CN108252684A - Production set administering method with pressure with skill set well head annular space and its device in gas well - Google Patents

Production set administering method with pressure with skill set well head annular space and its device in gas well Download PDF

Info

Publication number
CN108252684A
CN108252684A CN201711442475.6A CN201711442475A CN108252684A CN 108252684 A CN108252684 A CN 108252684A CN 201711442475 A CN201711442475 A CN 201711442475A CN 108252684 A CN108252684 A CN 108252684A
Authority
CN
China
Prior art keywords
annular space
hose
sleeve pipe
described sleeve
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711442475.6A
Other languages
Chinese (zh)
Inventor
李万军
段德祥
王刚
闫军
罗慧洪
罗怀东
王岩峰
王俊峰
顾亦新
景宁
吉飞
吴羽珩
张华北
童振
林云涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
China National Oil and Gas Exploration and Development Corp
Original Assignee
China National Petroleum Corp
CNPC Drilling Research Institute Co Ltd
China National Oil and Gas Exploration and Development Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Drilling Research Institute Co Ltd, China National Oil and Gas Exploration and Development Corp filed Critical China National Petroleum Corp
Priority to CN201711442475.6A priority Critical patent/CN108252684A/en
Publication of CN108252684A publication Critical patent/CN108252684A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B37/00Methods or apparatus for cleaning boreholes or wells
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B21/00Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
    • E21B21/16Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor using gaseous fluids
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices, or the like

Abstract

The invention discloses a kind of administering method with pressure with skill set well head annular space of production set in gas well and its devices, are related to petroleum drilling engineering field, and production set includes the following steps with skill set well head annular space administering method with pressure in the gas well:Hose is stretched to from casing head gate in casing annulus;One end of hose outside described sleeve pipe annular space is connected into pump installation;After the hose is stretched in described sleeve pipe annular space, start the pump installation and replace out the waste liquid in described sleeve pipe annular space;After waste liquid replaces out in described sleeve pipe annular space, one end of the hose outside described sleeve pipe annular space is connected into air pump;Start the air pump and gas is pumped into described sleeve pipe annular space so as to which the cleaning solution in described sleeve pipe annular space be replaced out;One end of hose outside described sleeve pipe annular space is connected into pump installation, starts the pump installation and is pumped into cement mortar and fluid sealant into described sleeve pipe annular space.The application can solve the problems, such as that well head annular space is with pressure.

Description

Production set administering method with pressure with skill set well head annular space and its device in gas well
Technical field
The present invention relates to petroleum drilling engineering field, production set and skill set well head annular space are with pressure in more particularly to a kind of gas well Administering method and its device.
Background technology
In petroleum gas drilling, since the variation of temperature and pressure in cementing quality problem and operation causes to cement the well Cement sheath cement plane generates gap, and natural gas is covered from bottom reservoir or at tubing string leakage along production and skill lantern ring space cement It is altered in circumferential weld gap to well head, wellhead casing pipe annular space is caused to build the pressure, which is common in production set and skill lantern ring space.Inner room pressure can increase Plus-pressure monitors the cost bled off pressure with well head, can also aggravate the corrosion of casing, can also cause high-pressure gas well out of control, toxic when serious The problem of poisonous gas leakage and influence oil/gas well service life.
Since the construction of natural gas fields, more than 80% high-pressure gas well is all asked there are well head annular space is with pressure in recovery process Topic, this always affects and threatens the safety in production in gas field.At present there are mainly two types of well head annular space processing methods with pressure:It is a kind of Be by casing head of well head take over line bled off pressure, which can only mitigate well head pressure in the short time, it is therefore desirable to pass through Often repeat to bleed off pressure work, in this way, add additional cost of labor, while can not also cut off inner room and calm the anger source channels and solution Corrosion of the inner room pressure to well head.Second is to be blocked by casing head of well head to the strong squeeze method of casing annulus.To closed loop Empty squeeze method needs higher operation pressure, but is limited again by the specified bearing capacity of wellhead assembly, and operation pressure was not easy Height so causes the cement amount squeezed into limited, and it is relatively low to block success rate.
Inner room pressure threatens the safety of well head at any time, closing well operation can only be carried out when serious, this substantially reduces oil/gas well Service life, therefore, there is an urgent need for a kind of improvement inner rooms at scene to press and extends the technical method in oil/gas well service life.
Invention content
In order to overcome the drawbacks described above of the prior art, the technical problem to be solved is that provide one kind for the embodiment of the present invention Production set administering method with pressure with skill set well head annular space and its device, can solve the problems, such as that well head annular space is with pressure in gas well.
The specific technical solution of the embodiment of the present invention is:
Production set covers well head annular space administering method with pressure with skill in a kind of gas well, and production set covers well head ring with skill in the gas well Empty administering method with pressure includes the following steps:
Hose is stretched to from casing head gate in casing annulus;
One end of hose outside described sleeve pipe annular space is connected into pump installation;
After the hose is stretched in described sleeve pipe annular space, start the pump installation by the waste liquid in described sleeve pipe annular space It replaces out;
After waste liquid replaces out in described sleeve pipe annular space, one end of the hose outside described sleeve pipe annular space is connected into air pump;
Start the air pump and gas is pumped into described sleeve pipe annular space so as to which the cleaning solution in described sleeve pipe annular space be replaced out;
One end of hose outside described sleeve pipe annular space is connected into pump installation, starts the pump installation to described sleeve pipe ring Cement mortar and fluid sealant are pumped into sky.
In a preferred embodiment, hose is inserted from casing head gate stretching in casing annulus described The step of in, the hose is inserted into deep-controlled within 30 meters in described sleeve pipe annular space.
In a preferred embodiment, production set is also wrapped with skill set well head annular space administering method with pressure in the gas well Include following steps:
When the cleaning solution in described sleeve pipe annular space being replaced out with gas, measure the liquid measure of discharge liquor, so as to according to liquid measure The depth that casing annulus replaces out liquid is calculated, adjustment hose depth of setting is consistent with the depth that casing annulus replaces out liquid.
In a preferred embodiment, the hose is stretched to by hose conveyer in casing annulus, positioned at institute The one end for stating the hose outside casing annulus is connected with connector.
In a preferred embodiment, start the pump installation be alternately pumped into described sleeve pipe annular space cement mortar and Fluid sealant.
In a preferred embodiment, the pump installation is included for row's pump.
In a preferred embodiment, described sleeve pipe head gate is connected by discharge pipe with waste liquid metering pool.
In a preferred embodiment, cement mortar and close is pumped into described sleeve pipe annular space starting the pump installation Sealing closes casing head gate to full of after described sleeve pipe annular space, treats cement mortar and fluid sealant condensation.
In a preferred embodiment, open casing head gate with to being bled off pressure in casing annulus, by hose from It is stretched in casing annulus in casing head gate.
Production set and the gas used in skill set well head annular space administering method with pressure in a kind of any of the above-described gas well Production set covers well head annular space controlling device with pressure with skill in well, including:
Hose conveyer is arranged with hose on the hose conveyer, and one end of the hose is connected with connector;
The waste liquid metering pool that can be connected with described sleeve pipe head gate, the waste liquid metering pool can collect liquid and to liquid The volume of body is measured;
What can be connected with the connector of the hose pumps for row;
The air pump that can be connected with the connector of the hose.
Technical scheme of the present invention has following notable advantageous effect:
Production set and skill set well head annular space administering method construction technology with pressure are simple in gas well in the application, whole process It all realizes on ground, without underground work, is conveniently operated.Meanwhile it can be cement to use cleaning solution cleaning and gas drain Slurry, fluid sealant and casing wall are cementing more preferable, and sealing is more reliable.The application can solve existing gas well in current world wide Annular space phenomenon with pressure, and without large-scale cementing equipment, operating expenses is at low cost, and promotion prospect is wide, and there is significant economy to imitate Benefit.
With reference to following explanation and attached drawing, only certain exemplary embodiments of this invention is disclosed in detail, specifies the original of the present invention Reason can be in a manner of adopted.It should be understood that embodiments of the present invention are not so limited in range.In appended power In the range of the spirit and terms of profit requirement, embodiments of the present invention include many changes, modifications and are equal.For a kind of reality The feature that the mode of applying is described and/or shown can be made in a manner of same or similar in one or more other embodiments With, with the feature in other embodiment it is combined or substitute other embodiment in feature.
Description of the drawings
Attached drawing described here is only used for task of explanation, and is not intended to limit model disclosed by the invention in any way It encloses.In addition, shape and proportional sizes of each component in figure etc. are only schematical, the understanding of the present invention is used to help, and It is not the specific shape and proportional sizes for limiting each component of the present invention.Those skilled in the art under the teachings of the present invention, can Implement the present invention to select various possible shapes and proportional sizes as the case may be.
Fig. 1 is that production set and the operation of skill set well head annular space administering method with pressure are illustrated in gas well in the embodiment of the present invention Figure.
Fig. 2 is that production set covers the flow chart of well head annular space administering method with pressure with skill in gas well in the embodiment of the present invention.
The reference numeral of the figures above:
1st, casing head gate;2nd, casing annulus;3rd, hose;4th, hose conveyer;5th, connector;6th, discharge pipe;7th, waste liquid Metering pool;8th, air pump;9th, pump installation.
Specific embodiment
With reference to the drawings and the description of the specific embodiments of the present invention, the details of the present invention can clearly be understood.But It is the specific embodiment of invention described herein, is only used for explaining the purpose of the present invention, and cannot understands in any way Into being limitation of the present invention.Under the teachings of the present invention, technical staff is contemplated that the arbitrary possible change based on the present invention Shape, these are regarded as belonging to the scope of the present invention.It should be noted that when element is referred to as " being set to " another yuan Part, it can be directly on another element or there may also be elements placed in the middle.When an element is considered as " connection " Another element, it can be directly to another element or may be simultaneously present centering elements.Term " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be inside mechanical connection or electrical connection or two elements Connection, can be directly connected, can also be indirectly connected by intermediary, for the ordinary skill in the art, The concrete meaning of above-mentioned term can be understood as the case may be.Term as used herein " vertical ", " horizontal ", For illustrative purposes only, it is unique embodiment to be not offered as " on ", " under ", "left", "right" and similar statement.
Unless otherwise defined, all of technologies and scientific terms used here by the article and belong to the technical field of the application The normally understood meaning of technical staff is identical.The term used in the description of the present application is intended merely to description tool herein The purpose of the embodiment of body, it is not intended that in limitation the application.Term as used herein "and/or" includes one or more The arbitrary and all combination of relevant Listed Items.
In order to solve the problems, such as that well head annular space is with pressure, production set in a kind of gas well is proposed in this application and covers well with skill The empty administering method with pressure of choma, Fig. 1 are that production set covers well head annular space improvement side with pressure with skill in gas well in the embodiment of the present invention The operation schematic diagram of method, Fig. 2 are that production set covers the stream of well head annular space administering method with pressure with skill in gas well in the embodiment of the present invention Cheng Tu, as shown in Figure 1 and Figure 2, production set includes the following steps with skill set well head annular space administering method with pressure in gas well:
S101:Hose is stretched to from casing head gate in casing annulus.
In petroleum gas drilling, since the variation of temperature and pressure in cementing quality problem and operation leads to water of cementing the well Mud ring cement plane generates gap, and the gas overflowing in gap can cause wellhead casing pipe annular space to build the pressure, and serious threat the service life of gas well. When inner room pressure, which occurs, in well head to be administered, casing head gate is opened to being bled off pressure in casing annulus, to pass through hose Conveyer stretches to hose in casing annulus from casing head gate.In general, in hose substantially plug-in-sleeve annular space Depth can be controlled within 30 meters.Hose can be high pressure resistant hose, can select the resistance to height of outer diameter 16mm, internal diameter 6mm Press hose.
S102:One end of hose outside casing annulus is connected into pump installation.
In this step, one end of the hose outside casing annulus can be connected with connector, by the connector and pump installation It is connected, it is however generally that, preferentially selection pumps pump installation for row.
S103:After hose is stretched in casing annulus, start pump installation and replace out the waste liquid in casing annulus;
In this step, after hose is stretched in casing annulus, start pump installation, by pump installation into casing annulus Cleaning solution is pumped into, cleaning solution comes out waste liquid in casing annulus from displacement in casing head gate, by cleaning repeatedly, so as to cover The complete displacement of the aerial waste liquid of pipe ring comes out, at this point, being essentially cleaning solution in casing annulus.
S104:After waste liquid replaces out in casing annulus, one end of the hose outside casing annulus is connected into air pump.
In this step, after waste liquid replaces out in casing annulus, pump installation is located to one of the hose outside casing annulus certainly It is disassembled on the connector at end, by the upper air pump of connector connection of one end of the hose outside casing annulus.
S105:Booster air pump is pumped into gas into casing annulus so as to which the cleaning solution in casing annulus be replaced out.
In this step, booster air pump is pumped into gas into casing annulus so as to which the cleaning solution in casing annulus be replaced out, So that gassy in casing annulus.
S106:When the cleaning solution in casing annulus being replaced out with gas, measure the liquid measure of discharge liquor, so as to according to liquid measure The depth that casing annulus replaces out liquid is calculated, adjustment hose depth of setting is consistent with the depth that casing annulus replaces out liquid.
In this step, casing head gate can be connected by discharge pipe with waste liquid metering pool.It will be covered with gas When the aerial cleaning solution of pipe ring replaces out, cleaning solution flow to waste liquid metering pool from casing head gate by discharge pipe, passes through waste liquid Metering pool measures the liquid measure of discharge liquor, so as to replace out the depth of liquid according to liquid measure calculating casing annulus, then adjusts under hose It is consistent with the depth that casing annulus replaces out liquid to enter depth.By the above-mentioned means, being pumped into cement mortar and close into casing annulus During sealing, cement mortar and fluid sealant can be caused fully to pour into casing annulus.
S107:One end of hose outside casing annulus is connected into pump installation, starts pump installation and is pumped into casing annulus Enter cement mortar and fluid sealant.
In this step, the connector of one end of the hose outside casing annulus is reconnected into pump installation, starts pump installation Cement mortar and fluid sealant are pumped into casing annulus.In a preferred embodiment, start pump installation alternately to sleeve ring Cement mortar and fluid sealant are pumped into sky, alternating is pumped into cement mortar and fluid sealant can cause cement mortar and fluid sealant and casing wall glue Knot is more preferable, and sealing is more reliable.Cement mortar and fluid sealant are pumped into casing annulus to after full of casing annulus starting pump installation, Casing head gate is closed, treats cement mortar and fluid sealant condensation, so as to cut off oil gas rising passway, eliminates showing for well head inner room pressure As.
In order to which production set in gas well is coordinated to cover well head annular space administering method with pressure with skill, one kind also proposed in this application Production set covers well head annular space controlling device with pressure with skill in gas well, as shown in Figure 1, production set and skill set well head annular space are with pressure in gas well Controlling device can include:Hose conveyer is arranged with hose on hose conveyer, and one end of hose is connected with connector;Energy The waste liquid metering pool being connected with casing head gate, waste liquid metering pool can collect liquid and the volume of liquid measured; What can be connected with the connector of hose pumps for row;The air pump that can be connected with the connector of hose.
Production set and skill set well head annular space administering method construction technology with pressure are simple in gas well in the application, whole process It all realizes on ground, without underground work, is conveniently operated.Meanwhile it can be cement to use cleaning solution cleaning and gas drain Slurry, fluid sealant and casing wall are cementing more preferable, and sealing is more reliable.The application can solve existing gas well in current world wide Annular space phenomenon with pressure, and without large-scale cementing equipment, operating expenses is at low cost, and promotion prospect is wide, and there is significant economy to imitate Benefit.
All articles and reference disclosed, including patent application and publication, for various purposes by quoting knot Together in this.Identified element, ingredient, component or step and reality should be included by describing the term " substantially by ... form " of combination Other elements, ingredient, component or the step of the basic novel feature of the combination are not influenced in matter.Using term "comprising" or " comprising " describes the combination of element here, ingredient, component or step it is also contemplated that substantially by these elements, ingredient, component Or the embodiment that step is formed.Here by using term " can with ", it is intended to it is described any to illustrate that " can with " includes Attribute is all optional.Multiple element, ingredient, component or step can be carried by single integrated component, ingredient, component or step For.Alternatively, single integrated component, ingredient, component or step can be divided into multiple element, ingredient, component or the step of separation Suddenly.Open "a" or "an" for describing element, ingredient, component or step do not say in order to exclude other elements, into Point, component or step.
Each embodiment in this specification is described by the way of progressive, the highlights of each of the examples are with The difference of other embodiment, just to refer each other for identical similar part between each embodiment.Above-described embodiment is only Illustrate the technical concepts and features of the present invention, its object is to allow person skilled in the art that can understand present disclosure And implement according to this, it is not intended to limit the scope of the present invention.All equivalence changes made according to spirit of the invention Or modification, it should be covered by the protection scope of the present invention.

Claims (10)

1. in a kind of gas well production set with skill cover well head annular space administering method with pressure, which is characterized in that in the gas well production set with Skill set well head annular space administering method with pressure includes the following steps:
Hose is stretched to from casing head gate in casing annulus;
One end of hose outside described sleeve pipe annular space is connected into pump installation;
After the hose is stretched in described sleeve pipe annular space, start the pump installation and replace the waste liquid in described sleeve pipe annular space Go out;
After waste liquid replaces out in described sleeve pipe annular space, one end of the hose outside described sleeve pipe annular space is connected into air pump;
Start the air pump and gas is pumped into described sleeve pipe annular space so as to which the cleaning solution in described sleeve pipe annular space be replaced out;
One end of hose outside described sleeve pipe annular space is connected into pump installation, starts the pump installation into described sleeve pipe annular space It is pumped into cement mortar and fluid sealant.
2. production set covers well head annular space administering method with pressure with skill in gas well according to claim 1, which is characterized in that Described to be inserted from stretching in the step in casing annulus in casing head gate by hose, the hose is inserted into described sleeve pipe annular space In it is deep-controlled within 30 meters.
3. production set covers well head annular space administering method with pressure with skill in gas well according to claim 1, which is characterized in that institute It is further comprising the steps of to state production set and skill set well head annular space administering method with pressure in gas well:
When the cleaning solution in described sleeve pipe annular space being replaced out with gas, measure the liquid measure of discharge liquor, so as to be calculated according to liquid measure Casing annulus replaces out the depth of liquid, and adjustment hose depth of setting is consistent with the depth that casing annulus replaces out liquid.
4. production set covers well head annular space administering method with pressure with skill in gas well according to claim 1, which is characterized in that institute It states hose to stretch in casing annulus by hose conveyer, one end of the hose outside described sleeve pipe annular space, which is connected with, to be connect Head.
5. production set covers well head annular space administering method with pressure with skill in gas well according to claim 1, which is characterized in that opens The dynamic pump installation is alternately pumped into cement mortar and fluid sealant into described sleeve pipe annular space.
6. production set covers well head annular space administering method with pressure with skill in gas well according to claim 1, which is characterized in that institute Pump installation is stated to include for row's pump.
7. production set covers well head annular space administering method with pressure with skill in gas well according to claim 1, which is characterized in that institute Casing head gate is stated by discharge pipe with waste liquid metering pool to be connected.
8. production set covers well head annular space administering method with pressure with skill in gas well according to claim 1, which is characterized in that Start the pump installation and cement mortar and fluid sealant are pumped into described sleeve pipe annular space to full of after described sleeve pipe annular space, close casing Head gate treats cement mortar and fluid sealant condensation.
9. production set covers well head annular space administering method with pressure with skill in gas well according to claim 1, which is characterized in that beats Casing head gate is opened so as to being bled off pressure in casing annulus, hose is stretched to from casing head gate in casing annulus.
10. production set and the gas used in skill set well head annular space administering method with pressure in a kind of gas well described in claim 1 Production set covers well head annular space controlling device with pressure with skill in well, which is characterized in that including:
Hose conveyer is arranged with hose on the hose conveyer, and one end of the hose is connected with connector;
The waste liquid metering pool that can be connected with described sleeve pipe head gate, the waste liquid metering pool can collect liquid and to liquid Volume is measured;
What can be connected with the connector of the hose pumps for row;
The air pump that can be connected with the connector of the hose.
CN201711442475.6A 2017-12-27 2017-12-27 Production set administering method with pressure with skill set well head annular space and its device in gas well Pending CN108252684A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711442475.6A CN108252684A (en) 2017-12-27 2017-12-27 Production set administering method with pressure with skill set well head annular space and its device in gas well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711442475.6A CN108252684A (en) 2017-12-27 2017-12-27 Production set administering method with pressure with skill set well head annular space and its device in gas well

Publications (1)

Publication Number Publication Date
CN108252684A true CN108252684A (en) 2018-07-06

Family

ID=62722996

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711442475.6A Pending CN108252684A (en) 2017-12-27 2017-12-27 Production set administering method with pressure with skill set well head annular space and its device in gas well

Country Status (1)

Country Link
CN (1) CN108252684A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953711A (en) * 2012-11-28 2013-03-06 西南石油大学 Device and method for horizontal gas well to drain liquid and produce gas
CN105156084A (en) * 2015-08-26 2015-12-16 中国石油天然气股份有限公司 Drainage device for accumulated liquid in annular space
CN106761568A (en) * 2017-03-10 2017-05-31 中国石油大学(北京) One kind administers gas well annular space method with pressure
CN106928947A (en) * 2017-03-28 2017-07-07 诺斯石油工具(天津)有限公司 The plugging material of annular space, plugging device and method for blocking between a kind of sleeve pipe

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102953711A (en) * 2012-11-28 2013-03-06 西南石油大学 Device and method for horizontal gas well to drain liquid and produce gas
CN105156084A (en) * 2015-08-26 2015-12-16 中国石油天然气股份有限公司 Drainage device for accumulated liquid in annular space
CN106761568A (en) * 2017-03-10 2017-05-31 中国石油大学(北京) One kind administers gas well annular space method with pressure
CN106928947A (en) * 2017-03-28 2017-07-07 诺斯石油工具(天津)有限公司 The plugging material of annular space, plugging device and method for blocking between a kind of sleeve pipe

Similar Documents

Publication Publication Date Title
MX336590B (en) Wellbore filter screen and related methods of use.
CN105781508A (en) Constant-pressure throttling device for small-diameter water injection well
US20170328169A1 (en) Downhole occluder, pressurized sucker rod and operation technique to repair oil pipes
CN108252684A (en) Production set administering method with pressure with skill set well head annular space and its device in gas well
CN104963634B (en) A kind of actuating oil-pumping unit method
RU2547860C1 (en) Method of development of oil deposits
CN207436998U (en) For the water detection instrument of High water cut stop-spraying horizontal well
CN206220933U (en) Oil recovery process units
RU2475631C1 (en) Plant for simultaneous-separate pumping of working agent
RU96167U1 (en) WELL WASHING DEVICE
CN206016756U (en) A kind of down-hole plugging device of sleeve pipe snubbing serving method
CN204283384U (en) Sleeve pipe grug feeding jar
CN206035455U (en) Motionless former well casing post secondary packing sand control instrument
RU146622U1 (en) IMPLOSIVE PRESSURE HYDROGENERATOR
CN204283336U (en) A kind of laterally opened ball-and-seat
RU141765U1 (en) Wellhead Equipment
CN206830120U (en) A kind of sand block packer
CN211448541U (en) Horizontal well leak-stopping water-plugging pipe column
CN211715112U (en) Wellhead gas injection device
CN108442916A (en) Horizontal well bore hole screen casing damage testing tubing string
CN107869327A (en) A kind of coal bed gas well of fixed tubular column pumping and washing process with pressure
CN106837291A (en) Oil jacket annular space gas-liquid separation device in non-conventional gas well head
CN206769886U (en) A kind of concentric tube cross connection type leak stopping water mixing flow string
CN207406315U (en) Coiled tubing pouring valve
RU169736U1 (en) Complex stepless submersible rodless electric pump installation with a cylindrical device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Wanjun

Inventor after: Jing Ning

Inventor after: Ji Fei

Inventor after: Wu Yuhang

Inventor after: Zhang Huabei

Inventor after: Tong Zhen

Inventor after: Lin Yuntao

Inventor after: Duan Dexiang

Inventor after: Wang Gang

Inventor after: Yan Jun

Inventor after: Luo Huihong

Inventor after: Luo Huaidong

Inventor after: Wang Yanfeng

Inventor after: Wang Junfeng

Inventor after: Gu Yixin

Inventor before: Li Wanjun

Inventor before: Jing Ning

Inventor before: Ji Fei

Inventor before: Wu Yuhang

Inventor before: Zhang Huabei

Inventor before: Tong Zhen

Inventor before: Lin Yuntao

Inventor before: Duan Dexiang

Inventor before: Wang Gang

Inventor before: Yan Jun

Inventor before: Luo Huihong

Inventor before: Luo Huaidong

Inventor before: Wang Yanfeng

Inventor before: Wang Junfeng

Inventor before: Gu Yixin

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180706