CN108193862A - Building wall plastering construction method - Google Patents
Building wall plastering construction method Download PDFInfo
- Publication number
- CN108193862A CN108193862A CN201711499031.6A CN201711499031A CN108193862A CN 108193862 A CN108193862 A CN 108193862A CN 201711499031 A CN201711499031 A CN 201711499031A CN 108193862 A CN108193862 A CN 108193862A
- Authority
- CN
- China
- Prior art keywords
- building
- plastering
- building wall
- construction method
- moisturizing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F21/00—Implements for finishing work on buildings
- E04F21/02—Implements for finishing work on buildings for applying plasticised masses to surfaces, e.g. plastering walls
- E04F21/06—Implements for applying plaster, insulating material, or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Finishing Walls (AREA)
Abstract
The present invention provides a kind of building wall plastering construction methods, are related to technical field of building construction, and above-mentioned building wall plastering construction method includes:Base treatment is configured base pastes, carries out scratch coat and smears mat coat powder.Above-mentioned building wall plastering construction method, the density of the binding force and primary coat of primary coat and basal plane in building wall plastering construction can be significantly improved, and then improve the quality of scratch coat, effectively alleviate the construction of existing plastering technique time-consuming and often occur primary coat fallen due to dead weight split and whole plastering complete back wall easy cracked, hollowing the problems such as.Meanwhile decrease the construction cost done over again and brought.
Description
Technical field
The present invention relates to technical field of building construction, more particularly, to a kind of building wall plastering construction method.
Background technology
Plastering engineering refers to the surface that base material is applied to decorative mortar, has protecting grassroots level and increases beautiful work
With providing the system construction process of specific function for building.Plastering engineering has two big functions:First, safeguard function, protection
Not by the wind, rain, the erosion of snow, increase metope is moisture-proof, efflorescence prevention, heat-insulated ability for wall, improves the endurance quality of wall body, thermal technology
Performance;Second is that beautifying functions, improve indoor sanitation condition, air is purified, is beautified the environment, improve residence comfort.
At present for building construction, the Forming Quality of wall plastering increasingly causes the concern of each side, but traditional
Building wall scratch coat method is to carry out scratch coat to metope using bricklayer trowel, generally requires to carry out metope repeatedly more
Second bottom is plastered, and can not one-pass molding, process costs are high, and time-consuming, and quality also cannot be guaranteed for construction, often occur
There is the situation of wall crackle after primary coat pendant is split and whole plastering is completed.
CN205444825U discloses a kind of plastering and gets rid of sizing device, which includes handle and work network, and work network passes through
Tied silk is fixed on the top of handle;Work network is formed by wire netting transverse and longitudinal interfolded, and the thickness of work network is 10~15mm.On
State plastering and get rid of sizing device, work network is intensive, and transverse and longitudinal is interlocked, and improves the midge ability of work network, be effectively ensured operating efficiency and
Engineering construction quality.
Therefore, sizing device is got rid of in plastering with reference to disclosed in CN205444825U, and a kind of novel building wall of research and probe is smeared
Grey construction method,
Since plastering gets rid of that sizing device work network is intensive, and transverse and longitudinal is interlocked disclosed in CN205444825U, midge ability is strong, can be with
The density of the binding force and primary coat of primary coat and basal plane in building wall plastering construction is significantly improved, and then improves bottom
The quality of layer plastering, and construction cost is reduced, effectively alleviating existing plastering technique construction, time-consuming and plastering bottom often occurs
There is the problem of wall crackle after completion that layer pendant is split and entirety is plastered, become very necessary and urgent.
In view of this, it is special to propose the present invention.
Invention content
The first object of the present invention is to provide a kind of building wall plastering construction method, the building wall plastering construction
The disclosed plasterings of method application CN205444825U get rid of sizing device and carry out scratch coat to building wall, due to CN205444825U
Disclosed plastering gets rid of that sizing device work network is intensive, and transverse and longitudinal is interlocked, and midge ability is strong, can significantly improve building wall plastering construction
The density of the binding force and primary coat of middle primary coat and basal plane, and then the quality of scratch coat is improved, and reduce construction
Cost effectively alleviates the construction of existing plastering technique time-consuming and primary coat pendant often occur and splits and after whole plastering completes
There is the problem of wall crackle, become very necessary and urgent.
In the present invention, signified plastering gets rid of sizing device and gets rid of sizing device for the disclosed plasterings of CN205444825U.
A kind of building wall plastering construction method provided by the invention, the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b), base pastes are configured:Cement and building glue are sufficiently mixed to stir evenly to form base pastes;
(c), scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
The continuous sizing device that gets rid of the plastering for sticking slurry is clapped uniform in the slurry burr on wall, thrown away every time, then, treats base pastes
Moisturizing processing is carried out to wall after initial set;
(d) mat coat powder is smeared:It carries out smearing mat coat powder, and to the whole matter of building wall plastering after step (c) moisturizing processing
Amount is checked.
Further, the cement in the step (b) is the portland cement of strength grade >=42.5.
Further, the building glue in the step (b) is 801 building glues.
Further, the mixing quality of cement and building glue ratio is 3~5 in the step (b):1.
Further, the mixing quality of cement and building glue ratio is 4 in the step (b):1.
Further, height >=5mm of the slurry burr thrown away every time in the step (c).
Further, the height of slurry burr thrown away every time in the step (c) is 5~7mm.
Further, the method for carrying out moisturizing processing to wall in the step (c) is that wall is carried out using sprayer
Moisturizing, the curing time after moisturizing are 3~7 days.
Further, it the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b) base pastes are configured:By the portland cement of strength grade >=42.5 and 801 finished architectural glue with 4:1
Mass ratio, which is sufficiently mixed, to stir evenly to form base pastes;
(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
Continuous the plastering for sticking slurry is got rid of to sizing device and is clapped in the slurry burr height on wall, thrown away every time is 5~7mm, then, is treated
Moisturizing is carried out to wall using sprayer after base pastes initial set, the curing time after moisturizing is 3~7 days;
(d) mat coat powder is smeared:After step (c) moisturizing, treated smears mat coat powder again after scratch coat reaches some strength, and
The total quality of building wall plastering is checked.
Further, construction temperature >=5 DEG C of the building wall plastering construction method.
Compared with prior art, beneficial effects of the present invention are:
The present invention provides a kind of building wall plastering construction method, the method includes:Base treatment, configuration bottom slurry
Expect, carry out scratch coat, smear mat coat powder.Above-mentioned building wall plastering construction method, it is public using CN205444825U
The plastering opened gets rid of sizing device and carries out scratch coat to building wall.Since sizing device operation is got rid of in plastering disclosed in CN205444825U
Net intensive, transverse and longitudinal is interlocked, and midge ability is strong, can significantly improve the combination of primary coat and basal plane in building wall plastering construction
The density of power and primary coat, and then the quality of scratch coat is improved, effectively alleviating existing plastering technique construction, time-consuming, with
And often occur primary coat fallen due to dead weight split and whole plastering complete easily cracked back wall, hollowing the problems such as.Meanwhile
Decrease the construction cost done over again and brought.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below
Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor
It puts, can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is building wall plastering construction method part provided in an embodiment of the present invention construction effect figure;
Fig. 2 is building wall plastering construction method integral construction design sketch provided in an embodiment of the present invention;
Fig. 3 is the existing construction drawing for carrying out scratch coat to metope using bricklayer trowel provided in an embodiment of the present invention;
Fig. 4 gets rid of sizing device structure diagram for plastering provided in an embodiment of the present invention.
Specific embodiment
Technical scheme of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation
Example is part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill
Personnel's all other embodiments obtained without making creative work, shall fall within the protection scope of the present invention.
The specific embodiment of the present invention is described in detail below in conjunction with attached drawing.It should be understood that this place is retouched
The specific embodiment stated is merely to illustrate and explain the present invention, and is not intended to restrict the invention.
Fig. 1 is building wall plastering construction method part provided in an embodiment of the present invention construction effect figure;
Fig. 2 is building wall plastering construction method integral construction design sketch provided in an embodiment of the present invention;
Fig. 3 is the existing construction drawing for carrying out scratch coat to metope using bricklayer trowel provided in an embodiment of the present invention;
Fig. 4 gets rid of sizing device structure diagram for plastering provided in an embodiment of the present invention.
Fig. 1, Fig. 2, Fig. 3 and Fig. 4 are please referred to, is plastered below in conjunction with attached drawing to building wall provided in an embodiment of the present invention
Construction method elaborates.
According to an aspect of the present invention, a kind of building wall plastering construction method, the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b), base pastes are configured:Cement and building glue are sufficiently mixed to stir evenly to form base pastes;
(c), scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
The continuous sizing device that gets rid of the plastering for sticking slurry is clapped uniform in the slurry burr on wall, thrown away every time, and dynamics is moderate, then,
Moisturizing processing is carried out to wall after base pastes initial set;
(d) mat coat powder is smeared:It carries out smearing mat coat powder, and to the whole matter of building wall plastering after step (c) moisturizing processing
Amount is checked.
As shown in figure 4, in the present embodiment, above-mentioned plastering gets rid of sizing device and gets rid of slurry dress for the disclosed plasterings of CN205444825U
It puts.
As shown in Figures 1 to 3, building wall plastering construction method provided by the invention, discloses using CN205444825U
Plastering get rid of sizing device to building wall carry out scratch coat.Since sizing device work network is got rid of in plastering disclosed in CN205444825U
Intensive, transverse and longitudinal is interlocked, and midge ability is strong, can significantly improve the binding force of primary coat and basal plane in building wall plastering construction
With the density of primary coat, and then the quality of scratch coat is improved, and reduce construction cost, effectively alleviate existing plastering technique
Construction time-consuming and often occur primary coat pendant split and whole plastering complete after there is the problem of wall crackle,
In the preferred embodiment of the present invention, the cement in the step (b) is the silicon of strength grade >=42.5
Acid salt cement.
In above-mentioned preferred embodiment, the strength grade of above-mentioned cement is the mark of strength of cement size, and measure refers to
The compression strength of cement is designated as, the present invention is 42.5Mpa using the compression strength of cement.Use intensity grade >=42.5 of the present invention
Portland cement the building wall after plastering can be made more durable.
In the preferred embodiment of the present invention, the building glue in the step (b) is 801 building glues.
As a preferred embodiment, the building glue in above-mentioned steps (b) is 801 building glues.Above-mentioned 801 build
Glue is built applied to cement mortar or the adhesive strength of concrete can be significantly increased in base pastes, plays cohesive base and slurry
Bonding transitional function between material.
In the preferred embodiment of the present invention, the mixing quality of cement and building glue ratio in the step (b)
It is 3~5:1.
In above-mentioned preferred embodiment, the mixing quality of cement and building glue ratio is 3~5 in above-mentioned steps (b):
1.In cement and building glue mixed process, if the too high levels of cement, the caking property of base pastes and basal plane can be influenced,
And it is solid to cause to be pasted not strongly;If the too high levels of building glue, phenomena such as building wall is cracking after drying is easily led to.
In above-mentioned preferred embodiment, the mixing quality of cement and building glue ratio is 4 in the step (b):1.
In the preferred embodiment of the present invention, the height of slurry burr thrown away every time in the step (c) >=
5mm。
In above-mentioned preferred embodiment, the height of slurry burr thrown away every time in the step (c) is 5~7mm.
In the preferred embodiment of the present invention, it is to the method for wall progress moisturizing processing in the step (c),
Moisturizing is carried out to wall using sprayer, the curing time after moisturizing is 3~7 days.
In above-mentioned preferred embodiment, sprayer need to be used to carry out moisturizing processing, the curing time after moisturizing to wall
It it is 3~7 days, phenomena such as dry and cracked occurs in scratch coat after constructing to avoid bottom.
As a preferred embodiment, after the moisture-keeping maintaining, it is firm without picking phenomenon to touch burr with hand, you can into
Row next step smears mat coat powder construction, and picking phenomenon is serious when touching burr such as hand, then should carry out reworked processing.
In the preferred embodiment of the present invention, it the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b) base pastes are configured:By the portland cement of strength grade >=42.5 and 801 finished architectural glue with 4:1
Mass ratio, which is sufficiently mixed, to stir evenly to form base pastes;
(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
Continuous the plastering for sticking slurry is got rid of to sizing device and is clapped in the slurry burr height on wall, thrown away every time is 5~7mm, then, is treated
Moisturizing is carried out to wall using sprayer after base pastes initial set, the curing time after moisturizing is 3~7 days;
(d) mat coat powder is smeared:After step (c) moisturizing, treated smears mat coat powder again after scratch coat reaches some strength, and
The total quality of building wall plastering is checked.
In the preferred embodiment of the present invention, construction temperature >=5 DEG C of the building wall plastering construction method.
Embodiment 1
A kind of building wall plastering construction method, the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b) base pastes are configured:By the portland cement of strength grade 42.5 and 801 building glues with 3:1 mass ratio
It is sufficiently mixed and stirs evenly to form base pastes;
(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
Continuous the plastering for sticking slurry is got rid of to sizing device and is clapped in the slurry burr height on wall, thrown away every time is 5mm, then, treats bottom
Moisturizing is carried out to wall using sprayer after layer slurry initial set, the curing time after moisturizing is 3 days;
(d) mat coat powder is smeared:It carries out smearing mat coat powder, and to the whole matter of building wall plastering after step (c) moisturizing processing
Amount is checked.
Embodiment 2
A kind of building wall plastering construction method, the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b) base pastes are configured:By the portland cement of strength grade 52.5 and 801 building glues with 5:1 mass ratio
It is sufficiently mixed and stirs evenly to form base pastes;
(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
Continuous the plastering for sticking slurry is got rid of to sizing device and is clapped in the slurry burr height on wall, thrown away every time is 7mm, then, treats bottom
Moisturizing is carried out to wall using sprayer after layer slurry initial set, the curing time after moisturizing is 7 days;
(d) mat coat powder is smeared:It carries out smearing mat coat powder, and to the whole matter of building wall plastering after step (c) moisturizing processing
Amount is checked.
Embodiment 3
A kind of building wall plastering construction method, the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b) base pastes are configured:By the portland cement of strength grade 62.5 and 801 building glues with 4:1 mass ratio
It is sufficiently mixed and stirs evenly to form base pastes;
(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
Continuous the plastering for sticking slurry is got rid of to sizing device and is clapped in the slurry burr height on wall, thrown away every time is 6mm, then, treats bottom
Moisturizing is carried out to wall using sprayer after layer slurry initial set, the curing time after moisturizing is 4 days;
(d) mat coat powder is smeared:It carries out smearing mat coat powder, and to the whole matter of building wall plastering after step (c) moisturizing processing
Amount is checked.
Embodiment 4
A kind of building wall plastering construction method, the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b) base pastes are configured:By the portland cement of strength grade 52.5 and 801 building glues with 3:1 mass ratio
It is sufficiently mixed and stirs evenly to form base pastes;
(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
Continuous the plastering for sticking slurry is got rid of to sizing device and is clapped in the slurry burr height on wall, thrown away every time is 5mm, then, treats bottom
Moisturizing is carried out to wall using sprayer after layer slurry initial set, the curing time after moisturizing is 5 days;
(d) mat coat powder is smeared:It carries out smearing mat coat powder, and to the whole matter of building wall plastering after step (c) moisturizing processing
Amount is checked.
Embodiment 5
A kind of building wall plastering construction method, the described method comprises the following steps:
(a) base treatment:The base for treating construction building metope is handled, and removes the dust, dirt, mortar block of metope
Wait attachments;
(b) base pastes are configured:By the portland cement of strength grade 62.5 and 801 building glues with 5:1 mass ratio
It is sufficiently mixed and stirs evenly to form base pastes;
(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, is uniformly connected
Continuous the plastering for sticking slurry is got rid of to sizing device and is clapped in the slurry burr height on wall, thrown away every time is 7mm, then, treats bottom
Moisturizing is carried out to wall using sprayer after layer slurry initial set, the curing time after moisturizing is 6 days;
(d) mat coat powder is smeared:It carries out smearing mat coat powder, and to the whole matter of building wall plastering after step (c) moisturizing processing
Amount is checked.
In conclusion building wall plastering construction method of the present invention, can significantly improve and be smeared in building wall plastering construction
The density of the binding force and primary coat of grey bottom and basal plane, and then the quality of scratch coat is improved, effectively alleviate existing smear
Time-consuming and primary coat often occurs falls and split and the whole plastering back wall that completes easily is split due to dead weight for grey construction technology
The problems such as line, hollowing.Meanwhile decrease the construction cost done over again and brought.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Pipe is described in detail the present invention with reference to foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to
Can so modify to the technical solution recorded in foregoing embodiments either to which part or all technical features into
Row equivalent replacement;And these modifications or replacement, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme.
Claims (10)
- A kind of 1. building wall plastering construction method, which is characterized in that the described method comprises the following steps:(a) base treatment:The base for treating construction building metope is handled, and it is attached to remove the dust, dirt, mortar block of metope etc. Object;(b) base pastes are configured:Cement and building glue are sufficiently mixed to stir evenly to form base pastes;(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, uniformly continuous By the plastering for sticking slurry get rid of sizing device clap it is uniform in the slurry burr on wall, thrown away every time, then, treat base pastes initial set Moisturizing processing is carried out to wall afterwards;(d) mat coat powder is smeared:After step (c) moisturizing, treated smears mat coat powder again, and to building after scratch coat reaches some strength The total quality for building wall plastering is checked.
- 2. building wall plastering construction method according to claim 1, which is characterized in that the cement in the step (b) Portland cement for strength grade >=42.5.
- 3. building wall plastering construction method according to claim 1, which is characterized in that the building in the step (b) Glue is 801 building glues.
- 4. building wall plastering construction method according to claim 1, which is characterized in that in the step (b) cement and The mixing quality ratio of building glue is 3~5:1.
- 5. building wall plastering construction method according to claim 4, which is characterized in that in the step (b) cement and The mixing quality ratio of building glue is 4:1.
- 6. building wall plastering construction method according to claim 1, which is characterized in that got rid of every time in the step (c) Height >=5mm of the slurry burr gone out.
- 7. building wall plastering construction method according to claim 6, which is characterized in that got rid of every time in the step (c) The height of slurry burr gone out is 5~7mm.
- 8. building wall plastering construction method according to claim 1, which is characterized in that wall in the step (c) The method for carrying out moisturizing processing is to carry out moisturizing to wall using sprayer, the curing time after moisturizing is 3~7 days.
- 9. building wall plastering construction method according to claim 1, which is characterized in that the method includes following steps Suddenly:(a) base treatment:The base for treating construction building metope is handled, and it is attached to remove the dust, dirt, mortar block of metope etc. Object;(b) base pastes are configured:By the portland cement of strength grade >=42.5 and 801 finished architectural glue with 4:1 quality Base pastes are formed than being sufficiently mixed to stir evenly;(c) scratch coat is carried out:Plastering is got rid of in sizing device immersion base pastes and sticks base pastes, then, uniformly continuous It is 5~7mm that the plastering for sticking slurry, which is got rid of sizing device and clapped in the slurry burr height on wall, thrown away every time, then, treats bottom Moisturizing is carried out to wall using sprayer after slurry initial set, the curing time after moisturizing is 3~7 days;(d) mat coat powder is smeared:After step (c) moisturizing processing smear mat coat powder, and to the total quality of building wall plastering into Row checks.
- 10. according to claim 1~9 any one of them building wall plastering construction method, which is characterized in that the building wall Construction temperature >=5 DEG C of face plastering construction method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711499031.6A CN108193862A (en) | 2017-12-30 | 2017-12-30 | Building wall plastering construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201711499031.6A CN108193862A (en) | 2017-12-30 | 2017-12-30 | Building wall plastering construction method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108193862A true CN108193862A (en) | 2018-06-22 |
Family
ID=62587793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201711499031.6A Pending CN108193862A (en) | 2017-12-30 | 2017-12-30 | Building wall plastering construction method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108193862A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138307A (en) * | 2018-10-16 | 2019-01-04 | 严园妹 | A kind of anti-hollowing wall of environmental protection and its construction method |
CN110219443A (en) * | 2019-06-05 | 2019-09-10 | 南通鑫金建设集团有限公司 | Machinery whitewashing plastering construction method |
CN111561117A (en) * | 2020-04-17 | 2020-08-21 | 郑州市创意装饰设计有限公司 | Construction method for building decoration |
CN112942709A (en) * | 2021-03-15 | 2021-06-11 | 福建筑兆建设有限公司 | Construction method for preventing hollowing and cracking of wall plastering |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4654919A (en) * | 1985-11-29 | 1987-04-07 | Isak Liberman | Spreader tool for applying plaster and cement to wallboard, and the like |
US4731258A (en) * | 1985-11-29 | 1988-03-15 | Isak Liberman | Method for applying plaster and cement to wallboard and the like |
CN101886460A (en) * | 2010-07-16 | 2010-11-17 | 江苏弘盛建设工程集团有限公司 | Press polishing method of plastered mesh cloth of inner wall |
CN202202552U (en) * | 2011-08-18 | 2012-04-25 | 中建四局第六建筑工程有限公司 | Telescopic slurry flinging bat for wall plastering construction |
CN205444825U (en) * | 2016-02-23 | 2016-08-10 | 中国建筑第二工程局有限公司 | Plaster and get rid of thick liquid device |
-
2017
- 2017-12-30 CN CN201711499031.6A patent/CN108193862A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4654919A (en) * | 1985-11-29 | 1987-04-07 | Isak Liberman | Spreader tool for applying plaster and cement to wallboard, and the like |
US4731258A (en) * | 1985-11-29 | 1988-03-15 | Isak Liberman | Method for applying plaster and cement to wallboard and the like |
CN101886460A (en) * | 2010-07-16 | 2010-11-17 | 江苏弘盛建设工程集团有限公司 | Press polishing method of plastered mesh cloth of inner wall |
CN202202552U (en) * | 2011-08-18 | 2012-04-25 | 中建四局第六建筑工程有限公司 | Telescopic slurry flinging bat for wall plastering construction |
CN205444825U (en) * | 2016-02-23 | 2016-08-10 | 中国建筑第二工程局有限公司 | Plaster and get rid of thick liquid device |
Non-Patent Citations (1)
Title |
---|
邹伟、殷娜: "伸缩式甩浆拍甩浆抹灰施工技术应用", 《建筑工程技术与设计》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109138307A (en) * | 2018-10-16 | 2019-01-04 | 严园妹 | A kind of anti-hollowing wall of environmental protection and its construction method |
CN110219443A (en) * | 2019-06-05 | 2019-09-10 | 南通鑫金建设集团有限公司 | Machinery whitewashing plastering construction method |
CN111561117A (en) * | 2020-04-17 | 2020-08-21 | 郑州市创意装饰设计有限公司 | Construction method for building decoration |
CN112942709A (en) * | 2021-03-15 | 2021-06-11 | 福建筑兆建设有限公司 | Construction method for preventing hollowing and cracking of wall plastering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108193862A (en) | Building wall plastering construction method | |
CN102584133B (en) | Emulsion bi-component interface agent and preparation method for emulsion bi-component interface agent | |
JP5049090B2 (en) | Thermal insulation laminate | |
CN101886460B (en) | Press polishing method of plastered mesh cloth of inner wall | |
CN101886457B (en) | Method for constructing wear-resistant and crack-resistant hardened ground | |
CN101565997A (en) | Construction method for large-area irregular floor tile | |
CN101935196A (en) | Putty for building external wall | |
CN104047410B (en) | Stone material paving construction method | |
CN106284998A (en) | Plastering on inner walls completely spreads fiberglass gridding cloth construction method | |
CN102587527A (en) | Steel column-coated fire-protection construction method | |
CN105272113A (en) | Dry plastering technology | |
CN105625669B (en) | A kind of laying method of vitrified tile paving structure | |
CN109853888A (en) | A kind of historical building plucking wall surface construction technology | |
CN103291024A (en) | Novel cement-based plastering mortar construction method | |
CN104909661A (en) | Glue for renovating ceramic tiles | |
WO2017177749A1 (en) | Building reinforcement structure and building reinforcement method | |
JP2010240570A (en) | Coating method | |
CN102330477B (en) | Paper honeycomb light wallboard joint treatment method | |
CN107419858A (en) | A kind of inner wall render smears construction method | |
CN205577324U (en) | Vitrified tile spreads and pastes structure | |
CN116816026A (en) | Close joint paving method for high-quality ceramic tiles and rock plates | |
CN110563416A (en) | Repairing method suitable for masonry structure surface and application thereof | |
CN206538953U (en) | Structure of plastering is exempted from a kind of Novel interior wall gypsum bottoming | |
CN101666144A (en) | Plastering and trough-pulling construction method of face brick wall surface and pull trough plate | |
CN108569872A (en) | A kind of protective materials and the application as building surface protective layer and reparation building corrosion location |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180622 |