CN108166547A - Resistance value alertness grid settlement of foundation tests system and method - Google Patents

Resistance value alertness grid settlement of foundation tests system and method Download PDF

Info

Publication number
CN108166547A
CN108166547A CN201810090682.8A CN201810090682A CN108166547A CN 108166547 A CN108166547 A CN 108166547A CN 201810090682 A CN201810090682 A CN 201810090682A CN 108166547 A CN108166547 A CN 108166547A
Authority
CN
China
Prior art keywords
measuring cell
settlement
foundation
grid
resistance value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810090682.8A
Other languages
Chinese (zh)
Inventor
张炯
代朝霞
崔新壮
佘蕊
马国栋
明瑞平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201810090682.8A priority Critical patent/CN108166547A/en
Publication of CN108166547A publication Critical patent/CN108166547A/en
Priority to AU2018405759A priority patent/AU2018405759B2/en
Priority to PCT/CN2018/092747 priority patent/WO2019148752A1/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Abstract

The invention discloses resistance value alertness grid settlement of foundation to test system and method, measuring cell including not influencing TGXG performance parameter after insertion, the measuring cell be embedded in each grid it is horizontal and vertical on, and to be connected in parallel between measuring cell, insulating layer is enclosed with outside the measuring cell, it is connected between the insulating layer and measuring cell, insulating layer and TGXG by cohesive mode, the orthogonal placement of the TGXG embedded with measuring cell, every layer is superimposed in order;Grid stress deformation causes the deformation of measuring cell, then brings measuring cell change in resistance, and the variation of resistance value causes measurement change in electric, and data transmission is collected to Cloud Server in monitoring point, and Cloud Server communicates with remote control center.The resistance value alertness grid settlement of foundation test system proposed in the present invention can increase the visuality of settlement of foundation process, contribute to the further research of settlement of foundation.

Description

Resistance value alertness grid settlement of foundation tests system and method
Technical field
The present invention relates to technical field of civil engineering, and system and side are tested more particularly to resistance value alertness grid settlement of foundation Method.
Background technology
Disaster of mountain massif coast takes place frequently in recent years, has seriously threatened the security of the lives and property of people, while can influence attached The normal pass of nearly road traffic.TGXG is mostly used in civil engineering and does protection network, with stable side slope.Settlement of foundation refers to ground Base soil layer foundation surface caused by densification under additional stress effect sinks.Excessive sedimentation, particularly differential settlement, meeting Make building run-off the straight, cracking so that being unable to normal use.Existing foundation settlement prediction method is by its assumed condition and reality There are the larger limitation not being inconsistent, gained settlement prediction result is often between measured settlement there are larger difference, therefore over the ground The research of base settlement prediction method needs further to be developed.
Foundation displacement test at present is mostly carried out using laboratory test or numerical simulation, without representativeness, can not be tested The correctness of conclusion is demonstrate,proved, and the measure of existing pre- landslide-proofing is only through the sign before naked-eye observation landslide occurs or abnormal existing As the mode of judgement is influenced greatly by subjective factor, and human error is larger, and micro-cracks or displacement naked eyes can not be observed, only After fracture extension is to certain length and width, it is considerable just to become naked eyes.
In conclusion effective solution is still lacked for the visual testing problem of settlement of foundation in the prior art.
Invention content
In order to solve the deficiencies in the prior art, there is provided the surveys of resistance value alertness grid settlement of foundation for an object of the present invention The test system system according to wire resistance sizes with the reduction of cross-sectional area increased principle, it is orthogonal using multilayer TGXG monitoring settlement of foundation and analysis of slope slip-crack surface, pass through analogy layerwise summation method, measure each layer of displacement and become Change situation is superimposed each layer as a result, Space foundation sedimentation face can be obtained, so that settlement of foundation to get each layer final mean annual increment movement curved surface Process ornamental enhances, and helps further to study the infall process of ground.
Resistance value alertness grid settlement of foundation tests system, the measurement member including not influencing TGXG performance parameter after insertion Part, the measuring cell be embedded in each grid it is horizontal and vertical on, it is described to measure member and to be connected in parallel between measuring cell Insulating layer is enclosed with outside part, is connected between the insulating layer and measuring cell, insulating layer and TGXG by cohesive mode It connects, the orthogonal placement of the TGXG embedded with measuring cell, every layer is superimposed in order;
The grid stress deformation causes the deformation of measuring cell, then brings measuring cell change in resistance, the change of resistance value Change causes measurement change in electric, and data transmission is collected to Cloud Server in monitoring point, and Cloud Server communicates with remote control center.
Further, the measuring cell use sensitive grid, with thickness be 0.003~0.101mm metal foil palisade or It is made of metal wire.
Resistance value alertness grid settlement of foundation test method, including:
The horizontal and vertical embedded measuring cell for not influencing TGXG performance parameter of each grid;
It is connected between insulating layer and measuring cell, insulating layer and TGXG by cohesive mode;
The orthogonal placement of TGXG of measuring cell is would be embedded with, is superimposed in order in layer, according to layering summation Method is being calculated in depth bounds, if settlement of foundation is divided into dried layer by TGXG arrangement;
Measuring cell according to TGXG is segmented, while measures the resistance of all measuring cell segments, during settlement of foundation, Final position after each point sedimentation is determined according to the resistance of measurement, so as to form a settlement of foundation face;
Each soil layer can generate a settlement of foundation face, and multiple sedimentation faces are superimposed to form a three-dimensional ground Settle body.
Further, when being formed, geogrid deformation leads to measuring cell tension, cross section in the settlement of foundation face Product reduces, and resistance value becomes larger, and single measuring cell can not determine tension point position, can by mutually perpendicular two measuring cells Determine one of tension point, then more mutually perpendicular wires can determine multiple tension points, according to each vertical direction On displacement it is different, the final position after each point sedimentation is determined, so as to form a settlement of foundation face.
Further, after the measuring cell segmentation, each measuring cell segment is considered as a resistance, same root measures In circuit, electric current is equal, and initial resistance all same, then voltage is identical for metal segments series connection on element.
Further, after ground settles, the metal segment pulled condition on same measuring cell is different, then resistance Difference surveys the voltage of each segment respectively, corresponding resistance change rate and change in displacement value is can obtain, so as to entirely be counted The displacement of each tension point in depth is calculated to get the settlement of foundation face of each soil layer and three-dimensional settlement of foundation body.
Further, by the variation of resistance value in circuit caused by geogrid deformation, electricity is converted to by conversion circuit The variation of pressure acquires the displacement of each tension point, by network transmission to Cloud Server, passes through data conversion storage module in real time Data conversion storage processing is carried out after reception, remote monitoring center returns data receiver in database, carry out Data Management Analysis and Graphical interfaces is shown, finally realizes the automatic monitoring of settlement of foundation process.
Compared with prior art, the beneficial effects of the invention are as follows:
First, existing foundation settlement prediction method by its assumed condition and physical presence it is larger be not inconsistent limited, gained sedimentation Prediction result needs into one the research of foundation settlement prediction method often between measured settlement there are larger difference The development of step.And the resistance value alertness grid settlement of foundation test system proposed in the present invention can increase the visual of settlement of foundation process Property, contribute to the further research of settlement of foundation.
2nd, the change in displacement of a large amount of tension points is disposably measured, it is time saving and energy saving, it does not need to carry out to repeat to test many times, Complicated cumbersome experimentation is reduced, and disposably provides a large amount of data for scientific worker.
3rd, it is tested using the TGXG of embedded wire, observes the entire evolution of settlement of foundation in real time, So that development visuality and the controllability enhancing destroyed, can obtain the real-time change in displacement of each soil layer, data are very comprehensive, both Chromatographic analysis can be carried out, can also carry out vertical analysis.
4th, the abnormal phenomenon shown before only being occurred by naked-eye observation landslide, the result of judgement is by subjective factor shadow Sound is very big, and is monitored by instrument and equipment, and data are reliably accurate, and can observe naked-eye observation less than destruction, can be in ground It the primary stage of depression, takes appropriate measures in time, reduces the funds of engineering maintenance.
5th, compared to resistance-strain type displacement sensor, using the method for embedding wire into TGXG, to geotechnological lattice The influence of grid functional characteristic is smaller, compared with equipment on the market, can reduce the disturbance to concrete, will not destroy structure, and It is easier to operate, streamline operation method can be carried out.
Description of the drawings
The accompanying drawings which form a part of this application are used for providing further understanding of the present application, and the application's shows Meaning property embodiment and its explanation do not form the improper restriction to the application for explaining the application.
Fig. 1 is the schematic diagram for embedding wire into TGXG;
Fig. 2 tests system flow chart for resistance value alertness grid settlement of foundation;
Fig. 3 resistance value alertness grid foundation displacement test principle schematic diagrames;
Fig. 4 resistance value alertness grids foundation displacement tests system circuit diagram.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.It is unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singulative It is also intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or combination thereof.
As background technology is introduced, the visual testing that settlement of foundation exists in the prior art is insufficient, in order to solve As above the technical issues of, present applicant proposes resistance value alertness grid settlement of foundation to test system and method.
In a kind of typical embodiment of the application, resistance value alertness grid settlement of foundation test system, the resistance are provided Check-in quick grid settlement of foundation test system, according to wire resistance sizes with the reduction of cross-sectional area increased principle, It can be by wire in TGXG.
As shown in Figure 1, wire is embedded in TGXG, it is desirable that wire is sensitive to the reacting condition of cross-sectional area, and It is as thin as possible, it is proposed that using sensitive grid, made of the metal foil palisade that thickness is 0.003~0.101mm or of metal wire, To ensure that wire does not influence the performance parameters such as the intensity of TGXG after being embedded in.Each grid is horizontal and vertical two embedded Wire is wrapped outside wire with insulating layer, shields, prevent moisture, dust etc. from corroding to it.
It is with binding agent that insulating layer and wire, insulating layer and TGXG is bonding, to ensure that the small of wire should Change also can be transmitted accurately.
Resistance value alertness grid settlement of foundation test system flow is illustrated in figure 2, during settlement of foundation, geogrid deformation, Lead to wire tension, cross-sectional area reduces, and resistance value becomes larger, the variation of resistance value in circuit is converted by conversion circuit For the variation of voltage, the displacement of each tension point is acquired in real time, by network transmission to Cloud Server, passes through data conversion storage Module carries out data conversion storage processing after receiving, and remote monitoring center returns data receiver in database, carries out data processing point Analysis and graphical interfaces are shown, finally realize the automatic monitoring of settlement of foundation process.
In test, resistance value alertness grid foundation displacement test principle is as shown in figure 3, would be embedded with the geotechnique of wire The orthogonal placement of grid, is superimposed in order in layer, according to layerwise summation method, is calculating in depth bounds, ground is sunk If drop is divided into dried layer by TGXG arrangement, the decrement of each layering is observed, it is assumed that TGXG arranges n-layer altogether, then N-th layer settling amount is the sum of each layer settling amount in top.
What layerwise summation method measured is the sum of settling amount of a certain all soil layers in layer top, and it is each point that decrement, which is, herein The settling amount of layer, which is to be different from settling amount, can be acquired often with the mode of retrodicting after layerwise summation method acquires result The settling amount of one layering.
Wire according to TGXG is segmented, while measures the resistance of all wire segments, during settlement of foundation, geotechnique Grid deforms, and leads to wire tension, and cross-sectional area reduces, and resistance value becomes larger, and single wire can not determine tension point position, One of tension point can determine by mutually perpendicular two one metal wire, then more mutually perpendicular wires can determine multiple Tension point, it is different according to the displacement on each vertical direction, it may be determined that the final position after each point sedimentation, so as to shape Into a settlement of foundation face.Each soil layer can generate a settlement of foundation face, and multiple sedimentation faces, which are superimposed, to be formed One three-dimensional settlement of foundation body.
According to the voltage change in the circuit where each layering, the resistance change rate and displacement for obtaining corresponding measuring cell become Change value can obtain crosspoint (tension point) settling amount according to horizontal and vertical displacement variable, this settling amount sinks for each layer in top The displacement of the sum of drop amount, i.e. the tension point, so as to obtain the final position after tension point sedimentation.
Resistance value alertness grid foundation displacement test circuit system as shown in figure 4, wire be coupled circuit mode for parallel connection, Both the accuracy of measurement result can have been improved, prevented also from the damage of a wherein one metal wire during failure, has influenced measurement result.It will be every A wire segment is considered as a resistance, and in circuit, electric current is equal the metal segments series connection on same root resistance wire, initially Resistance all same, then voltage is identical.
All wires are in parallel, are respectively compared the voltage change of horizontal and vertical each metal segment, consider friendship The displacement of each tension point of fork, you can obtain every layer of settlement of foundation face.
After ground settles, the metal segment pulled condition on same wire is different, then resistance is different, surveys respectively The voltage of each segment, can obtain corresponding resistance change rate and change in displacement value, each in depth so as to obtain entirely calculating Settlement of foundation face and three-dimensional settlement of foundation body of the displacement of a tension point to get each soil layer.
In the field of the invention examples of implementation, resistance value alertness grid settlement of foundation test method is also disclosed, including:
The horizontal and vertical embedded measuring cell for not influencing TGXG performance parameter of each grid;
It is connected between insulating layer and measuring cell, insulating layer and TGXG by cohesive mode;
The orthogonal placement of TGXG of measuring cell is would be embedded with, is superimposed in order in layer, according to layering summation Method is being calculated in depth bounds, if settlement of foundation is divided into dried layer by TGXG arrangement;
Measuring cell according to TGXG is segmented, while measures the resistance of all measuring cell segments, during settlement of foundation, Final position after each point sedimentation is determined according to the resistance of measurement, so as to form a settlement of foundation face;
Each soil layer can generate a settlement of foundation face, and multiple sedimentation faces are superimposed to form a three-dimensional ground Settle body.
The sedimentation test of the present invention:Multilayer TGXG is laid with, passes through layer and the settlement of foundation of layer in the vertical direction, shape Into three-dimensional settlement of foundation body, it is intended to observe the subsidence of foundations.
The present invention in the specific implementation, is embedded wire into TGXG or water channel, all it should be noted that preventing wire from giving birth to Rust, since there are circuits in system, it should be noted that setting insulating layer, protective resistance silk are not influenced by water grading factors.Simultaneously should Wire, insulating layer and ground are bonded together with binding agent, it is ensured that the small strain of ground also can be anti-by wire It reflects in system, ensures the accuracy of parameter.
The present invention is simple and practicable using wire detection, and novelty is wire being applied in the measurement of deformation, The measurement of settlement of foundation is applied to by embedding wire into TGXG, the method can carry out pile line operation, convenient for advising greatly Mould uses, and is mainly improved in manufacture craft.
The foregoing is merely the preferred embodiments of the application, are not limited to the application, for the skill of this field For art personnel, the application can have various modifications and variations.It is all within spirit herein and principle, made any repair Change, equivalent replacement, improvement etc., should be included within the protection domain of the application.

Claims (7)

1. resistance value alertness grid settlement of foundation tests system, it is characterized in that, including TGXG performance parameter is not influenced after insertion Measuring cell, the measuring cell be embedded in each grid it is horizontal and vertical on, and to be connected in parallel between measuring cell, institute It states and insulating layer is enclosed with outside measuring cell, pass through bonding between the insulating layer and measuring cell, insulating layer and TGXG Mode connect, the orthogonal placement of the TGXG embedded with measuring cell, every layer is superimposed in order;
The grid stress deformation causes the deformation of measuring cell, then brings measuring cell change in resistance, and the variation of resistance value is drawn It rises and measures change in electric, data transmission is collected to Cloud Server in monitoring point, and Cloud Server communicates with remote control center.
2. resistance value alertness grid settlement of foundation as described in claim 1 tests system, it is characterized in that, the measuring cell uses Sensitive grid makes of the metal foil palisade that thickness is 0.003~0.101mm or of metal wire.
3. resistance value alertness grid settlement of foundation test method, it is characterized in that, including:
The horizontal and vertical embedded measuring cell for not influencing TGXG performance parameter of each grid;
It is connected between insulating layer and measuring cell, insulating layer and TGXG by cohesive mode;
The orthogonal placement of TGXG of measuring cell is would be embedded with, is superimposed in order in layer, according to layerwise summation method, It calculates in depth bounds, if settlement of foundation is divided into dried layer by TGXG arrangement;
Measuring cell according to TGXG is segmented, while measures the resistance of all measuring cell segments, during settlement of foundation, according to The resistance of measurement determines the final position after each point sedimentation, so as to form a settlement of foundation face;
Each soil layer can generate a settlement of foundation face, and multiple sedimentation faces are superimposed to form a three-dimensional settlement of foundation Body.
4. resistance value alertness grid settlement of foundation test method as claimed in claim 3, it is characterized in that, the settlement of foundation face exists During formation, geogrid deformation leads to measuring cell tension, and cross-sectional area reduces, and resistance value becomes larger, and single measuring cell can not Determine tension point position, one of tension point can determine by mutually perpendicular two measuring cells, then more it is orthogonal Wire can determine multiple tension points, it is different according to the displacement on each vertical direction, after determining each point sedimentation Final position, so as to form a settlement of foundation face.
5. resistance value alertness grid settlement of foundation test method as claimed in claim 3, it is characterized in that, the measuring cell segmentation Afterwards, each measuring cell segment is considered as a resistance, the metal segments series connection on same root measuring cell in circuit, electric current It is equal, initial resistance all same, then voltage is identical.
6. resistance value alertness grid settlement of foundation test method as claimed in claim 3, it is characterized in that, when ground settles Afterwards, the metal segment pulled condition on same measuring cell is different, then resistance is different, surveys the voltage of each segment respectively, can obtain To corresponding resistance change rate and change in displacement value, so as to obtain entirely calculating the displacement of each tension point in depth to get The settlement of foundation face of each soil layer and three-dimensional settlement of foundation body.
7. resistance value alertness grid settlement of foundation test method as claimed in claim 3, it is characterized in that, geogrid deformation is drawn The variation of resistance value, the variation of voltage is converted to by conversion circuit, acquires the displacement of each tension point in real time in the circuit risen, By network transmission to Cloud Server, data conversion storage processing is carried out after being received by data conversion storage module, in remote monitoring The heart returns data receiver in database, carries out Data Management Analysis and graphical interfaces is shown, final to realize settlement of foundation process Automatic monitoring.
CN201810090682.8A 2018-01-30 2018-01-30 Resistance value alertness grid settlement of foundation tests system and method Pending CN108166547A (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201810090682.8A CN108166547A (en) 2018-01-30 2018-01-30 Resistance value alertness grid settlement of foundation tests system and method
AU2018405759A AU2018405759B2 (en) 2018-01-30 2018-06-26 Resistance-sensitive grid foundation settlement test system and method
PCT/CN2018/092747 WO2019148752A1 (en) 2018-01-30 2018-06-26 Foundation settlement testing system and method adopting resistance-sensitive geogrids

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810090682.8A CN108166547A (en) 2018-01-30 2018-01-30 Resistance value alertness grid settlement of foundation tests system and method

Publications (1)

Publication Number Publication Date
CN108166547A true CN108166547A (en) 2018-06-15

Family

ID=62512721

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810090682.8A Pending CN108166547A (en) 2018-01-30 2018-01-30 Resistance value alertness grid settlement of foundation tests system and method

Country Status (1)

Country Link
CN (1) CN108166547A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019148752A1 (en) * 2018-01-30 2019-08-08 山东大学 Foundation settlement testing system and method adopting resistance-sensitive geogrids

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003097906A (en) * 2001-09-27 2003-04-03 Tokyo Sokki Kenkyusho Co Ltd Strain gauge and method for measuring strain
CN101793020A (en) * 2010-03-04 2010-08-04 中国矿业大学 Geogrid strain testing device and testing method thereof
CN105547139A (en) * 2015-12-05 2016-05-04 浙江大学 Wi-Fi-based wireless strain measurement system
CN107607030A (en) * 2017-09-22 2018-01-19 山东大学 The monitoring of structures and its construction method of a kind of existing roadbed, slope stability

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003097906A (en) * 2001-09-27 2003-04-03 Tokyo Sokki Kenkyusho Co Ltd Strain gauge and method for measuring strain
CN101793020A (en) * 2010-03-04 2010-08-04 中国矿业大学 Geogrid strain testing device and testing method thereof
CN105547139A (en) * 2015-12-05 2016-05-04 浙江大学 Wi-Fi-based wireless strain measurement system
CN107607030A (en) * 2017-09-22 2018-01-19 山东大学 The monitoring of structures and its construction method of a kind of existing roadbed, slope stability

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019148752A1 (en) * 2018-01-30 2019-08-08 山东大学 Foundation settlement testing system and method adopting resistance-sensitive geogrids

Similar Documents

Publication Publication Date Title
Johansson Seepage monitoring in embankment dams
CN104318103A (en) Landslide hazard monitoring and early warning rainfall threshold judging method
KR101493231B1 (en) Integration system for interworking seismic instrumentation and electrical resistivity monit0ring and hydraulic structure monitoring method using the same
CN103471647B (en) A kind of shield tunnel remote automation monitoring method
CN103399049B (en) The concrete cracking monitoring method of quick effect is drawn based on conducting polymer
Papanicolaou et al. Understanding mass fluvial erosion along a bank profile: using PEEP technology for quantifying retreat lengths and identifying event timing
CN109870484A (en) A kind of aqueous slope instability early warning system and method
CN106295040B (en) Landslide disaster monitoring and warning earth's surface inclinometer threshold determination method
CN108303498A (en) The linear monitoring system and method that water channel destroys
CN108166547A (en) Resistance value alertness grid settlement of foundation tests system and method
CN106706029B (en) Soil body performance monitoring device for underground structure construction and working method thereof
KR101078297B1 (en) System for infinite slope stability analysis considering saturation depth ratio of rainfall
Simm et al. Interpreting sensor measurements in dikes-experiences from UrbanFlood pilot sites
CN107036658A (en) A kind of appraisal procedure of shock resistance of the building and application
Zhao et al. PPP-BOTDA distributed optical fiber sensing technology and its application to the Baishuihe landslide
CN209619984U (en) Railway high precipitous rock slope Microseismic monitoring system
JP3041426B1 (en) Fill dam management system by resistivity tomography and its management method
Krebs et al. Implementation of sensor-based dike monitoring by smart geotextiles
AU2018405759B2 (en) Resistance-sensitive grid foundation settlement test system and method
CN108317948A (en) Resistance value alertness grid foundation displacement tests system and method
CN207963759U (en) Resistance value alertness grid foundation displacement tests system
CN108896397B (en) Roof greening safety load evaluation method based on microseismic monitoring technology
Zhao et al. Measurement of additional strains in shaft lining using differential resistance sensing technology
CN109458924A (en) Resistance value alertness grid deformation test system and method based on ten axle sensors
CN109506607A (en) A kind of landslide earth's surface and subterranean fracture comprehensive monitor system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination