shown in Figure 1, the integral composite thermal insulation external wall includes a cast-in-place load-bearing structure and an external thermal insulation structure, and the cast-in-place load-bearing structure includes a first shear wall body 1, a second shear wall body 2, and a beam body 3 , the beam body 3 is arranged on the upper end of the first shear wall body 1 and the second shear wall body 2, and the window 4 is set under the beam body 3, between the first shear wall body 1 and the second shear wall body 2 A filling wall 5 is provided, and according to the specific design of the building, the filling wall 5 can be a filling wall under the window, that is, the window 4 and the filling wall 5 divide the first shear wall body 1 and the second shear wall body 2 into upper and lower parts. Two parts; it can also be a combination of a filling wall under a window and a filling wall without a window, and the specific structure is shown in Figure 1.

上述第一剪力墙本体1与窗口4,第一剪力墙本体1与填充墙5,窗下填充墙和无窗口填充墙,第二剪力墙本体2与梁本体3之间的连接处C、D、E、F处的截面图如图4~7所示。具体的,第一剪力墙本体1与梁本体3、第一剪力墙本体1与填充墙5(D处)、填充墙5与第二剪力墙本体2、第二剪力墙本体2与梁本体3(F处)之间的连接处,在上述两者之间的保温材料之间插入保温板8,外侧的混凝土保护层之间的拼缝通过注胶密封。同样的,窗下填充墙和无窗口填充墙之间(E处)的保温材料中间插入保温板8,两侧的混凝土保温层拼缝通过注胶密封连接。进一步,第一剪力墙本体1与梁本体3、第一剪力墙本体1与填充墙5、填充墙5与第二剪力墙本体2、第二剪力墙本体2与梁本体3之间连接处外侧的混凝土保护层之间插入有PE棒11,窗下填充墙和无窗口填充墙两侧的混凝土保温层之间插入PE棒11,PE棒11外侧注胶密封。The connection between the first shear wall body 1 and the window 4, the first shear wall body 1 and the filling wall 5, the filling wall under the window and the windowless filling wall, and the second shear wall body 2 and the beam body 3 The cross-sectional views at C, D, E, and F are shown in Figures 4~7. Specifically, the first shear wall body 1 and the beam body 3, the first shear wall body 1 and the infill wall 5 (at D), the infill wall 5 and the second shear wall body 2, and the second shear wall body 2 At the junction with the beam body 3 (at F), an insulation board 8 is inserted between the insulation materials between the two, and the joints between the outer concrete protection layers are sealed by injecting glue. Similarly, the insulation board 8 is inserted in the middle of the insulation material between the infill wall under the window and the infill wall without window (at E), and the joints of the concrete insulation layers on both sides are sealed and connected by glue injection. Further, the first shear wall body 1 and the beam body 3, the first shear wall body 1 and the filling wall 5, the filling wall 5 and the second shear wall body 2, the second shear wall body 2 and the beam body 3 PE rods 11 are inserted between the concrete protective layers on the outside of the joints, PE rods 11 are inserted between the concrete insulation layers on both sides of the filling wall under the window and the filling wall without windows, and the outside of the PE rod 11 is sealed with glue.

其中,第一剪力墙本体1、第二剪力墙本体2、梁本体3为现浇筑构件,在现浇筑构件的第一剪力墙本体1、第二剪力墙本体2、梁本体3的外表面锚固有通过拉结件连接在一起的一层保温板和一层混凝土保护层,拉结件可以为对拉螺钉。填充墙5为两层等厚的混凝土层夹心保温板组成的整体式组合填充墙构件,填充墙5保护层在上部贯通,作为窗户的支撑。第一剪力墙本体1、第二剪力墙本体2、梁本体3的外表面锚固的通过拉结件连接在一起的一层保温板和一层混凝土保护层以及填充墙5既为外墙体的保温结构,又为外墙体的外立面模板。Among them, the first shear wall body 1, the second shear wall body 2, and the beam body 3 are cast-in-place components, and the first shear wall body 1, the second shear wall body 2, and the beam body 3 of the cast-in-place components The outer surface of the wall is anchored with a layer of insulation board and a layer of concrete protection layer connected together by a tie piece, and the tie piece can be a pull screw. The filling wall 5 is an integral combined filling wall component composed of two layers of equal-thick concrete sandwich insulation boards, and the protective layer of the filling wall 5 penetrates through the upper part as a support for the window. The outer surface of the first shear wall body 1, the second shear wall body 2, and the beam body 3 are anchored by a layer of thermal insulation board, a layer of concrete protection layer and a filling wall 5 connected together by tie pieces, which are both external walls. It is not only the thermal insulation structure of the body, but also the facade template of the outer wall.

第一剪力墙本体1、第二剪力墙本体2、梁本体3外侧的保温板以及填充墙5内的保温板为EPS板、XPS板或聚氨酯保温板。The insulation boards on the outside of the first shear wall body 1 , the second shear wall body 2 , the beam body 3 and the infill wall 5 are EPS boards, XPS boards or polyurethane insulation boards.

本实施例中,如图2所示,为进一步延长填充墙5的使用寿命,窗口4下方填充墙5的上表面设置有防水台7。窗口4上方梁本体3外侧的混凝土保护层底部设置有滴水槽6。In this embodiment, as shown in FIG. 2 , in order to further prolong the service life of the filling wall 5 , a waterproof platform 7 is provided on the upper surface of the filling wall 5 below the window 4 . A drip groove 6 is provided at the bottom of the concrete protective layer outside the beam body 3 above the window 4 .

如图3和5所示,在施工时为方便对上述构件连接,填充墙5的混凝土保护层上预留有锚固钢筋10,通过锚固钢筋10将填充墙5与第一剪力墙本体1、第二剪力墙本体2、梁本体3固定连接。As shown in Figures 3 and 5, in order to facilitate the connection of the above-mentioned components during construction, an anchoring steel bar 10 is reserved on the concrete protection layer of the filling wall 5, and the filling wall 5 and the first shear wall body 1, The second shear wall body 2 and the beam body 3 are fixedly connected.

如图8所示,窗口4下方的填充墙5连接有预制空调板9,预制空调板9与填充墙5之间的连接关系如图9所示,通过钢筋网固定框架后进行现场浇筑。梁本体3向外延伸也可以连接预制空调板9或阳台板或飘窗板,如图9所示。As shown in Figure 8, the infill wall 5 below the window 4 is connected with a prefabricated air-conditioning panel 9, and the connection relationship between the prefabricated air-conditioning panel 9 and the infill wall 5 is shown in Figure 9, and the frame is fixed by a steel mesh for on-site pouring. The outward extension of beam body 3 can also be connected with prefabricated air-conditioning panel 9 or balcony panel or bay window panel, as shown in FIG. 9 .

本实施例的整体式组合保温外墙体的具体施工方法为:The specific construction method of the integral combined thermal insulation exterior wall of the present embodiment is:

具体的,施工时,在楼板标高设置伸出外墙和挑梁作为构件安装放置的支撑,并采用背楞将构件连接成整体加固;Specifically, during construction, protruding external walls and cantilever beams are set at the floor level as supports for component installation and placement, and the components are connected as a whole by back corrugation;

外保温结构通过螺杆和外墙体内侧的模板拉结固定成模板体系;The external thermal insulation structure is fixed into a formwork system through screws and the formwork tie on the inner side of the external wall;

通过所述填充墙上部和左右两端预留的锚固钢筋将填充墙连接在结构钢筋上临时固定;The filling wall is temporarily fixed by connecting the filling wall to the structural reinforcement through the anchor reinforcement bars reserved on the top and left and right ends of the filling wall;

进行现场浇筑,构件间的接缝在结构浇筑完成后注胶密封,将内侧的模板拆除形成外保温墙体。On-site pouring is carried out, and the joints between components are sealed with glue after the structural pouring is completed, and the inner formwork is removed to form an external thermal insulation wall.

上述使用的外墙体内侧的模板为目前施工场地使用的模板,在此不再赘述。The formwork on the inner side of the exterior wall used above is the formwork used in the construction site at present, so it will not be repeated here.

进一步施工时,将本发明整体式组合保温外墙体与下梁连接即可。填充墙5与下梁连接时,先在下梁上铺垫一层素砂浆,对下梁进行打毛处理。During further construction, it is only necessary to connect the integral combined thermal insulation outer wall body of the present invention with the lower beam. When the filling wall 5 is connected with the lower beam, a layer of plain mortar is laid on the lower beam earlier, and the lower beam is roughened.

尽管已经示出和描述了本发明的实施例,对于本领域的普通技术人员而言,可以理解在不脱离本发明的原理和精神的情况下可以对这些实施例进行多种变化、修改、替换和变型,本发明的范围由所附权利要求及其等同物限定。Although the embodiments of the present invention have been shown and described, those skilled in the art can understand that various changes, modifications and substitutions can be made to these embodiments without departing from the principle and spirit of the present invention. and modifications, the scope of the invention is defined by the appended claims and their equivalents.

Claims (8)

1. a kind of monoblock type composite thermal insulation exterior wall, which is characterized in that the monoblock type composite thermal insulation exterior wall includes cast-in-place builds Load-carrying members and external thermal insulation structure, the cast-in-place load-carrying members built include the first shear wall ontology, the second shear wall ontology, beam Ontology, beam ontology are arranged in the upper end of the first shear wall ontology and the second shear wall ontology, and window is arranged in the lower section of beam ontology, the It is provided with filling wall between one shear wall ontology and the second shear wall ontology;
In the outer surface of cast-in-place the first shear wall ontology built, the second shear wall ontology, beam ontology, anchoring has is connected by tension member The one layer of heat preservation plate and a layer concrete protective layer being connected together;
The outer surface anchoring of the first shear wall ontology, the second shear wall ontology, beam ontology is connected to one by tension member The one layer of heat preservation plate and a layer concrete protective layer and filling wall risen constitutes the external thermal insulation structure.
2. monoblock type composite thermal insulation exterior wall according to claim 1, which is characterized in that the filling wall is two layers of uniform thickness Concrete layer sandwiched heat insulation board composition monoblock type combination filling wall member.
3. monoblock type composite thermal insulation exterior wall according to claim 2, which is characterized in that the first shear wall ontology, Second shear wall ontology, the thermal insulation board of beam outer body and filling thermal insulation board within the walls are that EPS sheet, XPS plate or polyurethane are protected Warm plate.
4. monoblock type composite thermal insulation exterior wall according to claim 1, which is characterized in that the beneath window filling wall Upper surface is provided with waterproof platform.
5. monoblock type composite thermal insulation exterior wall according to claim 1, which is characterized in that on the window outside square beam ontology The concrete cover bottom of side is provided with drip.
6. monoblock type composite thermal insulation exterior wall according to claim 1, which is characterized in that in the concrete of the filling wall Anchor bar is reserved on protective layer.
7. monoblock type composite thermal insulation exterior wall according to claim 1, which is characterized in that the filling wall of the beneath window It is connected with prefabricated air-conditioning plate.
8. a kind of construction method of claim 1 ~ 7 any one of them monoblock type composite thermal insulation exterior wall, which is characterized in that apply Working hour the support stretched out exterior wall and outrigger and placed as component installation is arranged in floor absolute altitude, and connect into using back cord first Integral reinforcing;
The external thermal insulation structure is fixed into template system by the template drawknot on the inside of screw rod and exterior wall;
Wall will be filled by the reserved anchor bar in the filling wall top and left and right ends to be connected on structure reinforcing bars temporarily admittedly It is fixed;
Cast in situs is carried out, injecting glue after the completion of structure pours of the seam between component seals, and the form removable of inside is formed outer Heat-preserving wall.
CN201810397276.6A 2018-04-28 2018-04-28 Integral combined heat-insulating outer wall and construction method thereof Expired - Fee Related CN108316525B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810397276.6A CN108316525B (en) 2018-04-28 2018-04-28 Integral combined heat-insulating outer wall and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810397276.6A CN108316525B (en) 2018-04-28 2018-04-28 Integral combined heat-insulating outer wall and construction method thereof

Publications (2)

Publication Number Publication Date
CN108316525A true CN108316525A (en) 2018-07-24
CN108316525B CN108316525B (en) 2023-09-08

Family

ID=62894779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810397276.6A Expired - Fee Related CN108316525B (en) 2018-04-28 2018-04-28 Integral combined heat-insulating outer wall and construction method thereof

Country Status (1)

Country Link
CN (1) CN108316525B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208816A (en) * 2018-10-12 2019-01-15 中国建筑第七工程局有限公司 A kind of external wall is cast-in-place with prefabricated thermal insulation integral system
CN112982722A (en) * 2021-02-07 2021-06-18 中国建筑第八工程局有限公司 Mounting structure of window in prefabricated wall and construction method thereof
CN114215231A (en) * 2021-12-03 2022-03-22 天津一冶建设工程有限公司 Construction method of window opening integrated heat preservation wall
CN114541757A (en) * 2021-11-23 2022-05-27 河南省德嘉丽科技集团有限公司 Construction method for preventing joint of built-in heat-insulation shear wall and filler wall under window from cracking

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010090294A (en) * 2000-03-24 2001-10-18 김종수 Precast concrete structure for variable plan of apartment house
JP2003027618A (en) * 2001-07-16 2003-01-29 Toyo Constr Co Ltd Construction method for outside insulation
CN101168977A (en) * 2007-07-26 2008-04-30 吴淑环 Plastering composite wall with reinforcing steel bar and/or metal net equipped at inter and outer or two-side
JP2008231701A (en) * 2007-03-17 2008-10-02 Nippon Kasei Kk Seismic and exterior thermal insulation structure and construction method for existing wooden houses
CN101586369A (en) * 2009-05-18 2009-11-25 吴淑环 Combined wall having both pliability and hardness
CN103114663A (en) * 2013-03-07 2013-05-22 浙江省建筑科学设计研究院有限公司 Assemble type multifunctional outer wall body and production and installation method thereof
CN104234219A (en) * 2014-09-02 2014-12-24 绿建科技集团新型建材高技术有限公司 Novel cast-in-situ composite wall self-insulation system
KR101707374B1 (en) * 2016-04-28 2017-02-17 우종태 The reinforced insulation and durability Korean-style house pillar structure and its construction methods
CN106930428A (en) * 2017-04-25 2017-07-07 山东龙新节能科技有限公司 Prefabricated steel wire net rack integrated board self-heat conserving structure and construction method for filling wall
CN208152323U (en) * 2018-04-28 2018-11-27 中建科技河南有限公司 A kind of monoblock type composite thermal insulation exterior wall

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20010090294A (en) * 2000-03-24 2001-10-18 김종수 Precast concrete structure for variable plan of apartment house
JP2003027618A (en) * 2001-07-16 2003-01-29 Toyo Constr Co Ltd Construction method for outside insulation
JP2008231701A (en) * 2007-03-17 2008-10-02 Nippon Kasei Kk Seismic and exterior thermal insulation structure and construction method for existing wooden houses
CN101168977A (en) * 2007-07-26 2008-04-30 吴淑环 Plastering composite wall with reinforcing steel bar and/or metal net equipped at inter and outer or two-side
CN101586369A (en) * 2009-05-18 2009-11-25 吴淑环 Combined wall having both pliability and hardness
CN103114663A (en) * 2013-03-07 2013-05-22 浙江省建筑科学设计研究院有限公司 Assemble type multifunctional outer wall body and production and installation method thereof
CN104234219A (en) * 2014-09-02 2014-12-24 绿建科技集团新型建材高技术有限公司 Novel cast-in-situ composite wall self-insulation system
KR101707374B1 (en) * 2016-04-28 2017-02-17 우종태 The reinforced insulation and durability Korean-style house pillar structure and its construction methods
CN106930428A (en) * 2017-04-25 2017-07-07 山东龙新节能科技有限公司 Prefabricated steel wire net rack integrated board self-heat conserving structure and construction method for filling wall
CN208152323U (en) * 2018-04-28 2018-11-27 中建科技河南有限公司 A kind of monoblock type composite thermal insulation exterior wall

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208816A (en) * 2018-10-12 2019-01-15 中国建筑第七工程局有限公司 A kind of external wall is cast-in-place with prefabricated thermal insulation integral system
CN109208816B (en) * 2018-10-12 2024-11-15 中国建筑第七工程局有限公司 An integrated system of cast-in-place and prefabricated thermal insulation for building exterior walls
CN112982722A (en) * 2021-02-07 2021-06-18 中国建筑第八工程局有限公司 Mounting structure of window in prefabricated wall and construction method thereof
CN114541757A (en) * 2021-11-23 2022-05-27 河南省德嘉丽科技集团有限公司 Construction method for preventing joint of built-in heat-insulation shear wall and filler wall under window from cracking
CN114215231A (en) * 2021-12-03 2022-03-22 天津一冶建设工程有限公司 Construction method of window opening integrated heat preservation wall
CN114215231B (en) * 2021-12-03 2024-08-02 天津一冶建设工程有限公司 Construction method of window opening integrated heat-preserving wall

Also Published As

Publication number Publication date
CN108316525B (en) 2023-09-08

Similar Documents

Publication Publication Date Title
CN102505779B (en) A modular hoisting and assembling wall system and its construction method
CN102691366B (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN205046685U (en) External heated board of prefabricated masonry wall
CN106436893A (en) Fully-prefabricated structure and construction method thereof
WO2014094458A1 (en) Fully assembled, fully cast-in-place, composite-type house and construction method thereof
CN110206173B (en) Construction method of heat-insulation external wall
CN215253698U (en) Ceramsite foam concrete exterior wall hanging plate in assembly type building
CN108316525A (en) A kind of monoblock type composite thermal insulation exterior wall and its construction method
CN105714963A (en) An inorganic lightweight composite thermal insulation integrated exterior wall hanging board system and its installation method
CN206220238U (en) Fully-prefabricated assembled structure
CN211286074U (en) Self-heat-insulation system for prefabricated light high-strength foam concrete filled wallboard outer wall
CN108756020A (en) A kind of foamed concrete composite insulation wall
CN108035485A (en) Assembled CF steam pressures porcelain powder air entrained concrete shear wall Side fascia and production method
CN202809892U (en) Precast concrete self-insulating shear wall and assembly type concrete building shear wall structure
CN115534095A (en) Assembled counter-beating prefabricated part and production process thereof
CN114687459A (en) Assembly type composite wallboard and floor slab self-tapping nail cluster and post-cast strip combined connecting structure and manufacturing method
CN107575033A (en) Prefabrication and construction method of prefabricated steel structure prefabricated exterior wall panels
CN203066294U (en) Assembled multifunctional outer wall body
CN115234071B (en) A combined connection structure and method of self-tapping screw blocks and post-cast strips for assembled one-shaped composite wall panels
CN207959692U (en) A kind of assembled CF steam pressures porcelain powder air entrained concrete shear wall Side fascia
CN204531006U (en) The prefabricated combined wall board of embedded steel column and constructing with the connected node of girder steel
CN214423691U (en) Light concrete reinforced bar net frame composite thermal insulation wall board
CN208152323U (en) A kind of monoblock type composite thermal insulation exterior wall
CN205475877U (en) Compound outer thermal insulation walling system of assembled self preservation temperature wallboard
EP3580396A1 (en) Fast construction of energy-efficient buildings

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230908

CF01 Termination of patent right due to non-payment of annual fee