CN108206487A - A kind of auxiliary mould for cable construction - Google Patents
A kind of auxiliary mould for cable construction Download PDFInfo
- Publication number
- CN108206487A CN108206487A CN201810093998.2A CN201810093998A CN108206487A CN 108206487 A CN108206487 A CN 108206487A CN 201810093998 A CN201810093998 A CN 201810093998A CN 108206487 A CN108206487 A CN 108206487A
- Authority
- CN
- China
- Prior art keywords
- idler wheel
- bottom plate
- cross bar
- threaded rod
- sliding slot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G1/00—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
- H02G1/06—Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
Abstract
The invention discloses a kind of auxiliary mould for cable construction, including:Bottom plate,Supporting rod,Fixed block,Idler wheel,Cross bar,Block,Snap-gauge,Threaded rod,Through-hole,Location nut,The vertical affixed supporting rod of difference at left and right sides of the bottom plate upper surface,An and affixed fixed block on each supporting rod,Two fixed blocks are in same vertical height,The idler wheel is rotatablely connected by short axle and both sides fixed block,The idler wheel peripheral surface is equipped with the sliding slot of indent,The cross bar is connected horizontally between two supporting rods,And cross bar is placed in the top of idler wheel,The cross bar lower face tilts two blocks of installation,The lower end of the block is stretched into the sliding slot on idler wheel,The snap-gauge is placed in above bottom plate,And snap-gauge lower face inboard, upright is connected with two threaded rods,Correspond at threaded rod to be provided on the bottom plate and be provided with the through-hole that threaded rod passes through,The location nut is threaded in the lower part that threaded rod passes through through-hole.The present invention is easy for installation, time saving and energy saving.
Description
Technical field
The present invention relates to a kind of auxiliary mould for cable construction, applied to cable construction technical field.
Background technology
Cable is typically by several or the cable of similar rope that several groups of wire strandings form, mutually exhausted between every group of conducting wire
Edge, and be often twisted into around a center, entire outside is surrounded by the coating of high-insulation.Cable has interior energization, external insulation
Feature.City be laid with cable, be mostly laid in existing cable tunnel, in process of deployment, cable directly with hole
Road junction contacts, and during trailing cable, since the frictional force of cable and adit opening acts on, on the one hand can increase construction personnel
Construction intensity and labor intensity, be on the other hand also easy to that cable skin is caused to damage, influence construction quality.
Invention content
The defects of to solve prior art, the invention discloses a kind of auxiliary moulds for cable construction, have
The advantages of time saving and energy saving, easy for installation.
The invention discloses a kind of auxiliary mould for cable construction, including:Bottom plate, supporting rod, fixed block, idler wheel,
Cross bar, block, snap-gauge, threaded rod, through-hole, location nut, the vertical affixed branch of bottom plate upper surface left and right sides difference
Strut, and affixed fixed block on each supporting rod, two fixed blocks are in same vertical height, described idler wheel or so
Horizontal affixed short axle, the idler wheel are rotatablely connected by short axle and both sides fixed block in both ends of the surface, the idler wheel periphery
Face is equipped with the sliding slot of indent, and the cross bar is connected horizontally between two supporting rods, and cross bar is placed in the top of idler wheel, described
Cross bar lower face tilts two blocks of installation, and the lower end of the block is stretched into the sliding slot on idler wheel, and the snap-gauge is placed in bottom plate
Top, and snap-gauge lower face inboard, upright is connected with two threaded rods, corresponds at threaded rod to be provided with and is provided with spiral shell on the bottom plate
The through-hole that rasp bar passes through, the location nut are threaded in the lower part that threaded rod passes through through-hole.
Two supporting rods are placed on the inside of bottom plate upper surface, and supporting rod, threaded rod are placed on same perpendicular.
A sliding slot is recessed to centre at left and right sides of the idler wheel, and detent surface is bonded one layer of rubber layer.
The block lower end is tilted to sliding slot center side, and is smaller than the straight of cable between block lower end and sliding slot
Diameter.
Due to the adoption of the above technical scheme, the present invention has following beneficial advantage:
1st, it is easy for installation;
2nd, it is time saving and energy saving.
Description of the drawings
Fig. 1 is a kind of structure diagram of auxiliary mould for cable construction of the invention.
Wherein:1- bottom plates;2- supporting rods;3- fixed blocks;4- idler wheels;5- cross bars;6- blocks;7- snap-gauges;8- threaded rods;9-
Through-hole;10- location nuts.
Specific embodiment
As shown in Figure 1, the invention discloses a kind of auxiliary mould for cable construction, including:Bottom plate 1, supporting rod 2,
Fixed block 3, idler wheel 4, cross bar 5, block 6, snap-gauge 7, threaded rod 8, through-hole 9, location nut 10,1 upper surface of bottom plate or so
A both sides vertical affixed supporting rod 2, an and affixed fixed block 3 on each supporting rod 2, two fixed blocks 3 are in respectively
In same vertical height, horizontal affixed short axle, the idler wheel 4 pass through short axle and two on the 4 left and right ends face of idler wheel
Side fixed block 3 is rotatablely connected, and 4 peripheral surface of idler wheel is equipped with the sliding slot of indent, and the cross bar 5 is connected horizontally on two supports
Between bar 2, and cross bar 5 is placed in the top of idler wheel 4, and 5 lower face of cross bar, which tilts, installs two blocks 6, under the block 6
End is stretched into the sliding slot on idler wheel 4, and the snap-gauge 7 is placed in 1 top of bottom plate, and 7 lower face inboard, upright of snap-gauge is connected with two
Threaded rod 8, corresponds at threaded rod 8 to be provided on the bottom plate 1 and is provided with the through-hole 9 that threaded rod 8 passes through, 10 spiral shell of the location nut
Line is connected to the lower part that threaded rod 8 passes through through-hole 9.
Two supporting rods 2 are placed on the inside of 1 upper surface of bottom plate, and supporting rod 2, threaded rod 8 are placed on same perpendicular.
4 left and right sides of idler wheel is recessed a sliding slot, and detent surface is bonded one layer of rubber layer to centre.
6 lower end of block is tilted to sliding slot center side, and is smaller than cable between 6 lower end of block and sliding slot
Diameter.
The present invention is implemented:Auxiliary mould disclosed in the present application is placed in the adit opening in cable tunnel, passed through
Snap-gauge 7 and the edge of 1 adit opening of bottom plate clamp, and then screw location nut 10, you can auxiliary mould is mounted at adit opening,
Cable one end to be laid is passed through into idler wheel 4 and in the gap of cross bar 5, since the lower face of cross bar 5 is equipped with block 6, cable exists
In distraction procedure, it will not deviate from out of idler wheel 4 sliding slot, using the technical program, due to the presence of idler wheel 4, cable will not be with hole
Road junction is in direct contact, and rubber layer is bonded in sliding slot, small to cable destruction in distraction procedure, while is operated and more saved
Power reduces labor intensity.
Finally it should be noted that:Above example is only to illustrate the present invention and not limits technology described in the invention
Scheme;Therefore, although this specification with reference to above-mentioned each embodiment to present invention has been detailed description, this
Field it is to be appreciated by one skilled in the art that still can modify to the present invention or equivalent replacement;And all do not depart from this
The technical solution of the spirit and scope of invention and its improvement should all be covered in scope of the presently claimed invention.
Claims (4)
1. a kind of auxiliary mould for cable construction, including:Bottom plate, supporting rod, fixed block, idler wheel, cross bar, block, snap-gauge,
Threaded rod, through-hole, location nut, a bottom plate upper surface left and right sides vertical affixed supporting rod, and each support respectively
Affixed fixed block on bar, two fixed blocks are in same vertical height, it is characterised in that:The idler wheel left and right ends
Horizontal affixed short axle on face, the idler wheel is rotatablely connected by short axle and both sides fixed block, on the idler wheel peripheral surface
Sliding slot equipped with indent, the cross bar are connected horizontally between two supporting rods, and cross bar is placed in the top of idler wheel, the cross bar
Lower face tilts two blocks of installation, and the lower end of the block is stretched into the sliding slot on idler wheel, and the snap-gauge is placed in above bottom plate,
And snap-gauge lower face inboard, upright is connected with two threaded rods, corresponds at threaded rod to be provided on the bottom plate and is provided with threaded rod and wears
The through-hole crossed, the location nut are threaded in the lower part that threaded rod passes through through-hole.
2. according to a kind of auxiliary mould for cable construction described in claim 1, it is characterised in that:Two supporting rods are put
On the inside of bottom plate upper surface, and supporting rod, threaded rod are placed on same perpendicular.
3. according to a kind of auxiliary mould for cable construction described in claim 1, it is characterised in that:Described idler wheel or so
Two lateral centres are recessed a sliding slot, and detent surface is bonded one layer of rubber layer.
4. according to a kind of auxiliary mould for cable construction described in claim 1, it is characterised in that:The block lower end
It is tilted to sliding slot center side, and the diameter for being smaller than cable between block lower end and sliding slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810093998.2A CN108206487A (en) | 2018-01-31 | 2018-01-31 | A kind of auxiliary mould for cable construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810093998.2A CN108206487A (en) | 2018-01-31 | 2018-01-31 | A kind of auxiliary mould for cable construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108206487A true CN108206487A (en) | 2018-06-26 |
Family
ID=62606488
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810093998.2A Pending CN108206487A (en) | 2018-01-31 | 2018-01-31 | A kind of auxiliary mould for cable construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108206487A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112103848A (en) * | 2020-08-19 | 2020-12-18 | 燕霞 | Continuous laying and positioning device for underground cable and positioning and laying method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105762700A (en) * | 2016-03-28 | 2016-07-13 | 国网山东省电力公司章丘市供电公司 | Cable laying manual traction auxiliary tool |
CN206041361U (en) * | 2016-08-31 | 2017-03-22 | 中国铁建电气化局集团第一工程有限公司 | Wellhead cable lays auxiliary device |
CN107310967A (en) * | 2017-07-24 | 2017-11-03 | 天津山旗线缆有限公司 | A kind of cable laying protection support |
-
2018
- 2018-01-31 CN CN201810093998.2A patent/CN108206487A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105762700A (en) * | 2016-03-28 | 2016-07-13 | 国网山东省电力公司章丘市供电公司 | Cable laying manual traction auxiliary tool |
CN206041361U (en) * | 2016-08-31 | 2017-03-22 | 中国铁建电气化局集团第一工程有限公司 | Wellhead cable lays auxiliary device |
CN107310967A (en) * | 2017-07-24 | 2017-11-03 | 天津山旗线缆有限公司 | A kind of cable laying protection support |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112103848A (en) * | 2020-08-19 | 2020-12-18 | 燕霞 | Continuous laying and positioning device for underground cable and positioning and laying method thereof |
CN112103848B (en) * | 2020-08-19 | 2022-05-31 | 河南揽盛通信科技有限公司 | Continuous laying and positioning device for underground cable and positioning and laying method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108206487A (en) | A kind of auxiliary mould for cable construction | |
CN207727441U (en) | A kind of adjustable for height bent cap holder | |
CN201493345U (en) | Portable pay-off rack | |
CN205645933U (en) | Electric vehicle battery support | |
CN203529808U (en) | Combined type balancing weight device | |
CN210968775U (en) | Work bench of KYN instrument box integrated device mounting panel | |
CN205990090U (en) | A kind of power cable tensioner | |
CN104999438A (en) | Main grider turnover tooling for blade of wind-driven generator and using method of main grider turnover tooling | |
CN210023387U (en) | Truck instrument panel framework pressing equipment | |
KR200477185Y1 (en) | Roof with a cable spoke | |
CN207564114U (en) | A kind of gantry machining center gantry support | |
CN207225373U (en) | A kind of motor-car framework and the motor car bogie with the motor-car framework | |
CN210341690U (en) | High-speed railway rockfall protection network along line | |
CN209467171U (en) | A kind of large size insulator transfer trolley | |
CN209493259U (en) | A kind of detachable mounting device suitable for subway DC equipment | |
CN113699888A (en) | Method for lifting steel arch ribs of through-type steel arch bridge in typhoon area and alignment adjusting device | |
CN205657404U (en) | Wire pole cross arm | |
CN203130123U (en) | Snapping-preventive device for two-frame-in-on-group type face end support | |
CN104929418A (en) | Wire lifting support for power transmission line | |
CN206456407U (en) | Bus bar canister revolution trolley | |
CN209119572U (en) | A kind of electric power distributing cabinet | |
CN209886961U (en) | Aluminum alloy welding wire anti-jumping device | |
CN214787416U (en) | Lining cutting platform truck with novel braced system | |
CN205335686U (en) | Switching station base | |
CN207747946U (en) | One kind being used for the fixed holder of vehicle bottom spare tyre |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180626 |
|
RJ01 | Rejection of invention patent application after publication |