CN108304985A - Method for optimal evaluation of green space project of power grid enterprise - Google Patents
Method for optimal evaluation of green space project of power grid enterprise Download PDFInfo
- Publication number
- CN108304985A CN108304985A CN201711135671.9A CN201711135671A CN108304985A CN 108304985 A CN108304985 A CN 108304985A CN 201711135671 A CN201711135671 A CN 201711135671A CN 108304985 A CN108304985 A CN 108304985A
- Authority
- CN
- China
- Prior art keywords
- project
- evaluation
- power grid
- green space
- optimization selection
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000011156 evaluation Methods 0.000 title claims abstract description 38
- 238000000034 method Methods 0.000 title description 4
- 238000005457 optimization Methods 0.000 claims abstract description 25
- 238000013210 evaluation model Methods 0.000 claims abstract description 4
- 238000011160 research Methods 0.000 claims description 4
- 238000011835 investigation Methods 0.000 claims description 3
- 238000012550 audit Methods 0.000 claims description 2
- 238000013480 data collection Methods 0.000 claims description 2
- 238000005516 engineering process Methods 0.000 claims description 2
- 238000012795 verification Methods 0.000 claims description 2
- 238000011161 development Methods 0.000 abstract description 4
- 230000000694 effects Effects 0.000 abstract description 4
- 238000007619 statistical method Methods 0.000 abstract 1
- 230000008901 benefit Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000005611 electricity Effects 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000007670 refining Methods 0.000 description 2
- 230000002195 synergetic effect Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/067—Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Tourism & Hospitality (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Marketing (AREA)
- General Business, Economics & Management (AREA)
- Physics & Mathematics (AREA)
- Educational Administration (AREA)
- Quality & Reliability (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a power grid enterprise green land project optimization evaluation method. And (3) establishing an evaluation model and an index system and setting index weight by summarizing the basic requirements and general steps for the optimal evaluation of the power grid green space project, thereby completing the development of evaluation software of the power grid green space project. The green space project is divided according to the scale and the income, the project factor and the enterprise factor, thereby achieving the aim of scientifically and systematically optimizing the green space project. The invention provides a basis for the comparison and evaluation of the quality degree of the green space projects with the same attribute, carries out statistical analysis on the evaluation conclusion and the historical data of the green space projects, and provides a scientific and reasonable suggestion of the project development effect for the reference of decision makers.
Description
Technical field
The present invention relates to project management field more particularly to a kind of power grid enterprises greenery patches project optimization selection evaluation methods.
Background technology
Project optimization selection evaluation is in widespread attention in foreign countries, and project optimization selection evaluation system is had been set up in many companies,
Have received good effect.And the project optimization selection evaluation work of the electric system in China is started late, each net, provincial electric power company are first
After formulated projects management measures, but really effectively carry out project optimization selection evaluation and it is few.
With the rapidly development of China's electric power, each grid company increases investment paces, and the greenery patches project of development gradually increases
More, project is excellent
Be selected in ensure investment security, raise the management level, to accelerate power grid construction more important.
The present invention is according to each assessment models, the foundation of evaluation index, by using analytic hierarchy process (AHP) setting target weight
The greenery patches project optimization selection evaluation method of formation can optimize project evaluation method, improve assessment efficiency, reach multiple target comparison
Purpose, while making greenery patches project optimization selection evaluation work more standardization, the systematization for grid company.
Invention content
The object of the present invention is to provide a kind of power grid enterprises greenery patches project optimization selection evaluation methods.
The technical solution that the present invention solves above-mentioned technical problem is as follows.
The present invention in the course of the research, by the classification processing to power grid enterprises' greenery patches project, establishes and meets electricity
The index system of net feature.A kind of greenery patches project optimization selection evaluation system of power grid enterprises includes two first class index:Company factor
Index and project factor index;By successively decomposing, refining description indexes and its judge criterion, and then reaches and treat evaluation item
Each angle precision illustrate.The assessment result can reflect the good and bad degree of project;
A kind of power grid enterprises greenery patches project optimization selection evaluation method, includes the following steps:
Step 1:Greenery patches project optimization selection evaluation basic model is established, is required according to evaluation work, to grid company greenery patches
Mesh establishes first class index and two-level index in terms of company factor and project factor two, forms the basic mould of project optimization selection evaluation
Type;
Step 2:The basic data of project to be assessed is collected, item base data collection includes:Project verification data, financial audit
The information such as report, research report, technical report, responsible investigation situation;
Step 3:Record Entry Details to be assessed;
Step 4:According to assessment models, finished item marking obtains each index score of project evaluation model;
Advantageous effects of the present invention are:
(1) manager uniformly can be edited and recorded and managed to greenery patches project, allow staff clearly to understand industry dynamic
State and project evaluation situation.When to the project evaluation, for the category attribute of project to be assessed, by successively decomposing, refining description
Index and its judge criterion, and then reach and treat each angle precision elaboration that evaluation item carries out effect.The assessment result can
Reflect the good and bad degree of project investment.
(2) accurately give a mark by indices, reduce the interference of subjective factor, according to marking situation can automatic bubble diagram,
Make assessment result is more lively to show, project comment suggestion is manually entered by expert group, more targetedly.
(3) assessment models of project can modify, and increase the sustainability and practicability of evaluation work.
Description of the drawings
Fig. 1 is a kind of power grid enterprises greenery patches project optimization selection evaluation method flow diagram of the present invention.
Specific implementation mode
The present invention is further illustrated with reference to the accompanying drawings and examples.It is emphasized that following the description is only
It is exemplary, rather than in order to limit range and its application of invention.
A kind of power grid enterprises greenery patches project optimization selection evaluation method proposed by the present invention is green in certain power grid international corporation to apply
For ground project optimization selection evaluation, as shown in Figure 1
The present embodiment initially sets up greenery patches project optimization selection evaluation basic model, and assembled item basic data passes through entry item
Mesh details complete the storage work of project to be assessed;Then according to assessment models, expert estimation is completed, is repeated the above steps
Complete the evaluation work of multiple projects;Secondly to multiple projects of evaluation work are completed, score sequence is carried out, while generating more
A project optimization selection evaluation result.The detailed embodiment of the present embodiment is as described below:
Establish greenery patches project optimization selection evaluation basic model.Referred to as the level-one of assessment models using company factor and project factor
Mark, company factor includes six indexs such as construction period, investment, earning rate, technical advantage, government guarantee, synergistic effect;
Mesh factor includes item types, scale of the project, the operation phase, crosses net electricity, expropriation of land situation, way of bidding, State Grid's investment ring
Eight two-level index such as border, Power Supplies Condition.
Collect the basic data of project to be assessed.Including:Greenery patches project evaluation report;Data of approving and initiate a project (project feasible
Property report, project application book and Project charter etc.);Financial analysis is reported;The research report and technical report of project;Other moneys
Material.
Record Entry Details to be assessed.Including:Construction period, investment, earning rate, technical advantage, government guarantee,
Synergistic effect etc..
According to assessment models, marking is completed.It can obtain《Germany --- 200KV direct current transportation projects》Score 64.
Generate grade form and assessment result.
Method provided by the invention, on the basis of fully investigation greenery patches project, to the actual conditions at project decision initial stage
Carry out comprehensive, scientifical, comprehensive comparison examination, the economic and social benefit and its operation foreground that project obtains can be carried out compared with
Objective, science, just analysis assessment.
Claims (1)
1. a kind of power grid enterprises greenery patches project optimization selection evaluation method, which is characterized in that include the following steps:Step 001:It establishes green
Ground project optimization selection evaluation basic model, according to optimization selection evaluation job requirement, to grid company greenery patches project from company's privacy and item
Two aspects of mesh factor establish first class index and two-level index, form project optimization selection evaluation model;Step 002:It collects to be assessed
The basic data of greenery patches project, item base data collection include:Project verification data, financial audit report, research report, technology report
The information such as announcement, responsible investigation;Step 003:Record single Entry Details to be assessed;Step 004:It is item according to assessment models
Mesh completes marking, obtains each index score and comment of project optimization selection evaluation model;Step 005:Generation project assessment result.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711135671.9A CN108304985A (en) | 2017-11-16 | 2017-11-16 | Method for optimal evaluation of green space project of power grid enterprise |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711135671.9A CN108304985A (en) | 2017-11-16 | 2017-11-16 | Method for optimal evaluation of green space project of power grid enterprise |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108304985A true CN108304985A (en) | 2018-07-20 |
Family
ID=62869510
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711135671.9A Pending CN108304985A (en) | 2017-11-16 | 2017-11-16 | Method for optimal evaluation of green space project of power grid enterprise |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108304985A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111143763A (en) * | 2019-12-13 | 2020-05-12 | 广东电网有限责任公司 | Method and device for evaluating state of power equipment and storage medium thereof |
CN113159537A (en) * | 2021-04-06 | 2021-07-23 | 南方电网能源发展研究院有限责任公司 | Evaluation method and device for new technical project of power grid and computer equipment |
-
2017
- 2017-11-16 CN CN201711135671.9A patent/CN108304985A/en active Pending
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111143763A (en) * | 2019-12-13 | 2020-05-12 | 广东电网有限责任公司 | Method and device for evaluating state of power equipment and storage medium thereof |
CN111143763B (en) * | 2019-12-13 | 2021-09-17 | 广东电网有限责任公司 | Method and device for evaluating state of power equipment and storage medium thereof |
CN113159537A (en) * | 2021-04-06 | 2021-07-23 | 南方电网能源发展研究院有限责任公司 | Evaluation method and device for new technical project of power grid and computer equipment |
CN113159537B (en) * | 2021-04-06 | 2023-05-23 | 南方电网能源发展研究院有限责任公司 | Assessment method and device for new technical project of power grid and computer equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
YURCHENKO | INFORMATION SUPPORT SYSTEM DESIGNED FOR TECHNICAL OPERATION PLANNING OF RECLAMATIVE FACILITIES. | |
CN108846592A (en) | A kind of valuation of enterprise report-generating method and device based on big data | |
CN105184510A (en) | Project management system | |
Niu et al. | Effects of digitalization on energy efficiency: evidence from Zhejiang Province in China | |
CN106127399A (en) | Deposit project intelligent auditing method based on group of assets | |
CN108304985A (en) | Method for optimal evaluation of green space project of power grid enterprise | |
CN114021873A (en) | Data index quantification method and intelligent park enterprise value evaluation system | |
CN114662909A (en) | Rural land operation right circulation transaction price index calculation system | |
CN106022507B (en) | Optimization method and system for farmland connected piece remediation | |
CN107194536A (en) | The power supply reliability negative benefit appraisal procedure and device of a kind of project investment | |
Zhang et al. | Small-scale forest cooperative management of the grain for green program in Xinjiang, China: a SWOT-ANP analysis | |
Liu et al. | How does population agglomeration influence China’s energy eco-efficiency? Evidence from spatial econometric analysis | |
CN107093018A (en) | Communication engineering project information method for visualizing and device based on health model | |
CN106503447A (en) | A kind of non-point pollution emission inventories immediate processing method | |
CN114676931B (en) | Electric quantity prediction system based on data center technology | |
CN106022546B (en) | Load prediction method based on residential community load growth cycle | |
CN106251217A (en) | Portfolio Optimization method based on historical analogy method WCVaR Risk Model | |
CN113762712B (en) | Small hydropower cleaning rectification evaluation index screening strategy in big data environment | |
Chutcheva et al. | An institutional approach to the decarbonization of the economy and the transition to clean energy based on EnergyTech | |
CN109446182A (en) | A kind of compound acquisition method | |
CN107704981A (en) | A kind of method that power distribution network project planning is assessed | |
CN109492209A (en) | A kind of table signature automatic generation method | |
Wang | The Construction Cost Management Method Based on BIM Information Integration Platform | |
CN116151522B (en) | DEA-based expressway pavement maintenance auxiliary decision-making method and system | |
CN115689370B (en) | Forest asset management performance evaluation index system construction method based on analytic hierarchy process |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20180720 |
|
WD01 | Invention patent application deemed withdrawn after publication |