CN108252277A - More import confluences, multiple exit shunting hydraulic facility - Google Patents
More import confluences, multiple exit shunting hydraulic facility Download PDFInfo
- Publication number
- CN108252277A CN108252277A CN201810128565.6A CN201810128565A CN108252277A CN 108252277 A CN108252277 A CN 108252277A CN 201810128565 A CN201810128565 A CN 201810128565A CN 108252277 A CN108252277 A CN 108252277A
- Authority
- CN
- China
- Prior art keywords
- section
- water
- inlet
- break
- diversion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B9/00—Water-power plants; Layout, construction or equipment, methods of, or apparatus for, making same
- E02B9/02—Water-ways
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
本发明提供一种多进口汇流、多出口分流水工设施,结构自上游至下游依次为进水段、跌落段、退水段,所述跌落段自上至下由依次相接的顶部空腔段、涡室、收缩段、直段、底部水垫保护井相接构成,所述进水段与涡室相接,退水段与直段下端相接,所述进水段和退水段分别设置多个,整个水工设施通过各进水段分别与上游各引水隧洞衔接,通过各退水段与下游各引水隧洞衔接。该水工设施在保证完成基本消能任务的同时,通过合理布置上下游水流衔接设施的进出口型式,提高调水、排水或给水过程中多支流引水、多支流分流的复杂水环境下上下游水流衔接灵活性,降低工程难度,增强工程的实用性和安全性。
The invention provides a multi-inlet confluence and multi-outlet diversion hydraulic facility. The structure is sequentially composed of a water inlet section, a drop section, and a water return section from upstream to downstream, and the drop section is sequentially connected by top cavities from top to bottom. Section, vortex chamber, constriction section, straight section, and bottom water cushion protection well are connected. A plurality of them are arranged respectively, and the whole hydraulic facility connects with the upstream water diversion tunnels through each water inlet section, and connects with the downstream water diversion tunnels through each water retreat section. While ensuring the completion of the basic energy dissipation tasks, the hydraulic facilities can improve the upstream and downstream in the complex water environment of multi-tributary water diversion and multi-tributary diversion in the process of water diversion, drainage or water supply by rationally arranging the inlet and outlet types of upstream and downstream water flow connection facilities. The flexibility of water flow connection reduces the difficulty of the project and enhances the practicability and safety of the project.
Description
技术领域technical field
本发明属于水利水电工程中的水流衔接技术领域,特别涉及一种多进口、多出口水工设施。The invention belongs to the technical field of water flow connection in water conservancy and hydropower projects, and in particular relates to a multi-inlet and multi-outlet hydraulic facility.
背景技术Background technique
在落差大、管线多的调水、排水或给水等工程中,需要考虑在水流输水管线分布复杂、上下游支流数量不止一个时合理的进行水流衔接,即有效地消除水流携带的多余能量。特别是对落差大的水流进行消能的主要形式为掺气水流在跌落过程中和在底部水垫保护井内上下翻滚,相互冲撞将大部分能量消除,从而保证水工建筑物及下游出口河床在过流时的安全。为确保过流时的安全可靠,通常需要保证水流衔接设施内的流速、掺气浓度等水力学指标在安全指定范围内。传统的水流衔接设施为单进口单出口型式,因而在较为复杂的输水网络环境下适应性差,缺乏灵活性,且其进水段与退水段洞室开挖面积大,施工难度高,进而影响工程整体效益。In water diversion, drainage or water supply projects with large drop and many pipelines, it is necessary to consider the reasonable connection of water flow when the distribution of water flow pipelines is complex and the number of upstream and downstream tributaries is more than one, that is, to effectively eliminate the excess energy carried by the water flow. In particular, the main form of energy dissipation for water with a large drop is that the aerated water rolls up and down in the bottom water cushion protection well during the falling process, and the collision with each other eliminates most of the energy, thus ensuring that the hydraulic structures and the downstream outlet riverbed are in good condition. Safety during overcurrent. In order to ensure the safety and reliability of the flow, it is usually necessary to ensure that the hydraulic indicators such as the flow rate and aeration concentration in the water connection facilities are within the safety specified range. The traditional water connection facilities are single-inlet and single-outlet, so they have poor adaptability and lack of flexibility in a relatively complex water delivery network environment. Moreover, the excavation area of the water inlet section and the backwater section of the cavern is large, and the construction is difficult. affect the overall efficiency of the project.
发明内容Contents of the invention
本发明的目的在于针对现有技术的不足,提供一种多进口汇流、多出口分流的水工设施,在保证完成基本消能任务的同时,通过合理布置上下游水流衔接设施的进出口型式,提高调水、排水或给水过程中多支流引水、多支流分流的复杂水环境下上下游水流衔接灵活性,降低工程难度,增强工程的实用性和安全性。The purpose of the present invention is to address the deficiencies of the prior art and provide a hydraulic facility with multiple inlets converging and multiple outlets diverging. While ensuring the completion of the basic energy dissipation tasks, by rationally arranging the inlet and outlet types of the upstream and downstream water flow connection facilities, Improve the flexibility of upstream and downstream water flow connection in the complex water environment of multi-tributary water diversion and multi-tributary diversion in the process of water diversion, drainage or water supply, reduce engineering difficulty, and enhance the practicability and safety of the project.
本发明提供的多进口汇流、多出口分流水工设施,结构自上游至下游依次为进水段、跌落段、退水段,所述跌落段自上至下由依次相接的顶部空腔段、涡室、收缩段、直段、底部水垫保护井相接构成,所述进水段与涡室相接,退水段与直段下端相接,所述进水段和退水段分别设置多个,整个水工设施通过各进水段分别与上游各引水隧洞衔接,通过各退水段分别与下游各引水隧洞衔接。The multi-inlet confluence and multi-outlet diversion hydraulic facility provided by the present invention has a structure from upstream to downstream in order of water inlet section, drop section, and water return section, and the drop section is connected by top cavity sections sequentially from top to bottom , vortex chamber, contraction section, straight section, and bottom water cushion protection well are connected, the water inlet section is connected with the vortex chamber, the water retreat section is connected with the lower end of the straight section, and the water inlet section and the water retreat section are respectively There are multiple sets, and the entire hydraulic facility connects with the upstream water diversion tunnels through the water inlet sections, and connects with the downstream water diversion tunnels through the water retreat sections.
上述多进口汇流、多出口分流水工设施,各进水段布置在跌落段的同一高程,多个进水段沿涡室周向均匀布置,所述涡室、收缩段各设置一个;或各进水段布置在跌落段的不同高程,且高程数为2,对应于每个进水段,在跌落段上分别设置一个与该进水段相接的涡室和与涡室相接的收缩段。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facilities, each water inlet section is arranged at the same elevation of the drop section, and multiple water inlet sections are evenly arranged along the circumference of the vortex chamber, and each of the vortex chamber and the contraction section is provided with one; or each The water inlet section is arranged at different elevations of the drop section, and the number of elevations is 2. Corresponding to each water inlet section, a vortex chamber connected to the water inlet section and a constriction chamber connected to the vortex chamber are respectively set on the drop section. part.
上述多进口汇流、多出口分流水工设施,各进水段布置在跌落段的同一高程时,沿涡室周向均匀布置2~3个进水段;各进水段布置在跌落段的不同高程时,沿每个涡室周向均匀布置1~3个进水段。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facilities, when each water inlet section is arranged at the same elevation of the drop section, 2 to 3 water inlet sections are evenly arranged along the circumference of the vortex chamber; When the height is high, 1 to 3 water inlet sections are evenly arranged along the circumference of each vortex chamber.
上述多进口汇流、多出口分流水工设施,对应同一涡室布置的相邻进水段之间的夹角为30°~180°。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facility, the included angle between adjacent water inlet sections corresponding to the same vortex chamber arrangement is 30°-180°.
上述多进口汇流、多出口分流水工设施,各退水段布置在跌落段中直段下端的同一高程,各退水段根据所需分流方向布置;或各退水段布置在跌落段中直段下端的不同高程且高程数为2~3个,各退水段根据下游所需分流高程和方向布置。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facilities, each water retreat section is arranged at the same elevation at the lower end of the straight section in the drop section, and each water retreat section is arranged according to the required diversion direction; or each water retreat section is arranged in the drop section straight The lower end of the section has different elevations and the number of elevations is 2 to 3, and each retreat section is arranged according to the downstream required diversion elevation and direction.
上述多进口汇流、多出口分流水工设施,所述退水段布置在跌落直段下端的同一高程时,沿直段周向均匀布置2~3个退水段;所述退水段布置在跌落直段下端的不同高程时,沿直段周向均匀布置1~3个退水段。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facility, when the water retreat section is arranged at the same elevation as the lower end of the straight section, 2 to 3 water retreat sections are evenly arranged along the circumference of the straight section; the water retreat section is arranged at When falling to different elevations at the lower end of the straight section, 1 to 3 receding water sections are evenly arranged along the circumference of the straight section.
上述多进口汇流、多出口分流水工设施,布置在同一高程的相邻两个退水段之间的夹角为30°~180°。The above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facilities are arranged at the same elevation with an included angle between two adjacent receding water sections of 30° to 180°.
上述多进口汇流、多出口分流水工设施,所述进水段由上平段与变坡段沿进水方向相接构成,进水段断面为矩形,变坡段底板高程沿进水方向降低,变坡段一侧边壁与涡室相切,另一侧边壁沿进水方向向内收缩,使水流通道变窄。In the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facility, the water inlet section is composed of an upper flat section and a slope-changing section connected along the water inlet direction, the cross-section of the water inlet section is rectangular, and the floor elevation of the slope-changing section decreases along the water inlet direction , one side wall of the variable slope section is tangent to the vortex chamber, and the other side wall shrinks inward along the water inlet direction, so that the water flow channel is narrowed.
上述多进口汇流、多出口分流水工设施,所述退水段由沿水流方向依次相接的渐变段和下平段构成,所述渐变段沿出水方向水流通道变小,退水段与跌落段直段下端通过弧线段(反弧段)平滑相接。In the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facility, the water retreat section is composed of a gradual change section and a lower flat section successively connected along the water flow direction, the water flow channel of the gradual change section becomes smaller along the water outlet direction, and the water retreat section and the drop section The lower end of the straight section is smoothly connected by an arc section (anti-arc section).
上述多进口汇流、多出口分流水工设施,所述进水段、退水段断面为矩形,跌落段断面为圆形,跌落段中收缩段外形为沿水流方向的倒圆锥台形,顶部空腔段、涡室与收缩段顶部入口直径相等,直段与收缩段下部出口直径相等。空腔段顶部设置有通气孔。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facility, the section of the water inlet section and the backwater section is rectangular, the section of the drop section is circular, and the shape of the contraction section in the drop section is an inverted truncated cone along the direction of water flow. The top cavity The diameters of the section, the vortex chamber and the top inlet of the contraction section are equal, and the diameters of the straight section and the bottom outlet of the contraction section are equal. Ventilation holes are arranged on the top of the cavity section.
上述多进口汇流、多出口分流水工设施,所述跌落段涡室直径r=(1.2~1.4)D,D为跌落段直段直径。For the hydraulic facility with multiple inlets converging and multiple outlets diverging, the diameter of the vortex chamber in the drop section is r=(1.2-1.4)D, where D is the diameter of the straight section of the drop section.
上述多进口汇流、多出口分流水工设施,跌落段收缩段高度L=(1.2~2.0)D,D为跌落段直段直径。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facilities, the height of the contraction section of the drop section is L=(1.2-2.0)D, where D is the diameter of the straight section of the drop section.
上述多进口汇流、多出口分流水工设施,所述跌落段涡室下部连接收缩段的尺寸(与进水段连接处的最低点至与收缩段连接处之间的涡室高度)一般取Z=0.4D,其中D为跌落段直段直径。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facility, the size of the constriction section connected to the lower part of the vortex chamber of the drop section (the height of the vortex chamber between the lowest point at the connection with the water inlet section and the connection with the constriction section) is generally taken as Z =0.4D, where D is the diameter of the straight section of the drop section.
上述多进口汇流、多出口分流水工设施,所述跌落段涡室尺寸为r×H(直径×高),顶部空腔部分尺寸为r×Δd(直径×高),开挖Δd高度的空腔部分应满足在最大流量时避免进入的水流冲击顶板造成破坏,其中Δd=(0.9~1.2)r。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facility, the size of the vortex chamber in the drop section is r×H (diameter×height), the size of the top cavity is r×Δd (diameter×height), and the cavity with a height of Δd is excavated. The cavity part should meet the requirements of avoiding the damage caused by the incoming water impacting the top plate at the maximum flow rate, where Δd=(0.9~1.2)r.
上述多进口汇流、多出口分流水工设施,所述底部水垫保护井尺寸为Φ×d(直径×高),其中d=(0.7~1.7)Φ。For the hydraulic facility with multiple inlets converging and multiple outlets diverging, the size of the bottom water cushion protection well is Φ×d (diameter×height), where d=(0.7~1.7)Φ.
上述多进口汇流、多出口分流水工设施,进水段中上平段尺寸为a×b(宽×高),变坡段底板倾斜角和内侧边墙收缩角度为4°~8°。退水段尺寸为e×f(宽×高),退水段上顶板与反弧段之间为一渐变段,其坡度为1:4~1:6,反弧段半径为R。For the above-mentioned multi-inlet confluence and multi-outlet diversion hydraulic facilities, the size of the middle and upper flat section of the water inlet section is a×b (width×height), and the inclination angle of the bottom plate and the shrinkage angle of the inner side wall of the slope section are 4°~8°. The size of the receding section is e×f (width×height). There is a gradient section between the top plate and the anti-arc section of the receding section. The slope is 1:4~1:6, and the radius of the anti-arc section is R.
本发明所述多进口汇流、多出口分流水工设施,水流通过多个进水段进入该水工设施后形成沿涡室内壁面切线的旋流,旋流通过收缩段来避免大流量下水流脱壁,水流脱壁易破坏中部空腔形成气囊危害建筑物边壁。旋流在进入跌落段后不断掺入空气形成水、气两相流,有效的消除能量。水流在进入底部水垫保护井后在井内形成深水垫,防止初始落水冲蚀底板,同时与下落的水流相互碰撞,井中水流的掺气和紊动更加充分,急剧消耗能量,从而提高消能率,达到工程要求。下泄后的水流可通过多个退水段流出,以实现合理布置隧洞系统的目的。According to the multi-inlet confluence and multi-outlet diversion hydraulic facility in the present invention, the water flow enters the hydraulic facility through a plurality of water inlet sections to form a swirling flow along the tangent line of the inner wall of the vortex, and the swirling flow passes through the contraction section to prevent the water from falling off under a large flow rate. The wall, the water flow off the wall is easy to damage the central cavity to form an air bag that endangers the side wall of the building. After the swirling flow enters the falling section, it is continuously mixed with air to form a two-phase flow of water and gas, which effectively eliminates energy. After the water flow enters the bottom water cushion protection well, a deep water cushion is formed in the well to prevent the initial falling water from eroding the bottom plate. At the same time, it collides with the falling water flow, the aeration and turbulence of the water flow in the well are more sufficient, and the energy is consumed rapidly, thereby improving the energy dissipation rate. meet engineering requirements. The water flow after discharge can flow out through multiple receding sections, so as to achieve the purpose of rationally arranging the tunnel system.
与现有技术相比,本发明具有以下有益效果:Compared with the prior art, the present invention has the following beneficial effects:
1、本发明所述多进口汇流、多出口分流水工设施采用多进口与多出口结合,在非常规泄洪、落差大的给排水以及多流域调水中通过多进口与多出口的灵活运用,实现了隧洞系统的优化布置,提高排水、给水、调水过程中多支流引水、多支流分流的复杂水环境下上下游水流衔接灵活性,真正发挥了其在水流衔接与流域结合处的枢纽作用,增强工程的实用性和安全性。1. The multi-inlet confluence and multi-outlet diversion hydraulic facilities of the present invention adopt the combination of multi-inlet and multi-outlet, and the flexible use of multi-inlet and multi-outlet in unconventional flood discharge, water supply and drainage with large drop and multi-basin water transfer, The optimal layout of the tunnel system has been realized, and the flexibility of upstream and downstream water flow connection under the complex water environment of multi-tributary water diversion and multi-tributary diversion in the process of drainage, water supply and water transfer has been improved, and its role as a hub at the junction of water flow and watershed has been truly played. , Enhance the practicality and safety of the project.
2、本发明所述多进口汇流、多出口分流水工设施能将水流挟带的大部分能量在水流旋流跌落过程与底部水垫保护井中消除,大大降低了下泄水流挟带的能量,减少了对下游出口段造成的危害,保护了河床及河岸,减少了下游河床加固的费用耗损。2. The multi-inlet confluence and multi-outlet diversion hydraulic facilities of the present invention can eliminate most of the energy carried by the water flow during the swirling flow drop process and the bottom water cushion protection well, which greatly reduces the energy carried by the discharged water flow, reducing The damage to the downstream outlet section is avoided, the riverbed and river bank are protected, and the cost of downstream riverbed reinforcement is reduced.
3、本发明所述多进口汇流、多出口分流水工设施采用多进口多出口型式,进、出口数量适当增多减小了进口与出口的横断面积,可以避免大断面的洞室开挖,减小了施工难度,提高了施工过程中的安全性。3. The multi-inlet confluence and multi-outlet diversion hydraulic facilities of the present invention adopt the multi-inlet and multi-outlet type, and the number of inlets and outlets is appropriately increased to reduce the cross-sectional area of the inlet and outlet, which can avoid excavation of large-section caverns and reduce The difficulty of construction is reduced, and the safety in the construction process is improved.
4、本发明所述多进口汇流、多出口分流水工设施在较小空间和较短距离内,安全泄散水流能量,在正常运行情况下使上游水流与下游水流获得妥善衔接,有效布置下游出口,与传统水流衔接设施相比,出口方向的多元化改变出口水流方向,实现向不同方向调水的作用,减少了引水沟渠、隧洞的开挖。4. The multi-inlet confluence and multi-outlet diversion hydraulic facilities described in the present invention can safely discharge the water flow energy in a small space and a short distance, so that the upstream water flow and the downstream water flow can be properly connected under normal operation conditions, and the downstream water flow can be effectively arranged. Outlet, compared with the traditional water flow connection facilities, the diversification of the outlet direction changes the direction of the outlet water flow, realizes the function of diverting water in different directions, and reduces the excavation of diversion ditches and tunnels.
5、本发明所述多进口汇流、多出口分流水工设施在增多进出口数量的同时,结合上游引水隧道与下游出流高程,可以通过改变相应进出口高程实现在单个水工衔接设施中满足更加复杂的引水环境需求,避免了因高程差异增加水工设施数量或改建隧道而造成工程量的加大进而影响工期以及工程效益。5. The multi-inlet confluence and multi-outlet diversion hydraulic facilities described in the present invention increase the number of inlets and outlets, combined with the upstream water diversion tunnel and the downstream outflow elevation, it can be achieved in a single hydraulic connection facility by changing the corresponding inlet and outlet elevations. The more complex water diversion environment requirements avoid the increase in the amount of engineering due to the increase in the number of hydraulic facilities or the reconstruction of tunnels due to elevation differences, which will affect the construction period and project benefits.
附图说明Description of drawings
图1为本发明所述同高程双进口汇流、双出口分流水工设施的剖面图;Fig. 1 is the cross-sectional view of the same elevation double-inlet confluence and double-outlet diversion hydraulic facilities of the present invention;
图2为图1的俯视图;Fig. 2 is the top view of Fig. 1;
图3为图1的A-A剖视图;Fig. 3 is A-A sectional view of Fig. 1;
图4为图1的B-B剖视图;Fig. 4 is the B-B sectional view of Fig. 1;
图5为图1的C-C剖视图;Fig. 5 is a C-C sectional view of Fig. 1;
图6为图1的D-D剖视图;Fig. 6 is a D-D sectional view of Fig. 1;
图7为本发明所述水工设施在同高程布置了三个进水段、三个退水段的俯视图。Fig. 7 is a top view of the hydraulic facilities of the present invention arranged at the same elevation with three water inlet sections and three water retreat sections.
图8~图13为进水段、退水段位于不同高程时多进口汇流、多出口分流水工设施的示意图。Figures 8 to 13 are schematic diagrams of hydraulic facilities with multiple inlets converging and multiple outlets diverging when the water inlet section and the water retreat section are located at different elevations.
图中,1—进水段上平段,2—进水段变坡段,3—顶部空腔段,4—涡室,5—收缩段,6—直段,7—底部水垫保护井,8—退水段弧线段,9—退水段渐变段,10—退水段下平段,11—通气孔。In the figure, 1—the upper flat section of the water inlet section, 2—the variable slope section of the water inlet section, 3—the top cavity section, 4—the vortex chamber, 5—the contraction section, 6—the straight section, 7—the bottom water cushion protection well, 8 —Arc segment of receding water segment, 9—gradient segment of receding water segment, 10—lower flat segment of receding water segment, 11—ventilation hole.
具体实施方式Detailed ways
下面通过实施例对本发明所述多进口汇流、多出口分流水工设施作进一步说明。The following examples will further illustrate the multi-inlet confluence and multi-outlet diversion hydraulic facilities of the present invention.
实施例1和对比例1的工程概况如下:The engineering overview of embodiment 1 and comparative example 1 is as follows:
某电站需要建造水工设施对某一具有高差的上下游水流进行衔接,且上游存在两条平行支流,按设计要求下有水流同时存在两条分流路径。上游为矩型隧洞,原隧洞接进口水平段处宽度a=8m,泄洪流量500m3/s。A power station needs to build hydraulic facilities to connect an upstream and downstream water flow with a height difference, and there are two parallel tributaries upstream. According to the design requirements, there are two diversion paths for the water flow at the same time. The upstream is a rectangular tunnel, the width of the horizontal section where the original tunnel connects to the entrance is a=8m, and the discharge flow is 500m 3 /s.
针对上述工程,采用实施例1和对比例1两种消能系统进行水工模型试验。Aiming at the above projects, two energy dissipation systems of Example 1 and Comparative Example 1 were used to carry out hydraulic model tests.
实施例1Example 1
本实施例所述多进口汇流、多出口分流水工设施,结构如图1-6所示,采用双进口汇流、双出口分流水工设施,结构自上游至下游依次为进水段、跌落段、退水段,跌落段自上至下由设置有通气孔的圆柱形顶部空腔段3、圆柱形涡室4、圆锥台型收缩段5、圆柱形直段6、圆柱形底部水垫保护井7依次相接构成,所述进水段与涡室相接,退水段与直段末端相接,进水段沿涡室周向均匀布置2个,所述退水段于直段末端周向均匀布置2个。所述进水段由上平段1与变坡段2沿进水方向相接构成,进水段断面为矩形,变坡段底板高程沿进水方向降低,变坡段一侧边壁与涡室相切,另一侧边壁沿进水方向向内收缩,使水流通道变窄。退水段由沿水流方向依次相接的渐变段9和下平段10构成,所述渐变段沿出水方向隧洞横断面积变小,退水段底部底板通过弧线段8与跌落段直段末端平滑衔接。整个水工设施通过各进水段分别与上游各引水隧洞衔接,通过各退水段分别与下游各引水隧洞衔接。水流通过上游隧洞,进入进水段,继而进入跌落段,经过跌水后进入底部水垫保护井内防止跌落水流冲蚀底板并充分消能后,通过出口退水段流入下游隧洞。The multi-inlet confluence and multi-outlet diversion hydraulic facility described in this embodiment has a structure as shown in Figure 1-6. It adopts a double-inlet confluence and double-exit diversion hydraulic facility. The structure is an inlet section and a drop section from upstream to downstream. , Water retreat section, the drop section is protected from top to bottom by a cylindrical top cavity section 3 with vent holes, a cylindrical vortex chamber 4, a truncated conical shrinkage section 5, a cylindrical straight section 6, and a cylindrical bottom water cushion The wells 7 are connected sequentially, the water inlet section is connected to the vortex chamber, the water retreat section is connected to the end of the straight section, two water inlet sections are evenly arranged along the circumference of the vortex chamber, and the water retreat section is connected to the end of the straight section 2 evenly arranged in the circumferential direction. The water inlet section is composed of an upper flat section 1 and a slope changing section 2 connected along the water inlet direction. The cross section of the water inlet section is rectangular. The chamber is tangent, and the other side wall shrinks inward along the water inlet direction, so that the water flow channel is narrowed. The receding section is composed of a gradual transition section 9 and a lower flat section 10 which are successively connected along the water flow direction. The tunnel cross-sectional area of the transition section becomes smaller along the water outlet direction. connect. The entire hydraulic facility is connected to the upstream water diversion tunnels through the water intake sections, and is connected to the downstream water diversion tunnels through the water retreat sections. The water flows through the upstream tunnel, enters the inlet section, and then enters the drop section. After passing through the drop, it enters the bottom water cushion protection well to prevent the drop water flow from eroding the bottom plate and fully dissipates energy. Then, it flows into the downstream tunnel through the outlet return section.
进水段的水平段尺寸为a=b=6.5m,变坡段底板倾斜角和内侧边墙收缩角均为8°,顶部空腔部分尺寸为7.2m×6.5m(直径×高),涡室尺寸为7.2m×8.0m(直径×高),收缩段高度L为7.5m,跌落段直段尺寸l×R=25m×6m(高×直径),底部水垫保护井尺寸为4.2m×6m(高×直径),出口退水段尺寸为6.0m×7.0m(宽×高)。The size of the horizontal section of the water inlet section is a=b=6.5m, the inclination angle of the bottom plate and the shrinkage angle of the inner side wall of the slope section are both 8°, and the size of the top cavity is 7.2m×6.5m (diameter×height). The size of the vortex chamber is 7.2m×8.0m (diameter×height), the height L of the contraction section is 7.5m, the size of the straight section of the drop section is l×R=25m×6m (height×diameter), and the size of the bottom water cushion protection well is 4.2m × 6m (height × diameter), and the size of the exit water retreat section is 6.0m × 7.0m (width × height).
试验结果:进水段内水流流速为7.5m/s,进入涡室后经过收缩段后进入跌落段直段,在进入底部水垫保护井前水流流速为29m/s,经过在水垫保护井内水流碰撞混掺之后流入退水段的水流流速为14.6m/s,水流平稳进入下游隧洞。若进水段与退水段开挖长度均为20m,则该水工系统共开挖5100m3石料。进水段开挖横断面积为45m2,退水段开挖横断面积为42m2。Test results: The water flow velocity in the water inlet section is 7.5m/s. After entering the vortex chamber, it passes through the contraction section and then enters the straight section of the drop section. Before entering the bottom water cushion protection well, the water flow velocity is 29m/s. After passing through the water cushion protection well After the water flow collides and mixes, the flow velocity of the water flowing into the retreating section is 14.6m/s, and the water flow enters the downstream tunnel smoothly. If the excavation lengths of the water inlet section and the water retreat section are both 20m, the hydraulic system will excavate a total of 5100m 3 stones. The excavation cross-sectional area of the water inlet section is 45m 2 , and the excavation cross-sectional area of the water withdrawal section is 42m 2 .
对比例1Comparative example 1
本对比例隧洞中设置单进口单出口式水工设施,其他结构与时实施例1相同。The tunnel of this comparative example is provided with single-entrance and single-exit hydraulic facilities, and other structures are the same as those in Example 1.
进口水平段尺寸为a=b=8m,变坡段底板倾斜角与内侧边墙收缩角均为6°,顶部空腔部分尺寸为7.2m×7.0m(直径×高),涡室尺寸为7.2m×8.0m(直径×高),收缩段高度L为7.5m,跌落段直段尺寸l×R=25m×6m(高×直径),底部水垫保护井尺寸为4.2m×6m(高×直径),出口退水段尺寸为6.0m×8.0m(宽×高)。因需将上游两条支流在进入水工衔接设施前提前汇流,因此需额外建设汇流口,长度为10m,下游建设额外分流口,长度为10m。The size of the horizontal section of the inlet is a=b=8m, the inclination angle of the bottom plate of the slope section and the contraction angle of the inner side wall are both 6°, the size of the top cavity is 7.2m×7.0m (diameter×height), and the size of the vortex chamber is 7.2m×8.0m (diameter×height), the height L of the shrinkage section is 7.5m, the size of the straight section of the drop section is l×R=25m×6m (height×diameter), and the size of the bottom water cushion protection well is 4.2m×6m (height ×diameter), and the size of the exit water recoil section is 6.0m×8.0m (width×height). Because the two upstream tributaries need to be merged in advance before entering the hydraulic connection facilities, an additional confluence with a length of 10m is required, and an additional diversion with a length of 10m is built downstream.
实验结果:在与实施例1相同进口断面处测得速度为9m/s,底部水垫保护井前测得水流流速为30m/s,经过水垫保护井后在出口退水段前测得水流流速为15m/s,水流平稳进入下游隧洞。若进水段与退水段开挖长度均为20m,则该水工系统共开挖4800m3石料,进水段开挖断面面积为64m2,退水段开挖横断面积为50m2。Experimental results: The measured velocity at the same inlet section as in Example 1 is 9m/s, the water flow velocity measured before the bottom water cushion protection well is 30m/s, and the water flow measured before the exit water retreat section after passing through the water cushion protection well The flow velocity is 15m/s, and the water flows smoothly into the downstream tunnel. If the excavation length of the water inlet section and the water retreat section are both 20m, the hydraulic system will excavate a total of 4800m 3 of stone materials, the excavation section area of the water inlet section will be 64m 2 , and the excavation cross-sectional area of the water outlet section will be 50m 2 .
实施例2和对比例2的工程概况如下:The engineering overview of embodiment 2 and comparative example 2 is as follows:
某涉及三条流域的调水工程因地势及环境需要,在消能的同时更好的进行水流衔接,上游引水隧洞为矩形隧洞,原隧洞接进水段水平段处宽度a=4m。泄洪流量82.1m3/s。A water diversion project involving three river basins, due to terrain and environmental needs, better connects water flow while dissipating energy. The upstream diversion tunnel is a rectangular tunnel, and the width of the horizontal section of the original tunnel connection to the water section is a=4m. The flood discharge flow is 82.1m 3 /s.
针对上述工程,采用实施例2和对比例2两种消能系统进行水工模型试验。Aiming at the above projects, two energy dissipation systems of Example 2 and Comparative Example 2 were used to carry out hydraulic model tests.
实施例2Example 2
多流域调水空间分布不均,难度较大,本实施例所述多进口汇流、多出口分流水工设施,进水段和退水段布置结构如图7所示。与实施例1的不同之处在于:进水段沿涡室周向同高程均匀布置3个,退水段周向同高程均匀布置3个。使用上述三进口三出口式水流衔接水工设施,水流通过进水段形成旋流进入涡室,继而进入收缩段,经过跌水段后进入底部水垫保护井内并充分消能后,通过出口退水段流入下游隧洞。The spatial distribution of multi-basin water transfer is uneven and difficult. The multi-inlet confluence and multi-outlet diversion hydraulic facilities described in this embodiment, the layout structure of the water intake section and the water withdrawal section are shown in Figure 7. The difference from Example 1 is that three water inlet sections are evenly arranged at the same elevation along the circumference of the vortex chamber, and three water retreat sections are evenly arranged at the same elevation along the circumference of the vortex chamber. Using the above-mentioned three-inlet and three-outlet water flow connection hydraulic facilities, the water flow forms a swirl flow through the water inlet section and enters the vortex chamber, then enters the contraction section, and enters the bottom water cushion protection well after passing through the water drop section, and after fully dissipating energy, it exits through the outlet. The water section flows into the downstream tunnel.
采用三进口三出口式水工设施进行水流的衔接,进口水平段尺寸为a×b=2.0m×2.5m,变坡段底板倾斜角和内侧边墙收缩角均为4°,跌落段顶部空腔部分尺寸为11.2m×10m(直径×高),涡室尺寸为11.2m×10.5m(直径×高),收缩段高度为12m,直段尺寸l×R=50m×8m(高×直径),底部水垫保护井尺寸为8.0m×8.0m(高×直径),出口退水段尺寸为2.0m×2.5m(宽×高)。Three-inlet and three-outlet hydraulic facilities are used to connect the water flow. The size of the horizontal section of the entrance is a×b=2.0m×2.5m. The size of the cavity part is 11.2m×10m (diameter×height), the size of the vortex chamber is 11.2m×10.5m (diameter×height), the height of the contraction section is 12m, and the size of the straight section is l×R=50m×8m (height×diameter ), the size of the bottom water cushion protection well is 8.0m×8.0m (height×diameter), and the size of the outlet water retreat section is 2.0m×2.5m (width×height).
试验结果:上游隧洞内水流流速为15.5m/s,进入涡室后经过收缩段后进入直段,在进入底部水垫保护井前水流流速为40m/s,经过底部水垫保护井后流入退水段的水流流速为10.3m/s,水流平稳进入下游隧洞。在利用该水工设施进行调水消能的同时,各流域可利用本身地理位置各自修建引水道至该水工设施进水段,平均每条引水道修建60m,进水段与退水段开挖长度均为20m,则该水工系统共开挖8,800m3石料,每个进口与出口开挖断面面积为5.0m2。Test results: The water flow velocity in the upstream tunnel is 15.5m/s. After entering the vortex chamber, it passes through the contraction section and then enters the straight section. Before entering the bottom water cushion protection well, the water flow velocity is 40m/s. The water velocity in the water section is 10.3m/s, and the water flows smoothly into the downstream tunnel. While using the hydraulic facilities for water diversion and energy dissipation, each river basin can use its own geographical location to build diversion channels to the water intake section of the hydraulic facility, with an average of 60m for each diversion channel. If the excavation length is 20m, the hydraulic system excavates a total of 8,800m 3 of rocks, and the cross-sectional area of each entrance and exit is 5.0m 2 .
对比例2:Comparative example 2:
本对比例隧洞中设置单进口单出口水工设施,其余结构与实施例2相同。隧洞接进口水平段处宽度a=4m,泄洪流量82.1m3/s。The tunnel of this comparative example is provided with single-entrance and single-exit hydraulic facilities, and the rest of the structure is the same as that of Example 2. The width of the horizontal section at the entrance of the tunnel is a = 4m, and the discharge flow is 82.1m 3 /s.
进口水平段尺寸为a=b=4.0m,变坡段底部边墙与内侧边墙收缩角均为4°,顶部空腔部分尺寸为7.2m×7.0m(直径×高),涡室尺寸为7.2m×8.0m(直径×高),收缩段高度为12.0m,直段尺寸l×R=25m×6m(高×直径),底部水垫保护井尺寸为4.2m×6m(高×直径),出口退水段尺寸为4.0m×4.0m(宽×高)。The size of the horizontal section of the inlet is a=b=4.0m, the shrinkage angle of the bottom side wall and the inner side wall of the slope section is 4°, the size of the top cavity is 7.2m×7.0m (diameter×height), the size of the vortex chamber is 7.2m×8.0m (diameter×height), the height of the shrinkage section is 12.0m, the size of the straight section is l×R=25m×6m (height×diameter), and the size of the bottom water cushion protection well is 4.2m×6m (height×diameter ), the size of the outlet water receding section is 4.0m×4.0m (width×height).
实验结果:在与实施例2相同进口断面处测得速度为15.5m/s,水垫保护井前测得水流流速为39m/s,经过水垫保护井后在出口退水段前测得水流流速为10.4m/s,水流平稳进入下游隧洞。因为该调水工程涉及多条流域,在利用该水工设施进行调水消能的同时,需提前修建引水道完成“三合一”至该水工设施进水段,平均每条引水道修建80m,进水段与退水段开挖长度均为20m,则该水工系统共开挖9200m3石料,进水段开挖断面面积为16m2,退水段开挖横断面积为16m2。Experimental results: The velocity measured at the same inlet section as in Example 2 is 15.5m/s, the water flow velocity measured before the water cushion protection well is 39m/s, and the water flow measured before the exit water retreat section after passing through the water cushion protection well The flow velocity is 10.4m/s, and the water flows smoothly into the downstream tunnel. Because the water diversion project involves multiple river basins, while using the hydraulic facilities for water transfer and energy dissipation, it is necessary to build aqueducts in advance to complete the "three-in-one" to the water intake section of the hydraulic facilities, and the average construction of each aqueduct 80m, and the excavation length of the water inlet section and the water retreat section are both 20m, so the hydraulic system excavates a total of 9200m 3 stone materials, the excavation cross-sectional area of the water inlet section is 16m 2 , and the excavation cross-sectional area of the water outlet section is 16m 2 .
实施例3和对比例3的工程概况如下:The engineering overview of embodiment 3 and comparative example 3 is as follows:
某水利工程给水路线涉及两条不同高程入水口及两条方向不同的出水口,上下游存在约15m调水高差。根据当地水环境需要,在优化水流衔接的同时进行水流消能,上游引水隧洞为矩形隧洞,原隧洞接该衔接设施进口水平段处宽度a=1.5m。调水流量19m3/s。The water supply route of a water conservancy project involves two water inlets with different elevations and two water outlets with different directions, and there is a water diversion height difference of about 15m between the upstream and downstream. According to the needs of the local water environment, water flow energy dissipation is carried out while optimizing the water flow connection. The upstream diversion tunnel is a rectangular tunnel, and the width of the horizontal section where the original tunnel connects to the entrance of the connection facility is a=1.5m. The adjusted water flow rate is 19m 3 /s.
针对上述工程,采用实施例3和对比例3两种消能系统进行水工模型试验。Aiming at the above projects, two energy dissipation systems of Example 3 and Comparative Example 3 were used to carry out hydraulic model tests.
实施例3Example 3
本实施例所述多进口汇流、多出口分流水工设施,进水段和退水段布置结构如图8所示。与实施例1的不同之处在于:在不同高程布置2个进水段,各进水段对应布置一个涡室和收缩段,退水段根据下游在同一高程根据调水方向布置2个。使用上述双进口汇流、双出口分流式水工设施进行水流衔接,水流通过进水段形成旋流进入涡室,继而进入收缩段,经过跌水段后进入底部水垫保护井内并充分消能后,通过出口退水段流入下游隧洞。Figure 8 shows the arrangement structure of the water inlet section and the water retreat section of the multi-inlet confluence and multi-outlet diversion hydraulic facilities described in this embodiment. The difference from Example 1 is that two water inlet sections are arranged at different elevations, each water inlet section is arranged with a vortex chamber and a contraction section correspondingly, and two water retreat sections are arranged at the same elevation according to the direction of water diversion in the downstream. The above-mentioned double-inlet confluence and double-outlet diversion hydraulic facilities are used for water flow connection. The water flow forms a swirl flow through the water inlet section and enters the vortex chamber, then enters the contraction section, and enters the bottom water cushion protection well after passing through the water drop section and fully dissipates energy. , and flow into the downstream tunnel through the outlet receding section.
采用双进口汇流、双出口分流式水工设施进行水流衔接,进口水平段尺寸为a×b=1.5m×1.5m,变坡段底板倾斜角和内侧边墙收缩角均为5°,跌落段顶部空腔部分尺寸为2.8m×2.0m(直径×高),涡室尺寸为2.8m×3.0m(直径×高),收缩段高度为L为3.0m,两个涡室型式相同,直段尺寸l×R=6m×2.1m(高×直径),底部水垫保护井尺寸为3.5m×2.1m(高×直径),出口退水段尺寸为3.0m×3.0m(宽×高)。Double-inlet converging and double-outlet diverging hydraulic facilities are used for water flow connection. The size of the horizontal section of the inlet is a×b=1.5m×1.5m. The size of the cavity at the top of the section is 2.8m×2.0m (diameter×height), the size of the vortex chamber is 2.8m×3.0m (diameter×height), the height of the contraction section is 3.0m, and the two vortex chambers are of the same type. Section size l×R=6m×2.1m (height×diameter), the size of the bottom water cushion protection well is 3.5m×2.1m (height×diameter), and the size of the exit water retreat section is 3.0m×3.0m (width×height) .
试验结果:上游隧洞内水流流速均为13.0m/s,水流进入双涡室后经过收缩段后进入直段,在进入底部水垫保护井前水流流速为20.6m/s,经过底部水垫保护井后流入退水段的水流流速为7.5m/s,水流平稳进入下游隧洞。利用此双涡室型式水工设施进行调水时,根据上游两条支流高程特点修建引水隧洞及进水段位置,平均每条引水隧洞修建30m,进水段与退水段开挖长度均为10m,则该水工系统共开挖700m3石料,每个进口的开挖断面面积为4.0m2,每个出口的开挖断面面积为9m2。Test results: The water flow velocity in the upstream tunnel is 13.0m/s. After entering the double vortex chamber, the water flow passes through the contraction section and then enters the straight section. Before entering the bottom water cushion protection well, the water flow velocity is 20.6m/s. After passing through the bottom water cushion protection The flow velocity of the water flowing into the retreating section behind the well is 7.5m/s, and the water flows smoothly into the downstream tunnel. When using this double vortex chamber type hydraulic facility for water diversion, the diversion tunnel and the position of the water inlet section shall be constructed according to the elevation characteristics of the two upstream tributaries. The average construction of each diversion tunnel is 30m, and the excavation length of the water inlet section and the water retreat section shall be 10m, the hydraulic system will excavate a total of 700m 3 stone materials, the excavation section area of each entrance is 4.0m 2 , and the excavation section area of each exit is 9m 2 .
对比例3:Comparative example 3:
本对比例隧洞中设置单进口双出口水工设施,采用单涡室型式,其余结构与实施例3相同。原隧洞接进口水平段处宽度a=2.2m。调水流量19m3/s。The tunnel of this comparative example is equipped with hydraulic facilities with single inlet and double outlet, and adopts the type of single vortex chamber, and the rest of the structure is the same as that of Embodiment 3. The width at the horizontal section where the original tunnel connects to the entrance is a=2.2m. The adjusted water flow rate is 19m 3 /s.
进口水平段尺寸为a×b=2.2m×2.2m,变坡段底板倾斜角和内侧边墙收缩角均为7°,跌落段顶部空腔部分尺寸为2.9m×2.0m(直径×高),涡室尺寸为2.9m×3.0m(直径×高),收缩段高度为L为3.0m,直段尺寸l×R=9m×2.1m(高×直径),底部水垫保护井尺寸为3.5m×2.1m(高×直径),出口退水段尺寸为3.0m×3.0m(宽×高)。The size of the horizontal section of the entrance is a×b=2.2m×2.2m, the inclination angle of the bottom plate of the slope section and the contraction angle of the inner side wall are both 7°, and the size of the cavity at the top of the drop section is 2.9m×2.0m (diameter×height ), the size of the vortex chamber is 2.9m × 3.0m (diameter × height), the height of the contraction section is 3.0m for L, the size of the straight section l × R = 9m × 2.1m (height × diameter), and the size of the bottom water cushion protection well is 3.5m×2.1m (height×diameter), and the size of the outlet backwater section is 3.0m×3.0m (width×height).
实验结果:在与实施例2相同进口断面处测得速度为13.0m/s,水垫保护井前测得水流流速为20.0m/s,经过水垫保护井后在出口退水段前测得水流流速为7.6m/s,水流平稳进入下游隧洞。因为该调水工程中上游两条调水支流高程差异,在水流汇流至进水段前需修建汇流口至同一高程,在增大工程难度的同时,增加开挖量400m3,平均每条引水道修建30m,进水段与退水段开挖长度均为10m,则该水工系统共开挖874m3石料,进水段开挖断面面积为5m2,退水段开挖横断面积为9m2。Experimental results: The velocity measured at the same inlet section as in Example 2 is 13.0m/s, the water flow velocity measured before the water pad protection well is 20.0m/s, and is measured before the exit water retreat section after passing through the water pad protection well The water flow velocity is 7.6m/s, and the water flow enters the downstream tunnel smoothly. Because of the difference in elevation between the upper and upper streams of the water diversion project, the confluence mouth needs to be built to the same elevation before the water flow converges to the water intake section. While increasing the difficulty of the project, the excavation volume will be increased by 400m 3 . The waterway is built to be 30m, and the excavation length of the water inlet section and the water retreat section are both 10m, so the hydraulic system excavates a total of 874m 3 stone materials, the excavation cross-sectional area of the water inlet section is 5m 2 , and the excavation cross-sectional area of the water outlet section is 9m 2 .
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810128565.6A CN108252277A (en) | 2018-02-08 | 2018-02-08 | More import confluences, multiple exit shunting hydraulic facility |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201810128565.6A CN108252277A (en) | 2018-02-08 | 2018-02-08 | More import confluences, multiple exit shunting hydraulic facility |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN108252277A true CN108252277A (en) | 2018-07-06 |
Family
ID=62745084
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201810128565.6A Pending CN108252277A (en) | 2018-02-08 | 2018-02-08 | More import confluences, multiple exit shunting hydraulic facility |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN108252277A (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110552333A (en) * | 2019-09-23 | 2019-12-10 | 重庆交通大学 | Bottom suddenly-expanding type rotational flow shaft flood discharge tunnel |
| CN120211775A (en) * | 2025-05-28 | 2025-06-27 | 中国电建集团中南勘测设计研究院有限公司 | A vertical shaft and a water discharge system for a pumped storage power station |
Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102767164A (en) * | 2012-08-16 | 2012-11-07 | 华北水利水电学院 | Bidirectional inflow whirling current type shaft facility for flood discharge and energy dissipation in dam |
-
2018
- 2018-02-08 CN CN201810128565.6A patent/CN108252277A/en active Pending
Patent Citations (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102767164A (en) * | 2012-08-16 | 2012-11-07 | 华北水利水电学院 | Bidirectional inflow whirling current type shaft facility for flood discharge and energy dissipation in dam |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110552333A (en) * | 2019-09-23 | 2019-12-10 | 重庆交通大学 | Bottom suddenly-expanding type rotational flow shaft flood discharge tunnel |
| CN120211775A (en) * | 2025-05-28 | 2025-06-27 | 中国电建集团中南勘测设计研究院有限公司 | A vertical shaft and a water discharge system for a pumped storage power station |
| CN120211775B (en) * | 2025-05-28 | 2025-09-23 | 中国电建集团中南勘测设计研究院有限公司 | Shaft and pumped storage power station drainage system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN100552147C (en) | The Method of Reconstructing the Diversion Tunnel into a Vertical Shaft with Internal Jet Energy Dissipation | |
| CN216075424U (en) | Energy dissipation device for drainage pipeline | |
| CN109750641B (en) | Outlet energy dissipation arrangement structure for concentrated arrangement of different water discharge buildings on water and electricity engineering bank | |
| CN112391998B (en) | Scour prevention energy dissipation wall of hydraulic engineering overflow dam | |
| CN206428676U (en) | Spillway inlet channel guiding device | |
| CN113089600B (en) | A swirl flood discharge tunnel that reduces the velocity at the outlet of the swirl tunnel | |
| CN216812005U (en) | Underground mine hole well type water inlet arrangement structure | |
| CN104652378B (en) | Become radial spi flood discharging tunnel | |
| CN215802153U (en) | Take reposition of redundant personnel regulation and storage system of spiral ladder and orifice plate drop well | |
| CN210827754U (en) | Shaft and tunnel linking structure | |
| CN118653434A (en) | A stepped water discharge tunnel and energy dissipation method | |
| CN105908684B (en) | River is from energy dissipating silt pipe | |
| CN108194120B (en) | Tunnel structure with power generation function | |
| CN202090327U (en) | Self-compensation and energy dissipation device in tunnel | |
| CN109083107B (en) | An aeration facility that utilizes the centrifugal force of water flow to form an aerated cavity | |
| CN110552333A (en) | Bottom suddenly-expanding type rotational flow shaft flood discharge tunnel | |
| CN105888043A (en) | Drainage deep-tunnel spiral channel type swirl shaft | |
| CN217784544U (en) | Bend of pressure water delivery pipeline | |
| CN207159957U (en) | A kind of downstream rectification pier structure built jointly applied to pump lock | |
| CN206706960U (en) | Jet type drainage four-way inspection well | |
| CN215593924U (en) | Flood discharge energy dissipation structure with large-altitude-difference slope at outlet of flood discharge tunnel | |
| CN220953283U (en) | High-low bank structure for diversion ecological flow of tail water of power station | |
| CN203821345U (en) | Three-side inflowing flush gallery structure | |
| CN108130948A (en) | A kind of pressure current water inlet flow channel system suitable for deeper subsurface draining Boosting pumping station | |
| CN209493909U (en) | A structure for diverting and taking water from water pipelines across reservoirs |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180706 |
|
| RJ01 | Rejection of invention patent application after publication |