CN108122377A - Landslide early warning system based on GIS - Google Patents

Landslide early warning system based on GIS Download PDF

Info

Publication number
CN108122377A
CN108122377A CN201711483357.XA CN201711483357A CN108122377A CN 108122377 A CN108122377 A CN 108122377A CN 201711483357 A CN201711483357 A CN 201711483357A CN 108122377 A CN108122377 A CN 108122377A
Authority
CN
China
Prior art keywords
monitoring
grade
landslide
gateway
monitoring device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711483357.XA
Other languages
Chinese (zh)
Inventor
钟开田
朱能创
陈世玉
唐珊
钟振云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi 3d Remote Sensing Information Engineering Technology Co Ltd
Original Assignee
Guangxi 3d Remote Sensing Information Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi 3d Remote Sensing Information Engineering Technology Co Ltd filed Critical Guangxi 3d Remote Sensing Information Engineering Technology Co Ltd
Priority to CN201711483357.XA priority Critical patent/CN108122377A/en
Publication of CN108122377A publication Critical patent/CN108122377A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G08SIGNALLING
    • G08BSIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
    • G08B21/00Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
    • G08B21/02Alarms for ensuring the safety of persons
    • G08B21/10Alarms for ensuring the safety of persons responsive to calamitous events, e.g. tornados or earthquakes

Abstract

A kind of landslide early warning system based on GIS of the present invention, the early warning system, which includes early warning system, includes GIS platform, radio network gateway, monitoring device, alarming device, UAV system, monitoring device is installed on monitoring area, gateway is installed in monitoring device, monitoring device and the data transmission of monitoring platform can be realized by gateway, UAV system includes unmanned plane and the camera, radar, gateway, the light compensating lamp that are installed on unmanned plane.The early warning system can in real time be monitored the landslide situation of monitoring area, with reference to the use of unmanned plane, so that it is guaranteed that the reliability of monitoring data, and the alarming device and message sending function having can improve the forewarning function of landslide, reduce loss.

Description

Landslide early warning system based on GIS
【Technical field】
The present invention relates to monitoring technology for geological hazards fields, and in particular to a kind of landslide early warning system based on GIS System.
【Background technology】
Landslide refers to hillside under the influence of the factors such as river degradation, rainfall, earthquake, artificial blending rock, and soil layer or rock stratum are whole Or dispersedly along slope slide downward the phenomenon that.The ground flowing water that mud-rock flow refers to be formed in precipitation, dam break or ice dissolution is made Under, a kind of special mighty torrent for carrying under one's arms the solid matters such as a large amount of silt particles, stone for being generated on cheuch or hillside.Due to China mountain Area's area is big, mountain topography landforms, in addition the trigger conditions such as Human dried bloodstains aggravation, extreme rainfall and earthquake, cause landslide, The generation of the geological disasters such as avalanche, mud-rock flow causes grave danger to the lives and properties of people, and Easy Living Envi-ronment deteriorates.Due to cunning Slope mud-rock flow can impact road, communication etc. after occurring, and cause external rescue personnel that can not obtain the reality in disaster area in time Situation, so as to influence the progress of rescue work.Landslide is usually associated with the generation of the factors such as rainfall, earthquake, by it The phenomenon that before generation, is studied and is monitored, and establishes loss when early warning system can reduce disaster generation.
【The content of the invention】
The present invention is intended to provide a kind of landslide early warning system based on GIS, to solve related landslide debris at present The monitoring system of stream is directed to the problem of not strong.
In order to solve the above technical problems, the present invention uses following technical scheme:
Landslide early warning system based on GIS, the early warning system include GIS platform, radio network gateway, monitoring dress It puts, alarming device, UAV system, monitoring device is installed on monitoring area, and gateway is installed in monitoring device, can by gateway Realize the data transmission of monitoring device and monitoring platform, UAV system include unmanned plane and the camera being installed on unmanned plane, Radar, gateway, light compensating lamp.
Quantity >=2 of the gateway.
Quantity >=1 of the monitoring device.
Alignment system is also equipped in the monitoring device.
The monitoring device can realize monitoring water level and vibration monitoring.
The monitoring water level is divided according to water level sets blueness, yellow, orange, red four grades, blueness, yellow, orange Color, red scale increase successively, show the possibility increase that landslide occurs.
The vibration monitoring is divided into IV grade, III grade, II grade, I grade of four grade according to oscillation intensity, IV grade, III grade, II Grade, I grade enhance successively, show landslide occur possibility increase.
The alarming sound cent of the alarming device is supervised into general, relatively rapid, rapid, very rapid four grades with water level The blueness of control, yellow, IV grade of orange, red four grades and vibration monitoring, III grade, II grade, I grade of four grade it is corresponding.
The GIS platform is stored with the condition of a disasters data such as monitoring region precipitation data, landslide, mud-rock flow over the years.
The GIS platform can be by instruction to centered on monitoring device, and radius is the mobile communications device hair within 3km Send the monitoring information of monitoring area landslide.
It is an advantage of the invention that:The early warning system of the present invention includes GIS platform, radio network gateway, monitoring device, warning dress It puts, UAV system, monitoring device is installed on monitoring area, and gateway is installed in monitoring device, and monitoring can be realized by gateway The data transmission of device and monitoring platform, UAV system include unmanned plane and the camera, radar, the net that are installed on unmanned plane It closes, light compensating lamp.The early warning system can in real time be monitored the landslide situation of monitoring area, with reference to making for unmanned plane With, so that it is guaranteed that the reliability of monitoring data, and the alarming device and message sending function that have can improve landslide debris The forewarning function of stream reduces loss.
【Specific embodiment】
It for ease of more fully understanding the present invention, is illustrated by following instance, these examples belong to the protection of the present invention Scope, but do not limit the scope of the invention.
Embodiment 1
Landslide early warning system based on GIS, the early warning system include GIS platform, radio network gateway, monitoring dress It puts, alarming device, UAV system, monitoring device is installed on monitoring area, and gateway is installed in monitoring device, can by gateway Realize the data transmission of monitoring device and monitoring platform, UAV system include unmanned plane and the camera being installed on unmanned plane, Radar, gateway, light compensating lamp.
The quantity of the gateway 2.
The quantity of the monitoring device 1.
Alignment system is also equipped in the monitoring device.
The monitoring device can realize monitoring water level and vibration monitoring.
The monitoring water level is divided according to water level sets blueness, yellow, orange, red four grades, blueness, yellow, orange Color, red scale increase successively, show the possibility increase that landslide occurs.
The vibration monitoring is divided into IV grade, III grade, II grade, I grade of four grade according to oscillation intensity, IV grade, III grade, II Grade, I grade enhance successively, show landslide occur possibility increase.
The alarming sound cent of the alarming device is supervised into general, relatively rapid, rapid, very rapid four grades with water level The blueness of control, yellow, IV grade of orange, red four grades and vibration monitoring, III grade, II grade, I grade of four grade it is corresponding.
The GIS platform is stored with the condition of a disasters data such as monitoring region precipitation data, landslide, mud-rock flow over the years.
The GIS platform can be by instruction to centered on monitoring device, and radius is the mobile communications device hair within 3km Send the monitoring information of monitoring area landslide.
Embodiment 2
Landslide early warning system based on GIS, the early warning system include GIS platform, radio network gateway, monitoring dress It puts, alarming device, UAV system, monitoring device is installed on monitoring area, and gateway is installed in monitoring device, can by gateway Realize the data transmission of monitoring device and monitoring platform, UAV system include unmanned plane and the camera being installed on unmanned plane, Radar, gateway, light compensating lamp.
The quantity of the gateway 7.
The quantity of the monitoring device 6.
Alignment system is also equipped in the monitoring device.
The monitoring device can realize monitoring water level and vibration monitoring.
The monitoring water level is divided according to water level sets blueness, yellow, orange, red four grades, blueness, yellow, orange Color, red scale increase successively, show the possibility increase that landslide occurs.
The vibration monitoring is divided into IV grade, III grade, II grade, I grade of four grade according to oscillation intensity, IV grade, III grade, II Grade, I grade enhance successively, show landslide occur possibility increase.
The alarming sound cent of the alarming device is supervised into general, relatively rapid, rapid, very rapid four grades with water level The blueness of control, yellow, IV grade of orange, red four grades and vibration monitoring, III grade, II grade, I grade of four grade it is corresponding.
The GIS platform is stored with the condition of a disasters data such as monitoring region precipitation data, landslide, mud-rock flow over the years.
The GIS platform can be by instruction to centered on monitoring device, and radius is the mobile communications device hair within 3km Send the monitoring information of monitoring area landslide.
Embodiment 3
Landslide early warning system based on GIS, the early warning system include GIS platform, radio network gateway, monitoring dress It puts, alarming device, UAV system, monitoring device is installed on monitoring area, and gateway is installed in monitoring device, can by gateway Realize the data transmission of monitoring device and monitoring platform, UAV system include unmanned plane and the camera being installed on unmanned plane, Radar, gateway, light compensating lamp.
The quantity of the gateway 5.
The quantity of the monitoring device 4.
Alignment system is also equipped in the monitoring device.
The monitoring device can realize monitoring water level and vibration monitoring.
The monitoring water level is divided according to water level sets blueness, yellow, orange, red four grades, blueness, yellow, orange Color, red scale increase successively, show the possibility increase that landslide occurs.
The vibration monitoring is divided into IV grade, III grade, II grade, I grade of four grade according to oscillation intensity, IV grade, III grade, II Grade, I grade enhance successively, show landslide occur possibility increase.
The alarming sound cent of the alarming device is supervised into general, relatively rapid, rapid, very rapid four grades with water level The blueness of control, yellow, IV grade of orange, red four grades and vibration monitoring, III grade, II grade, I grade of four grade it is corresponding.
The GIS platform is stored with the condition of a disasters data such as monitoring region precipitation data, landslide, mud-rock flow over the years.
The GIS platform can be by instruction to centered on monitoring device, and radius is the mobile communications device hair within 3km Send the monitoring information of monitoring area landslide.
The above content is combine it is specific/the present invention is described in more detail for preferred embodiment, it is impossible to assert this The specific implementation of invention is confined to these explanations.For those of ordinary skill in the art to which the present invention belongs, not On the premise of departing from present inventive concept, some replacements or modification can also be made to the embodiment that these have been described, and these It substitutes or variant should all be considered as belonging to protection scope of the present invention.

Claims (10)

1. the landslide early warning system based on GIS, which is characterized in that the early warning system includes GIS platform, wireless network Pass, monitoring device, alarming device, UAV system, monitoring device are installed on monitoring area, and gateway is installed in monitoring device, Monitoring device and the data transmission of monitoring platform can be realized by gateway, UAV system includes unmanned plane and is installed on unmanned plane On camera, radar, gateway, light compensating lamp.
2. the monitoring system of landslide according to claim 1, which is characterized in that quantity >=2 of the gateway.
3. the monitoring system of landslide according to claim 1, which is characterized in that quantity >=1 of the monitoring device It is a.
4. the monitoring system of landslide according to claim 1, which is characterized in that be also equipped in the monitoring device Alignment system.
5. the monitoring system of landslide according to claim 1, which is characterized in that the monitoring device can realize water level Monitoring and vibration monitoring.
6. the monitoring system of landslide according to claim 4, which is characterized in that the monitoring water level is drawn according to water level Set up separately and put blueness, yellow, orange, red four grades, blueness, yellow, orange, red scale increase successively, show the mud that comes down The possibility increase that rock glacier occurs.
7. the monitoring system of landslide according to claim 4, which is characterized in that the vibration monitoring is strong according to vibration Degree is divided into IV grade, III grade, II grade, I grade of four grade, and IV grade, III grade, II grade, I grade enhances successively, shows landslide The possibility increase of generation.
8. the monitoring system of landslide according to claim 1, which is characterized in that the warning sound of the alarming device It is divided into general, relatively rapid, rapid, very rapid four grades, blueness, yellow with monitoring water level, orange, red four grades With IV grade of vibration monitoring, III grade, II grade, I grade of four grade it is corresponding.
9. the monitoring system of landslide according to claim 1, which is characterized in that the GIS platform is stored with monitoring The condition of a disasters data such as region precipitation data over the years, landslide, mud-rock flow.
10. the monitoring system of landslide according to claim 1, which is characterized in that the GIS platform can pass through instruction To centered on monitoring device, radius is the monitoring letter of the mobile communications device transmission monitoring area landslide within 3km Breath.
CN201711483357.XA 2017-12-29 2017-12-29 Landslide early warning system based on GIS Pending CN108122377A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711483357.XA CN108122377A (en) 2017-12-29 2017-12-29 Landslide early warning system based on GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711483357.XA CN108122377A (en) 2017-12-29 2017-12-29 Landslide early warning system based on GIS

Publications (1)

Publication Number Publication Date
CN108122377A true CN108122377A (en) 2018-06-05

Family

ID=62232509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711483357.XA Pending CN108122377A (en) 2017-12-29 2017-12-29 Landslide early warning system based on GIS

Country Status (1)

Country Link
CN (1) CN108122377A (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163363A (en) * 2011-04-07 2011-08-24 北京航空航天大学 Landslide real-time monitoring and warning system
CN202275482U (en) * 2011-09-06 2012-06-13 北京中民防险科技发展有限公司 Debris flow disaster prevention and alarm system
CN102682574A (en) * 2012-04-27 2012-09-19 中航捷锐(北京)光电技术有限公司 Disaster early-warning system
CN104143252A (en) * 2014-07-09 2014-11-12 无锡蓝赛科技有限公司 System for real-time monitoring of landslip based on UWB
CN104821067A (en) * 2015-05-19 2015-08-05 何小明 Landslide disaster early warning system based on unmanned aerial vehicle relay WIFI or radio data transmission and early warning method thereof
CN104881960A (en) * 2015-05-05 2015-09-02 北京国信华源科技有限公司 Multi-factor monitoring integrated early warning system and method
CN105678966A (en) * 2016-03-01 2016-06-15 张晓华 Integrated monitoring and early warning system for geological mountain torrent disaster and realization method thereof
CN106846736A (en) * 2016-12-28 2017-06-13 中国科学院深圳先进技术研究院 A kind of sensing system of landslide Geological Hazards Monitoring
CN107238408A (en) * 2017-05-04 2017-10-10 安徽广安电子科技有限公司 A kind of safety monitoring system based on Beidou navigation satellite

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102163363A (en) * 2011-04-07 2011-08-24 北京航空航天大学 Landslide real-time monitoring and warning system
CN202275482U (en) * 2011-09-06 2012-06-13 北京中民防险科技发展有限公司 Debris flow disaster prevention and alarm system
CN102682574A (en) * 2012-04-27 2012-09-19 中航捷锐(北京)光电技术有限公司 Disaster early-warning system
CN104143252A (en) * 2014-07-09 2014-11-12 无锡蓝赛科技有限公司 System for real-time monitoring of landslip based on UWB
CN104881960A (en) * 2015-05-05 2015-09-02 北京国信华源科技有限公司 Multi-factor monitoring integrated early warning system and method
CN104821067A (en) * 2015-05-19 2015-08-05 何小明 Landslide disaster early warning system based on unmanned aerial vehicle relay WIFI or radio data transmission and early warning method thereof
CN105678966A (en) * 2016-03-01 2016-06-15 张晓华 Integrated monitoring and early warning system for geological mountain torrent disaster and realization method thereof
CN106846736A (en) * 2016-12-28 2017-06-13 中国科学院深圳先进技术研究院 A kind of sensing system of landslide Geological Hazards Monitoring
CN107238408A (en) * 2017-05-04 2017-10-10 安徽广安电子科技有限公司 A kind of safety monitoring system based on Beidou navigation satellite

Similar Documents

Publication Publication Date Title
CN106120641B (en) A kind of flood control baffle device for water positioning system based on Bluetooth communication
CN107067183A (en) A kind of distribution line damage to crops caused by thunder methods of risk assessment
CN109859442A (en) Mountain region disaster chain prediction and monitoring and warning system and implementation process
CN203260160U (en) Debris flow monitoring system
CN103914950A (en) Landslide and debris-flow pre-warning system based on 4G network
Sati Glacier bursts-triggered debris flow and flash flood in Rishi and Dhauli Ganga valleys: A study on its causes and consequences
CN110490782A (en) Urban waterlogging traffic dispersion and command system based on GIS-Geographic Information System
CN204551213U (en) A kind of highway deformation monitoring system based on CORS base station
CN108122377A (en) Landslide early warning system based on GIS
Heliker Volcanic and seismic hazards on the island of Hawaii
Iqbal et al. Impacts of Attabad lake (Pakistan) and its future outlook
Abouelfadl et al. Impact assessment of global warming on Egypt
CN108253945A (en) Landslide analysis method based on unmanned plane
Xu Fires and postfire debris/mudflows triggered by landforms in Colorado Front Range and the subsequent impact on and by humans
CN108154650A (en) The monitoring system of landslide
Baddiley The flood risk in Cairns
CN205284451U (en) Shelterbelt network vertical arrangement device
Collins et al. Climate and weather extremes
Rotaru Landslides in Romania
Lu et al. Post-disaster survey of Typhoon Megi in Wenzhou City
Huang et al. Disasters
Liu et al. Advances of geo-disaster mitigation technologies in Taiwan
Guo et al. Problems and countermeasures of road safety in disaster-prone environment
Mishra et al. Cyclonic hazards in Odisha and its mitigation
Dongtao et al. Approach to mountain hazards in Tibet, China

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20180605

RJ01 Rejection of invention patent application after publication