CN108175279A - A kind of method for infusing coffee - Google Patents

A kind of method for infusing coffee Download PDF

Info

Publication number
CN108175279A
CN108175279A CN201711483633.2A CN201711483633A CN108175279A CN 108175279 A CN108175279 A CN 108175279A CN 201711483633 A CN201711483633 A CN 201711483633A CN 108175279 A CN108175279 A CN 108175279A
Authority
CN
China
Prior art keywords
water
boiler
coffee
predetermined pressure
brewing device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201711483633.2A
Other languages
Chinese (zh)
Other versions
CN108175279B (en
Inventor
王德涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711483633.2A priority Critical patent/CN108175279B/en
Publication of CN108175279A publication Critical patent/CN108175279A/en
Application granted granted Critical
Publication of CN108175279B publication Critical patent/CN108175279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J31/00Apparatus for making beverages
    • A47J31/40Beverage-making apparatus with dispensing means for adding a measured quantity of ingredients, e.g. coffee, water, sugar, cocoa, milk, tea
    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47JKITCHEN EQUIPMENT; COFFEE MILLS; SPICE MILLS; APPARATUS FOR MAKING BEVERAGES
    • A47J31/00Apparatus for making beverages
    • A47J31/44Parts or details or accessories of beverage-making apparatus
    • A47J31/4403Constructional details

Abstract

The present invention provides a kind of method for infusing coffee, include the following steps:Hot water in brewing device moistens ground coffee;The hot water in the brewing device extracts the part in the ground coffee under the first predetermined pressure;The hot water in the brewing device extracts the rest part of the ground coffee under the second predetermined pressure, wherein, second predetermined pressure is less than first predetermined pressure.The present invention solves in the prior art, it is impossible to the problem of adjusting extracting pressure according to different phase demand.

Description

A kind of method for infusing coffee
Technical field
The present invention relates to coffee brewing technical fields, and in particular to a kind of method for infusing coffee.
Background technology
In daily life, coffee is liked by vast consumer, mainly has during infusing coffee following Parameter can have an impact the mouthfeel of coffee:Soaking temperature, extracting pressure and brewing time, coffee machine of the prior art can be with Soaking temperature and brewing time are controlled, but ground coffee is extracted in the presence of the extracting pressure that can only remain certain value Problem, this method for infusing coffee are easy in last extraction stages excessive extraction, so as to influence the mouthfeel of coffee, therefore are now needed Want a kind of method infused coffee that extracting pressure can be adjusted according to different phase demand.
Invention content
It, in the prior art cannot be according to difference with solution it is a primary object of the present invention to provide a kind of method for infusing coffee Stage demand adjusts the problem of extracting pressure.
To achieve the above object, the present invention provides a kind of method for infusing coffee, include the following steps:
Ground coffee is moistened using the hot water in brewing device;
The hot water in brewing device extracts the part in ground coffee under the first predetermined pressure;
The hot water in brewing device extracts the rest part of ground coffee under the second predetermined pressure, wherein, the Two predetermined pressures are less than the first predetermined pressure.
Further, method for infusing coffee is moistened and is extracted to ground coffee using coffee machine, and coffee machine includes:Female pot Stove, sub- boiler, the water supply installation and brewing device for supplying cold water, sub- boiler is arranged in female boiler, the water inlet of female boiler and The water inlet of sub- boiler connects respectively with water supply installation, and female boiler is equipped with the first heating dress for heating the water in female boiler It puts, water outlet of the brewing device respectively with water supply installation and sub- boiler connects, and brewing device has apopore, brewing device and confession It is in parallel between water installations to be equipped with water pump and decompression solenoid valve, in the process for moistening and being extracted to the part in ground coffee In, water pump is opened, and decompression solenoid valve is closed, and during being extracted to the rest part in ground coffee, water pump is closed, drop Pressure electromagnetic valve is opened.
Further, the first predetermined pressure is in the range of 9~10bar.
Further, the time extracted to the part in ground coffee is in the range of 14~18s.
Further, during being extracted to the rest part in ground coffee, is reduced to from the first predetermined pressure Two predetermined pressures, the second predetermined pressure are 5~6bar.
Further, the time extracted to the rest part of ground coffee is in the range of 0~6s.
Further, institute's ground coffee is moistened under third predetermined pressure, third predetermined pressure is the model of 2~4bar In enclosing.
Further, the time of moistening is in the range of 3~8s.
Further, according to a kind of method for infusing coffee of above-mentioned any one, time of moistening, to one in ground coffee The sum of time for being extracted of part and time for being extracted to the rest part of ground coffee are no more than 30s.
Further, during moistening and extraction, the temperature of the hot water in brewing device remains unchanged.
Further, coffee machine further includes mixing arrangement, and mixing arrangement is in the hot water and water supply installation in sub- boiler Cold water is uniformly mixed, so that the temperature of the hot water in brewing device remains unchanged.
Further, brewing device include it is spaced brew boiler and tea infuser, brew going out for boiler and sub- boiler The mouth of a river, water supply installation connection, the water container for brewing boiler and tea infuser pass through the first water stream channel setting up and down and second Water stream channel connects, and brews boiler, the second water stream channel, water container and the first water stream channel and forms circulation loop, tea infuser Secondary heating mechanism is equipped with, the inner roof wall for brewing boiler is higher than the inner roof wall of water container, secondary heating mechanism and is recycled back to Road forms mixing arrangement, and apopore is arranged on the bottom of water container.
Technical solution of the present invention has the following advantages that:In actual use, the water in water supply installation enters female pot In stove 10, female boiler 10 is heated by first heater 30, so as to be heated the sub- boiler 20 being arranged in female boiler 10, from The hot water flowed out and the cold water flowed out from water supply installation are mixed in brewing device in sub- boiler 20.It is brewed by setting Device can by hot water and cold water mix to the arbitrary temp for being suitble to infuse coffee, so as to avoid the water temperature over-high infused coffee, And then the problem of causing mouthfeel bad.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution of the prior art Embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, in being described below Attached drawing is some embodiments of the present invention, for those of ordinary skill in the art, before not making the creative labor It puts, can also be obtained according to these attached drawings other attached drawings.In the accompanying drawings:
Fig. 1 shows the internal structure schematic diagram of coffee machine according to the present invention;
Fig. 2 is pressure changing when infusing coffee using coffee machine of the prior art;
Fig. 3 is pressure changing when infusing coffee using the coffee machine in the application;
Fig. 4 shows the flow diagram of method for infusing coffee according to the present invention.
Wherein, the reference numeral in above-mentioned attached drawing is:
10th, female boiler;11st, steam brewing head;12nd, hot water head;13rd, pressure switch;14th, water level probe;15th, air gauge; 16th, air bleeding valve;17th, safety valve;20th, sub- boiler;30th, first heater;41st, boiler is brewed;411st, water pressure gauge;421st, it is filled with water Container;4211st, water outlet;422nd, pedestal;4221st, brewing mouth;4231st, first interface;4232nd, second interface;4233rd, third connects Mouthful;424th, water supply line;425th, brewing pipeline;43rd, the first water stream channel;44th, the second water stream channel;45th, secondary heating mechanism; 51st, the first pipeline section;52nd, the second pipeline section;521st, first check-valve;522nd, flow control valve;53rd, third pipeline section;54th, the 4th pipe Section;541st, water pump;542nd, entering water electromagnetic valve;55th, the 5th pipeline section;552nd, second check-valve;60th, relief valve.
Specific embodiment
Technical scheme of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill Personnel's all other embodiments obtained without making creative work, shall fall within the protection scope of the present invention.
A kind of a kind of specific embodiment of coffee machine as shown in Figure 1, including:Female boiler 10, sub- boiler 20 and supply The water supply installation of cold water, sub- boiler 20 are arranged in female boiler 10, the water inlet of female boiler 10 and the water inlet of sub- boiler 20 point It is not connected with water supply installation, female boiler 10 is equipped with the first heater 30 for heating the water in female boiler 10, coffee machine The brewing device with water outlet 4211 is further included, brewing device connects respectively with water supply installation and sub- boiler 20, so that sub- pot Hot water in stove 20 is mixed with the cold water in water supply installation.
In actual use, the water in water supply installation is entered in female boiler 10, and female boiler 10 is filled by the first heating 30 heating are put, so as to be heated the sub- boiler 20 being arranged in female boiler 10, the hot water that is flowed out from sub- boiler 20 and from confession The cold water flowed out in water installations is mixed in brewing device.By setting brewing device can be by hot water and cold water mix extremely It is suitble to the arbitrary temp infused coffee, so as to avoid the water temperature over-high infused coffee, and then the problem of cause mouthfeel bad.
Specifically, coffee machine further include the cold water in the hot water and water supply installation in sub- boiler 20 is carried out it is uniformly mixed Mixing arrangement.Hot water or cold water can be uniformly mixed by mixing arrangement, and the coffee mouthfeel for brewing out is more preferable.
Specifically, coffee machine further includes PID temperature controllers, and PID temperature controllers are electric with first heater, temperature sensor respectively Connection, and first heater is controlled to work.
Specifically, brewing device include it is spaced brew boiler 41 and tea infuser, brew boiler 41 and sub- boiler 20, Water supply installation connects, and brews the water container 421 of boiler 41 and tea infuser and passes through the first water stream channel 43 setting up and down and the Two water stream channels 44 connect, and brew boiler 41, the second water stream channel 44,421 and first water stream channel 43 of water container and are formed and followed Loop back path, tea infuser are equipped with secondary heating mechanism 45, brew the inner roof wall of boiler 41 higher than water container 421 inner roof wall, Secondary heating mechanism 45 and circulation loop form mixing arrangement, and water outlet 4211 is arranged on the bottom of water container 421.Second adds Thermal 45 works so that and the water temperature around secondary heating mechanism 45 increases, because the density of the density ratio cold water of hot water is small, because This hot water moves upwards, and passes through the first water stream channel 43 flow direction and brew boiler 41, and the cold water for brewing lower portion thereof at this time passes through Second water stream channel 44 flows into water container, and is higher than the inner roof wall of water container 421 due to brewing the inner roof wall of boiler 41, According to the pressure formula of liquid it is found that under isodensity, the height of liquid is higher, bigger to the pressure of bottom surface, therefore first The pressure that water in boiler 41 is brewed at water stream channel 43 and at the second water stream channel 44 is more than the pressure of water in water container 421, Therefore the water brewed in boiler 41 also can flow to water container 421 by the first water stream channel 43 and the second water stream channel 44, but It is that hot water cannot be still mixed thoroughly with cold water at this time, then detect actual water temperature by temperature sensor, and utilize PID temperature Control the work of instrument control secondary heating mechanism so that actual temperature is consistent with set temperature, can accurately control through the above way Actual water temperature.
Specifically, boiler is brewed equipped with water pressure gauge 411, and water pressure gauge can measure the hydraulic pressure brewed in boiler, and pass through With the cooperating of relief valve 60, ensure to brew the hydraulic pressure in boiler in certain range.
Specifically, tea infuser includes pedestal 422 and water container 421, and water container 421 is arranged on pedestal 422, is discharged Outlet conduit is connected at mouth 4211 downwards, one end of the separate water outlet 4211 of outlet conduit forms brewing mouth 4221, water outlet Pipeline is equipped with switch valve.The water flowed out from brewing mouth 4221 can infuse coffee, and switch valve can control beating for outlet conduit On or off is closed.
Specifically, switch valve is two position three-way valve, and outlet conduit is divided into what is connected with water outlet 4211 by two position three-way valve Water supply line 424 and brewing pipeline 425, the first interface 4231 of two position three-way valve are connect with water supply line 424, two position three-way valve Second interface 4232 connected with brewing pipeline 425, two position three-way valve have first interface 4231 and second interface 4232 are connected The first logical operating position and the second operating position for connecting its third interface 4233 with second interface 4232, brewing mouth 4221 position is higher than the position of second interface 4232, when two position three-way valve is in the second operating position, in brewing pipeline 425 Water passes sequentially through second interface 4232 and third interface 4233 is discharged.When two position three-way valve is in the first operating position, be filled with water appearance Water in device 421 flows to brewing pipeline 425 from water supply line 424, and finally outflow carries out brewing coffee from brewing mouth 4221;Two When position three-way valve is in the second operating position, the water in water container 421 is flowed to from brewing pipeline 425 by second interface 4232 Third interface 4233 so as to discharge the waste water remained in brewing pipeline 425, avoids two position three-way valve from being in the first work next time The water temperature that the cold water influence remained in during position in brewing pipeline 425 is infused coffee with water.
Specifically, tea infuser is equipped with passes for detecting the temperature of water outlet 4211 or the water temperature at water outlet 4211 Sensor.Temperature sensor is arranged on water outlet 4211 and is nearby more conducive to the accurate water measured and flowed out from water outlet 4211 Actual temperature.
Specifically, water pump 541 is equipped between brewing device and water supply installation.Water pump 541 can make the pressure rise of water, side Just it is female boiler water supply, is also convenient for extracting ground coffee in the first predetermined pressure.
Specifically, coffee machine further includes the pressure regulating solenoid valve being arranged in parallel with water pump 541.Pressure regulating solenoid valve can adjust water Pressure.
Specifically, pressure regulating solenoid valve is decompression solenoid valve.When open decompression solenoid valve and switch off the pump 541 when, decompression electricity Magnet valve causes the pressure reduction of water, so that the pressure reduction of the water in brewing device, therefore finally flowed from brewing mouth 4221 The pressure reduction of the water gone out.
Specifically, flow control valve 522 is equipped between water pump 541 and brewing device.Flow control valve 522 is conducive to adjust The flow of water, the flow of the water flowed into brewing device by control can change water temperature.
Specifically, also there is steam brewing head 11, the hot water for cleaning cup that can dismiss milk foam on female boiler 10 First 12, control first heater 30 works pressure switch 13, the water level probe 14 for measuring water level, for measuring female boiler 10 The air gauge 15 of interior air pressure, the air bleeding valve 16 that gas can be discharged and ensure safety valve of the pressure in safe range in female boiler 10 17。
Specifically, coffee machine further includes:First pipeline section 51, the second pipeline section 52 and third pipeline section 53, the one of the first pipeline section 51 End is connected with sub- boiler 20, and one end of the second pipeline section 52 is connected with water supply installation, the first pipeline section 51 and the second pipeline section 52 it is another One end is connected with third pipeline section 53, and the other end of third pipeline section 53 is connected with brewing device, the heat flowed out from sub- boiler 20 Water and the cold water flowed out from water supply installation flow through third pipeline section 53, so as to which hot water and cold water be facilitated to be mixed in brewing device It is even.
Specifically, the 54 upper edge water (flow) direction of the 4th pipeline section being connected between water supply installation and female boiler 10 is equipped with water pump 541 and entering water electromagnetic valve 542, the second pipeline section 52 be connected on the 4th pipeline section 54 between water pump 541 and entering water electromagnetic valve 542, Second pipeline section, 52 upper edge water (flow) direction is equipped with first check-valve 521 and flow control valve 522, and first check-valve 521 prevents water from falling Stream, flow control valve 522 control the uninterrupted of water.
Specifically, pressure release pipeline section is connected on third pipeline section 53, pressure release pipeline section is equipped with relief valve 60.Opening relief valve can With draining so that brew the pressure reduction of boiler.
Specifically, the 5th pipeline section 55, the 5th pipeline section are connected on the second pipeline section 52 of the upstream of first check-valve 521 55 connect with sub- boiler 20, and the 5th pipeline section 55 is equipped with second check-valve 552, and second check-valve 552 prevents aqueous reflux, and supply water dress The cold water put is flowed into from the 5th pipeline section 55 in sub- boiler 20 successively by the 4th pipeline section 54, the second pipeline section 52.
Working method of the coffee machine in actual application is described in detail with reference to Fig. 1:
After coffee machine is powered, water level probe 14 controls water pump 541 to work, and entering water electromagnetic valve 542 is opened, and water pump 541 starts Work, water supply installation supplies water to female boiler 10 and sub- boiler 20, water pump 541 and into water power after female boiler 10 is intake to ordinary water level Magnet valve 542 is closed, and when water level probe 14 is detected less than ordinary water level, water pump 541 and entering water electromagnetic valve 542 work, so as to The water level in female boiler 10 is made to be maintained in the range of ordinary water level;Pressure switch 13 controls first heater 30 to work, the One heating unit 30 is by heating the water in female boiler 10 so that temperature rise in female boiler 10, when temperature reaches certain temperature Afterwards, air bleeding valve 16 is opened and discharges exhaust gas, and first heater after reaching certain value because of pressure is avoided just to stop situation about heating It generates, works on rear heating tube, air bleeding valve 16 is closed, and pot furnace pressure constantly rises, when steam pressure reaches in female boiler When being about 120 DEG C to 1.1bar both temperature, pressure switch 13 controls first heater to stop heating, when steam in female boiler When pressure is less than 1.1bar, first heater works on, and temperature is with the temperature raising in female boiler 10 in sub- boiler 20 And increase, the water in sub- boiler 20 is flowed in brewing device so that is brewed the temperature raising in boiler 41, and then is brewed boiler 41 In pressure rise, when brew the pressure in boiler 41 more than 9bar when, relief valve 60 open carry out draining pressure release so that brew Pressure remains at 9bar in boiler 41.
The course of work infused coffee is as follows:
Different temperature is set according to different ground coffees by temperature control panel;
The moistening stage:Water pump 541 does not work, and two position three-way valve is in the first operating position, the water in water container 421 from Outflow moistens coffee in brewing mouth 4221, and pressure is reduced to 3bar wherein from 9bar, moistens the time in stage according to need It can arbitrarily adjust;
The high pressure extraction stage:Water pump 541 and flow control valve 522 are started to work, cold water and sub- boiler in water supply installation Hot water in 20 mixes in brewing device, and secondary heating mechanism 45 works so that the water temperature around secondary heating mechanism 45 becomes Height, because the density of the density ratio cold water of hot water is small, therefore hot water moves upwards, and passes through the first water stream channel 43 flow direction and brew Boiler 41, the cold water for brewing lower portion thereof at this time flow into water container, and due to brewing boiler by the second water stream channel 44 41 inner roof wall is higher than the inner roof wall of water container 421, according to the pressure formula of liquid it is found that under isodensity, the height of liquid Degree is higher, bigger to the pressure of bottom surface, therefore is brewed in boiler 41 at the first water stream channel 43 and at the second water stream channel 44 The pressure of water be more than water container 421 in water pressure, therefore brew the water in boiler 41 also can be by the first water stream channel 43 Water container 421 is flowed to the second water stream channel 44, but hot water cannot be still mixed thoroughly, then pass through with cold water at this time Temperature sensor detects actual water temperature, and is worked using PID temperature controllers control secondary heating mechanism so that actual temperature and setting Temperature is consistent, can accurately control actual water temperature through the above way.Water pump 541 can make the pressure of water reach 9bar when working, Flow control valve 522 can be such that hydraulic pressure slightly rises, and final water is flowed out with the pressure of 9~10bar to coffee from brewing mouth 4221 Powder is extracted, wherein, the time in high pressure extraction stage can arbitrarily be adjusted;
The low pressure extractive stage:It is depressured solenoid valve to start to work, brewing pressure is made to be reduced to 5~7bar from 9~10bar, it is complete Into last low pressure extractive, then, two position three-way valve is in the second operating position, and the water in water container passes through from brewing pipeline Second interface flows to third interface, so as to discharge the waste water remained in brewing pipeline, avoids being in two position three-way valve next time the The water temperature that the cold water influence remained in during one operating position in brewing pipeline is infused coffee with water.Solenoid valve is depressured by control to set The pressure in fixed different low pressure extractive stage can set the pressure in different low pressure extractive stages according to the self-characteristic of ground coffee Power, can be to avoid the hypertonia when latter end extracts so as to low pressure extractive, and then leads to the coffee liquid mouthfeel extracted It is partially bitter, wherein, the time in low pressure extractive stage can arbitrarily be adjusted.
As shown in figure 4, the method to be made coffee using this coffee maker is described in detail below:
Specifically include following steps:
Ground coffee is moistened using the hot water in brewing device;
The hot water in brewing device extracts the part in ground coffee under the first predetermined pressure;
The hot water in brewing device extracts the rest part of ground coffee under the second predetermined pressure, wherein, the Two predetermined pressures are less than the first predetermined pressure.The first predetermined pressure is set fully to extract the grease in ground coffee, Latter end extraction is carried out under two predetermined pressures, is conducive to occur the phenomenon that avoiding excessive extraction that coffee mouthfeel is caused to become bitterness.
Specifically, the first predetermined pressure is in the range of 9~10bar.The hydraulic pressure brewed in boiler remains at 9bar, Hydraulic pressure is made slightly to fluctuate by the control of flow control valve, finally in the range of 9~10bar, ground coffee is extracted using high pressure It takes and is conducive to fully extract the grease in ground coffee.
Specifically, the time extracted to the part in ground coffee is in the range of 14~18s.It can by high pressure extraction The grease in ground coffee fully to be extracted, the mouthfeel for making coffee is more mellow.
Specifically, during being extracted to the rest part in ground coffee, the hydraulic pressure in brewing device is pre- from first Constant-pressure is down to after the second predetermined pressure and is maintained under the second predetermined pressure, and the second predetermined pressure is 5~6bar.Latter end is adopted With low pressure extractive, excessive extraction is avoided to cause coffee mouthfeel partially bitter.
Specifically, the time extracted to the rest part of ground coffee is in the range of 0~6s.The low pressure extractive stage Time is less than the time in high pressure extraction stage, and excessive extraction is avoided to cause coffee mouthfeel partially bitter.
Specifically, during being moistened to ground coffee, the hydraulic pressure in brewing device is down to from the first predetermined pressure It after third predetermined pressure and is maintained under third predetermined pressure, third predetermined pressure is in the range of 2~4bar, to ground coffee In a part extracted during, the hydraulic pressure in brewing device is risen to after predetermined pressure simultaneously from third predetermined pressure It is maintained under first predetermined pressure.Bored steamed journey when moistening process is made coffee similar to hand, can be with during bored steaming It is contacted so that grease in ground coffee is mild with water, grease is made to be more prone to detach with ground coffee, at the same time in ground coffee Carbon dioxide suitable can discharge, grease is finer and smoother.
Specifically, the time of moistening is in the range of 3~8s.Moistening process makes the mouthfeel of coffee more mellow.
Specifically, the time of moistening, time for being extracted to the part in ground coffee and its remaining part to ground coffee The sum of time extracted is divided to be no more than 30s.Can brewing time be determined according to different ground coffees.
Specifically, during moistening and extraction, the temperature of the hot water in brewing device remains unchanged.Add by second The mutual cooperation of thermal and temperature sensor can remain unchanged the water temperature in brewing device.
The specific steps for brewing espresso coffee are illustrated below:
Set water temperature is 93 DEG C;
The moistening stage:MEBO ribbon gauze is 5s, and the hydraulic pressure brewed in boiler is rapidly reduced to 3bar, and stablize from 9bar 3bar or so;Since hot water stream goes out so that brew the hydraulic pressure in boiler reduces naturally.
The high pressure extraction stage:The first predetermined pressure is set as 9bar, the hydraulic pressure brewed in boiler rapidly rises to from 3bar 9bar, and stablize in 9bar or so, the time of high pressure extraction is set as 15s;Make since the water brewed in boiler is gradually heated by the sonochemical activity The pressure that must be brewed in boiler constantly rises, and finally stablizes in 9bar.
The low pressure extractive stage:The second predetermined pressure is set as 6bar, the time of low pressure extractive is set as 6s, in the time of 6s In the range of pressure be reduced to 6bar from 9bar.It is depressured solenoid valve to start to work, reduces brewing pressure, complete last low pressure extraction It takes.
The coffee machine of process and the application that the coffee machine that the prior art is described below brews espresso coffee brews Italian type coffee The process of coffee:
Pressure changings of the Fig. 2 for conventional coffee machine of the prior art when brewing espresso coffee, conventional coffee machine Pressure be constant all the time, in the initial period infused coffee without moistening process, directly ground coffee is extracted by high pressure, is held It is easier that carbon dioxide is largely discharged, and then the mouthfeel of drinking of coffee is influenced, and still kept in latter end extraction process 9bar pressure easily will extract ground coffee transition, so as to generate bitterness sense.
Fig. 3 is the pressure changing when brewing espresso coffee using the coffee machine of the application, utilizes this coffee machine The pressure in each stage constantly changes when infusing coffee, and the pressure for moistening the stage is gradually decremented to 3bar from 9bar, similar to hand The process of bored steaming is carried out when making coffee to ground coffee, can cause the grease in ground coffee is mild to be connect with water during bored steaming It touches, it is made to be more prone to detach with ground coffee, at the same time the carbon dioxide in ground coffee suitable can be discharged, and grease is more It is fine and smooth.High pressure extraction staged pressure can fully extract the grease in ground coffee in 9bar or so, the pressure of 9bar. When extracting coffee to endpiece, the solable matter in ground coffee is fewer and fewer, and the coffee machine in the application can be in this stage Low pressure extractive is taken, pressure can be reduced to 6bar from 9bar, prevent extraction excessive while ensureing that coffee mouthfeel is complete, do Go out the espresso coffee of perfect mouthfeel.
Obviously, the above embodiments are merely examples for clarifying the description, and is not intended to limit the embodiments.It is right For those of ordinary skill in the art, can also make on the basis of the above description it is other it is various forms of variation or It changes.There is no necessity and possibility to exhaust all the enbodiments.And the obvious variation thus extended out or Among changing still in the protection domain of the invention.

Claims (9)

1. a kind of method for infusing coffee, which is characterized in that include the following steps:
Ground coffee is moistened using the hot water in brewing device;
The hot water in the brewing device extracts the part in the ground coffee under the first predetermined pressure;
The hot water in the brewing device extracts the rest part of the ground coffee under the second predetermined pressure, In, second predetermined pressure is less than first predetermined pressure.
2. a kind of method for infusing coffee according to claim 1, which is characterized in that the method for infusing coffee uses coffee Machine is moistened and is extracted to the ground coffee, and the coffee machine includes:Female boiler, sub- boiler, the water supply installation for supplying cold water With the brewing device, the sub- boiler is arranged in female boiler, the water inlet of mother's boiler and the sub- boiler Water inlet connects respectively with the water supply installation, and mother's boiler is equipped with to be added for heating first of the water in female boiler Thermal, water outlet of the brewing device respectively with the water supply installation and the sub- boiler connect, the brewing device tool There is apopore, it is in parallel between the brewing device and the water supply installation to be equipped with water pump and decompression solenoid valve, in moistening and to institute It states during the part in ground coffee extracted, the water pump is opened, and the decompression solenoid valve is closed, to the coffee During rest part in coffee powder is extracted, the water pump is closed, and the decompression solenoid valve is opened.
3. a kind of method for infusing coffee according to claim 1, which is characterized in that first predetermined pressure 9~ And/or, the time extracted to the part in the ground coffee is in the range of 14~18s in the range of 10bar.
4. a kind of method for infusing coffee according to claim 1, which is characterized in that the rest part in the ground coffee During being extracted, hydraulic pressure in the brewing device from first predetermined pressure be down to second predetermined pressure it Afterwards and be maintained under second predetermined pressure, second predetermined pressure for 5~6bar and/or, to its of the ground coffee The time that remaining part point is extracted is in the range of 0~6s.
5. a kind of method for infusing coffee according to claim 1, which is characterized in that in the mistake moistened to institute's ground coffee Cheng Zhong, the hydraulic pressure in the brewing device are down to after third predetermined pressure from first predetermined pressure and keep the third Under predetermined pressure, the third predetermined pressure is in the range of 2~4bar;A part in the ground coffee is extracted In the process, the hydraulic pressure in the brewing device rises to after first predetermined pressure and is maintained at from the third predetermined pressure Under first predetermined pressure;And/or the time of moistening is in the range of 3~8s.
6. a kind of method for infusing coffee described in any one in claim 1 to 5, which is characterized in that moistening when Between, the time extracted to the part in the ground coffee and the time extracted to the rest part of the ground coffee The sum of be no more than 30s.
7. a kind of method for infusing coffee according to claim 2, which is characterized in that during moistening and extraction, institute The temperature for stating the hot water in brewing device remains unchanged.
8. a kind of method for infusing coffee according to claim 2, which is characterized in that the coffee machine further includes mixing dress It puts, the mixing arrangement is uniformly mixed the hot water in the sub- boiler with the cold water in the water supply installation, so that institute The temperature for stating the hot water in brewing device remains unchanged.
9. a kind of method for infusing coffee according to claim 8, which is characterized in that the brewing device includes being arranged at intervals Brew boiler and tea infuser, the water outlet for brewing boiler and the sub- boiler, the water supply installation connect, described to brew Boiler is connected with the water container of the tea infuser by the first water stream channel and the second water stream channel setting up and down, the punching It steeps boiler, second water stream channel, the water container and first water stream channel and forms circulation loop, the tea infuser It is equipped with secondary heating mechanism, inner roof wall of the inner roof wall for brewing boiler higher than the water container, second heating Device and the circulation loop form the mixing arrangement, and the apopore is arranged on the bottom of the water container.
CN201711483633.2A 2017-12-29 2017-12-29 Coffee brewing method Active CN108175279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711483633.2A CN108175279B (en) 2017-12-29 2017-12-29 Coffee brewing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711483633.2A CN108175279B (en) 2017-12-29 2017-12-29 Coffee brewing method

Publications (2)

Publication Number Publication Date
CN108175279A true CN108175279A (en) 2018-06-19
CN108175279B CN108175279B (en) 2020-11-06

Family

ID=62549290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711483633.2A Active CN108175279B (en) 2017-12-29 2017-12-29 Coffee brewing method

Country Status (1)

Country Link
CN (1) CN108175279B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109044112A (en) * 2018-10-30 2018-12-21 四川爱创科技有限公司 The water-saving anti-dry method of coffee machine system boot
CN109091013A (en) * 2018-10-30 2018-12-28 四川爱创科技有限公司 Coffee machine system boot anti-dry method
CN110811327A (en) * 2019-11-19 2020-02-21 郝敏 Extraction machine and extraction method thereof
CN111227642A (en) * 2018-11-29 2020-06-05 西蒙内利集团股份公司 Coffee machine with proportional pre-soaking system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1959169A (en) * 2006-11-10 2007-05-09 宁波三A集团电器有限公司 Automatic valve in use for water supply apparatus of coffee maker
CN101317740A (en) * 2007-06-06 2008-12-10 阳光有限责任公司 Espresso machine
CN203483704U (en) * 2013-07-15 2014-03-19 李树新 Intestinal tract hydrotherapeutor with backflow pressure reduction
CN103874439A (en) * 2011-05-10 2014-06-18 布瑞威利私人有限公司 Apparatus and method for an improved coffee maker
CN103932587A (en) * 2013-01-21 2014-07-23 吉诺工业有限公司 Overheating type beverage brewing machine with constant temperature water supplied
EP2837311A1 (en) * 2010-11-24 2015-02-18 Rancilio Group S.p.A. Coffee machine

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1959169A (en) * 2006-11-10 2007-05-09 宁波三A集团电器有限公司 Automatic valve in use for water supply apparatus of coffee maker
CN101317740A (en) * 2007-06-06 2008-12-10 阳光有限责任公司 Espresso machine
EP2837311A1 (en) * 2010-11-24 2015-02-18 Rancilio Group S.p.A. Coffee machine
CN103874439A (en) * 2011-05-10 2014-06-18 布瑞威利私人有限公司 Apparatus and method for an improved coffee maker
CN103932587A (en) * 2013-01-21 2014-07-23 吉诺工业有限公司 Overheating type beverage brewing machine with constant temperature water supplied
CN203483704U (en) * 2013-07-15 2014-03-19 李树新 Intestinal tract hydrotherapeutor with backflow pressure reduction

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109044112A (en) * 2018-10-30 2018-12-21 四川爱创科技有限公司 The water-saving anti-dry method of coffee machine system boot
CN109091013A (en) * 2018-10-30 2018-12-28 四川爱创科技有限公司 Coffee machine system boot anti-dry method
CN111227642A (en) * 2018-11-29 2020-06-05 西蒙内利集团股份公司 Coffee machine with proportional pre-soaking system
CN110811327A (en) * 2019-11-19 2020-02-21 郝敏 Extraction machine and extraction method thereof

Also Published As

Publication number Publication date
CN108175279B (en) 2020-11-06

Similar Documents

Publication Publication Date Title
CN108125564A (en) A kind of coffee machine
CN201996322U (en) Full-automatic brewing machine
CN108175279A (en) A kind of method for infusing coffee
JP6697382B2 (en) Device and process for controlled and dispensing of beverages
CN209421716U (en) A kind of coffee machine
CN105942861A (en) Coffee maker device and pot device
CN200973627Y (en) Device for controlling the beverage diluting machine
CN102160753A (en) Intelligent soybean milk machine and soybean milk making method thereof
CN201055291Y (en) Coffee machine
CN102563841A (en) Drinking water heating device with water collecting tank
CN102973155A (en) Modified coffee machine
CN208524592U (en) A kind of double water tank segmentally heating system and coffee machine
CN202012895U (en) Steam generator
CN106037482A (en) Tea brewing machine
CN209404476U (en) Multiple beverage brewing machine
CN203619352U (en) Turkish coffee machine quantitative water supply device and Turkish coffee machine with device
CN104545426A (en) Rapid steaming and boiling device
CN209058856U (en) A kind of coffee machine leaving water temperature control system
CN208892284U (en) Coffee, tealeaves double end brew all-in-one machine
TWM545542U (en) Multifunctional coffee brewer
CN209605421U (en) A kind of instant heating type pressure extraction tea heating system
CN202960137U (en) Novel coffeemaker
CN206995095U (en) A kind of coffee extractor
CN208941814U (en) A kind of novel coffee machine
CN207285890U (en) Fountain can adjust coffee machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant