CN108257528A - A kind of project management progress chasing display board - Google Patents
A kind of project management progress chasing display board Download PDFInfo
- Publication number
- CN108257528A CN108257528A CN201711396447.5A CN201711396447A CN108257528A CN 108257528 A CN108257528 A CN 108257528A CN 201711396447 A CN201711396447 A CN 201711396447A CN 108257528 A CN108257528 A CN 108257528A
- Authority
- CN
- China
- Prior art keywords
- compartment
- subplate
- partition
- project management
- display board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000005192 partition Methods 0.000 claims abstract description 41
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 16
- 230000002787 reinforcement Effects 0.000 claims description 7
- 238000000034 method Methods 0.000 abstract description 11
- 238000007726 management method Methods 0.000 description 20
- 238000010586 diagram Methods 0.000 description 10
- 230000000694 effects Effects 0.000 description 3
- 230000000739 chaotic effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000012797 qualification Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F15/00—Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
- G09F15/0006—Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09F—DISPLAYING; ADVERTISING; SIGNS; LABELS OR NAME-PLATES; SEALS
- G09F15/00—Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like
- G09F15/0006—Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels
- G09F15/0037—Boards, hoardings, pillars, or like structures for notices, placards, posters, or the like planar structures comprising one or more panels supported by a post
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Display Racks (AREA)
Abstract
The invention discloses a kind of project management progress chasing display boards,Including mainboard,Supporting rod and pedestal,The mainboard is mounted on supporting rod,The pedestal is mounted on supporting rod bottom,And base bottom is equipped with universal wheel,The first compartment and the setting of second compartment upper and lower opening,The third compartment and the 4th compartment or so opening setting,The first compartment and second compartment are located on the outside of third compartment and the 4th compartment,The first compartment,Second compartment,Subplate is separately installed in third compartment and the 4th compartment,Lower subplate,Right subplate and left secondary plate,The right subplate is slidably connected to first partition and second partition respectively by the first sliding block,The left secondary plate is slidably connected to second partition and third partition board respectively by the second sliding block,The present invention is logical can more to show project process,Can according to project schedule plan show number be unfolded,Adaptability is wider,Realize the classification displaying of project process,With very high practicability.
Description
Technical field
The present invention relates to project management techniques field, specially a kind of project management progress chasing display board.
Background technology
Project management refers in project activity with special knowledge, technical ability, tool and method, enables project limited
Under resource qualifications, realize or the demand more than setting and desired process.Project management is to be successfully accomplished one to some
The whole monitoring of list of target relevant movable (for example task) and management and control.This includes planning, schedule and safeguards composition item
The progress of purpose activity, under limited resource constraint, with the viewpoint, method and theory of system, the whole being related to project
Work is effectively managed.The overall process terminated since the investment decision of project to project is planned, is organized, is referred to
It waves, coordinate, control and evaluates, to realize the target of project, project management belongs to the major class of project management engineering, project pipe in itself
Science and engineering journey includes:Development management (DM), project management (PM), facilities management (FM) and Building Information Model (BIM) and project
Management is then divided into three categories again:Information project management, project management, investment project management.
In project management process, needing to project process into line trace, traditional progress chasing displaying harden structure is fixed,
Be inconvenient to move, with the development of project, due to display board limited area, display board can not be completely by all progress chasings
It shows, manager is needed to change the project plan at any time, and the displaying of display board progress chasing is chaotic, it has not been convenient to which management makes
With with certain limitation.
Invention content
The purpose of the present invention is to provide a kind of project management progress chasing display board, can more show project into
Degree, can be shown according to project schedule plan number be unfolded, adaptability is wider, classification displaying, will not be chaotic, and fills
The Universal wheel structure of bottom set portion setting, is moved, to solve the problems mentioned in the above background technology convenient for device.
To achieve the above object, the present invention provides following technical solution:A kind of project management progress chasing display board, including
Mainboard, supporting rod and pedestal, the mainboard are mounted on supporting rod, and the pedestal is mounted on supporting rod bottom, and base bottom
Universal wheel is installed, first compartment, second are divided by first partition, second partition and third partition board respectively in the mainboard
Compartment, third compartment and the 4th compartment, the first compartment and the setting of second compartment upper and lower opening, the third compartment and the 4th
Compartment or so opening setting, the first compartment and second compartment are located at third compartment and the 4th compartment outside, described first every
Be separately installed with subplate, lower subplate, right subplate and left secondary plate in room, second compartment, third compartment and the 4th compartment, it is described on
Subplate and lower subplate are separately fixed at by bolt in first compartment and second compartment, and the right subplate passes through the first sliding block point
Be not slidably connected to first partition and second partition, the left secondary plate by the second sliding block be slidably connected to respectively second partition and
Third partition board, the supporting rod are fixedly connected on mainboard by link block.
Preferably, it is welded with the bearing diagonal being connected with pedestal on the supporting rod.
Preferably, at the top of the upper subplate and lower subplate bottom is equipped with the first pulling plate, the right subplate right side and left secondary
The second pulling plate is equipped on the left of plate.
Preferably, the sectional area of first pulling plate is more than the opening sectional area of first compartment and second compartment, described
The sectional area of second pulling plate is more than the opening sectional area of third compartment and the 4th compartment.
Preferably, it corresponds to the first sliding block respectively on the second partition and the second sliding block sliding position offers what is matched
First sliding rail and the second sliding rail, offer the third sliding rail to match with the first sliding block in the first partition, the third every
The 4th sliding rail to match with the second sliding block is offered on plate.
Preferably, the link block both sides be equipped with the connecting plate that is connected, through there is the first bolt on the connecting plate.
Preferably, it is connected between the supporting rod and link block by reinforcement block, running through on the reinforcement block has the second spiral shell
Bolt.
Preferably, the first compartment, second compartment, third compartment and the 4th compartment respectively with upper subplate, lower subplate, the right side
The matching relationship of subplate and left secondary plate is clearance fit.
Preferably, the threaded hole to match with bolt is offered on the upper subplate and lower subplate.
Compared with prior art, the beneficial effects of the invention are as follows:
1st, the present invention on the basis of mainboard by setting four subplate structures, upper subplate, lower subplate, right subplate and left secondary
Plate is corresponding respectively to be unfolded up and down with right left four orientation, can more show project process, can be according to project schedule plan
Displaying number be unfolded, adaptability is wider;
2nd, four groups of subplate structures can be unfolded and store, easy to use, realize the classification displaying of project process, will not mix
It is random, and the Universal wheel structure of bottom of device setting, it is moved convenient for device, there is very high practicability.
Description of the drawings
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the main board overlooking the structure diagram of the present invention;
Fig. 3 is the subplate deployment opening structure diagram of the present invention;
Fig. 4 is the partial top structure diagram of the present invention;
Fig. 5 is enlarged structure schematic diagram at the A of the present invention;
Fig. 6 is enlarged structure schematic diagram at the B of the present invention;
Fig. 7 is the second partition part-structure schematic diagram of the present invention;
Fig. 8 is the first partition part-structure schematic diagram of the present invention;
Fig. 9 is the third partition part structure diagram of the present invention;
Figure 10 is the supporting rod of the present invention and link block partially connected architecture schematic diagram.
In figure:1 mainboard, 2 supporting rods, 3 pedestals, 4 universal wheels, 5 bearing diagonals, 6 bolts, 61 threaded holes, 7 first pulling plates, 8
Two pulling plates, 9 first partitions, 10 second partitions, 11 third partition boards, 12 first compartments, 13 second compartments, 14 third compartments, 15
It is four compartments, subplate on 16,17 times subplates, 18 right subplates, 181 first sliding blocks, 1,811 first sliding rails, 1812 third sliding rails, 19 left
Subplate, 191 second sliding blocks, 1,911 second sliding rails, 1912 the 4th sliding rails, 20 link blocks, 21 connecting plates, 22 first bolts, 23 add
Strong block, 24 second bolts.
Specific embodiment
Below in conjunction with the attached drawing in the embodiment of the present invention, the technical solution in the embodiment of the present invention is carried out clear, complete
Site preparation describes, it is clear that described embodiment is only part of the embodiment of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, those of ordinary skill in the art are obtained every other without making creative work
Embodiment shall fall within the protection scope of the present invention.
- 10 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of project management progress chasing display board, including master
Plate 1, supporting rod 2 and pedestal 3, the mainboard 1 are mounted on supporting rod 2, and the pedestal 3 is mounted on 2 bottom of supporting rod, and pedestal
3 bottoms are equipped with universal wheel 4, and setting universal wheel 4 facilitates the movement of device;Pass through first partition 9, in the mainboard 1 respectively
Two partition boards 10 and third partition board 11 are divided into first compartment 12, second compartment 13,14 and the 4th compartment 15 of third compartment, and described
One compartment 12 and the setting of 13 upper and lower opening of second compartment, 14 and the 4th compartment 15 or so of the third compartment opening setting are described
First compartment 12 and second compartment 13 are located at 15 outside of third compartment 14 and the 4th compartment, the first compartment 12, second compartment
13rd, it is separately installed with subplate 16, lower subplate 17, right subplate 18 and left secondary plate 19 in 14 and the 4th compartment 15 of third compartment, four
Group subplate structure can provide four display panels;The upper subplate 16 and lower subplate 17 are separately fixed at by bolt 6
It in one compartment 12 and second compartment 13, is fixed by bolt 6, easy disassembly, is adjusted convenient for upper subplate 16 and lower subplate 17;It is described
Right subplate 18 is slidably connected to first partition 9 and second partition 10 respectively by the first sliding block 181, and the left secondary plate 19 passes through
Two sliding blocks 191 are slidably connected to second partition 10 and third partition board 11 respectively, and the supporting rod 2 is fixedly connected by link block 20
In mainboard 1.
Specifically, the bearing diagonal 5 being connected with pedestal 3 is welded on the supporting rod 2;Setting bearing diagonal 5 is carried for supporting rod 2
For supporting role.
Specifically, 16 top of upper subplate and lower 17 bottom of subplate are equipped with the first pulling plate 7, right 18 right side of subplate
The second pulling plate 8 is equipped with 19 left side of left secondary plate;Set the first pulling plate 7 and the second pulling plate 8 that pumping is facilitated to carry out four groups of subplate knots respectively
Structure.
Specifically, the sectional area of first pulling plate 7 is more than the opening sectional area of first compartment 12 and second compartment 13,
The sectional area of second pulling plate 8 is more than the opening sectional area of 14 and the 4th compartment 15 of third compartment;Using 7 He of the first pulling plate
The sectional area of second pulling plate 8 is more than the mode of opening section product, can fall into opening to avoid pulling plate, facilitate pull.
Specifically, corresponding first sliding block 181 and 191 sliding position of the second sliding block offer respectively on the second partition 10
The first sliding rail 1811 and the second sliding rail 1911 to match offers what is matched with the first sliding block 181 in the first partition 9
Third sliding rail 1812 offers the 4th sliding rail 1912 to match with the second sliding block 191 on the third partition board 11;According to sliding block
Corresponding rail structure is set, facilitates the slip of left and right subplate, and mobile and position-limiting action is provided by sliding rail.
Specifically, 20 both sides of link block are equipped with the connecting plate 21 being connected with 1, running through on the connecting plate 21 has first
Bolt 22;It is fixed using 21 and first bolt 22 of connecting plate so that it is convenient for disassembly and assembly, convenient for safeguarding and replacing.
Specifically, being connected between the supporting rod 2 and link block 20 by reinforcement block 23, running through on the reinforcement block 23 has
Second bolt 24;It is fixed using 23 and second bolt 24 of reinforcement block so that be arranged and fixed conveniently.
Specifically, the first compartment 12, second compartment 13,14 and the 4th compartment 15 of third compartment respectively with upper subplate
16th, the matching relationship of lower subplate 17, right subplate 18 and left secondary plate 19 is clearance fit;The mode being gap-matched facilitates four groups
Subplate, which can pull out, to be come.
Specifically, offer the threaded hole 61 to match with bolt 6 on the upper subplate 16 and lower subplate 17;Spiral shell is set
Pit 61 facilitates bolt 6 to be fixed.
Operation principle:In use, setting 1 structure of mainboard, it will by first partition 9, second partition 10 and third partition board 11
First compartment 12, second compartment 13,14 and the 4th compartment 15 of third compartment are divided into inside mainboard 1, respectively in four groups of compartments
Subplate 16, lower subplate 17, right subplate 18 and left secondary plate 19 are installed respectively, and upper subplate 16 can pull upwardly on, solid by bolt 6
It is fixed, lower subplate 17 can downward pull, fixed also by bolt 6, right subplate 18 and left secondary plate 19 are taken out respectively with left side to the right
It stretches out, realizes that four orientation can extend opening, facilitate the displaying of more project schedule plans, and can realize point
Class is shown so that bandwagon effect is more clear, and 4 structure of universal wheel of 3 bottom of pedestal installation moves convenient for device, has
Very high practicability.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (9)
1. a kind of project management progress chasing display board, including mainboard (1), supporting rod (2) and pedestal (3), it is characterised in that:Institute
Mainboard (1) is stated on supporting rod (2), the pedestal (3) is mounted on supporting rod (2) bottom, and pedestal (3) bottom is equipped with
Universal wheel (4) is divided into the in the mainboard (1) by first partition (9), second partition (10) and third partition board (11) respectively
One compartment (12), second compartment (13), third compartment (14) and the 4th compartment (15), the first compartment (12) and second compartment
(13) upper and lower opening is set, the third compartment (14) and the opening setting of the 4th compartment (15) left and right, the first compartment (12)
With second compartment (13) on the outside of third compartment (14) and the 4th compartment (15), the first compartment (12), second compartment
(13), be separately installed in third compartment (14) and the 4th compartment (15) subplate (16), lower subplate (17), right subplate (18) and
Left secondary plate (19), the upper subplate (16) and lower subplate (17) are separately fixed at first compartment (12) and by bolt (6)
In two compartments (13), the right subplate (18) by the first sliding block (181) be slidably connected to respectively first partition (9) and second every
Plate (10), the left secondary plate (19) are slidably connected to second partition (10) and third partition board respectively by the second sliding block (191)
(11), the supporting rod (2) is fixedly connected on mainboard (1) by link block (20).
2. a kind of project management progress chasing display board according to claim 1, it is characterised in that:The supporting rod (2)
On be welded with the bearing diagonal (5) being connected with pedestal (3).
3. a kind of project management progress chasing display board according to claim 1, it is characterised in that:The upper subplate (16)
Top and lower subplate (17) bottom are equipped with the first pulling plate (7), are all provided on the right side of the right subplate (18) with left secondary plate (19) left side
There is the second pulling plate (8).
4. a kind of project management progress chasing display board according to claim 3, it is characterised in that:First pulling plate
(7) sectional area is more than the opening sectional area of first compartment (12) and second compartment (13), the section of second pulling plate (8)
Product is more than third compartment (14) and the opening sectional area of the 4th compartment (15).
5. a kind of project management progress chasing display board according to claim 1, it is characterised in that:The second partition
(10) it corresponds to the first sliding block (181) respectively on and the second sliding block (191) sliding position offers the first sliding rail to match
(1811) and the second sliding rail (1911), the third sliding rail to match with the first sliding block (181) is offered on the first partition (9)
(1812), the 4th sliding rail (1912) to match with the second sliding block (191) is offered on the third partition board (11).
6. a kind of project management progress chasing display board according to claim 1, it is characterised in that:The link block (20)
Both sides are equipped with the connecting plate (21) being connected with (1), and running through on the connecting plate (21) has the first bolt (22).
7. a kind of project management progress chasing display board according to claim 1, it is characterised in that:The supporting rod (2)
It is connected between link block (20) by reinforcement block (23), running through on the reinforcement block (23) has the second bolt (24).
8. a kind of project management progress chasing display board according to claim 1, it is characterised in that:The first compartment
(12), second compartment (13), third compartment (14) and the 4th compartment (15) respectively with upper subplate (16), lower subplate (17), right pair
The matching relationship of plate (18) and left secondary plate (19) is clearance fit.
9. a kind of project management progress chasing display board according to claim 1, it is characterised in that:The upper subplate (16)
With the threaded hole (61) that matches with bolt (6) is offered on lower subplate (17).
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711396447.5A CN108257528A (en) | 2017-12-21 | 2017-12-21 | A kind of project management progress chasing display board |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201711396447.5A CN108257528A (en) | 2017-12-21 | 2017-12-21 | A kind of project management progress chasing display board |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108257528A true CN108257528A (en) | 2018-07-06 |
Family
ID=62723499
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201711396447.5A Pending CN108257528A (en) | 2017-12-21 | 2017-12-21 | A kind of project management progress chasing display board |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108257528A (en) |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105280092A (en) * | 2015-10-30 | 2016-01-27 | 哈尔滨意创空间展览展示制作有限公司 | Display board with stretching function and display method |
| CN205354389U (en) * | 2015-12-01 | 2016-06-29 | 新余学院 | College english teaching show board |
| CN106683493A (en) * | 2016-12-26 | 2017-05-17 | 苏州沃森优金电子科技有限公司 | Folding presenting board for psychology teaching |
| CN206441460U (en) * | 2017-01-17 | 2017-08-25 | 王益东 | World's wind direction and ocean current Pattern Teaching in Women panel |
| CN107301815A (en) * | 2017-07-03 | 2017-10-27 | 郭林华 | A kind of project management progress chasing Graphic Panel |
-
2017
- 2017-12-21 CN CN201711396447.5A patent/CN108257528A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105280092A (en) * | 2015-10-30 | 2016-01-27 | 哈尔滨意创空间展览展示制作有限公司 | Display board with stretching function and display method |
| CN205354389U (en) * | 2015-12-01 | 2016-06-29 | 新余学院 | College english teaching show board |
| CN106683493A (en) * | 2016-12-26 | 2017-05-17 | 苏州沃森优金电子科技有限公司 | Folding presenting board for psychology teaching |
| CN206441460U (en) * | 2017-01-17 | 2017-08-25 | 王益东 | World's wind direction and ocean current Pattern Teaching in Women panel |
| CN107301815A (en) * | 2017-07-03 | 2017-10-27 | 郭林华 | A kind of project management progress chasing Graphic Panel |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101748915B (en) | Modularization construction method for nuclear power station nuclear island | |
| CN101752017A (en) | Modularization construction method for nuclear power station nuclear island | |
| CN212473851U (en) | Cabin unit hoisting structure | |
| CN101136259A (en) | Modular construction method for nuclear island of nuclear power station | |
| CN118710448A (en) | A smart beam yard system | |
| CN104213561B (en) | A kind of high concrete pouring construction method building intensity dam | |
| CN203603455U (en) | Tool type hanger suitable for construction of vertical structure of super high-rise building | |
| CN108257528A (en) | A kind of project management progress chasing display board | |
| CN106522550B (en) | A method for setting up pipeline supports of an integral steel structure platform in an ultra-large underground refrigeration room | |
| Kim et al. | Marketing strategy and influential factors based on the attributes of unit modular system | |
| CN101736925A (en) | Modular construction method for nuclear island of nuclear power station | |
| CN206737145U (en) | For installing the node of multi-storied garage steel construction | |
| CN109317911A (en) | A kind of cross column welding production line | |
| CN103982881A (en) | Illuminating system with all-purpose lamp bracket and curtain wall and construction method thereof | |
| CN202767578U (en) | Modular data center | |
| CN207513259U (en) | A kind of twin spans two-wire production system of assembling type buildings material | |
| CN208122340U (en) | Detachable and recyclable discharging platform | |
| CN207714690U (en) | A kind of dismountable steel structure lift shaft | |
| CN118419219A (en) | Integrated building process for ocean engineering block | |
| CN207480851U (en) | One kind is used for flow production line novel steel skeleton die station | |
| CN208082837U (en) | Simple natural sand stone screening separator | |
| CN208133264U (en) | One kind is novel to pour truss manipulator | |
| CN107905378A (en) | Super High mixed type space steel lattice boxlike tube-in-tube structure and production method | |
| CN206814241U (en) | A kind of steel construction elevator ready-package corridor | |
| JPH04368568A (en) | How to build a versatile production system and buildings |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180706 |