CN108266196A - A kind of counterforce device and its setting method of shield jacking New Austrian Tunneling Method supporting - Google Patents
A kind of counterforce device and its setting method of shield jacking New Austrian Tunneling Method supporting Download PDFInfo
- Publication number
- CN108266196A CN108266196A CN201810066305.0A CN201810066305A CN108266196A CN 108266196 A CN108266196 A CN 108266196A CN 201810066305 A CN201810066305 A CN 201810066305A CN 108266196 A CN108266196 A CN 108266196A
- Authority
- CN
- China
- Prior art keywords
- shield
- tunnel
- reaction beam
- arch
- section
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 55
- 230000005641 tunneling Effects 0.000 title claims abstract description 41
- 238000006243 chemical reaction Methods 0.000 claims abstract description 71
- 238000010276 construction Methods 0.000 claims abstract description 26
- 238000005452 bending Methods 0.000 claims abstract description 16
- 239000011378 shotcrete Substances 0.000 claims abstract description 12
- 238000009412 basement excavation Methods 0.000 claims description 16
- 239000011435 rock Substances 0.000 claims description 13
- 239000004567 concrete Substances 0.000 claims description 12
- 230000002787 reinforcement Effects 0.000 claims description 10
- 238000004873 anchoring Methods 0.000 claims description 8
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 238000009434 installation Methods 0.000 claims description 3
- 210000003205 muscle Anatomy 0.000 claims description 3
- 239000002689 soil Substances 0.000 description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 210000000003 hoof Anatomy 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000007363 ring formation reaction Methods 0.000 description 2
- 230000011218 segmentation Effects 0.000 description 2
- 239000002131 composite material Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 238000000638 solvent extraction Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 238000009423 ventilation Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0607—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D20/00—Setting anchoring-bolts
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Architecture (AREA)
- Environmental & Geological Engineering (AREA)
- Civil Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
The invention belongs to tunneling and underground engineering technical fields, particularly relate to a kind of counterforce device and its setting method of shield jacking New Austrian Tunneling Method supporting, primarily to propose a kind of counterforce device, the effective tradition shield construction that solves must use pipe-plate lining to provide counter-force, New Austrian Tunneling Method shotcrete bolt lining can not be used to carry out the problem of supporting, the counterforce device, including shield machine body, multiple pipe bending cylinders are uniformly arranged in the shield tail upper edge shield direction of shield machine body, the structure type of the arrangement form and shield section of multiple pipe bending cylinder being uniformly arranged matches;The circumferential arch for being provided on shield section and being arranged along shield section has been excavated in shield machine body, the longitudinal reaction beam arranged along shield section is provided between circumferential arch, the device and its setting method safely and fast tunnel shield method to be combined the advantages of New Austrian Tunneling Method lining cutting manager is reasonable, realizes quick, safe, the economic construction target in tunnel.
Description
Technical field
The invention belongs to tunneling and underground engineering technical fields;Particularly relate to a kind of shield jacking New Austrian Tunneling Method supporting
Counterforce device and its setting method.
Background technology
At present tunnel is carried out in no underground water or the soft rock of few underground water, such as IV, V grade of country rock or soil property and rocky stratum
Road boring construction is generally constructed using New Austrian Tunneling Method or shield method;Wherein shield method is that one kind of tunneling and underground engineering is complete
Mechanized construction method, it is to promote Shield-type machinery in the earth formation, and supporting surrounding country rock by shield shell and section of jurisdiction prevents
Caving in tunnel occurs, while soil excavation is carried out with cutting apparatus in front of excavation face, machinery transports hole by being unearthed
Outside, it pressurizes in the lining cutting of the assembled cyclization in rear portion jacking by jack, then assembled precast concrete section of jurisdiction, forms tunnel structure
A kind of mechanized construction method;Shield method can realize the continuous driving in the construction of stratum, and construction efficiency is high, but liner structure
Using prefabricated pipe section assembled structure, cost is higher.
The construction of underground New Austrian Tunneling Method be using safeguard and using tunnel surrounding self-bearing ability as basic point, it is mixed using anchor pole and injection
Solidifying soil is main supporting means, timely carries out supporting, controls the deformation and relaxation of country rock, and country rock is made to become supporting and protecting system of tunnel
Component part, and the side for constructing tunnel and underground engineering design being instructed to construct by measurement to country rock and supporting, monitoring
Method and principle;Use New Austrian Tunneling Method construction tunnel section that circle, rectangle etc. can also be used based on the shape of a hoof, lining cutting mode is general
It is using composite lining form, i.e., highly beneficial to lining cutting stress in a manner that preliminary bracing adds secondary lining to be combined;Country rock
Under the conditions of the larger preliminary bracing of flexibility, larger deformation can be generated, releases most deformation energy, thus is set after making
Secondary lining reduce stress, after secondary lining applies, but can to preliminary bracing generate radial-thrust force, so as to improve initial stage branch
The stress condition of shield;And lining cutting any surface finish is smooth, is conducive to tunnel ventilation and waterproof, protects outer layer supporting;But on ground
When in lower IV, V grade of country rock of soft rock using New Austrian Tunneling Method construction, it need to generally divide bench excavation, mechanization degree is low, and operation is with artificial
Based on, construction efficiency is relatively low, and security risk is high, and tunneling operation environment is poor.
Invention content
The goal of the invention of the present invention:
Primarily to propose a kind of a kind of counterforce device being combined for shield method execution with New Austrian Tunneling Method supporting, it is effective to solve
Certainly traditional shield construction must use pipe-plate lining to provide counter-force, and New Austrian Tunneling Method shotcrete bolt lining can not be used to carry out the difficulty of supporting
Topic;Shield method is safely and fast tunneled and is combined with the advantages of New Austrian Tunneling Method lining cutting economical rationality, is not changing existing tunnel structure
Under conditions of design, it is ensured that soft rock tunnel mechanization speedy drivage, preliminary bracing quick closure cyclization are applicable to various
The lining section of type, such as round, horse-shoe tunnel section realize quick, safe, the economic construction target in tunnel.
The technical scheme is that:
A kind of counterforce device of shield jacking New Austrian Tunneling Method supporting is provided, including shield machine body, in the shield tail of shield machine body
Upper edge shield direction has been uniformly arranged multiple pipe bending cylinders, the arrangement form and shield tunnel of multiple pipe bending cylinders being uniformly arranged
The structure type of section matches;The circumferential arch arranged along tunnel cross-section is provided in shield machine body tunneling section
Frame is provided with the longitudinal reaction beam being longitudinally arranged along tunnel cross-section between adjacent two Pin circumferential direction arches;Pipe bending cylinder abut against to
At longitudinal reaction beam position.
Along shield tunnel, tunneling direction carries out subsection setup to longitudinal reaction beam forward;Each subsection setup is indulged
It is the distance between adjacent two Pin circumferential direction arches, and longitudinal reaction beam of each subsection setup is held in the length of reaction beam
On same axis.
This ring longitudinal direction reaction beam arranged along tunnel cross-section and upper ring longitudinal direction reaction beam set between circumferential arch leads to
Cross fastening bolt connection.
The upper and lower part of this ring longitudinal direction reaction beam front end is also connect with circumferential arch using fastening bolt.
This ring longitudinal direction reaction beam also sets lock foot anchoring stock with circumferential arch in joint.
Bar-mat reinforcement is also linked between the circumferential arch that adjacent two are arranged along tunnel cross-section, is sprayed on bar-mat reinforcement
Concrete.
Using a kind of above-described setting method of the counterforce device of shield jacking New Austrian Tunneling Method supporting, including following step
Suddenly:
1. according to tunnel formation condition, hydraulic character and shield shell length condition, calculate thrust needed for shield driving and its required push away
Into oil cylinder quantity, according to tunnel cross-section form, rationally determining shield driving oil cylinder is in the position of tunnel cross-section;
2. according to single cylinder thrust size, oil cylinder position and tunnel cross-section, Tunnel circumferential direction segmentation side is determined
Formula and preliminary bracing counter-force longeron position;
3. tunnel excavation according to Tunnel spacing, excavates a tunnel support gap length;
4. preliminary bracing is constructed, according to geological conditions, the shield tail of shield machine is integrally retracted or piecemeal is retracted, when piecemeal is retracted,
Often retract a piecemeal just to the piecemeal the circumferential arch of corresponding tunnel surrounding region setting, longitudinal reaction beam, reinforced mesh and
Anchor pole, gunite concrete after domain installation, and domain preliminary bracing construction is completed, longitudinal reaction beam of preliminary bracing is connected to tunnel
Road has been performed at secondary lining-up;
5. at the reaction beam of shield pipe bending cylinder top to preliminary bracing longitudinal direction, shield machine is pushed ahead into an excavation length;
6. repeating the above steps 1 to 5, tunnel excavation support cycle operation is carried out.
In step 3, the shield tail of shield machine is that piecemeal is formed, piecemeal size and Tunnel piecemeal size pair
Should, vertical equity stretching motion of each piecemeal along shield machine exposes the country rock face dividing that tunnel periphery is excavated.
In step 4, the construction procedure of preliminary bracing is:4.1 according to shield tail segmented areas, first tunnel inverted arch bottom
Piecemeal is retracted to tunnel tunnel face direction, is then retracted successively for left and right arch wall position, is finally retracted for arch crown part;4.2
Each shield tail retraction region installs the corresponding circumferential piecemeal arch in the region, then installs longitudinal reaction beam, this ring longitudinal direction first
Reaction beam end is bolted with upper ring longitudinal direction reaction beam, and ensures two ring reaction beams on the same axis, this ring longitudinal direction
Reaction beam upper front end and lower part are reliably connected with circumferential arch using bolt, set lock foot anchor after being provided in joint
Bar, hangs bar-mat reinforcement between front and rear two rings arch, and gunite concrete completes the region preliminary bracing construction;
4.3 repeat above step, complete domain preliminary bracing construction and longitudinal reaction beam setting.
The Tunnel includes circumferential arch, longitudinal reaction beam, longitudinally connected muscle, reinforced mesh, lock foot anchoring stock
And gunite concrete;Wherein longitudinal reaction beam is bolted with upper and lower circumferential direction arch in joint, longitudinal reaction beam it
Between in joint also by being bolted.
The beneficial effects of the invention are as follows:
(1)The economical rationality safely and fast with New Austrian Tunneling Method lining cutting of shield method is combined by the present invention, is set using a kind of counter-force
Method and apparatus are realized in the case where not needing to lining segment, the purpose that shield is pushed ahead, be tunnel safety, economy,
It efficiently builds up and provides new method.
(2)The counter-force set-up mode and device of the present invention, suitable for having no water or little water stratum, section configuration is unrestricted
System can carry out the constructing tunnel of circle, the shape of a hoof, rectangle and class rectangle section.
(3)The present invention uses Fully-mechanized operation, substantially reduces manual work intensity, powerful guarantee tunneling operation environment peace
Entirely, task environmental quality is significantly improved.
Description of the drawings
Fig. 1 is the structure diagram of the counterforce device arrangement of the present invention;
Fig. 2 is the structure diagram of the counterforce device section arrangement of the present invention;
Fig. 3 is the attachment structure schematic diagram of the circumferential arch and longitudinal reaction beam of the present invention.
In figure:1 is shield machine body;2 be shield tail;3 be pipe bending cylinder;4 be circumferential arch;5 be longitudinal reaction beam;6 are
Fastening bolt;7 be preliminary bracing;8 be secondary lining-up.
Specific embodiment
The specific embodiment of the present invention is described in detail below in conjunction with attached drawing.
As shown in Figures 1 to 3, a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting is provided, including shield machine body 1,
Multiple pipe bending cylinders 3, multiple pushing tow oil being uniformly arranged have been uniformly arranged in the 2 upper edge shield direction of shield tail of shield machine body
The arrangement form of cylinder and the structure type of shield tunnel section match;It is provided in shield machine body tunneling section
The circumferential arch 4 arranged along tunnel cross-section is provided with along what tunnel cross-section was longitudinally arranged between adjacent two Pin circumferential direction arches and indulges
To reaction beam 5;Pipe bending cylinder is abutted against to longitudinal reaction beam position.
With shield tunnel, tunneling direction carries out subsection setup to longitudinal reaction beam forward;Each subsection setup
The length of longitudinal reaction beam is the distance between adjacent two Pin circumferential direction arches, and longitudinal reaction beam of each subsection setup is kept
On the same axis.
This ring longitudinal direction reaction beam arranged along tunnel cross-section and upper ring longitudinal direction reaction beam set between circumferential arch leads to
Fastening bolt 6 is crossed to connect.
The upper and lower part of this ring longitudinal direction reaction beam front end is also connect with circumferential arch using fastening bolt 6.
This ring longitudinal direction reaction beam also sets lock foot anchoring stock with circumferential arch in joint.
Bar-mat reinforcement is also linked between the circumferential arch that adjacent two are arranged along tunnel cross-section, is sprayed on bar-mat reinforcement
Concrete.
Use the setting method of the counterforce device of above-mentioned shield jacking New Austrian Tunneling Method supporting for:
1. according to conditions such as tunnel formation condition, hydraulic character and shield shell length, thrust needed for shield driving and its required is calculated
Propelling cylinder quantity, according to tunnel cross-section form, rationally determining shield driving oil cylinder is in the position of tunnel cross-section;
2. according to single cylinder thrust size, oil cylinder position and tunnel cross-section, Tunnel circumferential direction segmentation side is determined
Formula and preliminary bracing counter-force longeron position;
3. tunnel excavation according to Tunnel spacing, excavates a tunnel support gap length;
4. preliminary bracing is constructed, according to geological conditions, the shield tail of shield machine can integrally retract or piecemeal is retracted, when piecemeal is retracted
When, often retract a piecemeal just corresponding tunnel surrounding region setting circumferential direction arch, longitudinal reaction beam, reinforced mesh to the piecemeal
And anchor pole, gunite concrete after domain installation, and complete domain preliminary bracing 7 and construct, longitudinal reaction beam connection of preliminary bracing
It has been performed at secondary lining-up 8 to tunnel;
5. at the reaction beam of shield pipe bending cylinder top to preliminary bracing longitudinal direction, shield machine is pushed ahead into an excavation length;
6. repeating the above steps 1 to 5, tunnel excavation support cycle operation is carried out.
In step 3, the shield tail of the shield tunneling equipment is that piecemeal is formed, piecemeal size and Tunnel
Piecemeal size corresponds to, and each piecemeal along the vertical equity stretching motion of shield machine, can make the country rock face of tunnel periphery excavation
Piecemeal exposes.
In step 4, the construction procedure of preliminary bracing is:4.1 according to shield tail segmented areas, first tunnel inverted arch bottom
Piecemeal is retracted to tunnel tunnel face direction, is then retracted successively for left and right arch wall position, is finally retracted for arch crown part;4.2
Each shield tail retraction region installs the corresponding circumferential piecemeal arch in the region, then installs longitudinal reaction beam, this ring longitudinal direction first
Reaction beam end is bolted with upper ring longitudinal direction reaction beam, and ensures two ring reaction beams on the same axis, this ring longitudinal direction
Reaction beam upper front end and lower part are reliably connected with circumferential arch using bolt, set lock foot anchor after being provided in joint
Bar, hangs bar-mat reinforcement between front and rear two rings arch, and gunite concrete completes the region preliminary bracing construction;
4.3 repeat above step, complete domain preliminary bracing construction and longitudinal reaction beam setting.
The Tunnel by circumferential arch, longitudinal reaction beam, longitudinally connected muscle, reinforced mesh, lock foot anchoring stock with
And the compositions such as gunite concrete;Wherein longitudinal reaction beam is bolted with upper and lower circumferential arch in joint, longitudinal counter-force
In joint also by being bolted between beam.
Embodiment one:For the shield method execution New Austrian Tunneling Method supporting will be used by horse-shoe tunnel below, further
Illustrate the form of implementation of the present invention:
The first step:According to tunnel geology condition and section, it is 9 to determine shield pipe bending cylinder.
Second step:According to single cylinder thrust size, oil cylinder position and tunnel cross-section, Tunnel ring is determined
To partitioning scheme and preliminary bracing counter-force longeron position.
Third walks:Tunnel excavation, according to Tunnel spacing, excavate a tunnel support gap length 0.8m~
1m。
4th step:Preliminary bracing is constructed, and the construction procedure of preliminary bracing is:1. according to shield tail segmented areas, tunnel first
The piecemeal of inverted arch bottom is retracted to tunnel tunnel face direction;2. in each shield tail retraction region, it is corresponding which is installed first
Then circumferential piecemeal arch installs longitudinal reaction beam, this ring longitudinal direction reaction beam end is connected with upper ring longitudinal direction reaction beam by bolt
It connects, and ensures two ring reaction beams on the same axis, this ring longitudinal direction reaction beam upper front end and lower part use spiral shell with circumferential arch
Bolt is reliably connected, and lock foot anchoring stock is set in joint after being provided with, and bar-mat reinforcement is hung between front and rear two rings arch, and injection is mixed
Solidifying soil completes the region preliminary bracing construction;3. repeating above step, complete tunnel side wall and vault preliminary bracing and longitudinal direction is anti-
The setting of power beam, forms domain preliminary bracing and longitudinal reaction beam, and longitudinal reaction beam in preliminary bracing is connected to tunnel and has applied
It does at secondary lining-up.
5th step:Shield pushes ahead shield machine at all pipe bending cylinder tops to corresponding preliminary bracing longitudinal direction reaction beam
One excavation length.
6th step:Step 1 is repeated to step 5, carries out tunnel excavation support cycle operation.
Claims (10)
1. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting, including shield machine body, it is characterised in that:In shield machine body
Shield tail upper edge shield direction be uniformly arranged multiple pipe bending cylinders, the arrangement form and shield of multiple pipe bending cylinders being uniformly arranged
The structure type of structure tunnel cross-section matches;It is provided with what is arranged along tunnel cross-section in shield machine body tunneling section
Circumferential arch is provided with the longitudinal reaction beam being longitudinally arranged along tunnel cross-section between adjacent two Pin circumferential direction arches;Pipe bending cylinder
It abuts against to longitudinal reaction beam position.
2. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 1, it is characterised in that:Described is vertical
To reaction beam along shield tunnel, tunneling direction carries out subsection setup forward;The length of longitudinal reaction beam of each subsection setup is
The distance between adjacent two Pin circumferential direction arches, and longitudinal reaction beam of each subsection setup is held on same axis.
3. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 1 or 2, it is characterised in that:In ring
This ring longitudinal direction reaction beam arranged along tunnel cross-section and upper ring longitudinal direction reaction beam set between arch is connected by fastening bolt
It connects.
4. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 3, it is characterised in that:The sheet
The upper and lower part of ring longitudinal direction reaction beam front end is also connect with circumferential arch using fastening bolt.
5. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 4, it is characterised in that:The sheet
Ring longitudinal direction reaction beam also sets lock foot anchoring stock with circumferential arch in joint.
6. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 1, it is characterised in that:Adjacent
Bar-mat reinforcement is also linked between two circumferential arches arranged along tunnel cross-section, the gunite concrete on bar-mat reinforcement.
7. a kind of a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting using described in any one of claim 1 to 6 is set
Put method, it is characterised in that:
(1), according to tunnel formation condition, hydraulic character and shield shell length condition, thrust needed for shield driving and its required is calculated
Propelling cylinder quantity, according to tunnel cross-section form, rationally determining shield driving oil cylinder is in the position of tunnel cross-section;
(2), according to single cylinder thrust size, oil cylinder position and tunnel cross-section, determine that Tunnel circumferential direction is divided
Mode and preliminary bracing counter-force longeron position;
(3), tunnel excavation, according to Tunnel spacing, excavate a tunnel support gap length;
(4)Preliminary bracing is constructed, and according to geological conditions, the shield tail of shield machine is integrally retracted or piecemeal is retracted, when piecemeal is retracted,
Often retract a piecemeal just to the piecemeal the circumferential arch of corresponding tunnel surrounding region setting, longitudinal reaction beam, reinforced mesh and
Anchor pole, gunite concrete after domain installation, and domain preliminary bracing construction is completed, longitudinal reaction beam of preliminary bracing is connected to tunnel
Road has been performed at secondary lining-up;
(5), at the reaction beam of shield pipe bending cylinder top to preliminary bracing longitudinal direction, shield machine is pushed ahead into an excavation length;
(6), repeat the above steps(1)Extremely(5), carry out tunnel excavation support cycle operation.
8. a kind of setting method of the counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 7, feature exist
In:In step 3, the shield tail of shield machine is that piecemeal is formed, and piecemeal size is corresponding with Tunnel piecemeal size, often
A piecemeal all along the vertical equity stretching motion of shield machine, exposes the country rock face dividing that tunnel periphery is excavated.
9. a kind of setting method of the counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 7, feature exist
In:In step 4, the construction procedure of preliminary bracing is:4.1 according to the piecemeal of shield tail segmented areas, first tunnel inverted arch bottom
It retracts to tunnel tunnel face direction, then retracts successively for left and right arch wall position, finally retract for arch crown part;4.2 each
Shield tail retraction region installs the corresponding circumferential piecemeal arch in the region, then installs longitudinal reaction beam, this ring longitudinal direction counter-force first
Beam end is bolted with upper ring longitudinal direction reaction beam, and ensures two ring reaction beams on the same axis, this ring longitudinal direction counter-force
Beam upper front end and lower part are reliably connected with circumferential arch using bolt, and lock foot anchoring stock is set in joint after being provided with,
Bar-mat reinforcement is hung between front and rear two rings arch, gunite concrete completes the region preliminary bracing construction;
4.3 repeat above step, complete domain preliminary bracing construction and longitudinal reaction beam setting.
10. a kind of setting method of the counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 7 or 9, special
Sign is:The Tunnel include circumferential arch, longitudinal reaction beam, longitudinally connected muscle, reinforced mesh, lock foot anchoring stock with
And gunite concrete;Wherein longitudinal reaction beam is bolted with upper and lower circumferential arch in joint, between longitudinal reaction beam
In joint also by being bolted.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810066305.0A CN108266196B (en) | 2018-01-24 | 2018-01-24 | Counterforce device for shield jacking new Otto support and setting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810066305.0A CN108266196B (en) | 2018-01-24 | 2018-01-24 | Counterforce device for shield jacking new Otto support and setting method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108266196A true CN108266196A (en) | 2018-07-10 |
CN108266196B CN108266196B (en) | 2024-01-19 |
Family
ID=62776466
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810066305.0A Active CN108266196B (en) | 2018-01-24 | 2018-01-24 | Counterforce device for shield jacking new Otto support and setting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108266196B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111188639A (en) * | 2020-03-10 | 2020-05-22 | 中南大学 | An active bearing system and method for a tunnel-locking steel pipe |
CN113685200A (en) * | 2021-09-07 | 2021-11-23 | 浙江数智交院科技股份有限公司 | Two-lining pushing construction method for highway tunnel |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4099388A (en) * | 1975-10-18 | 1978-07-11 | Gewerkschaft Eisenhutte Westfalia | Drive shield for tunneling apparatus and a method for operating such a shield |
JP2008303572A (en) * | 2007-06-06 | 2008-12-18 | Kumagai Gumi Co Ltd | Propulsion method of tunnel excavator and reaction force support device for use in the method |
ES2338289A1 (en) * | 2007-05-14 | 2010-05-05 | Dragados, S.A. | "machine for perforating and concreteing a tunnel in continuous" (Machine-translation by Google Translate, not legally binding) |
CN204327103U (en) * | 2014-12-12 | 2015-05-13 | 中铁十一局集团城市轨道工程有限公司 | A kind of reaction frame started for tunneling shield |
CN107152285A (en) * | 2017-04-28 | 2017-09-12 | 淮安市中球盾构技术服务有限公司 | For shield launching and the servicing unit of reception |
CN207829893U (en) * | 2018-01-24 | 2018-09-07 | 中铁工程装备集团有限公司 | A kind of counterforce device of shield jacking New Austrian Tunneling Method supporting |
-
2018
- 2018-01-24 CN CN201810066305.0A patent/CN108266196B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4099388A (en) * | 1975-10-18 | 1978-07-11 | Gewerkschaft Eisenhutte Westfalia | Drive shield for tunneling apparatus and a method for operating such a shield |
ES2338289A1 (en) * | 2007-05-14 | 2010-05-05 | Dragados, S.A. | "machine for perforating and concreteing a tunnel in continuous" (Machine-translation by Google Translate, not legally binding) |
JP2008303572A (en) * | 2007-06-06 | 2008-12-18 | Kumagai Gumi Co Ltd | Propulsion method of tunnel excavator and reaction force support device for use in the method |
CN204327103U (en) * | 2014-12-12 | 2015-05-13 | 中铁十一局集团城市轨道工程有限公司 | A kind of reaction frame started for tunneling shield |
CN107152285A (en) * | 2017-04-28 | 2017-09-12 | 淮安市中球盾构技术服务有限公司 | For shield launching and the servicing unit of reception |
CN207829893U (en) * | 2018-01-24 | 2018-09-07 | 中铁工程装备集团有限公司 | A kind of counterforce device of shield jacking New Austrian Tunneling Method supporting |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111188639A (en) * | 2020-03-10 | 2020-05-22 | 中南大学 | An active bearing system and method for a tunnel-locking steel pipe |
CN113685200A (en) * | 2021-09-07 | 2021-11-23 | 浙江数智交院科技股份有限公司 | Two-lining pushing construction method for highway tunnel |
CN113685200B (en) * | 2021-09-07 | 2024-05-14 | 浙江数智交院科技股份有限公司 | Highway tunnel secondary lining pushing construction method |
Also Published As
Publication number | Publication date |
---|---|
CN108266196B (en) | 2024-01-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP7125550B2 (en) | SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH | |
CN105863651B (en) | The method for tunnel construction that a kind of shield is combined with New Austrian Tunneling Method | |
CN104847374B (en) | Large-deformation tunnel in soft rock support system and its construction method | |
CN104653197B (en) | Method for constructing extra-large variable cross section tunnel | |
CN109209391A (en) | Tiny step excavation method suitable for IV-V grade of country rock of large cross-section tunnel | |
CN103306687B (en) | Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method | |
CN102733827B (en) | Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction | |
CN109209392B (en) | Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel | |
CN104453921B (en) | A kind of Soft Rock Tunnel Excavation construction technology | |
CN108756894B (en) | Tunnel micro- three step top Core Soil construction | |
JP4958035B2 (en) | Shield roof construction method | |
CN103244133B (en) | The milling of coal measure strata tunnel is dug and is combined construction with explosion | |
CN103899318B (en) | The milling of medium ground tunnel is dug and supporting machinery construction | |
CN109681210A (en) | A kind of two side-wall pilot tunnel of section bored tunnel construction | |
CN109611103B (en) | Method for reinforcing shield section suspended boulder group | |
CN106869969A (en) | A kind of excavation supporting construction method of soft rock large section tunnel | |
CN107143338B (en) | A kind of coal mine roadway driving and method for protecting support | |
CN105065037A (en) | Double-layer arch center support construction method for highway soft rock tunnel | |
CN106246191B (en) | A kind of hole body is dredged, fills plentiful large-scale karst cave treatment and tunnel excavation method deeply | |
CN105909262B (en) | A kind of bored tunnel driving method | |
CN109339800A (en) | A rapid construction method of tunnel in the connecting section of bridge and tunnel | |
CN107975383A (en) | Underground chamber tee T intersection excavation supporting construction method | |
CN109184733A (en) | Soft rock chamber pucking based on prefabricated assembled bottom arc plate administers supporting construction and method | |
CN208578574U (en) | A kind of nine supporting construction of double -side approach | |
CN104141500A (en) | Hardened sand gravel stratum cavern construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20231103 Address after: 450000 99 Avenue, Sixth Economic Development Zone, Zhengzhou, Henan. Applicant after: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP Co.,Ltd. Applicant after: Hangzhou Future City Underground Space Planning and Design Institute Co.,Ltd. Address before: 450000 99 Avenue, Sixth Economic Development Zone, Zhengzhou, Henan. Applicant before: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP Co.,Ltd. |
|
GR01 | Patent grant | ||
GR01 | Patent grant |