CN108204240A - 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法 - Google Patents

新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法 Download PDF

Info

Publication number
CN108204240A
CN108204240A CN201810042708.1A CN201810042708A CN108204240A CN 108204240 A CN108204240 A CN 108204240A CN 201810042708 A CN201810042708 A CN 201810042708A CN 108204240 A CN108204240 A CN 108204240A
Authority
CN
China
Prior art keywords
existing tunnel
newly built
closely
built tunnels
arch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810042708.1A
Other languages
English (en)
Inventor
李凤涛
王国光
阮剑辉
赵月
周文涛
吕宝伟
杨立新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Design Corp
Original Assignee
China Railway Design Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Design Corp filed Critical China Railway Design Corp
Priority to CN201810042708.1A priority Critical patent/CN108204240A/zh
Publication of CN108204240A publication Critical patent/CN108204240A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries

Abstract

本发明公开了一种新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法,其加固体系包括既有隧道,所述既有隧道上设置有新建隧道超前小导管和大管棚施作空间的支护体系,所述支护体系中设置有管棚施作用的导向架,所述导向架中沿地铁区间隧道打设有导向管,所述导向架中还设置有沿着导向管方向打设的大管棚;其加固方法包括如下步骤:开挖管棚施工工作室、做好初期支护、施工拱顶部超前小导管、架设导向架,施作导向管,施工大管棚,注浆加固拱底下注浆范围内的土层、施作拱顶和边墙初期支护,仰拱初期支护封闭成环、施作仰拱二次衬砌、二次衬砌封闭成环。本发明加固效果好,施工效率高,严格控制既有隧道变形,不影响结构安全和正常运营。

Description

新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固 方法
技术领域
本发明属于地铁工程领域,具体涉及一种新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法。
背景技术
随着城市建设的急速发展及交通线网的不断加密,新建地铁隧道小净距上跨既有地铁隧道、市政交通隧道等类似工程越来越多。在小净距上跨工程中,由于上部隧道开挖施工、破除既有隧道结构物、土体卸荷等因素,常使下部隧道上浮,影响下部结构正常使用,更甚者导致既有隧道结构破坏,造成安全事故。
在既有小净距上跨隧道工程中,一般采用锚杆结合注浆法、地层搅拌加固等方式进行施工处理,然而由于锚杆注浆进尺短、土层搅拌加固受地面制约条件多等原因,实际作用很难满足工程需求。
因此,工程中急需一种加固效果好、施工效率高、变形控制能力高的加固方法来满足现实工程的迫切需求。
发明内容
本发明为解决现有技术存在的问题而提出,其目的是提供一种新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法。
本发明的技术方案是:一种新建隧道近距离上跨既有隧道的抗上浮加固体系,包括既有隧道,其加固体系包括既有隧道,所述既有隧道上设置有新建隧道超前小导管和大管棚施作空间的支护体系,所述支护体系中设置有管棚施作用的导向架,所述导向架中沿地铁区间隧道打设有导向管,所述导向架中还设置有沿着导向管方向打设的大管棚。
所述大管棚上形成连接用丝扣和注浆用注浆孔。
所述支护体系包括工作室拱架、锁脚锚杆、超前小导管、混凝土等构筑的初期支护。
所述初期支护内设置有二次衬砌。
所述既有隧道中设置有既有隧道锚杆,所述既有隧道上方的既有隧道锚杆侵入到新建隧道中。
所述隧道锚杆探出新建隧道的部分为静力切割掉的静力割除段锚杆。
一种新建隧道近距离上跨既有隧道的抗上浮加固体系的加固方法,包括如下步骤:
(ⅰ)开挖管棚施工工作室,做好管棚工作室初期支护。
(ⅱ)喷射混凝土封闭工作面,施工拱顶部超前小导管。
(ⅲ)架设导向架,施作导向管,在仰拱施工大管棚,注浆加固拱底下注浆范围内的土层。
(ⅳ)台阶法开挖上半断面土体a,施作初期支护,台阶处打设两根锁脚锚杆;然后开挖核心土体b。
(ⅴ)开挖c部土体,静力割除既有隧道的既有隧道锚杆,并施作边墙初期支护,仰拱初期支护封闭成环。
(ⅵ)敷设仰拱防水板,施作仰拱二次衬砌。
(ⅶ)敷设边墙、拱部防水板,施作边墙、拱部二次衬砌,二次衬砌封闭成环。
所述管棚施工工作室较正洞标准拱架大850mm。
所述工作面后6m为开挖管棚施工工作室。
所述注浆范围为拱底下3m。
本发明的有益效果如下:
本发明采用大管棚一次施作成型加固效果好,施工效率高,能严格控制既有隧道的变形,不影响其结构安全和正常运营。
本发明管棚自身大孔径及注浆孔可以有效的保证注浆效果。
本发明注浆加固体系硬化后形成的类梁板加固体系可以有效的控制既有隧道上浮变形。
本发明采用暗挖法,对周边环境影响和交通影响小。
本发明克服了以往上跨隧道工程中注浆效果差、加固效果不显著、控制变形差及多次施工加固等不良问题,本发明施作大管棚速度快、注浆效率高、施工工期少、控制变形能力强、避免多次加固节省投资,可以有效的应用在人工填土、砂土、粉土、粘性土以及岩层中。
附图说明
图1 是本发明中新建隧道的横断面图;
图2 是本发明中小净距上跨既有隧道的纵断面图;
图3 是本发明中大管棚的结构示意图;
图4~9 是本发明中加固方法的施工工序图;
其中:
1 工作室拱架 2 超前小导管
3 初期支护 4 二次衬砌
5 导向架 6 导向管
7 大管棚 8 轨面线
9 既有隧道锚杆 10 静力割除段锚杆
11 注浆范围 12 锁脚锚杆
13 既有隧道 14 丝扣
15 注浆孔。
具体实施方式
以下,参照附图和实施例对本发明进行详细说明:
如图1~9所示,一种新建隧道近距离上跨既有隧道的抗上浮加固体系,包括既有隧道13,所述既有隧道13上设置有新建隧道超前小导管2和大管棚7施作空间的支护体系,所述支护体系中设置有管棚施作用的导向架5,所述导向架5中沿地铁区间隧道打设有导向管6,所述导向架5中还设置有沿着导向管6方向打设的大管棚7。
所述大管棚7上形成连接用丝扣14和注浆用注浆孔15。
所述支护体系包括工作室拱架1、锁脚锚杆12、超前小导管2、混凝土等构筑的初期支护3。
所述初期支护3内设置有二次衬砌4。
所述既有隧道13中设置有既有隧道锚杆9,所述既有隧道13上方的既有隧道锚杆9侵入到新建隧道中。
所述隧道锚杆9探出新建隧道的部分为静力切割掉的静力割除段锚杆10。
本发明在新建隧道拱底施作大管棚7,之后通过大管棚7自身注浆孔15注浆加固新建地铁隧道,最后及时施作初期支护3和二衬结构4,使加固土体、大管棚7、初期支护3、二衬结构4等加固体系形成类似钢筋混凝土梁板。
如图4~9所示,一种新建隧道近距离上跨既有隧道的抗上浮加固体系的加固方法,包括如下步骤:
ⅰ 开挖管棚施工工作室,做好管棚工作室初期支护。
ⅱ 喷射混凝土封闭工作面,施工拱顶部超前小导管2,如图4。
ⅲ 架设导向架5,施作导向管6,在仰拱施工大管棚7,注浆加固拱底下注浆范围11内的土层。
ⅳ 台阶法开挖上半断面土体a,施作初期支护3,台阶处打设两根锁脚锚杆12;然后开挖核心土体b,如图5。
ⅴ 开挖c部土体,静力割除既有隧道的既有隧道锚杆10,并施作边墙初期支护,仰拱初期支护封闭成环,如图6。
ⅵ 敷设仰拱防水板,施作仰拱二次衬砌4,如图7。
ⅶ 敷设边墙、拱部防水板,施作边墙、拱部二次衬砌,二次衬砌封闭成环,如图8、9。
所述管棚施工工作室较正洞标准拱架大850mm。
所述工作面后6m为开挖管棚施工工作室。
所述注浆范围11为拱底下3m。
实施案例
利用于某地铁4号线上跨既有公路隧道的设计施工中。
主要技术难点为:
①新建地铁4号线区间隧道与既有已运营公路隧道结构之间净距小,如采取直接开挖隧道则对既有公路隧道结构会有不利影响。
②需要破除部分既有隧道系统支护锚杆将对既有隧道结构及运营产生一定的影响,因此怎样细化解决新建地铁4号线区间隧道开挖时对既有公路隧道产生影响,两者之间的加固设计和改造将对增加社会经济效益、降低风险、既有隧道运营的影响程度等至关重要。
经过多番论证设计后,设计施工采用本文所示发明方法。保护形式采用预注浆、超前小导管和大管棚的支护加固形式。现场施工经验、监测数据及既有隧道的运营监测数据充分证明:采用大管棚加固新建地铁隧道底部土体技术可以严格控制既有隧道的结构的位移变形,确保隧道的安全正常运营;利用管棚补强夹层土体,避免了结构的破坏;利用静力切割方案噪声小,有利环境保护及文明施工。
本发明可广泛推广到新建隧道的上下穿越工程中,尤其适用小净距上跨既有市政隧道工程,可使工程更加安全、经济。

Claims (10)

1.一种新建隧道近距离上跨既有隧道的抗上浮加固体系,包括既有隧道(13),其特征在于:所述既有隧道(13)上设置有新建隧道的超前小导管(2)和大管棚(7)施作空间的支护体系,所述支护体系中设置有管棚施作用的导向架(5),所述导向架(5)中沿地铁区间隧道打设有导向管(6),所述导向架(5)中还设置有沿着导向管(6)方向打设的大管棚(7)。
2.根据权利要求1所述的一种新建隧道近距离上跨既有隧道的抗上浮加固体系,其特征在于:所述大管棚(7)上形成连接用丝扣(14)和注浆用注浆孔(15)。
3.根据权利要求1所述的一种新建隧道近距离上跨既有隧道的抗上浮加固体系,其特征在于:所述支护体系包括工作室拱架(1)、锁脚锚杆(12)、超前小导管(2)、混凝土等构筑的初期支护(3)。
4.根据权利要求3所述的一种新建隧道近距离上跨既有隧道的抗上浮加固体系,其特征在于:所述初期支护(3)内设置有二次衬砌(4)。
5.根据权利要求1所述的一种新建隧道近距离上跨既有隧道的抗上浮加固体系,其特征在于:所述既有隧道(13)中设置有既有隧道锚杆(9),所述既有隧道(13)上方的既有隧道锚杆(9)侵入到新建隧道中。
6.根据权利要求1所述的一种新建隧道近距离上跨既有隧道的抗上浮加固体系,其特征在于:所述隧道锚杆(9)探出新建隧道的部分为静力切割掉的静力割除段锚杆(10)。
7.一种新建隧道近距离上跨既有隧道的抗上浮加固体系的加固方法,其特征在于:包括如下步骤:
(ⅰ)开挖管棚施工工作室,做好管棚工作室初期支护
(ⅱ)喷射混凝土封闭工作面,施工拱顶部超前小导管(2)
(ⅲ)架设导向架(5),施作导向管(6),在仰拱施工大管棚(7),注浆加固拱底下注浆范围(11)内的土层
(ⅳ)台阶法开挖上半断面土体a,施作初期支护(3),台阶处打设两根锁脚锚杆(12);然后开挖核心土体b
(ⅴ)开挖c部土体,静力割除既有隧道的既有隧道锚杆(10),并施作边墙初期支护,仰拱初期支护封闭成环
(ⅵ)敷设仰拱防水板,施作仰拱二次衬砌(4)
(ⅶ)敷设边墙、拱部防水板,施作边墙、拱部二次衬砌,二次衬砌封闭成环。
8.根据权利要求7所述的一种新建隧道近距离上跨既有隧道的抗上浮加固体系的加固方法,其特征在于:所述管棚施工工作室较正洞标准拱架大850mm。
9.根据权利要求7所述的一种新建隧道近距离上跨既有隧道的抗上浮加固体系的加固方法,其特征在于:所述工作面后6m为开挖管棚施工工作室。
10.根据权利要求7所述的一种新建隧道近距离上跨既有隧道的抗上浮加固体系的加固方法,其特征在于:所述注浆范围(11)为拱底下3m。
CN201810042708.1A 2018-01-17 2018-01-17 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法 Pending CN108204240A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810042708.1A CN108204240A (zh) 2018-01-17 2018-01-17 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810042708.1A CN108204240A (zh) 2018-01-17 2018-01-17 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法

Publications (1)

Publication Number Publication Date
CN108204240A true CN108204240A (zh) 2018-06-26

Family

ID=62605266

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810042708.1A Pending CN108204240A (zh) 2018-01-17 2018-01-17 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法

Country Status (1)

Country Link
CN (1) CN108204240A (zh)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999620A (zh) * 2018-07-04 2018-12-14 中铁六局集团有限公司 岩质隧道超前小导管进出洞施工工法
CN109252877A (zh) * 2018-09-05 2019-01-22 中国建筑土木建设有限公司 近接隧道双层二衬结合梁板结构多台阶施工方法
CN109356592A (zh) * 2018-09-30 2019-02-19 中国建筑第八工程局有限公司 小净距叠层隧道的施工方法
CN110578536A (zh) * 2019-10-15 2019-12-17 中铁十二局集团有限公司 地铁暗挖区间下穿既有过街通道开挖支护加固方法
CN111396060A (zh) * 2020-01-08 2020-07-10 北京工业大学 一种新建隧道超近距上穿既有盾构隧道抗隆起加固方法
CN112196544A (zh) * 2020-10-15 2021-01-08 中铁二局第二工程有限公司 高地应力软岩地层的联络排烟道上跨既有隧道的施工方法
CN112253142A (zh) * 2020-11-27 2021-01-22 鲁东大学 一种深长隧道联络风道近净距上跨主洞施工方法
CN112443335A (zh) * 2020-10-27 2021-03-05 南昌轨道交通集团有限公司地铁项目管理分公司 隧道下穿管线自动控制变形的支护体系及其施工方法
CN112682048A (zh) * 2020-12-31 2021-04-20 中铁大桥局集团第五工程有限公司 一种新建隧道小净距上跨既有隧道的置换加固施工方法
CN112942300A (zh) * 2021-02-07 2021-06-11 杭州市市政工程集团有限公司 一种既有隧道上方土体的加固结构及其施工方法
CN113217021A (zh) * 2021-04-30 2021-08-06 中铁十六局集团有限公司 一种地下空间近距离扰动施工方法及设备
CN114809106A (zh) * 2022-04-08 2022-07-29 中铁建设集团南方工程有限公司 一种既有隧道的组合式保护结构的施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009144462A (ja) * 2007-12-17 2009-07-02 Shimizu Corp 構造物の構築工法、既設構造物の一時補強工法、既設構造物の改築工法
CN202543953U (zh) * 2012-03-31 2012-11-21 中铁第四勘察设计院集团有限公司 上跨运营中的浅埋隧道的支撑结构
KR101408667B1 (ko) * 2014-02-26 2014-06-17 김동수 기존 터널구조물을 활용하여 신규 터널구조물을 시공하는 방법
CN104790978A (zh) * 2015-03-10 2015-07-22 中铁九局集团有限公司 小净距立体交叉隧道环形导坑施工方法
CN105350973A (zh) * 2015-10-08 2016-02-24 同济大学 一种大跨断面黄土隧道下穿高速公路的施工方法
CN105781573A (zh) * 2016-03-18 2016-07-20 中铁九局集团第六工程有限公司 铁路下穿公路隧道双层套管加筋双管棚跟管钻进施工方法
CN105804758A (zh) * 2016-04-22 2016-07-27 中国电建集团铁路建设有限公司 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法
CN207934910U (zh) * 2018-01-17 2018-10-02 中国铁路设计集团有限公司 一种新建隧道近距离上跨既有隧道的抗上浮加固体系

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009144462A (ja) * 2007-12-17 2009-07-02 Shimizu Corp 構造物の構築工法、既設構造物の一時補強工法、既設構造物の改築工法
CN202543953U (zh) * 2012-03-31 2012-11-21 中铁第四勘察设计院集团有限公司 上跨运营中的浅埋隧道的支撑结构
KR101408667B1 (ko) * 2014-02-26 2014-06-17 김동수 기존 터널구조물을 활용하여 신규 터널구조물을 시공하는 방법
CN104790978A (zh) * 2015-03-10 2015-07-22 中铁九局集团有限公司 小净距立体交叉隧道环形导坑施工方法
CN105350973A (zh) * 2015-10-08 2016-02-24 同济大学 一种大跨断面黄土隧道下穿高速公路的施工方法
CN105781573A (zh) * 2016-03-18 2016-07-20 中铁九局集团第六工程有限公司 铁路下穿公路隧道双层套管加筋双管棚跟管钻进施工方法
CN105804758A (zh) * 2016-04-22 2016-07-27 中国电建集团铁路建设有限公司 浅覆土大断面小间距的矩形顶管上跨地铁隧道施工方法
CN207934910U (zh) * 2018-01-17 2018-10-02 中国铁路设计集团有限公司 一种新建隧道近距离上跨既有隧道的抗上浮加固体系

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
武永珍;王亚会;陆瑶;: "新建隧道上跨施工对既有隧道的影响及加固措施研究", 施工技术 *

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108999620A (zh) * 2018-07-04 2018-12-14 中铁六局集团有限公司 岩质隧道超前小导管进出洞施工工法
CN109252877A (zh) * 2018-09-05 2019-01-22 中国建筑土木建设有限公司 近接隧道双层二衬结合梁板结构多台阶施工方法
CN109356592A (zh) * 2018-09-30 2019-02-19 中国建筑第八工程局有限公司 小净距叠层隧道的施工方法
CN109356592B (zh) * 2018-09-30 2020-03-20 中国建筑第八工程局有限公司 小净距叠层隧道的施工方法
CN110578536A (zh) * 2019-10-15 2019-12-17 中铁十二局集团有限公司 地铁暗挖区间下穿既有过街通道开挖支护加固方法
CN111396060A (zh) * 2020-01-08 2020-07-10 北京工业大学 一种新建隧道超近距上穿既有盾构隧道抗隆起加固方法
CN112196544A (zh) * 2020-10-15 2021-01-08 中铁二局第二工程有限公司 高地应力软岩地层的联络排烟道上跨既有隧道的施工方法
CN112196544B (zh) * 2020-10-15 2022-10-18 中铁二局第二工程有限公司 高地应力软岩地层的联络排烟道上跨既有隧道的施工方法
CN112443335A (zh) * 2020-10-27 2021-03-05 南昌轨道交通集团有限公司地铁项目管理分公司 隧道下穿管线自动控制变形的支护体系及其施工方法
CN112253142B (zh) * 2020-11-27 2022-05-24 鲁东大学 一种深长隧道联络风道近净距上跨主洞施工方法
CN112253142A (zh) * 2020-11-27 2021-01-22 鲁东大学 一种深长隧道联络风道近净距上跨主洞施工方法
CN112682048A (zh) * 2020-12-31 2021-04-20 中铁大桥局集团第五工程有限公司 一种新建隧道小净距上跨既有隧道的置换加固施工方法
CN112682048B (zh) * 2020-12-31 2023-08-29 中铁大桥局集团第五工程有限公司 一种新建隧道小净距上跨既有隧道的置换加固施工方法
CN112942300A (zh) * 2021-02-07 2021-06-11 杭州市市政工程集团有限公司 一种既有隧道上方土体的加固结构及其施工方法
CN113217021A (zh) * 2021-04-30 2021-08-06 中铁十六局集团有限公司 一种地下空间近距离扰动施工方法及设备
CN114809106A (zh) * 2022-04-08 2022-07-29 中铁建设集团南方工程有限公司 一种既有隧道的组合式保护结构的施工方法
CN114809106B (zh) * 2022-04-08 2023-06-13 中铁建设集团南方工程有限公司 一种既有隧道的组合式保护结构的施工方法

Similar Documents

Publication Publication Date Title
CN108204240A (zh) 新建隧道近距离上跨既有隧道的抗上浮加固体系及其加固方法
CN105839643B (zh) 一种采用基坑支护的隧道进洞施工方法
CN106761778B (zh) 一种适用于上软下硬地层的地铁车站暗挖施工工艺
CN202707075U (zh) 基于柱拱法施工成型的地铁大跨度车站主体结构
CN104452809A (zh) 一种超浅埋隧道盖挖施工方法
CN103206219A (zh) 偏压状态下明暗交界段隧道进洞开挖支护结构及施工工法
CN108868778A (zh) 一种大型地下结构非开挖修建方法
CN107060771A (zh) 中短隧道单向出洞开挖方法
CN207934910U (zh) 一种新建隧道近距离上跨既有隧道的抗上浮加固体系
CN110043264A (zh) 一种顶进预制矩形竖井结构型式的施工方法
CN110259490B (zh) 一种地铁暗挖车站施工方法
CN107503754A (zh) 一种ⅵ级围岩富水浅埋大断面隧道的施工方法
CN208236427U (zh) 大变形软弱破碎围岩特大断面隧洞开挖支护结构
CN102748040A (zh) 地铁大跨度车站主体结构及其柱拱法施工方法
CN105604576A (zh) 一种软岩地层暗挖大断面隧道施工方法及支护体系
CN109457709A (zh) 一种双排桩结合大角度锚索的支护结构及施工方法
CN109056810A (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造及其施工方法
CN102808627A (zh) 钢管棚暗挖施工方法
CN107939415A (zh) 浅埋大跨软塑粘土隧道留核心土微二台阶施工方法
CN205036380U (zh) 一种四联拱pba暗挖地铁车站主体结构
CN109695457A (zh) 硬质岩的原位扩建超大断面隧道及台阶施工方法
CN109057802A (zh) 大断面浅埋隧道下穿高速公路施工方法
CN205036388U (zh) 一种四联拱pba暗挖地铁车站的扣拱施工结构
CN208815566U (zh) 既有建筑下方明挖或盖挖地下主体结构的横向扩挖构造
CN1190566C (zh) 导洞一隔离桩墙法防护邻近构造物沉降的方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination