CN108266196A - A kind of counterforce device and its setting method of shield jacking New Austrian Tunneling Method supporting - Google Patents

A kind of counterforce device and its setting method of shield jacking New Austrian Tunneling Method supporting Download PDF

Info

Publication number
CN108266196A
CN108266196A CN201810066305.0A CN201810066305A CN108266196A CN 108266196 A CN108266196 A CN 108266196A CN 201810066305 A CN201810066305 A CN 201810066305A CN 108266196 A CN108266196 A CN 108266196A
Authority
CN
China
Prior art keywords
shield
tunnel
reaction beam
arch
section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810066305.0A
Other languages
Chinese (zh)
Other versions
CN108266196B (en
Inventor
高毅
王全胜
李洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Future City Underground Space Planning And Design Institute Co ltd
China Railway Engineering Equipment Group Co Ltd CREG
Original Assignee
China Railway Engineering Equipment Group Co Ltd CREG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Engineering Equipment Group Co Ltd CREG filed Critical China Railway Engineering Equipment Group Co Ltd CREG
Priority to CN201810066305.0A priority Critical patent/CN108266196B/en
Publication of CN108266196A publication Critical patent/CN108266196A/en
Application granted granted Critical
Publication of CN108266196B publication Critical patent/CN108266196B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0607Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield being provided with devices for lining the tunnel, e.g. shuttering
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Environmental & Geological Engineering (AREA)
  • Civil Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention belongs to tunneling and underground engineering technical fields, particularly relate to a kind of counterforce device and its setting method of shield jacking New Austrian Tunneling Method supporting, primarily to propose a kind of counterforce device, the effective tradition shield construction that solves must use pipe-plate lining to provide counter-force, New Austrian Tunneling Method shotcrete bolt lining can not be used to carry out the problem of supporting, the counterforce device, including shield machine body, multiple pipe bending cylinders are uniformly arranged in the shield tail upper edge shield direction of shield machine body, the structure type of the arrangement form and shield section of multiple pipe bending cylinder being uniformly arranged matches;The circumferential arch for being provided on shield section and being arranged along shield section has been excavated in shield machine body, the longitudinal reaction beam arranged along shield section is provided between circumferential arch, the device and its setting method safely and fast tunnel shield method to be combined the advantages of New Austrian Tunneling Method lining cutting manager is reasonable, realizes quick, safe, the economic construction target in tunnel.

Description

A kind of counterforce device and its setting method of shield jacking New Austrian Tunneling Method supporting
Technical field
The invention belongs to tunneling and underground engineering technical fields;Particularly relate to a kind of shield jacking New Austrian Tunneling Method supporting Counterforce device and its setting method.
Background technology
At present tunnel is carried out in no underground water or the soft rock of few underground water, such as IV, V grade of country rock or soil property and rocky stratum Road boring construction is generally constructed using New Austrian Tunneling Method or shield method;Wherein shield method is that one kind of tunneling and underground engineering is complete Mechanized construction method, it is to promote Shield-type machinery in the earth formation, and supporting surrounding country rock by shield shell and section of jurisdiction prevents Caving in tunnel occurs, while soil excavation is carried out with cutting apparatus in front of excavation face, machinery transports hole by being unearthed Outside, it pressurizes in the lining cutting of the assembled cyclization in rear portion jacking by jack, then assembled precast concrete section of jurisdiction, forms tunnel structure A kind of mechanized construction method;Shield method can realize the continuous driving in the construction of stratum, and construction efficiency is high, but liner structure Using prefabricated pipe section assembled structure, cost is higher.
The construction of underground New Austrian Tunneling Method be using safeguard and using tunnel surrounding self-bearing ability as basic point, it is mixed using anchor pole and injection Solidifying soil is main supporting means, timely carries out supporting, controls the deformation and relaxation of country rock, and country rock is made to become supporting and protecting system of tunnel Component part, and the side for constructing tunnel and underground engineering design being instructed to construct by measurement to country rock and supporting, monitoring Method and principle;Use New Austrian Tunneling Method construction tunnel section that circle, rectangle etc. can also be used based on the shape of a hoof, lining cutting mode is general It is using composite lining form, i.e., highly beneficial to lining cutting stress in a manner that preliminary bracing adds secondary lining to be combined;Country rock Under the conditions of the larger preliminary bracing of flexibility, larger deformation can be generated, releases most deformation energy, thus is set after making Secondary lining reduce stress, after secondary lining applies, but can to preliminary bracing generate radial-thrust force, so as to improve initial stage branch The stress condition of shield;And lining cutting any surface finish is smooth, is conducive to tunnel ventilation and waterproof, protects outer layer supporting;But on ground When in lower IV, V grade of country rock of soft rock using New Austrian Tunneling Method construction, it need to generally divide bench excavation, mechanization degree is low, and operation is with artificial Based on, construction efficiency is relatively low, and security risk is high, and tunneling operation environment is poor.
Invention content
The goal of the invention of the present invention:
Primarily to propose a kind of a kind of counterforce device being combined for shield method execution with New Austrian Tunneling Method supporting, it is effective to solve Certainly traditional shield construction must use pipe-plate lining to provide counter-force, and New Austrian Tunneling Method shotcrete bolt lining can not be used to carry out the difficulty of supporting Topic;Shield method is safely and fast tunneled and is combined with the advantages of New Austrian Tunneling Method lining cutting economical rationality, is not changing existing tunnel structure Under conditions of design, it is ensured that soft rock tunnel mechanization speedy drivage, preliminary bracing quick closure cyclization are applicable to various The lining section of type, such as round, horse-shoe tunnel section realize quick, safe, the economic construction target in tunnel.
The technical scheme is that:
A kind of counterforce device of shield jacking New Austrian Tunneling Method supporting is provided, including shield machine body, in the shield tail of shield machine body Upper edge shield direction has been uniformly arranged multiple pipe bending cylinders, the arrangement form and shield tunnel of multiple pipe bending cylinders being uniformly arranged The structure type of section matches;The circumferential arch arranged along tunnel cross-section is provided in shield machine body tunneling section Frame is provided with the longitudinal reaction beam being longitudinally arranged along tunnel cross-section between adjacent two Pin circumferential direction arches;Pipe bending cylinder abut against to At longitudinal reaction beam position.
Along shield tunnel, tunneling direction carries out subsection setup to longitudinal reaction beam forward;Each subsection setup is indulged It is the distance between adjacent two Pin circumferential direction arches, and longitudinal reaction beam of each subsection setup is held in the length of reaction beam On same axis.
This ring longitudinal direction reaction beam arranged along tunnel cross-section and upper ring longitudinal direction reaction beam set between circumferential arch leads to Cross fastening bolt connection.
The upper and lower part of this ring longitudinal direction reaction beam front end is also connect with circumferential arch using fastening bolt.
This ring longitudinal direction reaction beam also sets lock foot anchoring stock with circumferential arch in joint.
Bar-mat reinforcement is also linked between the circumferential arch that adjacent two are arranged along tunnel cross-section, is sprayed on bar-mat reinforcement Concrete.
Using a kind of above-described setting method of the counterforce device of shield jacking New Austrian Tunneling Method supporting, including following step Suddenly:
1. according to tunnel formation condition, hydraulic character and shield shell length condition, calculate thrust needed for shield driving and its required push away Into oil cylinder quantity, according to tunnel cross-section form, rationally determining shield driving oil cylinder is in the position of tunnel cross-section;
2. according to single cylinder thrust size, oil cylinder position and tunnel cross-section, Tunnel circumferential direction segmentation side is determined Formula and preliminary bracing counter-force longeron position;
3. tunnel excavation according to Tunnel spacing, excavates a tunnel support gap length;
4. preliminary bracing is constructed, according to geological conditions, the shield tail of shield machine is integrally retracted or piecemeal is retracted, when piecemeal is retracted, Often retract a piecemeal just to the piecemeal the circumferential arch of corresponding tunnel surrounding region setting, longitudinal reaction beam, reinforced mesh and Anchor pole, gunite concrete after domain installation, and domain preliminary bracing construction is completed, longitudinal reaction beam of preliminary bracing is connected to tunnel Road has been performed at secondary lining-up;
5. at the reaction beam of shield pipe bending cylinder top to preliminary bracing longitudinal direction, shield machine is pushed ahead into an excavation length;
6. repeating the above steps 1 to 5, tunnel excavation support cycle operation is carried out.
In step 3, the shield tail of shield machine is that piecemeal is formed, piecemeal size and Tunnel piecemeal size pair Should, vertical equity stretching motion of each piecemeal along shield machine exposes the country rock face dividing that tunnel periphery is excavated.
In step 4, the construction procedure of preliminary bracing is:4.1 according to shield tail segmented areas, first tunnel inverted arch bottom Piecemeal is retracted to tunnel tunnel face direction, is then retracted successively for left and right arch wall position, is finally retracted for arch crown part;4.2 Each shield tail retraction region installs the corresponding circumferential piecemeal arch in the region, then installs longitudinal reaction beam, this ring longitudinal direction first Reaction beam end is bolted with upper ring longitudinal direction reaction beam, and ensures two ring reaction beams on the same axis, this ring longitudinal direction Reaction beam upper front end and lower part are reliably connected with circumferential arch using bolt, set lock foot anchor after being provided in joint Bar, hangs bar-mat reinforcement between front and rear two rings arch, and gunite concrete completes the region preliminary bracing construction;
4.3 repeat above step, complete domain preliminary bracing construction and longitudinal reaction beam setting.
The Tunnel includes circumferential arch, longitudinal reaction beam, longitudinally connected muscle, reinforced mesh, lock foot anchoring stock And gunite concrete;Wherein longitudinal reaction beam is bolted with upper and lower circumferential direction arch in joint, longitudinal reaction beam it Between in joint also by being bolted.
The beneficial effects of the invention are as follows:
(1)The economical rationality safely and fast with New Austrian Tunneling Method lining cutting of shield method is combined by the present invention, is set using a kind of counter-force Method and apparatus are realized in the case where not needing to lining segment, the purpose that shield is pushed ahead, be tunnel safety, economy, It efficiently builds up and provides new method.
(2)The counter-force set-up mode and device of the present invention, suitable for having no water or little water stratum, section configuration is unrestricted System can carry out the constructing tunnel of circle, the shape of a hoof, rectangle and class rectangle section.
(3)The present invention uses Fully-mechanized operation, substantially reduces manual work intensity, powerful guarantee tunneling operation environment peace Entirely, task environmental quality is significantly improved.
Description of the drawings
Fig. 1 is the structure diagram of the counterforce device arrangement of the present invention;
Fig. 2 is the structure diagram of the counterforce device section arrangement of the present invention;
Fig. 3 is the attachment structure schematic diagram of the circumferential arch and longitudinal reaction beam of the present invention.
In figure:1 is shield machine body;2 be shield tail;3 be pipe bending cylinder;4 be circumferential arch;5 be longitudinal reaction beam;6 are Fastening bolt;7 be preliminary bracing;8 be secondary lining-up.
Specific embodiment
The specific embodiment of the present invention is described in detail below in conjunction with attached drawing.
As shown in Figures 1 to 3, a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting is provided, including shield machine body 1, Multiple pipe bending cylinders 3, multiple pushing tow oil being uniformly arranged have been uniformly arranged in the 2 upper edge shield direction of shield tail of shield machine body The arrangement form of cylinder and the structure type of shield tunnel section match;It is provided in shield machine body tunneling section The circumferential arch 4 arranged along tunnel cross-section is provided with along what tunnel cross-section was longitudinally arranged between adjacent two Pin circumferential direction arches and indulges To reaction beam 5;Pipe bending cylinder is abutted against to longitudinal reaction beam position.
With shield tunnel, tunneling direction carries out subsection setup to longitudinal reaction beam forward;Each subsection setup The length of longitudinal reaction beam is the distance between adjacent two Pin circumferential direction arches, and longitudinal reaction beam of each subsection setup is kept On the same axis.
This ring longitudinal direction reaction beam arranged along tunnel cross-section and upper ring longitudinal direction reaction beam set between circumferential arch leads to Fastening bolt 6 is crossed to connect.
The upper and lower part of this ring longitudinal direction reaction beam front end is also connect with circumferential arch using fastening bolt 6.
This ring longitudinal direction reaction beam also sets lock foot anchoring stock with circumferential arch in joint.
Bar-mat reinforcement is also linked between the circumferential arch that adjacent two are arranged along tunnel cross-section, is sprayed on bar-mat reinforcement Concrete.
Use the setting method of the counterforce device of above-mentioned shield jacking New Austrian Tunneling Method supporting for:
1. according to conditions such as tunnel formation condition, hydraulic character and shield shell length, thrust needed for shield driving and its required is calculated Propelling cylinder quantity, according to tunnel cross-section form, rationally determining shield driving oil cylinder is in the position of tunnel cross-section;
2. according to single cylinder thrust size, oil cylinder position and tunnel cross-section, Tunnel circumferential direction segmentation side is determined Formula and preliminary bracing counter-force longeron position;
3. tunnel excavation according to Tunnel spacing, excavates a tunnel support gap length;
4. preliminary bracing is constructed, according to geological conditions, the shield tail of shield machine can integrally retract or piecemeal is retracted, when piecemeal is retracted When, often retract a piecemeal just corresponding tunnel surrounding region setting circumferential direction arch, longitudinal reaction beam, reinforced mesh to the piecemeal And anchor pole, gunite concrete after domain installation, and complete domain preliminary bracing 7 and construct, longitudinal reaction beam connection of preliminary bracing It has been performed at secondary lining-up 8 to tunnel;
5. at the reaction beam of shield pipe bending cylinder top to preliminary bracing longitudinal direction, shield machine is pushed ahead into an excavation length;
6. repeating the above steps 1 to 5, tunnel excavation support cycle operation is carried out.
In step 3, the shield tail of the shield tunneling equipment is that piecemeal is formed, piecemeal size and Tunnel Piecemeal size corresponds to, and each piecemeal along the vertical equity stretching motion of shield machine, can make the country rock face of tunnel periphery excavation Piecemeal exposes.
In step 4, the construction procedure of preliminary bracing is:4.1 according to shield tail segmented areas, first tunnel inverted arch bottom Piecemeal is retracted to tunnel tunnel face direction, is then retracted successively for left and right arch wall position, is finally retracted for arch crown part;4.2 Each shield tail retraction region installs the corresponding circumferential piecemeal arch in the region, then installs longitudinal reaction beam, this ring longitudinal direction first Reaction beam end is bolted with upper ring longitudinal direction reaction beam, and ensures two ring reaction beams on the same axis, this ring longitudinal direction Reaction beam upper front end and lower part are reliably connected with circumferential arch using bolt, set lock foot anchor after being provided in joint Bar, hangs bar-mat reinforcement between front and rear two rings arch, and gunite concrete completes the region preliminary bracing construction;
4.3 repeat above step, complete domain preliminary bracing construction and longitudinal reaction beam setting.
The Tunnel by circumferential arch, longitudinal reaction beam, longitudinally connected muscle, reinforced mesh, lock foot anchoring stock with And the compositions such as gunite concrete;Wherein longitudinal reaction beam is bolted with upper and lower circumferential arch in joint, longitudinal counter-force In joint also by being bolted between beam.
Embodiment one:For the shield method execution New Austrian Tunneling Method supporting will be used by horse-shoe tunnel below, further Illustrate the form of implementation of the present invention:
The first step:According to tunnel geology condition and section, it is 9 to determine shield pipe bending cylinder.
Second step:According to single cylinder thrust size, oil cylinder position and tunnel cross-section, Tunnel ring is determined To partitioning scheme and preliminary bracing counter-force longeron position.
Third walks:Tunnel excavation, according to Tunnel spacing, excavate a tunnel support gap length 0.8m~ 1m。
4th step:Preliminary bracing is constructed, and the construction procedure of preliminary bracing is:1. according to shield tail segmented areas, tunnel first The piecemeal of inverted arch bottom is retracted to tunnel tunnel face direction;2. in each shield tail retraction region, it is corresponding which is installed first Then circumferential piecemeal arch installs longitudinal reaction beam, this ring longitudinal direction reaction beam end is connected with upper ring longitudinal direction reaction beam by bolt It connects, and ensures two ring reaction beams on the same axis, this ring longitudinal direction reaction beam upper front end and lower part use spiral shell with circumferential arch Bolt is reliably connected, and lock foot anchoring stock is set in joint after being provided with, and bar-mat reinforcement is hung between front and rear two rings arch, and injection is mixed Solidifying soil completes the region preliminary bracing construction;3. repeating above step, complete tunnel side wall and vault preliminary bracing and longitudinal direction is anti- The setting of power beam, forms domain preliminary bracing and longitudinal reaction beam, and longitudinal reaction beam in preliminary bracing is connected to tunnel and has applied It does at secondary lining-up.
5th step:Shield pushes ahead shield machine at all pipe bending cylinder tops to corresponding preliminary bracing longitudinal direction reaction beam One excavation length.
6th step:Step 1 is repeated to step 5, carries out tunnel excavation support cycle operation.

Claims (10)

1. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting, including shield machine body, it is characterised in that:In shield machine body Shield tail upper edge shield direction be uniformly arranged multiple pipe bending cylinders, the arrangement form and shield of multiple pipe bending cylinders being uniformly arranged The structure type of structure tunnel cross-section matches;It is provided with what is arranged along tunnel cross-section in shield machine body tunneling section Circumferential arch is provided with the longitudinal reaction beam being longitudinally arranged along tunnel cross-section between adjacent two Pin circumferential direction arches;Pipe bending cylinder It abuts against to longitudinal reaction beam position.
2. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 1, it is characterised in that:Described is vertical To reaction beam along shield tunnel, tunneling direction carries out subsection setup forward;The length of longitudinal reaction beam of each subsection setup is The distance between adjacent two Pin circumferential direction arches, and longitudinal reaction beam of each subsection setup is held on same axis.
3. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 1 or 2, it is characterised in that:In ring This ring longitudinal direction reaction beam arranged along tunnel cross-section and upper ring longitudinal direction reaction beam set between arch is connected by fastening bolt It connects.
4. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 3, it is characterised in that:The sheet The upper and lower part of ring longitudinal direction reaction beam front end is also connect with circumferential arch using fastening bolt.
5. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 4, it is characterised in that:The sheet Ring longitudinal direction reaction beam also sets lock foot anchoring stock with circumferential arch in joint.
6. a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 1, it is characterised in that:Adjacent Bar-mat reinforcement is also linked between two circumferential arches arranged along tunnel cross-section, the gunite concrete on bar-mat reinforcement.
7. a kind of a kind of counterforce device of shield jacking New Austrian Tunneling Method supporting using described in any one of claim 1 to 6 is set Put method, it is characterised in that:
(1), according to tunnel formation condition, hydraulic character and shield shell length condition, thrust needed for shield driving and its required is calculated Propelling cylinder quantity, according to tunnel cross-section form, rationally determining shield driving oil cylinder is in the position of tunnel cross-section;
(2), according to single cylinder thrust size, oil cylinder position and tunnel cross-section, determine that Tunnel circumferential direction is divided Mode and preliminary bracing counter-force longeron position;
(3), tunnel excavation, according to Tunnel spacing, excavate a tunnel support gap length;
(4)Preliminary bracing is constructed, and according to geological conditions, the shield tail of shield machine is integrally retracted or piecemeal is retracted, when piecemeal is retracted, Often retract a piecemeal just to the piecemeal the circumferential arch of corresponding tunnel surrounding region setting, longitudinal reaction beam, reinforced mesh and Anchor pole, gunite concrete after domain installation, and domain preliminary bracing construction is completed, longitudinal reaction beam of preliminary bracing is connected to tunnel Road has been performed at secondary lining-up;
(5), at the reaction beam of shield pipe bending cylinder top to preliminary bracing longitudinal direction, shield machine is pushed ahead into an excavation length;
(6), repeat the above steps(1)Extremely(5), carry out tunnel excavation support cycle operation.
8. a kind of setting method of the counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 7, feature exist In:In step 3, the shield tail of shield machine is that piecemeal is formed, and piecemeal size is corresponding with Tunnel piecemeal size, often A piecemeal all along the vertical equity stretching motion of shield machine, exposes the country rock face dividing that tunnel periphery is excavated.
9. a kind of setting method of the counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 7, feature exist In:In step 4, the construction procedure of preliminary bracing is:4.1 according to the piecemeal of shield tail segmented areas, first tunnel inverted arch bottom It retracts to tunnel tunnel face direction, then retracts successively for left and right arch wall position, finally retract for arch crown part;4.2 each Shield tail retraction region installs the corresponding circumferential piecemeal arch in the region, then installs longitudinal reaction beam, this ring longitudinal direction counter-force first Beam end is bolted with upper ring longitudinal direction reaction beam, and ensures two ring reaction beams on the same axis, this ring longitudinal direction counter-force Beam upper front end and lower part are reliably connected with circumferential arch using bolt, and lock foot anchoring stock is set in joint after being provided with, Bar-mat reinforcement is hung between front and rear two rings arch, gunite concrete completes the region preliminary bracing construction;
4.3 repeat above step, complete domain preliminary bracing construction and longitudinal reaction beam setting.
10. a kind of setting method of the counterforce device of shield jacking New Austrian Tunneling Method supporting according to claim 7 or 9, special Sign is:The Tunnel include circumferential arch, longitudinal reaction beam, longitudinally connected muscle, reinforced mesh, lock foot anchoring stock with And gunite concrete;Wherein longitudinal reaction beam is bolted with upper and lower circumferential arch in joint, between longitudinal reaction beam In joint also by being bolted.
CN201810066305.0A 2018-01-24 2018-01-24 Counterforce device for shield jacking new Otto support and setting method thereof Active CN108266196B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810066305.0A CN108266196B (en) 2018-01-24 2018-01-24 Counterforce device for shield jacking new Otto support and setting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810066305.0A CN108266196B (en) 2018-01-24 2018-01-24 Counterforce device for shield jacking new Otto support and setting method thereof

Publications (2)

Publication Number Publication Date
CN108266196A true CN108266196A (en) 2018-07-10
CN108266196B CN108266196B (en) 2024-01-19

Family

ID=62776466

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810066305.0A Active CN108266196B (en) 2018-01-24 2018-01-24 Counterforce device for shield jacking new Otto support and setting method thereof

Country Status (1)

Country Link
CN (1) CN108266196B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188639A (en) * 2020-03-10 2020-05-22 中南大学 An active bearing system and method for a tunnel-locking steel pipe
CN113685200A (en) * 2021-09-07 2021-11-23 浙江数智交院科技股份有限公司 Two-lining pushing construction method for highway tunnel

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4099388A (en) * 1975-10-18 1978-07-11 Gewerkschaft Eisenhutte Westfalia Drive shield for tunneling apparatus and a method for operating such a shield
JP2008303572A (en) * 2007-06-06 2008-12-18 Kumagai Gumi Co Ltd Propulsion method of tunnel excavator and reaction force support device for use in the method
ES2338289A1 (en) * 2007-05-14 2010-05-05 Dragados, S.A. "machine for perforating and concreteing a tunnel in continuous" (Machine-translation by Google Translate, not legally binding)
CN204327103U (en) * 2014-12-12 2015-05-13 中铁十一局集团城市轨道工程有限公司 A kind of reaction frame started for tunneling shield
CN107152285A (en) * 2017-04-28 2017-09-12 淮安市中球盾构技术服务有限公司 For shield launching and the servicing unit of reception
CN207829893U (en) * 2018-01-24 2018-09-07 中铁工程装备集团有限公司 A kind of counterforce device of shield jacking New Austrian Tunneling Method supporting

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4099388A (en) * 1975-10-18 1978-07-11 Gewerkschaft Eisenhutte Westfalia Drive shield for tunneling apparatus and a method for operating such a shield
ES2338289A1 (en) * 2007-05-14 2010-05-05 Dragados, S.A. "machine for perforating and concreteing a tunnel in continuous" (Machine-translation by Google Translate, not legally binding)
JP2008303572A (en) * 2007-06-06 2008-12-18 Kumagai Gumi Co Ltd Propulsion method of tunnel excavator and reaction force support device for use in the method
CN204327103U (en) * 2014-12-12 2015-05-13 中铁十一局集团城市轨道工程有限公司 A kind of reaction frame started for tunneling shield
CN107152285A (en) * 2017-04-28 2017-09-12 淮安市中球盾构技术服务有限公司 For shield launching and the servicing unit of reception
CN207829893U (en) * 2018-01-24 2018-09-07 中铁工程装备集团有限公司 A kind of counterforce device of shield jacking New Austrian Tunneling Method supporting

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111188639A (en) * 2020-03-10 2020-05-22 中南大学 An active bearing system and method for a tunnel-locking steel pipe
CN113685200A (en) * 2021-09-07 2021-11-23 浙江数智交院科技股份有限公司 Two-lining pushing construction method for highway tunnel
CN113685200B (en) * 2021-09-07 2024-05-14 浙江数智交院科技股份有限公司 Highway tunnel secondary lining pushing construction method

Also Published As

Publication number Publication date
CN108266196B (en) 2024-01-19

Similar Documents

Publication Publication Date Title
JP7125550B2 (en) SUPPORT STRUCTURE AND CONSTRUCTION METHOD FOR TWO-STAGE HIGH-SPEED CLOSING TUNNEL WITH INVERTED ARCH
CN105863651B (en) The method for tunnel construction that a kind of shield is combined with New Austrian Tunneling Method
CN104847374B (en) Large-deformation tunnel in soft rock support system and its construction method
CN104653197B (en) Method for constructing extra-large variable cross section tunnel
CN109209391A (en) Tiny step excavation method suitable for IV-V grade of country rock of large cross-section tunnel
CN103306687B (en) Soft rock tunnel long cantilever horizontal jet grouting Deformation control construction method
CN102733827B (en) Tunnel arch exchanging construction method and construction structure in tunnel arch exchanging construction
CN109209392B (en) Full-ring excavation method suitable for IV-V-grade surrounding rock of large-section tunnel
CN104453921B (en) A kind of Soft Rock Tunnel Excavation construction technology
CN108756894B (en) Tunnel micro- three step top Core Soil construction
JP4958035B2 (en) Shield roof construction method
CN103244133B (en) The milling of coal measure strata tunnel is dug and is combined construction with explosion
CN103899318B (en) The milling of medium ground tunnel is dug and supporting machinery construction
CN109681210A (en) A kind of two side-wall pilot tunnel of section bored tunnel construction
CN109611103B (en) Method for reinforcing shield section suspended boulder group
CN106869969A (en) A kind of excavation supporting construction method of soft rock large section tunnel
CN107143338B (en) A kind of coal mine roadway driving and method for protecting support
CN105065037A (en) Double-layer arch center support construction method for highway soft rock tunnel
CN106246191B (en) A kind of hole body is dredged, fills plentiful large-scale karst cave treatment and tunnel excavation method deeply
CN105909262B (en) A kind of bored tunnel driving method
CN109339800A (en) A rapid construction method of tunnel in the connecting section of bridge and tunnel
CN107975383A (en) Underground chamber tee T intersection excavation supporting construction method
CN109184733A (en) Soft rock chamber pucking based on prefabricated assembled bottom arc plate administers supporting construction and method
CN208578574U (en) A kind of nine supporting construction of double -side approach
CN104141500A (en) Hardened sand gravel stratum cavern construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20231103

Address after: 450000 99 Avenue, Sixth Economic Development Zone, Zhengzhou, Henan.

Applicant after: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP Co.,Ltd.

Applicant after: Hangzhou Future City Underground Space Planning and Design Institute Co.,Ltd.

Address before: 450000 99 Avenue, Sixth Economic Development Zone, Zhengzhou, Henan.

Applicant before: CHINA RAILWAY ENGINEERING EQUIPMENT GROUP Co.,Ltd.

GR01 Patent grant
GR01 Patent grant