CN108249846A - A kind of non-evaporating curing concrete prefabricated components and its forming method - Google Patents

A kind of non-evaporating curing concrete prefabricated components and its forming method Download PDF

Info

Publication number
CN108249846A
CN108249846A CN201711331839.3A CN201711331839A CN108249846A CN 108249846 A CN108249846 A CN 108249846A CN 201711331839 A CN201711331839 A CN 201711331839A CN 108249846 A CN108249846 A CN 108249846A
Authority
CN
China
Prior art keywords
concrete
water
agent
prefabricated components
component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711331839.3A
Other languages
Chinese (zh)
Other versions
CN108249846B (en
Inventor
陆小军
蒙海宁
左李萍
张敏杰
许彦明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhenjiang Section Of Building Builds Science And Technology Ltd
Original Assignee
Zhenjiang Section Of Building Builds Science And Technology Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhenjiang Section Of Building Builds Science And Technology Ltd filed Critical Zhenjiang Section Of Building Builds Science And Technology Ltd
Priority to CN201711331839.3A priority Critical patent/CN108249846B/en
Publication of CN108249846A publication Critical patent/CN108249846A/en
Application granted granted Critical
Publication of CN108249846B publication Critical patent/CN108249846B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • C04B28/02Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements containing hydraulic cements other than calcium sulfates
    • C04B28/04Portland cements
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/24Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
    • B28B11/245Curing concrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/0025Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with installation or service material, e.g. tubes for electricity or water
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B23/00Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
    • B28B23/02Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28CPREPARING CLAY; PRODUCING MIXTURES CONTAINING CLAY OR CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28C5/00Apparatus or methods for producing mixtures of cement with other substances, e.g. slurries, mortars, porous or fibrous compositions
    • B28C5/003Methods for mixing
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2201/00Mortars, concrete or artificial stone characterised by specific physical values
    • C04B2201/50Mortars, concrete or artificial stone characterised by specific physical values for the mechanical strength

Abstract

The present invention relates to a kind of non-evaporating curing concrete prefabricated components, it is characterised in that:Inorganic whisker early strength agent and nucleus type early strength agent are added to by a certain percentage simultaneously, its early strength is improved in concrete prefabricated element raw material;Energy consumption can be reduced to avoid steam curing process, it is energy saving, inside concrete compactness is improved, increases concrete surface layer flatness, Crack prevention is formed, and late strength of concrete is kept to stablize, and improves concrete integral strength.

Description

A kind of non-evaporating curing concrete prefabricated components and its forming method
Technical field
The present invention relates to building material field more particularly to a kind of non-evaporating curing concrete prefabricated components and its forming method.
Background technology
Answer what State Council put into effect《About the instruction for greatly developing assembled architecture》In " want adaptation to local conditions development assembling The assembled architectures such as formula concrete structure, steel construction and modern wood structure strive the time with 10 years or so, making assembled architecture The ratio for accounting for new building area reaches 30% " requirement, and more and more with assembled architecture, required concrete is pre- Component processed is also more and more, and in order to improve early strength, form removal molding earlier need to usually use steam-cured work in the prior art Sequence, but steam curing process has the following disadvantages:
(1)It needs to consume a large amount of energy consumption;
(2)With the raising of temperature, a part of water translates into gas, so as to more aggravate expansion.This expansion can increase Add the porosity in concrete, and due to the increase of pressure in hole, can also cause internal generation microcrack.It is serious can be Concrete surface generates apparent crack, causes loose, shows " swelling " state;
(3)Simultaneously in heating or cooling, due to the temperature gradient and the draught head of generation between in concrete table, it can cause Water, gas transfer, and orientation access is formed in concrete, during heating, since steam condensate (SC) productive set is in concrete table Face is simultaneously inwardly shifted, this is for non-condensing cement mortar, it will the ratio of mud is caused to increase, causes surface layer skin effect phenomenon;
(4)In addition, concrete is in steam-cured, since the temperature difference can form temperature stress in table, particularly during cooling, due to table The drastically cooling of layer easily generates tensile stress so that there is crack.
(5)The growth of concrete strength depends mainly on the development of crystal colloid system in cement setting hardening process With variation.Wherein, colloid neoformation more can Developed fiber strength effect than crystal neoformation.But in hydrothermal curing, temperature is higher, shape Into crystal neoformation size it is bigger;Crystalline size is excessive, then means that dispersion degree is small, this is not for the development of later strength Profit.In addition, in high-temperature steam curing, since the neoplastic speed of separating out of colloid is accelerated, and around unhydrated cement particle One layer of colloid film, and glued membrane progressive additive are gathered, hinders moisture deeply and the aquation of cement particle develops, so as to make the later stage Intensity is hindered, and temperature is higher, and such phenomenon is more serious.
Invention content
The technical problem to be solved by the present invention is to:In order to overcome the deficiencies in the prior art and defect, the present invention carries For a kind of non-evaporating curing concrete prefabricated components and its forming method, energy consumption can be reduced to avoid steam curing process, it is energy saving, it carries Compactness inside high concrete increases concrete surface layer flatness, and Crack prevention is formed, and late strength of concrete is kept to stablize, Improve concrete integral strength.
The technical solution adopted by the present invention to solve the technical problems is:A kind of non-evaporating curing concrete prefabricated components, simultaneously Inorganic-organic hybrid early strength agent and nucleus type early strength agent are added to by a certain percentage and improved in concrete prefabricated element raw material Its early strength, wherein each cubic meter of concrete prefabricated components raw material is formed by following each component:
42.5 Portland cements:227.5Kg;
Inorganic-organic hybrid early strength agent:The 1% ~ 5% of cement gross mass;
Nucleus type early strength agent:The 10 ~ 15% of cement gross mass;
Sand:750Kg;
Handstone:290Kg;
Big stone:760Kg;
Water:150Kg;
High efficiency water reducing agent:3Kg;
The preparation method of the non-evaporating curing concrete prefabricated components raw material includes the following steps:Using forced mixer, first dry mixing Wet-mixing afterwards first adds in big stone, handstone and sand, starts forced mixer, stirs 40 ~ 60s;Add 42.5 common silicic acid Salt cement starts forced mixer, continues 40 ~ 60s of stirring;By inorganic-organic hybrid early strength agent and nucleus type early strength agent and High efficiency water reducing agent, which is dispersed in water, forms mixing water, is slowly injected into the mixing water of gross mass 80% in 20s in blender, Marginal not enters side stirring 2min, and the mixing water stirring 1min for then adding in remaining gross mass 20% at once can discharge.
Further, the early strong mass component 55% ~ 85% of inorganic salts, organic matter in the inorganic-organic hybrid early strength agent The early strong mass component 15% ~ 45% of class, wherein, the inorganic salts accelerating component is by sodium sulphate, sodium carbonate, calcium nitrate, nitrous acid At least two kinds of in calcium compound:Organic species accelerating component by calcium formate, calcium acetate, methanol, triethanolamine extremely Few 2 kinds compound.
Further, it is 1.0 ~ 1.7 that the nucleus type early strength agent, which selects calcium silicon mass ratio, uses the pure sodium metasilicate of analysis (Na2SiO3 × 9H2O), calcium nitrate (Ca (NO3) 2 × 4H2O) and deionized water, the deionized water is boiled before use boils 10 points Clock removes dissolubility CO2, and between consolidating mass ratio 9 ~ 12 using water, and being separately added into gel dispersal agent uniformly disperses reagent, makes It is synthetically prepared with 60 DEG C of waters bath with thermostatic control, timing agitation and solution pH value is kept more than 12 during reaction, reacted product after 7d Dry storage after filtering and washing.
Further, the forming method of the non-evaporating curing concrete prefabricated components includes the following steps:(1)Mold is installed;(2) Mold inspection;(3)Reinforcement fabrication;(4)Inspection of steel reinforcement bars;(5)First installation of embedded parts is with checking;(6)Concrete one-time-concreting; (7)Secondary formwork erection;(8)The installation of thermal insulation board and connector;(9)Secondary cloth muscle;(10)Second installation of embedded parts is with checking;(11) Concrete secondary pours;(12)Component troweling;(13)Concrete curing;(14)Concrete demoulding;(15)Component lifts by crane;(16)Dew Aggregate processing;(17)Component is examined and is repaired.
Further, step(1)In, side form carries out surface clean, so perpendicular to bed die after the completion of assembled when mold is installed After brush aqueous or wax releasing agent;
Further, step(2)In, mold inspection item includes checking the flatness of mould contact surface, plate face bending degree, spell Fill gap size and geometric dimension specification;
Further, step(3)In, during reinforcement fabrication, reinforcing bar binding tied silk is got rid of button and is bent towards on the inside of component, and protective layer cushion block presses plum Flower-shaped arrangement;
Further, step(4)In, inspection of steel reinforcement bars project includes reinforcement location, specification, spacing and protective layer thickness.
Further, step(5)In, the first built-in fitting includes fixing bolt and composite water, and inspection item includes fixing The installation site and specifications and models of bolt hole, composite water;
Further, step(6)In, uniformly continuous pours during concrete one-time-concreting, and the height that feeds intake is less than 500mm, between pouring The time have a rest less than 40min;
Further, step(7)In, when secondary formwork erection, first carries out surface clean, then bed die brushing aqueous release agent, and side form applies Brush wax retarder;
Further, step(8)In, binding material encapsulation process is used between thermal insulation board and connector.
Further, step(9)In, framework of steel reinforcement is first made, then framework of steel reinforcement is entered into mold forming;
Further, step(10)In, the second built-in fitting includes fixing screws and fixes sleeve, and inspection item includes fixed spiral shell The installation site and size model number of nail, fixes sleeve;
Further, step(11)In, it is secondary to be vibrated molding with vibrating spear when pouring;
Further, step(12)In, troweling is carried out to component surface, troweling number is 3-4 times, and the last time troweling time is 10min before initial set, and holding surface flatness difference of height≤3mm;
Further, step(13)In, concrete curing uses natural curing, covers one layer in concrete surface in maintenance processes Plastic film drips the wetting for destroying concrete surface and energy holding member to prevent condensed water;
Further, step(14)In, when demoulding, first removes fixing screws and fixing bolt, then removes composite water, then tear open Except fixes sleeve, last form removal.
Further, step(15)In, it is lifted by crane using multiple spot hanger, suspension hook is located on prefabricated components before keeping lifting At square 200mm, during lifting the prefabricated components road clearance be less than 500mm;
Further, step(16)In, using giant to undisguisedly expecting to clear up;
Further, step(17)In, setting Quality People carries out quality inspection to finished product, is repaired not using slurry is repaired Influence crack and the breakage of prefabricated components structural behaviour.
The beneficial effects of the invention are as follows:
(1)Energy consumption can be reduced to avoid steam curing process, it is energy saving, the inside compactness of concrete prefabricated element raw material is improved, Increase its surface layer flatness, Crack prevention is formed, and keeps concrete prefabricated element raw material stable long-term strength, and it is whole strong to improve it Degree;
(2)It by being used while a variety of early strength agent, can significantly reduce costs, reduce setting time, improve concrete prefabricated Component performance prolongs the service life;
(3)The concrete prefabricated element is molded by predetermined process, can cost of labor be reduced with effectively save process, accelerated mixed Solidifying soil prefabricated components molding time, improves shaping efficiency.
Description of the drawings
Fig. 1 is the step flow chart of the forming method of the non-evaporating curing concrete prefabricated components of the present invention.
Specific embodiment
In conjunction with the accompanying drawings, the present invention is further explained in detail.These attached drawings are simplified schematic diagram, only with Illustration illustrates the basic structure of the present invention, therefore it only shows composition related to the present invention.
[embodiment 1]
As shown in Figure 1, a kind of non-evaporating curing concrete prefabricated components, while inorganic-organic hybrid early strength agent and nucleus type is early strong Agent is added to by a certain percentage improves its early strength in concrete prefabricated element raw material, wherein each cubic meter of concrete is pre- Component raw material processed is formed by following each component:
42.5 Portland cements:227.5Kg;
Inorganic-organic hybrid early strength agent:The 1% ~ 5% of cement gross mass;
Nucleus type early strength agent:The 10 ~ 15% of cement gross mass;
Sand:750Kg;
Handstone:290Kg;
Big stone:760Kg;
Water:150Kg;
High efficiency water reducing agent:3Kg;
The preparation method of the non-evaporating curing concrete prefabricated components raw material includes the following steps:Using forced mixer, first dry mixing Wet-mixing afterwards first adds in big stone, handstone and sand, starts forced mixer, stirs 40 ~ 60s;Add 42.5 common silicic acid Salt cement starts forced mixer, continues 40 ~ 60s of stirring;By inorganic-organic hybrid early strength agent and nucleus type early strength agent and High efficiency water reducing agent, which is dispersed in water, forms mixing water, is slowly injected into the mixing water of gross mass 80% in 20s in blender, Marginal not enters side stirring 2min, and the mixing water stirring 1min for then adding in remaining gross mass 20% at once can discharge.
Specifically, the early strong mass component 55% ~ 85% of inorganic salts, organic species are early strong in inorganic-organic hybrid early strength agent Mass component 15% ~ 45%, wherein, inorganic salts accelerating component by sodium sulphate, sodium carbonate, calcium nitrate, calcium nitrite at least 2 kinds compound:Organic species accelerating component is compounded by least two kinds of in calcium formate, calcium acetate, methanol, triethanolamine.
Specifically, it is 1.0 ~ 1.7 that nucleus type early strength agent, which selects calcium silicon mass ratio, using analyze pure sodium metasilicate (Na2SiO3 × 9H2O), calcium nitrate (Ca (NO3) 2 × 4H2O) and deionized water, deionized water is boiled before use boils 10 minutes removal dissolubilities CO2, between consolidating mass ratio 9 ~ 12 using water, and being separately added into gel dispersal agent uniformly disperses reagent, uses 60 DEG C of thermostatted waters Bath is synthetically prepared, and timing agitation and solution pH value is kept more than 12 during reaction, will be done after product filtering and washing after reacting 7d Dry storage.
Specifically, the forming method of the non-evaporating curing concrete prefabricated components includes the following steps:(1)Mold is installed;(2)Mould Tool checks;(3)Reinforcement fabrication;(4)Inspection of steel reinforcement bars;(5)First installation of embedded parts is with checking;(6)Concrete one-time-concreting;(7) Secondary formwork erection;(8)The installation of thermal insulation board and connector;(9)Secondary cloth muscle;(10)Second installation of embedded parts is with checking;(11)It is mixed Solidifying soil is secondary to be poured;(12)Component troweling;(13)Concrete curing;(14)Concrete demoulding;(15)Component lifts by crane;(16)Undisguisedly Material processing;(17)Component is examined and is repaired.
Specifically, step(1)In, side form carries out surface clean, then perpendicular to bed die after the completion of assembled when mold is installed Brush aqueous or wax releasing agent;
Specifically, step(2)In, mold inspection item includes checking the flatness of mould contact surface, plate face bending degree, assembly Gap size and geometric dimension specification;
Specifically, step(3)In, during reinforcement fabrication, reinforcing bar binding tied silk is got rid of button and is bent towards on the inside of component, and protective layer cushion block presses plum blossom Shape is arranged;
Specifically, step(4)In, inspection of steel reinforcement bars project includes reinforcement location, specification, spacing and protective layer thickness.
Specifically, step(5)In, the first built-in fitting includes fixing bolt and composite water, and inspection item includes fixed spiral shell The installation site and specifications and models of keyhole, composite water;
Specifically, step(6)In, uniformly continuous pours during concrete one-time-concreting, and the height that feeds intake pours interval less than 500mm Time is less than 40min;
Specifically, step(7)In, when secondary formwork erection, first carries out surface clean, then bed die brushing aqueous release agent, side form brushing Wax retarder;
Specifically, step(8)In, binding material encapsulation process is used between thermal insulation board and connector.
Specifically, step(9)In, framework of steel reinforcement is first made, then framework of steel reinforcement is entered into mold forming;
Specifically, step(10)In, the second built-in fitting include fixing screws and fixes sleeve, inspection item include fixing screws, The installation site and size model number of fixes sleeve;
Specifically, step(11)In, it is secondary to be vibrated molding with vibrating spear when pouring;
Specifically, step(12)In, troweling is carried out to component surface, troweling number is 3-4 times, and the last time troweling time is first 10min before solidifying, and holding surface flatness difference of height≤3mm;
Specifically, step(13)In, concrete curing uses natural curing, and covering one layer in concrete surface in maintenance processes moulds Expect film, the wetting for destroying concrete surface and energy holding member is dripped to prevent condensed water;
Specifically, step(14)In, when demoulding, first removes fixing screws and fixing bolt, then removes composite water, then remove Fixes sleeve, last form removal.
Specifically, step(15)In, it is lifted by crane using multiple spot hanger, suspension hook is located above prefabricated components before keeping lifting At 200mm, during lifting the prefabricated components road clearance be less than 500mm;
Specifically, step(16)In, using giant to undisguisedly expecting to clear up;
Specifically, step(17)In, setting Quality People carries out quality inspection to finished product, and not shadow is repaired using slurry is repaired Ring crack and the breakage of prefabricated components structural behaviour.
[comparative example 1]
The difference of this comparative example and embodiment 1 is only that early strength agent only selects mineral admixture early strength agent.
[comparative example 2]
The difference of this comparative example and embodiment 1 is only that early strength agent only selects inorganic-organic hybrid early strength agent.
[comparative example 3]
The difference of this comparative example and embodiment 1 is only that early strength agent only selects nucleus type early strength agent.
[comparative example 4]
The difference of this comparative example and embodiment 1 is only that early strength agent only selects inorganic salts early strength agent.
[comparative example 5]
The difference of this comparative example and embodiment 1 is only that early strength agent only selects organic species early strength agent.
[comparative example 6]
The difference of this comparative example and embodiment 1 is only without using early strength agent.
Compared with prior art, the present invention can reduce energy consumption to avoid steam curing process, energy saving, and it is pre- to improve concrete The inside compactness of component raw material processed increases its surface layer flatness, and Crack prevention is formed, after keeping concrete prefabricated element raw material Phase intensity stabilization improves its integral strength;By being used while three kinds of early strength agent, it can significantly reduce costs, reduce condensation Time improves concrete prefabricated element performance, prolongs the service life;The concrete prefabricated element is molded by predetermined process, it can With effectively save process, cost of labor is reduced, accelerates concrete prefabricated element molding time, improves shaping efficiency.
The result shows that the non-evaporating curing concrete prefabricated components prepared by the present invention, can significantly improve its early stage and later stage Intensity, as shown in table 1.
The intensity test result of 1 non-evaporating curing concrete prefabricated components of table
Number 1d 2d 3d 28d
Embodiment 1 15.6MPa 26.8MPa 30.8MPa 39.9MPa
Comparative example 1 10.8MPa 24.5MPa 29.2MPa 33.5MPa
Comparative example 2 9.8MPa 25.2MPa 29.6MPa 34.0MPa
Comparative example 3 12.6MPa 20.2MPa 24.3MPa 29.4MPa
Comparative example 4 7.56MPa 22.6MPa 24.8MPa 29.8MPa
Comparative example 5 8.02MPa 23.2MPa 25.4MPa 31.2MPa
Comparative example 6 6.22MPa 18.6MPa 22.8MPa 28.8MPa
It can be seen that, obtained by the test of the contrast properties of comparative example and embodiment using raw material of the present invention and forming method mixed Solidifying soil prefabricated components have higher intensity in same time, and the early strength and later strength of concrete compare the prior art Height, and early strength effect is particularly evident, and thus the present invention there is significant progress relative to the prior art.
Using above-mentioned desirable embodiment according to the present invention as enlightenment, by above-mentioned description, relevant staff is complete Various changes and amendments can be carried out without departing from the scope of the technological thought of the present invention' entirely.The technology of this invention Property range is not limited to the content on specification, it is necessary to determine its technical scope according to right.

Claims (10)

1. a kind of non-evaporating curing concrete prefabricated components, it is characterised in that:It is simultaneously that inorganic-organic hybrid early strength agent and nucleus type is early Strong agent is added to by a certain percentage improves its early strength in concrete prefabricated element raw material, wherein each cubic meter of concrete Prefabricated components raw material is formed by following each component:
42.5 Portland cements:227.5Kg;
Inorganic-organic hybrid early strength agent:The 1% ~ 5% of gross mass;
Nucleus type early strength agent:The 10 ~ 15% of cement gross mass;
Sand:750Kg;
Handstone:290Kg;
Big stone:760Kg;
Water:150Kg;
High efficiency water reducing agent:3Kg;
The preparation method of the non-evaporating curing concrete prefabricated components raw material includes the following steps:Using forced mixer, first dry mixing Wet-mixing afterwards first adds in big stone, handstone and sand, starts forced mixer, stirs 40 ~ 60s;Add 42.5 common silicic acid Salt cement starts forced mixer, continues 40 ~ 60s of stirring;By inorganic-organic hybrid early strength agent, nucleus type early strength agent and height Effect water-reducing agent, which is dispersed in water, forms mixing water, is slowly injected into the mixing water of gross mass 80%, side in 20s in blender Side stirring 2min is injected, the mixing water stirring 1min for then adding in remaining gross mass 20% at once can discharge.
2. non-evaporating curing concrete prefabricated components according to claim 1, it is characterised in that:The inorganic-organic hybrid is early The early strong mass component 55% ~ 85% of inorganic salts in strong agent, the early strong mass component 15% ~ 45% of organic species, wherein, it is described inorganic Salt accelerating component is compounded by least two kinds of in sodium sulphate, sodium carbonate, calcium nitrate, calcium nitrite:Organic species are early Strong component is compounded by least two kinds of in calcium formate, calcium acetate, methanol, triethanolamine.
3. non-evaporating curing concrete prefabricated components according to claim 1, it is characterised in that:The nucleus type early strength agent is selected Calcium silicon mass ratio is 1.0 ~ 1.7, using analyze pure sodium metasilicate (Na2SiO3 × 9H2O), calcium nitrate (Ca (NO3) 2 × 4H2O) and Deionized water, the deionized water is boiled before use boils 10 minutes removal dissolubility CO2, between consolidating mass ratio 9 ~ 12 using water, And being separately added into gel dispersal agent uniformly disperses reagent, is synthetically prepared using 60 DEG C of waters bath with thermostatic control, timing agitation during reaction And solution pH value is kept more than 12, it is stored after reacting 7d by dry after product filtering and washing.
4. the forming method of the non-evaporating curing concrete prefabricated components described in any one of claim 1-3, it is characterised in that:Including Following steps:(1)Mold is installed;(2)Mold inspection;(3)Reinforcement fabrication;(4)Inspection of steel reinforcement bars;(5)First installation of embedded parts with It checks;(6)Concrete one-time-concreting;(7)Secondary formwork erection;(8)The installation of thermal insulation board and connector;(9)Secondary cloth muscle;(10)The Two installation of embedded parts are with checking;(11)Concrete secondary pours;(12)Component troweling;(13)Concrete curing;(14)Concrete Demoulding;(15)Component lifts by crane;(16)Undisguised material processing;(17)Component is examined and is repaired.
5. forming method according to claim 4, it is characterised in that:
Step(1)In, side form carries out surface clean perpendicular to bed die after the completion of assembled when mold is installed, then brush it is aqueous or Wax releasing agent;
Step(2)In, mold inspection item includes checking the flatness of mould contact surface, plate face bending degree, assembled gap ruler Very little and geometric dimension specification;
Step(3)In, during reinforcement fabrication, reinforcing bar binding tied silk is got rid of button and is bent towards on the inside of component, and protective layer cushion block is by plum blossom-shaped arrangement.
6. forming method according to claim 5, it is characterised in that:
Step(4)In, inspection of steel reinforcement bars project includes reinforcement location, specification, spacing and protective layer thickness;
Step(5)In, the first built-in fitting includes fixing bolt and composite water, and inspection item includes fixed bolt hole, water power connects The installation site and specifications and models of head;
Step(6)In, uniformly continuous pours during concrete one-time-concreting, and less than 500mm, pour the intermittent time is less than the height that feeds intake 40min。
7. forming method according to claim 6, it is characterised in that:
Step(7)In, when secondary formwork erection, first carries out surface clean, and then bed die brushing aqueous release agent, side form brushing wax are delayed Solidifying agent;
Step(8)In, binding material encapsulation process is used between thermal insulation board and connector;
Step(9)In, framework of steel reinforcement is first made, then framework of steel reinforcement is entered into mold forming.
8. forming method according to claim 7, it is characterised in that:
Step(10)In, the second built-in fitting includes fixing screws and fixes sleeve, and inspection item includes fixing screws, fixes sleeve Installation site and size model number;
Step(11)In, it is secondary to be vibrated molding with vibrating spear when pouring;
Step(12)In, troweling is carried out to component surface, troweling number is 3-4 times, before the last time troweling time is initial set 10min, and holding surface flatness difference of height≤3mm.
9. forming method according to claim 8, it is characterised in that:
Step(13)In, concrete curing uses natural curing, covers layer of plastic film in concrete surface in maintenance processes, The wetting for destroying concrete surface and energy holding member is dripped to prevent condensed water;
Step(14)In, when demoulding, first removes fixing screws and fixing bolt, then removes composite water, then remove fixing sleeve Cylinder, last form removal;
Step(15)In, it is lifted by crane using multiple spot hanger, suspension hook is located above prefabricated components at 200mm before keeping lifting, rises The prefabricated components road clearance is less than 500mm when hanging.
10. forming method according to claim 9, it is characterised in that:
Step(16)In, using giant to undisguisedly expecting to clear up;
Step(17)In, setting Quality People carries out quality inspection to finished product, is not influenced using reparation slurry reparation prefabricated The crack of element structure performance and breakage.
CN201711331839.3A 2017-12-13 2017-12-13 Steam-curing-free concrete prefabricated part and forming method thereof Active CN108249846B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711331839.3A CN108249846B (en) 2017-12-13 2017-12-13 Steam-curing-free concrete prefabricated part and forming method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711331839.3A CN108249846B (en) 2017-12-13 2017-12-13 Steam-curing-free concrete prefabricated part and forming method thereof

Publications (2)

Publication Number Publication Date
CN108249846A true CN108249846A (en) 2018-07-06
CN108249846B CN108249846B (en) 2020-01-10

Family

ID=62723022

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711331839.3A Active CN108249846B (en) 2017-12-13 2017-12-13 Steam-curing-free concrete prefabricated part and forming method thereof

Country Status (1)

Country Link
CN (1) CN108249846B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109942254A (en) * 2019-04-09 2019-06-28 台州普立德建筑科技有限公司 A kind of early-strength prefabricated components superimposed sheet and processing method
CN111848053A (en) * 2020-08-05 2020-10-30 湖北工业大学 Fly ash-based nano-micron crystal nucleus additive suitable for concrete prefabricated part and preparation method and application thereof
CN112694293A (en) * 2021-01-06 2021-04-23 东南大学 Non-autoclaved concrete containing seed crystal slurry admixture and preparation method thereof
CN114368952A (en) * 2022-02-15 2022-04-19 浙江瑞腾建筑新材料有限公司 Steam-curing-free concrete prefabricated part and forming method thereof

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101200354A (en) * 2007-11-30 2008-06-18 苏州二建建筑集团有限公司 Concrete super instant coagulant
CN101555108A (en) * 2009-05-25 2009-10-14 贵州省建筑材料科学研究设计院 Ultra-early-strength high-strength composite additive and preparation method thereof
CN103964793A (en) * 2014-04-23 2014-08-06 华南理工大学 Concrete for practical application of building industrial production
CN104402288A (en) * 2014-10-29 2015-03-11 上海建工集团股份有限公司 Calcium silicate hydrate gel solution early strength agent and preparation method thereof
CN104723449A (en) * 2015-02-12 2015-06-24 沈阳卫德住宅工业化科技有限公司 Automatic production line of building industrialization concrete precast members
CN104773988A (en) * 2015-04-03 2015-07-15 东南大学 Steam-curing-free early-strength steel fiber concrete pipe segment and preparation method thereof
CN105735309A (en) * 2016-04-01 2016-07-06 江苏东浦管桩有限公司 Prestressed concrete precast pile in form of mesh reinforcements
CN106363790A (en) * 2016-10-25 2017-02-01 河北晶通建筑科技股份有限公司 Manufacturing technique for precast concrete components
CN107032651A (en) * 2017-06-13 2017-08-11 刘翠芬 nucleus type concrete early strength agent and preparation method thereof
CN107352836A (en) * 2017-08-04 2017-11-17 南京成弘建新材料有限公司 Superpower nucleus of ultra early-strength concrete admixture and preparation method thereof

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101200354A (en) * 2007-11-30 2008-06-18 苏州二建建筑集团有限公司 Concrete super instant coagulant
CN101555108A (en) * 2009-05-25 2009-10-14 贵州省建筑材料科学研究设计院 Ultra-early-strength high-strength composite additive and preparation method thereof
CN103964793A (en) * 2014-04-23 2014-08-06 华南理工大学 Concrete for practical application of building industrial production
CN104402288A (en) * 2014-10-29 2015-03-11 上海建工集团股份有限公司 Calcium silicate hydrate gel solution early strength agent and preparation method thereof
CN104723449A (en) * 2015-02-12 2015-06-24 沈阳卫德住宅工业化科技有限公司 Automatic production line of building industrialization concrete precast members
CN104773988A (en) * 2015-04-03 2015-07-15 东南大学 Steam-curing-free early-strength steel fiber concrete pipe segment and preparation method thereof
CN105735309A (en) * 2016-04-01 2016-07-06 江苏东浦管桩有限公司 Prestressed concrete precast pile in form of mesh reinforcements
CN106363790A (en) * 2016-10-25 2017-02-01 河北晶通建筑科技股份有限公司 Manufacturing technique for precast concrete components
CN107032651A (en) * 2017-06-13 2017-08-11 刘翠芬 nucleus type concrete early strength agent and preparation method thereof
CN107352836A (en) * 2017-08-04 2017-11-17 南京成弘建新材料有限公司 Superpower nucleus of ultra early-strength concrete admixture and preparation method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109942254A (en) * 2019-04-09 2019-06-28 台州普立德建筑科技有限公司 A kind of early-strength prefabricated components superimposed sheet and processing method
CN111848053A (en) * 2020-08-05 2020-10-30 湖北工业大学 Fly ash-based nano-micron crystal nucleus additive suitable for concrete prefabricated part and preparation method and application thereof
CN112694293A (en) * 2021-01-06 2021-04-23 东南大学 Non-autoclaved concrete containing seed crystal slurry admixture and preparation method thereof
CN114368952A (en) * 2022-02-15 2022-04-19 浙江瑞腾建筑新材料有限公司 Steam-curing-free concrete prefabricated part and forming method thereof

Also Published As

Publication number Publication date
CN108249846B (en) 2020-01-10

Similar Documents

Publication Publication Date Title
CN108249846A (en) A kind of non-evaporating curing concrete prefabricated components and its forming method
CN103664073B (en) A kind of autoclave aerated concrete building block utilizing Yellow River Sand to prepare and preparation method thereof
CN85107041A (en) The manufacturing process of foamed concrete
CN108609974A (en) A kind of preparation method of ultra-high performance concrete and prefabricated PC
CN104499498B (en) A kind of construction method of mass concrete building
CN108249841A (en) A kind of pre stressed concrete sleeper concrete component and preparation method thereof
CN108951637A (en) Extreme cold area in low temperature season concrete construction method
CN106142336A (en) A kind of production technology of air entrained concrete arrangement of reinforcement wallboard
WO2020015508A1 (en) Method for treating concrete hole or rebar exposure
CN112549261A (en) Blank making mold for concrete hollow brick made of concrete
CN109384412A (en) A kind of normal silicate concrete accelerant
CN110590295B (en) Steam-cured concrete for CRTS III type ballastless track slab and preparation method thereof
CN112624690A (en) Manufacturing method of ceramsite aerated concrete light wall board
CN109454745A (en) A kind of waste heat recycling preparation method of concrete
CN106584642A (en) Manufacturing method of high-strength foam concrete product
CN107053446A (en) The steam protecting method of high frost resistance barrier board rapid shaping
CN113387653A (en) Non-autoclaved high-strength concrete pipe pile and preparation method thereof
CN102407561B (en) Pre-casting process for track board for high-speed railway
CN209456964U (en) A kind of anti-crack concrete panel
CN110963771A (en) Quick-turnover high-durability reinforced concrete drain pipe and manufacturing method thereof
CN110423138A (en) Yellow River Sand steam-pressing aero-concrete heat insulation building block and preparation method thereof
CN110963770A (en) Corrosion-resistant reinforced concrete drain pipe and manufacturing method thereof
CN110206139A (en) A kind of mass concrete construction method
CN110482926A (en) A kind of production method of environmental-friendly walling material for building
CN109553327A (en) Concrete additive and the preparation method and application thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Jianke science and Technology Park, No.1, Xiangshan Avenue, Gaozi street, Zhenjiang City, Jiangsu Province

Patentee after: ZHENJIANG JIANKE CONSTRUCTION TECHNOLOGY Co.,Ltd.

Address before: Beijing Xian Road 212000 Zhenjiang city Jiangsu province Jingkou District No. 38

Patentee before: ZHENJIANG JIANKE CONSTRUCTION TECHNOLOGY Co.,Ltd.